B08 Attachment 0012 - CHS 6 Production Assessment Survey.docx

DOCX document 35 KB Posted

Attached to
Common Hardware Systems 6th Generation (CHS-6) W15P7T-23-R-0001 Federal contract opportunity
Solicitation number
W15P7T23R0001
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

About this file

This document contains a production assessment survey template and details of the Common Hardware Systems Sixth Generation (CHS-6) federal contract opportunity. The survey template requests facility and production capacity information from offerors, such as total facility square footage, management staffing levels through 2026, production throughput from 2019 to 2022, and capacity utilization. The CHS-6 opportunity is a ten-year IDIQ contract valued at an estimated $7.9 billion to provide seamless procurement of commercial IT, COTS, and NDI hardware, components, sustainment strategies, non-personal services, and technology upgrades in support of the U.S. Army, DoD, and federal agencies. The solicitation will utilize best value source selection and award without discussions is authorized. The proposal due date will be specified in the solicitation to be available on SAM.gov on or after the issue date.

View the file

Other files for this federal contract opportunity

Other files attached to Common Hardware Systems 6th Generation (CHS-6) W15P7T-23-R-0001, newest first.
File Type Posted
W15P7T-23-R-0001 Amendment 0004.pdf PDF
B08 Attachment 0008 - CHS 6 Pricing Spreadsheet and Instructions 30 Jan 2023.xlsx XLSX spreadsheet
B08 Attachment 0008 - CHS 6 Pricing Spreadsheet and Instructions 26 Jan 2023.xlsx XLSX spreadsheet
W15P7T-23-R-0001 Amendment 0003.pdf PDF
B08 Attachment 0014 - CHS 6 Section L (09 Nov 2022).docx DOCX document
USG Responses to CHS-6 Questions Updated 9 Nov-22.xlsx XLSX spreadsheet
B08 Attachment 0001 - CHS 6 PWS.docx DOCX document
A03 CDRL B004 - Technical Assistance and Support Services Report (20 Oct 2022).pdf PDF
CHS 6 Approved Data and Cloud Centers.xlsx XLSX spreadsheet
A03 CDRL B010 - IUID Marking Activity V and V Report.pdf PDF
USG Responses to CHS-6 Questions 31-Oct-22 KO.xlsx XLSX spreadsheet
B08 Attachment 0016 - CHS-6 QASP.docx DOCX document
B08 Attachment 0010 - Historical Production Data (updated 31 Oct 2022).xlsx XLSX spreadsheet
B08 Attachment 0001 - CHS 6 PWS.docx DOCX document
B08 W15P7T-23-R-0001 0001 CHS-6 Sol (1 Nov 2022).pdf PDF
A03 CDRL C002 - V1 V2 V3 IK OTC Product Specifications.pdf PDF
A03 CDRL A007 - Operation Security Plan.pdf PDF
A03 CDRL A008 - Supply Chain Risk Management Plan.pdf PDF
A03 CDRL C005 - Technical Data Package Production.pdf PDF
A03 CDRL B003 - Failure Analysis Trend Reporting.pdf PDF
B08 Attachment 0014 - CHS 6 Section L.docx DOCX document
B08 Attachment 0009 - CHS 6 V-1 Equipment List for 14 Items.xlsx XLSX spreadsheet
B08 Attachment 0013 - CHS 6 Process Map.pdf PDF
B08 Attachment 0005 - CHS 6 DD-254.pdf PDF
B08 Attachment 0002 - CHS 6 PWS Appendix A - Survivability Reliability.docx DOCX document
A03 CDRL A006 - Quality Assurance Program Plan.pdf PDF
A03 CDRL A005 - Phase-In Transition Plan.pdf PDF
A03 CDRL C003 - Preliminary Design Review and Critical Design Review Packages.pdf PDF
A03 CDRL B011 - Product Acceptance Test Report.pdf PDF
A03 CDRL B012 - Government Property Inventory Report.pdf PDF
B08 Attachment 0007 - CHS 6 Small Business Participation Commitiment Document.docx DOCX document
B08 Attachment 0006 - CHS 6 Equipment Category Definitions.docx DOCX document
B08 Attachment 0003 - CHS 6 PWS Appendix B - Data Item Tables.xlsx XLSX spreadsheet
A03 CDRL B009 - Out of Warranty Report Data.pdf PDF
A03 CDRL A009 - Phase-Out Transition Plan.pdf PDF
A03 CDRL B001 - First Article Test Report.pdf PDF
A03 CDRL A002 - Counterfeit Prevention Plan.pdf PDF
A03 CDRL C004 - Technical Data Package Developmental.pdf PDF
A03 CDRL A004 - Configuration Management Plan.pdf PDF
A03 CDRL A001 - Program Protection Implementation Plan.pdf PDF
A03 CDRL C001 - V1 Storage Case Product Specifications.pdf PDF
A03 CDRL B008 - Other Than Fair Wear and Tear Report Data.pdf PDF
A03 CDRL B004 - Technical Assistance and Support Services Report.pdf PDF
B08 Attachment 0015 - CHS 6 Section M.docx DOCX document
B08 Attachment 0010 - Historical Production Data.xlsx XLSX spreadsheet
B08 Attachment 0008 - CHS 6 Pricing Spreadsheet and Instructions.xlsx XLSX spreadsheet
B08 Attachment 0001 - CHS-6 PWS.docx DOCX document
A03 CDRL A003 - First Article Qualification Test Plan and Procedures.pdf PDF
A03 CDRL B007 - Small Business Utilization Report.pdf PDF
A03 CDRL B010 - IUID Marking Activity Validation and Verification Report.pdf PDF
Show all 50

Common Hardware Systems 6th Generation (CHS-6) W15P7T-23-R-0001 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHS PRODUCTION ASSESSMENT SURVEY

Company Name:

Facility City/State/Zip Code (or City/Province/Postal Code):

CAGE Code:

Company POC/Title:

Phone:

FAX:

E-mail:

Date of Completion:

Note: If the offeror's format does not match the tables required by the Government, an offeror may respond in narrative form to that question and indicate as such on the template. However, all required information in Attachment 0012 shall be addressed.

Section I. Facility Description

1. Total (sq. ft.) of this facility available to support all production workload.

2. Proportion of Total (sq. ft.) to be dedicated to CHS production line.

3. Is there existing floor space available for expansion? If so, how much?

Section II. Business Related Questions

1. Is your company publicly or privately held?

1. Is this company non-US owned? (yes/no)

If yes, list name and location of parent company.

1. Do you have any foreign trade export control problems? (yes/no) If yes, describe.

Section III. Workforce Management

A. Management Provide the following information for this facility. Add additional categories, as needed.

Fiscal Year (FY) (Oct – Sep)

2019
2020
2021
2022
2024

(est) (est) (est.)

Total Employment

Direct Labor (#)

Indirect Labor (#)

**Note: Data for FY2023 will not be populated nor will the Offeror be required to populate FY2023, as the CHS-6 contract is not planned to be awarded until late 4QFY23.

1. Identify key management changes occurring within the last three years.

1. Describe your current operating shift(s) at this site (i.e. 1-8-5, 2-8-5 or 3-8-5).

Section IV. Production Capability

A. Workload.

1. Provide in chart below your planned production capabilities for CHS.

CHS Production Capacity (by units) Fiscal Year (FY) (Oct – Sep)

2019
2020
2021
2022
2024

(est) (est) (est) (est)

Total Plant Capacity Utilization (Max. units)

Capacity on 1-8-5 (One shift, for 8 hrs, running 5 days a week)

Actual Throughput* (by units)
71,189
103,688
101,030
64,194

Surge Capabilities (min 20%)

*Note: Values for throughput will not match the values in Attachment 0010. Some items were ordered on CHS-4, that were delivered in 2019/2020 due to long lead times. Additionally, items ordered in one FY will not necessarily be delivered in that same FY. Lastly, there are items delivered in 2022 that are not reflected in Attachment 0010; which only show years 1-4 of the CHS-5 contract.

**Note: Data for FY2023 will not be populated nor will the Offeror be required to populate FY2023, as the CHS-6 contract is not planned to be awarded until late 4QFY23.

1. What is your plant’s current capacity utilization (%)?

1. What are the limiting factors?

1. Time to reach the maximum production rate for this product at this facility? Months. What are the limiting factors?

1. Will the CHS production line be shared?

File details come from the government source that posted it. Updated .