B08 Attachment 0012 - CHS 6 Production Assessment Survey.docx
DOCX document 35 KB Posted
- Attached to
- Common Hardware Systems 6th Generation (CHS-6) W15P7T-23-R-0001 Federal contract opportunity
- Solicitation number
- W15P7T23R0001
About this file
This document contains a production assessment survey template and details of the Common Hardware Systems Sixth Generation (CHS-6) federal contract opportunity. The survey template requests facility and production capacity information from offerors, such as total facility square footage, management staffing levels through 2026, production throughput from 2019 to 2022, and capacity utilization. The CHS-6 opportunity is a ten-year IDIQ contract valued at an estimated $7.9 billion to provide seamless procurement of commercial IT, COTS, and NDI hardware, components, sustainment strategies, non-personal services, and technology upgrades in support of the U.S. Army, DoD, and federal agencies. The solicitation will utilize best value source selection and award without discussions is authorized. The proposal due date will be specified in the solicitation to be available on SAM.gov on or after the issue date.
View the file
Other files for this federal contract opportunity
Show all 50
Common Hardware Systems 6th Generation (CHS-6) W15P7T-23-R-0001 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHS PRODUCTION ASSESSMENT SURVEY
Company Name:
Facility City/State/Zip Code (or City/Province/Postal Code):
CAGE Code:
Company POC/Title:
Phone:
FAX:
E-mail:
Date of Completion:
Note: If the offeror's format does not match the tables required by the Government, an offeror may respond in narrative form to that question and indicate as such on the template. However, all required information in Attachment 0012 shall be addressed.
Section I. Facility Description
1. Total (sq. ft.) of this facility available to support all production workload.
2. Proportion of Total (sq. ft.) to be dedicated to CHS production line.
3. Is there existing floor space available for expansion? If so, how much?
Section II. Business Related Questions
1. Is your company publicly or privately held?
1. Is this company non-US owned? (yes/no)
If yes, list name and location of parent company.
1. Do you have any foreign trade export control problems? (yes/no) If yes, describe.
Section III. Workforce Management
A. Management Provide the following information for this facility. Add additional categories, as needed.
Fiscal Year (FY) (Oct – Sep)
| 2019 |
| 2020 |
| 2021 |
| 2022 |
| 2024 |
(est) (est) (est.)
Total Employment
Direct Labor (#)
Indirect Labor (#)
**Note: Data for FY2023 will not be populated nor will the Offeror be required to populate FY2023, as the CHS-6 contract is not planned to be awarded until late 4QFY23.
1. Identify key management changes occurring within the last three years.
1. Describe your current operating shift(s) at this site (i.e. 1-8-5, 2-8-5 or 3-8-5).
Section IV. Production Capability
A. Workload.
1. Provide in chart below your planned production capabilities for CHS.
CHS Production Capacity (by units) Fiscal Year (FY) (Oct – Sep)
| 2019 |
| 2020 |
| 2021 |
| 2022 |
| 2024 |
(est) (est) (est) (est)
Total Plant Capacity Utilization (Max. units)
Capacity on 1-8-5 (One shift, for 8 hrs, running 5 days a week)
| Actual Throughput* (by units) |
| 71,189 |
| 103,688 |
| 101,030 |
| 64,194 |
Surge Capabilities (min 20%)
*Note: Values for throughput will not match the values in Attachment 0010. Some items were ordered on CHS-4, that were delivered in 2019/2020 due to long lead times. Additionally, items ordered in one FY will not necessarily be delivered in that same FY. Lastly, there are items delivered in 2022 that are not reflected in Attachment 0010; which only show years 1-4 of the CHS-5 contract.
**Note: Data for FY2023 will not be populated nor will the Offeror be required to populate FY2023, as the CHS-6 contract is not planned to be awarded until late 4QFY23.
1. What is your plant’s current capacity utilization (%)?
1. What are the limiting factors?
1. Time to reach the maximum production rate for this product at this facility? Months. What are the limiting factors?
1. Will the CHS production line be shared?