B08__Attachment_0005_Price_Schedule_44038573_FOSU_HVAC.xlsx
XLSX spreadsheet 29 KB Posted
- Solicitation number
- 140P5126R0002
About this file
This is a Price Schedule document for HVAC replacement services at Fort Sumter National Historic Park's Liberty Square Visitor Center in Charleston, South Carolina. The file is structured as an Excel spreadsheet containing pricing information for the proposed heating, ventilation, and air conditioning system replacement project under Solicitation Number 140P5126R0002.
The price schedule template is designed to capture line item pricing for HVAC equipment, materials, labor, and associated installation costs required to complete the replacement project. As a pricing template document, it serves as the standardized format through which contractors must submit their cost proposals in response to the Department of the Interior National Park Service Southeast Region's solicitation. The document establishes the framework for competitive pricing evaluation and cost comparison among responding contractors. Specific pricing details, line items, and cost breakdowns would be completed by contractors during the proposal submission phase and are not pre-populated in the template itself.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Lump Sum Cost
| Contract Price Schedule | |||||
| National Park Service (NPS) - Denver Service Center (DSC) | 3-13-18 | |||||
| Solicitation Number: | 140P5126R0002 | ||||
| PARK - PMIS: | FOSU LISQ | ||||
| (Project Management Information System) | |||||
| Developed Area: | |||||
| Project Title: | Replace HVAC Systems at Liberty Square Visitor Education Center Charleston, South Carolina | ||||
| Notice: Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all | |||||
| option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced | |||||
| line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related | |||||
| item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts | |||||
| govern. Round totals and extended prices to whole dollars. | |||||
| Item Number | Line Item Title | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Exterior Enclosure | 1 | LS | $0.00 | |
| 2 | Interior Construction | 1 | LS | $0.00 | |
| 3 | HVAC | 1 | LS | $0.00 | |
| 4 | Electrical | 1 | LS | $0.00 | |
| 5 | Selective Building Demolition | 1 | LS | $0.00 | |
| 6 | Site Preparation | 1 | LS | $0.00 | |
| 7 | Site Improvements | 1 | LS | $0.00 | |
| TOTAL PROPOSED PRICE - (Contract Line Item Number 1 through 7) -------------------------- | $0.00 | ||||
| All measurement and payment information is included in Division 01 Specifications Section 01 27 00 Definition of Contract Line Items. |
Cost Breakdowns
| SOLICITATION PRICE SCHEDULE | |||||||||||
| SOLICITATION NUMBER: 140P5126R0001 | |||||||||||
| PROJECT TITLE: Replace HVAC Systems at Liberty Square Visitor Education Center Charleston, South Carolina | |||||||||||
| Item No. | Description | Material Cost/Unit | Total Material Cost | Labor Cost/Unit | Total Labor Cost | Equipment Cost/Unit | Total Equipment Cost | Direct Cost/Unit | Total Direct Costs | NET Cost/Unit | Total NET Costs |
| 1 | Exterior Doors | ||||||||||
| Install New Double Door - Chase | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 2 | Interior Construction | ||||||||||
| Interior Partitions | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 3 | Interior Finishes | ||||||||||
| Interior Coartings and Special Finishes | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 4 | HVAC | ||||||||||
| Heat Generating Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Cooling Generating Systems | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Distribution Systems (HVAC) | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Controls and Instruments | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Systems Teasting and Balancing | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Other HVAC Systems and Equipment | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 5 | Electrical | ||||||||||
| Electrical Service and Distribution | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Communication and Secuirty | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 6 | Selective Building Demolition | ||||||||||
| Building Elements Demolition | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 7 | Site Preparation | ||||||||||
| Site Celaring | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Site Demolition and Relocations | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Site Earthwork | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Other Site Preparation | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |||||
| 8 | Site Improvements | ||||||||||
| Pedestrian Paving | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Site Development | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Landscaping | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| Other Site Construction | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | |
| 9 | Bonds | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 10 | Overhead | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| 11 | Profit | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Subtotal Direct Construction Costs | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
File details come from the government source that posted it. Updated .