A03 CDRL C001 - V1 Storage Case Product Specifications.pdf

PDF 231 KB Posted

Attached to
Common Hardware Systems 6th Generation (CHS-6) W15P7T-23-R-0001 Federal contract opportunity
Solicitation number
W15P7T23R0001
Issued by
Department of the Army Materiel Command Army Contracting Command Aberdeen Proving Ground

About this file

This document package includes a Contract Data Requirements List (CDRL) and details of a related federal contract opportunity. The CDRL outlines technical data item requirements for the Common Hardware Systems Sixth Generation (CHS-6) contract, including product specifications and reports to be delivered electronically. Key deliverables include storage case specifications within 14 days of solicitation and a completed data table for all new products.

The contract opportunity is a Request for Proposal for the $7.9 billion CHS-6 IDIQ vehicle to provide total lifecycle solutions for the Army, DoD and federal agencies. The ten-year contract scope includes commercial hardware and software, integration and installation, testing, logistics and engineering support via task orders. Proposals are due on the issue date, with award based on best value.

View the file

Other files for this federal contract opportunity

Other files attached to Common Hardware Systems 6th Generation (CHS-6) W15P7T-23-R-0001, newest first.
File Type Posted
W15P7T-23-R-0001 Amendment 0004.pdf PDF
W15P7T-23-R-0001 Amendment 0003.pdf PDF
B08 Attachment 0008 - CHS 6 Pricing Spreadsheet and Instructions 26 Jan 2023.xlsx XLSX spreadsheet
USG Responses to CHS-6 Questions Updated 9 Nov-22.xlsx XLSX spreadsheet
B08 Attachment 0014 - CHS 6 Section L (09 Nov 2022).docx DOCX document
B08 W15P7T-23-R-0001 0002 CHS-6 (15 Nov 2022).pdf PDF
B08 Attachment 0001 - CHS 6 PWS.docx DOCX document
A03 CDRL B010 - IUID Marking Activity V and V Report.pdf PDF
USG Responses to CHS-6 Questions 31-Oct-22 KO.xlsx XLSX spreadsheet
B08 Attachment 0016 - CHS-6 QASP.docx DOCX document
A03 CDRL B004 - Technical Assistance and Support Services Report (20 Oct 2022).pdf PDF
CHS 6 Approved Data and Cloud Centers.xlsx XLSX spreadsheet
A03 CDRL A005 - Phase-In Transition Plan (20 Oct 2022).pdf PDF
B08 Attachment 0014 - CHS 6 Section L (31 Oct 2022).docx DOCX document
A03 CDRL A006 - Quality Assurance Program Plan.pdf PDF
A03 CDRL A005 - Phase-In Transition Plan.pdf PDF
A03 CDRL C003 - Preliminary Design Review and Critical Design Review Packages.pdf PDF
A03 CDRL B011 - Product Acceptance Test Report.pdf PDF
A03 CDRL B012 - Government Property Inventory Report.pdf PDF
B08 Attachment 0007 - CHS 6 Small Business Participation Commitiment Document.docx DOCX document
B08 Attachment 0006 - CHS 6 Equipment Category Definitions.docx DOCX document
B08 Attachment 0003 - CHS 6 PWS Appendix B - Data Item Tables.xlsx XLSX spreadsheet
A03 CDRL B009 - Out of Warranty Report Data.pdf PDF
A03 CDRL C002 - V1 V2 V3 IK OTC Product Specifications.pdf PDF
A03 CDRL A007 - Operation Security Plan.pdf PDF
A03 CDRL A008 - Supply Chain Risk Management Plan.pdf PDF
A03 CDRL C005 - Technical Data Package Production.pdf PDF
A03 CDRL B003 - Failure Analysis Trend Reporting.pdf PDF
B08 Attachment 0014 - CHS 6 Section L.docx DOCX document
B08 Attachment 0009 - CHS 6 V-1 Equipment List for 14 Items.xlsx XLSX spreadsheet
B08 Attachment 0013 - CHS 6 Process Map.pdf PDF
B08 Attachment 0012 - CHS 6 Production Assessment Survey.docx DOCX document
B08 Attachment 0005 - CHS 6 DD-254.pdf PDF
B08 Attachment 0002 - CHS 6 PWS Appendix A - Survivability Reliability.docx DOCX document
A03 CDRL A003 - First Article Qualification Test Plan and Procedures.pdf PDF
A03 CDRL B007 - Small Business Utilization Report.pdf PDF
A03 CDRL B010 - IUID Marking Activity Validation and Verification Report.pdf PDF
A03 CDRL B005 - CHS-6 Integrated Data Environment.pdf PDF
A03 CDRL B002 - End-of-Life End-of-Sale Reporting.pdf PDF
B08 W15P7T-23-R-0001 CHS-6 Solicitation (7 Oct 2022).pdf PDF
B08 Attachment 0011 - CHS 6 Past Performance Questionaire.docx DOCX document
B08 Attachment 0004 - CHS 6 PWS Appendix C - Safety Specification.docx DOCX document
A03 CDRL B006 - Safety Assessment Report.pdf PDF
A03 CDRL A009 - Phase-Out Transition Plan.pdf PDF
A03 CDRL B001 - First Article Test Report.pdf PDF
A03 CDRL A002 - Counterfeit Prevention Plan.pdf PDF
A03 CDRL C004 - Technical Data Package Developmental.pdf PDF
A03 CDRL A004 - Configuration Management Plan.pdf PDF
A03 CDRL A001 - Program Protection Implementation Plan.pdf PDF
A03 CDRL B008 - Other Than Fair Wear and Tear Report Data.pdf PDF
Show all 50

Common Hardware Systems 6th Generation (CHS-6) W15P7T-23-R-0001 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DD FORM 1423-1, FEB 2001

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

PREVIOUS EDITION MAY BE USED.

Form Approved OMB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE

7. DD 250 REQ

8. APP CODE

9. DIST STATEMENT

REQUIRED

10. FREQUENCY

11. AS OF DATE

12. DATE OF FIRST SUBMISSION

13. DATE OF SUBSEQUENT

SUBMISSION

14. DISTRIBUTION

a. ADDRESSEE

b. COPIES

Draft Final

Reg Repro

15. TOTAL

16. REMARKS

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Page of Pages

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP ________ TM _______ OTHER

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

16. REMARKS (Continued)

DD FORM 1423-1, FEB 2001 Page of Pages

INSTRUCTIONS FOR COMPLETING DD FORM 1423

(See DoD 5010.12-M for detailed instructions.)

FOR GOVERNMENT PERSONNEL

Item A. Self-explanatory.

Item B. Self-explanatory.

Item C. Mark (X) appropriate category: TDP - Technical Data Package;

TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.

Item D. Enter name of system/item being acquired that data will support.

Item E. Self-explanatory (to be filled in after contract award).

Item F. Self-explanatory (to be filled in after contract award).

Item G. Signature of preparer of CDRL.

Item H. Date CDRL was prepared.

Item I. Signature of CDRL approval authority.

Item J. Date CDRL was approved.

Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.

Item 2. Enter title as it appears on data acquisition document cited in Item 4.

Item 3. Enter subtitle of data item for further definition of data item (optional entry).

Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.

Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).

Item 6. Enter technical office responsible for ensuring adequacy of the data item.

Item 7. Specify requirement for inspection/acceptance of the data item by the Government.

Item 8. Specify requirement for approval of a draft before preparation of the final data item.

Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).

Item 10. Specify number of times data items are to be delivered.

Item 11. Specify as-of date of data item, when applicable.

Item 12. Specify when first submittal is required.

Item 13. Specify when subsequent submittals are required, when applicable.

Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.

Item 15. Enter total number of draft/final copies to be delivered.

Item 16. Use for additional/clarifying information for Items 1 through 15.

Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.

FOR THE CONTRACTOR

Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.

a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.

Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.

b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.

Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.

c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.

Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.

d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.

Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.

Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.

These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.

DD FORM 1423-1 (BACK), FEB 2001

data_item: C001
title: Scientific and Technical Reports
sub: V1 and Storage Case Product Specifications
auth: DI-MISC-80711A
ref: PWS 3.10
req_ofc: PdL CHS
dd250: LT
appcode:
dist: See Block 16
freq: With Proposal
asof:
firstsub: See Block16
subsub: See Block16
addressee1: See Block 16
draft1:
reg1:
repro1:
addressee2:
draft2:
reg2:
repro2:
addressee3:
draft3:
reg3:
repro3:
addressee4:
draft4:
reg4:
repro4:
addressee5:
draft5:
reg5:
repro5:
addressee6:
draft6:
reg6:
repro6:
addressee7:
draft7:
reg7:
repro7:
addressee8:
draft8:
reg8:
repro8:
addressee9:
draft9:
reg9:
repro9:
addressee10:
draft10:
reg10:
repro10:
addressee11:
draft11:
reg11:
repro11:
addressee12:
draft12:
reg12:
repro12:
addressee13:
draft13:
reg13:
repro13:
addressee14:
draft14:
reg14:
repro14:
addressee15:
draft15:
reg15:
repro15:
addressee16:
draft16:
reg16:
repro16:
addressee17:
draft17:
reg17:
repro17:
addressee18:
draft18:
reg18:
repro18:
addressee19:
draft19:
reg19:
repro19:
addressee20:
draft20:
reg20:
repro20:
addressee21:
draft21:
reg21:
repro21:
addressee22:
draft22:
reg22:
repro22:
addressee23:
draft23:
reg23:
repro23:
addressee24:
draft24:
reg24:
repro24:
addressee25:
draft25:
reg25:
repro25:
addressee26:
draft26:
reg26:
repro26:
addressee27:
draft27:
reg27:
repro27:
addressee28:
draft28:
reg28:
repro28:
addressee29:
draft29:
reg29:
repro29:
addressee30:
draft30:
reg30:
repro30:
addressee31:
draft31:
reg31:
repro31:
addressee32:
draft32:
reg32:
repro32:
addressee33:
draft33:
reg33:
repro33:
addressee34:
draft34:
reg34:
repro34:
addressee35:
draft35:
reg35:
repro35:
addressee36:
draft36:
reg36:
repro36:
addressee37:
draft37:
reg37:
repro37:
addressee38:
draft38:
reg38x:
repro38:
total_draft: 0
total_reg: 0
total_repro: 0
remarks: a. All submittals shall be via electronic transmission to the CHS-6 Information Portal (IP). LT via e-mail to Contracting Officer, Contracting Officer's Representative and PdL CHS Technology Insertion (TI) Manager.

b. Submit Product Specifications for each item NLT 14 days after corresponding RFP for that item.

c. V1 and Storage Case (SC) Product Specifications:

For each V1 item and SC the product specifications shall include:

i. Cover Page: A cover page which identifies the item, the CHS-6 part number, the corresponding Original Equipment Manufacturer (OEM) name and part number, and TI reference number.

ii. Commercial Product Literature: describes the functions, performance and environmental capabilities of the item (examples would include processor specifications, memory specifications, storage specifications, and other technical documentation in support of program fielding requirements).

a. Provide OEM operational manual, data sheet, and inserts (e.g. quick start guide) to accompany the material (documents should be attached to the specifications in their entirety as opposed to providing a link to the documentation).

b. End User License Agreements (EULAs) shall be attached to the Product Specification.

c. Provide material describing the actions to be taken by the user in order to exercise the CHS-6 warranty and obtain repaired / replaced equipment.

d. Provide any supplemental technical information (e.g. Technical Information Bulletins, product recalls, placards for installation and setup).

iii. Item Description: A written description of the item and the following supporting data:

a. Multi-view drawings and / or photographs showing every interface

b. Dimensions (in inches with and without packaging material)

group:
total_price:
prep_name: Raymundo G. Martinez
line_item:
exhibit: C
xtdp: Off
xtm: Off
othercat: X
system: CHS-6
ctr_no:
contr:
remarksb: iii. Item Description: A written description of the item and the following supporting data: (continued)

c. Weight (with and without packaging material, in pounds)

d. BIOS version

e. Firmware and/or driver versions

f. Where applicable, time period for an item possessing deteriorative or unstable characteristics shall be provided; i.e. battery shelf life.

g. Where applicable, list battery type and part number.

h. The product specification data table found in Attachment 0003, CHS-6 PWS Appendix B (Data Item Tables) shall be completed for each product added to the CHS-6 contract.

i. Bill of materials (including vendor name and vendor part number)

iv. Interfaces: A written description of all interfaces on the item to include:

a. User interfaces

b. Data interfaces and standards

c. Power interfaces and standards

d. Cables

v. Product Specification Data Table: The product specification data table found in Attachment 0003, CHS-6 PWS Appendix B (Data Item Tables) shall be completed for each product added to the CHS-6 contract.

vi. Design and Construction

a. Identification and Marking: This paragraph shall describe the requirements for identification and marking which shall be in accordance with the Hardware Marking, labeling, and Packaging section of this PWS.

b. Survivability Requirements: The specified environmental conditions for operation and storage of the item shall be documented in this paragraph.

c. Transportability: Any special requirements for transportability shall be specified. If transit cases are required, it shall be noted here and reference the appropriate product specification for transit cases. Identify storage space and environmental conditions for equipment.

d. Safety: This paragraph shall incorporate the safety requirements specified in the Safety section of the CHS-6 PWS as they apply to the particular item.

e. Disposal requirements

vii. Replaceable parts and Consumables: A listing of all expendables (user replaceable parts) and consumables.

viii. Notes: If required

d. Distribution Statement D: Distribution authorized to the DoD and DoD contractors only (critical technology) (25 February 2009). Other requests shall be referred to PdL CHS.

Page2:
Reset:
2022-06-06T15:18:12-0400
MARTINEZ.RAYMUNDO.G.1231130698
prep_date: 6/6/2022
app_by: David Bogert
2022-06-07T14:29:47-0400
BOGERT.DAVID.VAN.II.1017619400
app_date: 7 June 2022
Page:
of_pages:
app: Adobe Professional 8.0

File details come from the government source that posted it. Updated .