This document outlines quality assurance surveillance plan (QASP) standards for transportation, personal property operations, passenger movements, motor pool operations, and cargo movements requirements at the Presidio of Monterey in California. Key services include providing transportation reports, maintaining property records, counseling customers, processing reimbursements and passenger requests, operating motor pools, and routing cargo shipments. Acceptable quality levels range from 90% to 100% for timeliness and accuracy metrics across random samplings of requirements on areas such as counseling, inspections, and commercial invoice processing. The related federal contract opportunity is for maintenance, supply and transportation services at the Presidio of Monterey with a solicitation number of W519TC-23-R-0104 issued by the Department of the Army Materiel Command Contracting Command at Rock Island Arsenal.
View the file
Other files
Show all 40
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Annex C - Transportation PRS
| Task/Requirement |
| Standard |
| Sampling Method, Lot & Acceptable Quality Level (AQL) |
TRANSPORTATION - GENERAL
5.26.3 Provide reports and statistical data Timeliness: Reports and statistical data delivered by the due date.
Quality: IAW DLRS ITD-01 Accurate and complete Surveillance activity report
Lot: Inspect reports submitted per quarter.
AQL: 95
ADD Maintain Copy of Transportation records from the site QASP
PERSONAL PROPERTY OPERATIONS
5.27.1 Provide disposition instructions to current DPM contractor for shipments on-hand after expiration of previous DPM contract period.
Timeliness: Disposition documents will be completed prior to the 180th day following the end of the current contract.
Quality: Disposition instructions for shipments on-hand after the end of contract period will be complete and accurate.
Surveillance activity report
All shipment remaining after expiration of current contract at time of surveillance.
AQL: 100%
5.27.1 Process Reimbursements.
Timeliness: Reimbursements will be submitted to the Government rep, within 3 business days of receipt.
Approved reimbursements will be forward to BMO daily and to DFAS weekly.
Quality: Reimbursements will be accurately prepared using applicable government rates in effect at the time of the move and a complete copy will be provided to QAE upon request.
Weights will be entered accurately and completely into AIS.
Random sampling
Each reimbursement completed at time of surveillance.
AQL: 100%
5.27.1 Statement of Accessorial Services performed Timeliness: Approved SF 1034 submitted to DFAS within 3 business days of receipt from Government representative.
Quality: Services performed are verified as rendered. SF 1034 is accurate and complete.
Random sampling
Lot: Each SF 1034 completed at time of surveillance.
AQL: 100%
5.27.2 Counsel customers Timeliness: In conjunction with shipment application and/or movement request.
Quality: Customers will be counseled IAW DTR Part IV, and/or service guidance. Copy will be provided to QAE on request.
Random sampling
Lot: Counseling completed at the time of surveillance.
AQL: 99%
5.27.2 Counsel personnel on entitlements and procedures for pickup, delivery and/or storage of personal property/household goods Timeliness: Personnel counseled with 3 hours of arrival/walk-in time and/or 1 hour of appointment time
Random sampling
Lot: Percent of personnel counseled within 3 hours of arrival/walk-in time; percent counseled within 1 hour of appointment time.
AQL: 90%
5.27.3 Provide Specialized, Expedited Assistance for Sensitive circumstances Timeliness: To meet member/family member’s needs.
Quality: Blue Bark shipments will be handled IAW DTR Part IV, 410-E, and a complete copy will be provided to QAE on request.
Random sampling
Lot: Blue Bark/Sensitive shipments Completed at the time of surveillance.
AQL: 100%
5.27.4 Route personal property shipments for pick up.
Timeliness: Personal Property will be routed and awarded prior to pick up date in shipment application.
Quality: IAW DTR Part IV requirements Random sampling
Lot: Each shipment or storage lot offered for acceptance.
AQL: 100%
5.27.6 Prepare shipment applications and personally procured movement (PPM) Requests.
Timeliness: Assist DPS customers when required.
Quality: Will be completed IAW DTR Part IV and governing service regulations and a complete copy will be provided to QAE on request.
Random sampling
Lot: Shipments applications and self-movement requests completed at the time of surveillance.
AQL: 95%
5.27.8 Conduct Quality Control inspections for personal property movements
| Timeliness: Conduct i QC inspections on 100% percent of Army Branch of Service which includes Soldiers and Department of the Army Civilians, personal property movements (Physical or virtually) during pack-out or move-in with a minimum of 75% of inspections in person. A minimum of 50% of other Branch of Services shipments must be inspections in-person. Conduct QC inspections on 100 percent of Blue Bark and Gold Star Shipments in person. |
| Random sampling |
Percent of in-person (physical) QC inspections conducted on Joint Service Shipments (non-Army).
AQL: 100%
5.27.9 Collect Excess Costs.
Timeliness: DD 139 prepared within the same week excess costs are discovered / determined; approved 139 will be submitted to DFAS as required. DD1131 prepared in the same week monies are received; submitted to Government rep, for deposit weekly.
DD Form 139 or DD Form 1131 will be prepared and maintained completely and accurately. Provide a copy to QAE upon request.
Random sampling
Lot: Collection forms completed at time of surveillance.
AQL: 100%
PASSENGER MOVEMENTS
5.28.1 Process Commercial Invoices.
Timeliness: Approved invoices and supporting documents will be submitted to the COR within 3 business days of receipt from TSP.
Quality: TSP charges will be complete and verified correctly before submitted to COR completely reviewed before submission to COR.
Random sampling
Lot: Each commercial ticket invoices in process or completed at time of surveillance.
AQL: 100%
5.28.1 Process Individual/Family passenger movement requests.
Timeliness: Requests will be processed and completed to meet passenger’s departure and arrival requirements.
Quality: Mode of travel will be based on individual/family travel requirements and entitlements.
Random sampling
Lot: Passenger movement requests in process, or completed at time of surveillance.
AQL: 97%
5.28.1 Process overseas travel requests.
Timeliness: Port calls and changes processed to meet customers travel requirements.
Quality: Port call request or orders processed accurately and completely.
Random sampling
Lot: Each port call request being processed, or completed at time of surveillance.
AQL: 97%
5.28.5 Reconcile centralized billing accounts and certify payment by DFAS Timeliness: Reconcile and submit to DFAS within 15 calendar days. NOTE: Certify CBAs within 5 working days of hard copy receipt for DTS Accounts, and 10 days for manual accounts. FMR standard of 30 days still applies for processing.
Random sampling
Lot: Percent of CBAs reconciled and submitted to DFAS within 15 calendar days
AQL: 90%
MOTOR POOL OPERATIONS
5.29.1 Control & Account for GSA vehicles, keys, and credit cards report loss/abuse Timeliness: By COB daily notify COR upon discovery.
Quality: Complete & accurate Random sampling
Lot: Each GSA vehicle hand receipt completed at time of surveillance.
AQL: 99% (100) percent in old PRS
5.29.1 Pick up and deliver vehicles Timeliness: Vehicles pickup within (5) business days when notified.
Quality: Pick up & delivery to designated area.
Random sampling
Lot: Each vehicle requiring pickup and delivery completed at time of surveillance.
AQL: 98%
5.29.1 Maintain a copy of justification on each motor vehicle utilized for official use and notify users when it is due to expire excluding LSEV.
Timeliness: Annually
Quality: Justification must meet the requirements of AR 58-1.
Random sampling
Lot: GSA vehicle justifications prepared each year.
AQL: 100%
5.29.3 Receive requests for motor transportation Timeliness: Requests reviewed and submitted to government rep, by COB.
Quality: Requests are complete and accurate prior to government rep, manual or telephonic approval.
Random sampling
Lot: Each request for motor transportation completed at time of surveillance.
AQL: 99%
5.29.3 Inspect & dispatch GSA vehicles and GSA credit cards Timeliness: Vehicle inspected at time of dispatch and upon return. LSEV inspected and dispatch quarterly.
Quality: Inspection shall be performed accurately Random sampling
Lot: Each GSA vehicle dispatch in process or completed at time of surveillance.
AQL: 95% Dispatching 100% Credit Card
5.29.5 Operate buses and other non-tactical vehicles Timeliness: To meet mission requirements. Bus arrival times of 7 minutes or less. Passenger wait times not exceeding 10 minutes.
Quality: Vehicles operated safely.
Random sampling
Lot: Bus arrival times and passenger wait times at time of surveillance.
AQL: 95%
5.29.11 Schedule for Maintenance of GSA vehicles.
Timeliness: Users notified 5 business days prior to scheduled maintenance date
Quality: Scheduled maintenance performed.
Surveillance activity checklist
Lot: Each GSA vehicle requiring maintenance completed at time of surveillance.
AQL: 95%
CARGO MOVEMENTS
5.31.1 Route military cargo and equipment.
Timeliness: To meet mission requirements
Quality: Shipment will be routed IAW DTR PART II. Data entry into ETA/FAST/GFM CMOS will be accurate and complete.
Random sampling
Lot: Each shipment competed at time of surveillance.
AQL: 100%
5.31.2 Hazardous materials, oversized, sensitive items properly identified, documented, marked, labeled, and/or placarded Timeliness: Prior to preparation of GBL/CBL.
Quality: Certified HazMat preparers are verified; documents are complete and accurate.
Random sampling
Lot: Each hazardous materials, oversized, sensitive shipments in process or completed at time of surveillance.
AQL: 100%
Add invoice language from QASP 5.31.1 reference Add language from QASP section 5.32.6 reference para 5.31.1