B08_Attach 3 Exhibit 5 Dwg_Second Floor Shoring Plan_as-built_S3.0_2011.pdf

PDF 280 KB Posted

Attached to
CRLA 198641 - Correct Structural Deficiencies & St Federal contract opportunity
Solicitation number
140P2020R0158
Issued by
Department of the Interior National Park Service National Office

About this file

This document contains engineering drawings and details for structural deficiencies corrections and stabilization of a steel visitor center. The drawings show existing structural elements and proposed modifications including relocating columns, upsizing beams, adding dunnage pads, terminating beams, and dividing cross beams. The related federal contract opportunity is solicitation number 140P2020R0158 for corrective work at the visitor center located within the Department of the Interior National Park Service National Office. The opportunity type is a solicitation to correct structural deficiencies and stabilize the steel visitor center.

View the file

Other files for this federal contract opportunity

Other files attached to CRLA 198641 - Correct Structural Deficiencies & St, newest first.
File Type Posted
B08_Attach 1-A TVC Spec Vol 4_20Nov2020_Rev20_Apr2021_Div 3-5-6-7_0003.pdf PDF
Sol_140P2020R0158_Amd_0003.pdf PDF
Sol_140P2020R0158_Amd_0002.pdf PDF
Sol_140P2020R0158_Amd_0001.pdf PDF
B08_Attach 5B1 SF1442-Vol 2 140P2020R0158.pdf PDF
B08_Attach 5A4 HazMatls-Vol 1.pdf PDF
B08_Attach 5A1_ProjExpQuest-Vol 1.pdf PDF
B08_Attach 3 Report 9_NPS Uniguide Standard for Road Signs_TVC sheet C2.0.pdf PDF
B08_Attach 3 Report 7_Discovery Demolition Observations Report.pdf PDF
B08_Attach 1 Specs_CRLA Final CD Div 2-12.pdf PDF
B08_Attach 5B3 PriceSched-Vol 2.xlsx XLSX spreadsheet
B08_Attach 5A3 ProposedEquals-Vol 1.pdf PDF
B08_Attach 5A2 PastPerf-Vol 1.docx DOCX document
B08_Attach 3 Exhibit 4 Dwg_Emergency Repair of Roof_2011.pdf PDF
B08_Attach 3 Report 8_Crater Lake VC Discovery Demo.pdf PDF
B08_Attach 3 Report 4_Condition Assessment Historic Masonry.pdf PDF
B08_Attach 3 Report 2_Hazmat Survey.pdf PDF
B08_Attach 5A_PropSubPkg TOC.pdf PDF
B08_Attach 5B6 GeneralRef-Vol 2.pdf PDF
B08_Attach 5B7 SubKPlanForm-Vol 2.doc DOC document
B08_Attach 5B4 SF24 BidBonds-Vol 2.pdf PDF
B08_Attach 4 WageDetermin-Building OR20210040_20210212.pdf PDF
B08_Attach 3 Report 6_Historic Structure Report.pdf PDF
B08_Attach 3 Report 5_Mortar Evaluation.pdf PDF
B08_Attach 3 Report 3_Assessment of Structural Stone at Steel Visitor Center.pdf PDF
B08_Attach 3 Report 1_Subsurface Exploration and Foundation Recommendations.pdf PDF
B08_Attach 3 Exhibit 3 Dwg_Renovation of Ranger Dorm No 2_1990.pdf PDF
B08_Attach 3 Exhibit 2 Dwg_Crater Lake National Park Wash Room 1935 dwg.pdf PDF
B08_Attach 3 Exhibit 1 Dwg_Crater Lake National Park Dormitory 1932 dwgs.pdf PDF
B08_Attach 2 Rev_Dwgs_Temp VC_CRLA_FINAL SET.pdf PDF
B08_Attach 2 Dwgs_Steel VC_CRLA_FINAL SET.pdf PDF
B08_Attach 1 Specs_CRLA Final CD Div 21-33.pdf PDF
B08_Attach 1 Rev_Specs_CRLA Final CD Div 1.pdf PDF
B08_Attach 1 Rev_Specs_CRLA Final CD Temp VC vol 4.pdf PDF
Sol_140P2020R0158.pdf PDF
Show all 35

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

hlam Line hlam Rectangle hlam Rectangle hlam Line hlam Callout cantilever w8x58 to wall hlam Line hlam Rectangle hlam Line hlam Rectangle hlam Text Box C-08 hlam Text Box C-21 hlam Callout move columns C-07 and C-08 to inside stairwell; replace W8x31 with 7"x1" steel plate, see stairway alternate beam detail hlam Text Box C-07 hlam Text Box C-09 hlam Rectangle hlam Callout upsize to W8x67 hlam Line hlam Callout delete W8x58 hlam Text Box C-22 hlam Line hlam Line hlam Polygon hlam Line hlam Rectangle hlam Callout delete w8x58, C-019, W8x58 cross beam hlam Callout terminate w10x68 inside entry, relocate C-18 to W10x68 end hlam Rectangle hlam Callout move north 16" hlam Callout delete C-03, change beam to W8x40 and connect to C-04

HLam Callout 12/5/11: relocate C-02 to directly underneath conx of W8x40 and W8x48, eliminate cross beam W8x35

HLam Callout 12/5/11: relocate C-22 to directly underneath connecting corner of W8x48 and cross beam W8x40; relocate hot water heater as needed; divide cross bean W8x40 into two short sections from C-22 to C-21 and from C-11 to corner of beam W8x58 in the men's restroom

HLam Line

HLam Line

HLam Callout 5x5 dunnage pad hlam Rectangle hlam Callout 12-15-11: relocate C-01 hlam Callout 12-15-11: delete cross beam

File details come from the government source that posted it. Updated .