A03 CDRL A006 - Quality Assurance Program Plan.pdf
PDF 233 KB Posted
- Attached to
- Common Hardware Systems 6th Generation (CHS-6) W15P7T-23-R-0001 Federal contract opportunity
- Solicitation number
- W15P7T23R0001
About this file
This document contains a federal contract opportunity solicitation and a related contract data requirements list. The Army Contracting Command Aberdeen Proving Ground is seeking proposals for the Common Hardware Systems Sixth Generation indefinite delivery indefinite quantity contract, with an estimated total value of $7.9 billion over a ten-year period of performance including a four-year base period and two three-year option periods. The solicitation will provide for the rapid procurement of total lifecycle management solutions for commercial information technology including commercial off-the-shelf items, non-developmental items, components, sustainment strategies, non-personal services and continuous technology upgrades. The contract data requirements list specifies the quality assurance program plan deliverable, outlining management responsibilities, design control, purchasing, process control, problem reporting and corrective actions, handling and storage, quality records, audits, and statistical techniques. Proposals are due on the date specified in the solicitation to be available on SAM.gov.
View the file
Other files for this federal contract opportunity
Show all 50
Common Hardware Systems 6th Generation (CHS-6) W15P7T-23-R-0001 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DD FORM 1423-1, FEB 2001
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
PREVIOUS EDITION MAY BE USED.
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE
7. DD 250 REQ
8. APP CODE
9. DIST STATEMENT
REQUIRED
10. FREQUENCY
11. AS OF DATE
12. DATE OF FIRST SUBMISSION
13. DATE OF SUBSEQUENT
SUBMISSION
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
Draft Final
Reg Repro
15. TOTAL
16. REMARKS
17. PRICE GROUP
18. ESTIMATED
TOTAL PRICE
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Page of Pages
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ________ TM _______ OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
16. REMARKS (Continued)
DD FORM 1423-1, FEB 2001 Page of Pages
INSTRUCTIONS FOR COMPLETING DD FORM 1423
(See DoD 5010.12-M for detailed instructions.)
FOR GOVERNMENT PERSONNEL
Item A. Self-explanatory.
Item B. Self-explanatory.
Item C. Mark (X) appropriate category: TDP - Technical Data Package;
TM - Technical Manual; Other - other category of data, such as "Provisioning,""Configuration Management," etc.
Item D. Enter name of system/item being acquired that data will support.
Item E. Self-explanatory (to be filled in after contract award).
Item F. Self-explanatory (to be filled in after contract award).
Item G. Signature of preparer of CDRL.
Item H. Date CDRL was prepared.
Item I. Signature of CDRL approval authority.
Item J. Date CDRL was approved.
Item 1. See DoD FAR Supplement Subpart 4.71 for proper numbering.
Item 2. Enter title as it appears on data acquisition document cited in Item 4.
Item 3. Enter subtitle of data item for further definition of data item (optional entry).
Item 4. Enter Data Item Description (DID) number, military specification number, or military standard number listed in DoD 5010.12-L (AMSDL), or one-time DID number, that defines data content and format requirements.
Item 5. Enter reference to tasking in contract that generates requirement for the data item (e.g., Statement of Work paragraph number).
Item 6. Enter technical office responsible for ensuring adequacy of the data item.
Item 7. Specify requirement for inspection/acceptance of the data item by the Government.
Item 8. Specify requirement for approval of a draft before preparation of the final data item.
Item 9. For technical data, specify requirement for contractor to mark the appropriate distribution statement on the data (ref. DoDD 5230.24).
Item 10. Specify number of times data items are to be delivered.
Item 11. Specify as-of date of data item, when applicable.
Item 12. Specify when first submittal is required.
Item 13. Specify when subsequent submittals are required, when applicable.
Item 14. Enter addressees and number of draft/final copies to be delivered to each addressee. Explain reproducible copies in Item 16.
Item 15. Enter total number of draft/final copies to be delivered.
Item 16. Use for additional/clarifying information for Items 1 through 15.
Examples are: Tailoring of documents cited in Item 4; Clarification of submittal dates in Items 12 and 13; Explanation of reproducible copies in Item 14.; Desired medium for delivery of the data item.
FOR THE CONTRACTOR
Item 17. Specify appropriate price group from one of the following groups of effort in developing estimated prices for each data item listed on the DD Form 1423.
a. Group I. Definition - Data which is not otherwise essential to the contractor's performance of the primary contracted effort (production, development, testing, and administration) but which is required by DD Form 1423.
Estimated Price - Costs to be included under Group I are those applicable to preparing and assembling the data item in conformance with Government requirements, and the administration and other expenses related to reproducing and delivering such data items to the Government.
b. Group II. Definition - Data which is essential to the performance of the primary contracted effort but the contractor is required to perform additional work to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, or quality of the data item.
Estimated Price - Costs to be included under Group II are those incurred over and above the cost of the essential data item without conforming to Government requirements, and the administrative and other expenses related to reproducing and delivering such data item to the Government.
c. Group III. Definition - Data which the contractor must develop for his internal use in performance of the primary contracted effort and does not require any substantial change to conform to Government requirements with regard to depth of content, format, frequency of submittal, preparation, control, and quality of the data item.
Estimated Price - Costs to be included under Group III are the administrative and other expenses related to reproducing and delivering such data item to the Government.
d. Group IV. Definition - Data which is developed by the contractor as part of his normal operating procedures and his effort in supplying these data to the Government is minimal.
Estimated Price - Group IV items should normally be shown on the DD Form 1423 at no cost.
Item 18. For each data item, enter an amount equal to that portion of the total price which is estimated to be attributable to the production or development for the Government of that item of data.
These estimated data prices shall be developed only from those costs which will be incurred as a direct result of the requirement to supply the data, over and above those costs which would otherwise be incurred in performance of the contract if no data were required. The estimated data prices shall not include any amount for rights in data. The Government's right to use the data shall be governed by the pertinent provisions of the contract.
DD FORM 1423-1 (BACK), FEB 2001
| data_item: A006 |
| title: Quality Assurance Program Plan |
| sub: Quality Assurance Program Plan |
| auth: DI-QCIC-81794A |
| ref: PWS 4.9.3 |
| req_ofc: PdL CHS |
| dd250: LT |
| appcode: A |
| dist: See Block 16 |
| freq: Once |
| asof: |
| firstsub: See Block16 |
| subsub: See Block16 |
| addressee1: See Block 16 |
| draft1: |
| reg1: |
| repro1: |
| addressee2: |
| draft2: |
| reg2: |
| repro2: |
| addressee3: |
| draft3: |
| reg3: |
| repro3: |
| addressee4: |
| draft4: |
| reg4: |
| repro4: |
| addressee5: |
| draft5: |
| reg5: |
| repro5: |
| addressee6: |
| draft6: |
| reg6: |
| repro6: |
| addressee7: |
| draft7: |
| reg7: |
| repro7: |
| addressee8: |
| draft8: |
| reg8: |
| repro8: |
| addressee9: |
| draft9: |
| reg9: |
| repro9: |
| addressee10: |
| draft10: |
| reg10: |
| repro10: |
| addressee11: |
| draft11: |
| reg11: |
| repro11: |
| addressee12: |
| draft12: |
| reg12: |
| repro12: |
| addressee13: |
| draft13: |
| reg13: |
| repro13: |
| addressee14: |
| draft14: |
| reg14: |
| repro14: |
| addressee15: |
| draft15: |
| reg15: |
| repro15: |
| addressee16: |
| draft16: |
| reg16: |
| repro16: |
| addressee17: |
| draft17: |
| reg17: |
| repro17: |
| addressee18: |
| draft18: |
| reg18: |
| repro18: |
| addressee19: |
| draft19: |
| reg19: |
| repro19: |
| addressee20: |
| draft20: |
| reg20: |
| repro20: |
| addressee21: |
| draft21: |
| reg21: |
| repro21: |
| addressee22: |
| draft22: |
| reg22: |
| repro22: |
| addressee23: |
| draft23: |
| reg23: |
| repro23: |
| addressee24: |
| draft24: |
| reg24: |
| repro24: |
| addressee25: |
| draft25: |
| reg25: |
| repro25: |
| addressee26: |
| draft26: |
| reg26: |
| repro26: |
| addressee27: |
| draft27: |
| reg27: |
| repro27: |
| addressee28: |
| draft28: |
| reg28: |
| repro28: |
| addressee29: |
| draft29: |
| reg29: |
| repro29: |
| addressee30: |
| draft30: |
| reg30: |
| repro30: |
| addressee31: |
| draft31: |
| reg31: |
| repro31: |
| addressee32: |
| draft32: |
| reg32: |
| repro32: |
| addressee33: |
| draft33: |
| reg33: |
| repro33: |
| addressee34: |
| draft34: |
| reg34: |
| repro34: |
| addressee35: |
| draft35: |
| reg35: |
| repro35: |
| addressee36: |
| draft36: |
| reg36: |
| repro36: |
| addressee37: |
| draft37: |
| reg37: |
| repro37: |
| addressee38: |
| draft38: |
| reg38x: |
| repro38: |
| total_draft: 0 |
| total_reg: 0 |
| total_repro: 0 |
| remarks: a. The QAPP shall be submitted at time of proposal. |
b. DELETED.
c. Reference Documents
- A complete list of compliance and reference documents (e.g. ISO 9001:2015 or equivalent) that are used to guide the writing and implementation of QAP.
d. Management
- Provides the organizational structure, and their responsibilities that will influence the quality of all CHS-6 products. Elements to be addressed include quality planning, implementation, control and monitoring; significant interfaces that affect products, contracts, vendors, problem reporting and resolution; review of audit results; authorization for deviation to quality policy; and control of corrective and preventive actions.
e. Design Control
- Identify and describe the standards, practices, conventions and metrics that are to be applied to the CHS-6 program. Also identify and describe how quality personnel will monitor compliance to these standards and how conformance to the requirements will be verified.
f. Purchasing
- Provide the details of how material will be purchased and any relevant quality assurance requirements for this material. Depict the method used to evaluate, select and control vendors.
g. Process Control
- Give details of the methods employed to verify process controls are in place and being used in the manufacture/assembly process. Verification should include process documentation, monitor and control of characteristics, acceptable workmanship standards, use of qualified processes, equipment and personnel, adequate and appropriate tooling and test equipment. List all critical processes used on this project and the method or plan to use to control each of them.
h. Problem Reporting and Preventive/Corrective Action
- Identify the methods used to detect, report, track, and resolve product/process problems and trends.
| group: |
| total_price: |
| prep_name: Jamie Plakosh |
| line_item: |
| exhibit: A |
| xtdp: Off |
| xtm: Off |
| othercat: X |
| system: CHS-6 |
| ctr_no: |
| contr: |
| remarksb: i. Handling, Storage, Marking, Packaging, Preservation and Delivery |
- Describe the methodology used to verify that specific parts and product handling, storage, marking, packaging, and delivery requirements are met. Includes the method used to verify that the delivered products have not degraded or been tampered with beyond the requirements.
j. Control of Quality Records
- Depicts what records are to be kept, for how long, where, by whom, and in what form these records will exist. Provides a description of how the records will be stored, retrieved, disposition, confidentiality requirements, and the method used to implement them.
k. Quality Audits
- Identify the nature and extent of the quality audits performed (e.g. internal, customer supplier, regulatory, seller and ISO registration) and how the results will be used in the corrective and preventive action system.
l. Statistical Techniques
- Identify any statistical techniques to be used to evaluate and maintain consistent quality control.
m. Distribution Statement D: Distribution authorized to the DoD and DoD contractors only (critical technology) (25 February 2009). Other requests shall be referred to PdL CHS.
| Page2: 2 | |
| Reset: | |
| 2022-06-06T15:49:03-0400 | |
| PLAKOSH.JAMIE.1298697480 |
| prep_date: 6 Jun 22 | |
| app_by: David Bogert | |
| 2022-06-07T14:10:56-0400 | |
| BOGERT.DAVID.VAN.II.1017619400 |
| app_date: 7 June 2022 |
| Page: 1 |
| of_pages: 2 |
| app: Adobe Professional 8.0 |
File details come from the government source that posted it. Updated .