B08_Attach 2 Dwgs_Steel VC_CRLA_FINAL SET.pdf
PDF 39 MB Posted
- Attached to
- CRLA 198641 - Correct Structural Deficiencies & St Federal contract opportunity
- Solicitation number
- 140P2020R0158
About this file
This document provides details for a federal solicitation opportunity from the Department of the Interior National Park Service National Office. Solicitation number 140P2020R0158 seeks to address structural deficiencies and stabilize the steel visitor center at CRLA 198641. The agency is soliciting bids to correct structural issues and stabilize the existing steel visitor center. The attached file appears to include relevant drawings to inform any response. The solicitation number and project name are provided, along with the contracting agency.
View the file
Other files for this federal contract opportunity
Show all 35
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ALind Text Box X
ALind Text Box 106/142813
SHEET
PMIS/PKG NO.
DRAWING NO.
142813
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF 1521/
5/
2:
:4
A
M B
IM
.0
S
T E
E L
V
IS
IT
O
R C
E N
T E
R
-0
_C
R
LA
.r vt
M.BARTOLOME
Checker
B. KLUG
G1.1
SHEET INDEX
CRATER LAKE NATIONAL PARK
2020.11.20
198641
126 E1.2 SECOND FLOOR LIGHTING DEMOLITION PLAN
127 E1.3 SNOW TUNNEL AND BASEMENT LIGHTING DEMOLITION PLANS
128 E1.4 FIRST FLOOR POWER & SIGNAL DEMOLITION PLAN
129 E1.5 SECOND FLOOR POWER & SIGNAL DEMOLITION PLAN
130 E1.6 SNOW TUNNEL AND BASEMENT POWER & SIGNAL DEMOLITION PLANS
131 E1.7 FIRST FLOOR FIRE ALARM DEMOLITION PLAN
132 E1.8 SECOND FLOOR FIRE ALARM DEMOLITION PLAN
133 E2.1 FIRST FLOOR LIGHTING REMODEL PLAN
134 E2.2 FIRST FLOOR SNOW TUNNEL LIGHTING REMODEL PLAN
135 E2.3 SECOND FLOOR LIGHTING REMODEL PLAN
136 E2.4 BASEMENT/ CRAWLSPACE LIGHTING REMODEL PLAN - BASE BID
137 E3.1 FIRST FLOOR POWER AND SIGNAL REMODEL PLAN
138 E3.2 FIRST FLOOR SNOW TUNNEL POWER AND SIGNAL REMODEL PLAN
139 E3.3 SECOND FLOOR POWER AND SIGNAL REMODEL PLAN
140 E3.4 BASEMENT/ CRAWLSPACE POWER AND SIGNAL PLAN
141 E4.1 FIRST FLOOR FIRE ALARM REMODEL PLAN
142 E4.2 FIRST FLOOR SNOW TUNNEL FIRE ALARM REMODEL PLAN
143 E4.3 SECOND FLOOR FIRE ALARM REMODEL PLAN
144 E4.4 BASEMENT/ CRAWLSPACE FIRE ALARM REMODEL PLAN
145 E5.1 ATTIC ELECTRICAL REMODEL PLAN
146 E6.1 POWER ONE-LINE DIAGRAMS
147 E6.2 TELECOM AND FIRE ALARM DETAILS
148 E7.1 ELECTRICAL DETAILS
149 E7.2 SNOW MELT DETAILS
150 E7.3 LIGHTING CONTROL SEQUENCE AND DETAILS
151 E7.4 ELECTRICAL DETAILS
152 E8.1 PANEL SCHEDULES
122 E0.1 ELECTRICAL LEGEND AND EXISTING FIXTURE SCHEDULE
123 E0.2 LIGHTING FIXTURE SCHEDULE
124 E0.3 ELECTRICAL SITE PLAN
125 E1.1 FIRST FLOOR LIGHTING DEMOLITION PLAN
98 M0.1 MECHANICAL LEGEND AND ABBREVIATIONS
99 M0.2 MECHANICAL SCHEDULES
100 M1.1 CRAWLSPACE PLUMBING DEMOLTION PLAN
101 M1.2 FIRST FLOOR PLUMBING DEMOLITION PLAN
102 M1.3 SECOND FLOOR PLUMBING DEMOLITION PLAN
103 M1.4 CRAWLSPACE HVAC DEMOLITION PLAN
104 M1.5 FIRST FLOOR HVAC DEMOLITION PLAN
105 M1.6 ATTIC AND SECOND FLOOR HVAC DEMOLITION PLAN
106 M2.1 CRAWLSPACE PLUMBING REMODEL PLAN
107 M2.2 FIRST FLOOR PLUMBING REMODEL PLAN
108 M2.3 SECOND FLOOR PLUMBING REMODEL PLAN
109 M3.1 CRAWLSPACE HVAC REMODEL PLAN
110 M3.2 FIRST FLOOR HVAC REMODEL PLAN
111 M3.3 SECOND FLOOR HVAC REMODEL PLAN
112 M3.4 ATTIC FLOOR HVAC REMODEL PLAN
113 M4.1 ENLARGED MECHANICAL ROOM PLUMBING PLANS
114 M4.2 ENLARGED MECHANICAL ROOM HVAC PLANS
115 M5.1 CRAWLSPACE HVAC SECTION VIEWS
116 M5.2 MECHANICAL ROOM HVAC SECTIONS
117 M5.3 MECHANICAL ROOM HVAC SECTIONS
118 M5.4 ATTIC HVAC SECTION VIEWS
119 M5.5 ATTIC HVAC SECTION VIEWS PART 2
120 M6.1 SCHEMATICS AND DETAILS
121 M6.2 SCHEMATICS AND DETAILS
93 FP1.1 FIRE SPRINKLER PLAN
94 FP1.2 FIRE SPRINKLER PLAN
95 FP1.3 ENLARGED MECHANICAL ROOM PLAN AND RISER DETAILS
96 FP2.1 FIRE SPRINKLER SECTIONS
97 FP3.1 FIRE SPRINKLER DETAILS
63 A1.9 DEMO WALL SECTIONS
64 A1.10 DEMOLITION DETAILS
65 A2.1 FLOOR PLAN - VISITOR CENTER - BASEMENT
66 A2.2 FLOOR PLAN - VISITOR CENTER - FIRST FLOOR
67 A2.3 FLOOR PLAN - SNOW TUNNEL - FIRST FLOOR
68 A2.4 FLOOR PLAN - VISITOR CENTER - SECOND FLOOR
69 A2.5 FLOOR PLAN - VISITOR CENTER - ATTIC
70 A2.6 REFLECTED CEILING PLAN - VISITOR CENTER - FIRST FLOOR
71 A2.7 REFLECTED CEILING PLAN - VISITOR CENTER - SECOND FLOOR
72 A2.8 ROOF PLAN
73 A3.1 EXTERIOR ELEVATIONS
74 A4.1 BUILDING SECTIONS
75 A4.2 WALL SECTIONS
76 A4.3 WALL SECTIONS
77 A5.1 ENLARGED FLOOR PLANS
78 A5.2 INTERIOR ELEVATIONS
79 A5.3 INTERIOR ELEVATIONS
80 A5.4 STAIR PLANS AND SECTIONS
81 A6.1 EXTERIOR DETAILS
82 A6.2 EXTERIOR DETAILS
83 A6.3 EXTERIOR DETAILS
84 A6.4 WINDOW DETAILS
85 A6.5 WINDOW DETAILS
86 A6.6 DOOR DETAILS
87 A6.10 INTERIOR DETAILS
88 A6.11 MISCELLANEOUS DETAILS
89 A6.12 DETAILS
90 A6.13 DETAILS
91 A7.1 OPENING SCHEDULES
92 A7.2 ROOM FINISH & SIGNAGE SCHEDULES
53 A0.1 ABBREVIATIONS & SYMBOLS LEGEND
54 A0.2 WALL ASSEMBLIES
55 A1.1 DEMO PLANS - VISITOR CENTER - BASEMENT
56 A1.2 DEMO PLANS - VISITOR CENTER - FIRST FLOOR
57 A1.3 DEMO PLANS - SNOW TUNNEL - FIRST FLOOR
58 A1.4 DEMO PLANS - VISITOR CENTER - SECOND FLOOR
59 A1.5 DEMO PLANS - ATTIC
60 A1.6 DEMO ROOF PLAN
61 A1.7 DEMO ELEVATIONS
62 A1.8 DEMO SECTIONS
20 S0.1 GENERAL STRUCTURAL NOTES
21 S0.2 GENERAL STRUCTURAL NOTES
22 S0.3 GENERAL STRUCTURAL NOTES
23 S0.4 SPECIAL INSPECTION SCHEDULE
24 S0.5 STRUCTURAL ABBREVIATIONS
25 S0.6 STRUCTURAL SYMBOLS
26 S1.1 DEMO PLANS - VISITOR CENTER - BASEMENT/CRAWL SPACE
27 S1.2 DEMO PLANS - VISITOR CENTER - FIRST FLOOR
28 S1.3 DEMO PLANS - SNOW TUNNEL - FOUNDATION PLAN
29 S1.4 DEMO PLANS - VISITOR CENTER - SECOND FLOOR
30 S1.5 DEMO PLANS - VISITOR CENTER - ATTIC
31 S1.6 DEMO PLANS - VISITOR CENTER - ROOF
32 S2.1 FLOOR PLAN - VISITOR CENTER - BASEMENT/CRAWL SPACE
33 S2.2 FLOOR PLAN - VISITOR CENTER - FIRST FLOOR FRAMING PLAN
34 S2.3 FLOOR PLANS - SNOW TUNNEL - FOUNDATION PLAN
35 S2.4 FLOOR PLAN - VISITOR CENTER - SECOND FLOOR FRAMING PLAN
36 S2.5 FLOOR PLAN - VISITOR CENTER - ATTIC FRAMING PLAN
37 S2.6 FLOOR PLAN - VISITOR CENTER - ROOF FRAMING PLAN
39 S3.1 BUILDING ELEVATIONS
40 S3.2 SHEARWALL ELEVATIONS
41 S3.4 TRUSS ELEVATION
42 S5.1 TYPICAL CONCRETE DETAILS
43 S5.2 FOUNDATION DETAILS
44 S5.3 CONCRETE WALL DETAILS
45 S6.1 TYPICAL FRAMING DETAILS
46 S6.2 FRAMING DETAILS
47 S6.3 FRAMING DETAILS
48 S6.4 SECTIONS AND DETAILS
49 S6.5 SECTIONS AND DETAILS
50 S6.6 SECTIONS AND DETAILS
51 S6.7 SECTIONS AND DETAILS
38 S6.8 SECTIONS AND DETAILS
52 S6.9 SECTIONS AND DETAILS
19 L1.0 LANDSCAPE PLAN
5 -- TOPOGRAPHIC SURVEY COVER
6 --- TOPOGRAPHIC SURVEY
7 C1.0 EXISTING CONDITIONS PLAN
8 C2.0 SITE PROGRAM PLAN
9 C3.0 LANDSCAPE PROTECTION PLAN
10 C3.1 DEMOLITION PLAN
11 C3.2 SITE PLAN
12 C3.3 SITE PLAN
13 C3.4 GRADING PLAN
14 C3.5 UTILITY PLAN
15 C3.6 UTILITY PLAN
16 C4.0 EROSION CONTROL DETAIL & UTILITY NOTES
17 C4.1 SITE DETAILS & BUILDING SECTIONS
18 C4.2 SITE DETAILS
1 - COVER SHEET
2 G1.1 SHEET INDEX
3 G1.2 CODE ANALYSIS
4 G1.3 LIFE SAFETY PLANS
SHEET INDEX
GENERAL
CIVIL
ARCHITECTURAL, CONT
STRUCTURAL
MECHANICAL
ELECTRICAL
SUB SHEET SHEET NAME
FIRE PROTECTION
LANDSCAPE
ARCHITECTURAL
ELECTRICAL, CONT
SHEET SUB SHEET SHEET NAMESHEET SUB SHEET SHEET NAMESHEET
CODE ANALYSIS
OTHER EGRESS COMPONENTS
MIN. EGRESS COMPONENTS WIDTH
(BUILDING EXIT DOORS): 49 (OL/EXIT) X 0.2” = 10” (IBC 1005.3.2)
STAIRWAY EGRESS WIDTH:
2ND FLOOR OL AT STAIR: 14 X 0.2(SPRINKLERS)=2.8” (IBC 1005.3.1)
MIN. WIDTH, 2ND FLOOR OL <50: 36” (IBC 1011.2, EXCEPTION 1); THIS MINIMUM GOVERNS
DIRECTION OF DOOR SWING:
DOORS SHALL SWING IN DIRECTION OF EGRESS WHERE ROOM/AREA HAS OCCUPANT LOAD >50 (1010.1.2.1)
FIRE RATING REQUIREMENTS (IBC TABLE 601)
PRIMARY STRUCTURAL FRAME: 0 HR
BEARING WALLS, EXTERIOR & INTERIOR: 0 HR
NONBEARING WALLS, INTERIOR: 0 HR
FLOOR CONSTRUCTION: 0 HR
ROOF CONSTRUCTION: 0 HR
OTHER FIRE RATING REQUIREMENTS
DUCTS THROUGH HORIZONTAL ASSEMBLIES: COMPLY WITH IBC 717.6.3
INTERIOR EXIT STAIRWAYS COMMUNICATING ONLY BETWEEN TWO STORIES (INCLUDING BASEMENT) NOT REQUIRED TO BE SHAFT ENCLOSURE, PER IBC 1019.3, EXCEPTION 1. INTERIOR EXIT STAIRWAYS SHALL LEAD DIRECTLY TO THE EXTERIOR, 50% CAN EGRESS THROUGH AREAS ON THE LEVEL OF DISCHARGE (SPRINKLER
SYSTEM REQUIRED) PER IBC 1023.1 & 1028.1, EXCEPTION 1.
ROOF ASSEMBLY & ROOF COVERING: CLASS C (IBC TABLE 1505.1) DUE TO APPLICABILITY OF INT'L WILDLAND - URBAN INTERFACE CODE, CLASS B RATED WOOD SHAKES, OVER CLASS A RATED UNDERLAYMENT, WILL BE
PROVIDED.
CORRIDOR FIRE-RESISTANCE RATING:
B & M OCCUPANCIES >30: WITH SPRINKLERS: 0 HR
PLUMBING FIXTURE CALCULATION: (IBC TABLE 2902.1 & IPC TABLE 403.1)
OCC LOAD WC/URINAL LAVS DF SERV SINK
MEN (ASSEM.) 25 1 1
MEN (BUSIN.,MER.) 30 2 1
MEN TOTAL: 55 3 2
WOMEN (ASSEM.) 25 1 1
WOMEN (BUSIN.,MER.) 30 2 1
WOMEN TOTAL: 55 3 2
OTHER 1* 1
EXISTING PROVIDED:
MEN 2/2 2
WOMEN 3 2
UNISEX ON 2ND FLOOR 1 1
OTHER 1* 1
*NO FEWER THAN TWO DRINKING FOUNTAINS SHALL BE PROVIDED (ABA F211.2)
THE REQUIRED EMPLOYEE AND PUBLIC TOILETS SHALL BE LOCATED NOT ONE STORY ABOVE OR BELOW THE SPACE REQUIRED TO BE PROVIDED WITH THE TOILET FACILITIES (IBC 2902.3.2 & IPC 403.3.3)
CRAWLSPACE VENTILATION:
UNDER-FLOOR VENTILATION IS REQUIRED, UNLESS ONE OF THE THREE FOLLOWING EXCEPTIONS APPLY:
- WHERE WARRANTED BY CLIMATIC CONDITIONS, AND VENTILATION OPENINGS TO THE INTERIOR ARE
PROVIDED. (IBC 1203.4.2, EXCEPTION 1)
- WHERE CONTINUOUSLY OPERATED MECHANICAL VENTILATION IS PROVIDED AT A RATE OF 1.0 CFM
FOR EACH 500 SF OF CRAWLSPACE, AND GROUND IS COVERED WITH VAPOR, EXCEPTION 3)
- THE GROUND IS COVERED WITH VAPOR RETARDER, PERIMETER WALLS ARE INSULATED, AND
CRAWLSPACE IS CONDITIONED IN ACCORDANCE WITH IECC. (IBC 1203.4.2, EXCEPTION 4)
EXISTING BUILDING – CLASSIFICATION OF WORK:
ALTERATION: LEVEL 3; IEBC CHAPTERS 7, 8 & 9 APPLY (IEBC 505.1 & 505.2)
CHANGE OF OCCUPANCY: NONE; NO APPLICABLE CHAPTERS (IEBC 506)
HISTORIC BUILDING: YES; CHAPTER 12 APPLIES (IEBC 508)
ACCESSIBILITY – SECOND FLOOR
ELEVATOR TO SECOND FLOOR NOT REQUIRED, PER IBC 1009.2.1.
HOWEVER, PER ABAS F206.2.3 - MULTI-STORY BUILDINGS, ONE ACCESSIBLE ROUTE SHALL CONNECT EACH STORY.
EXCEPTION 6 (ABAS F206.2.3) APPLIES AS LONG AS, PER ABAS F202.5, THE OR SHPO AGREES COMPLIANCE WITH THE REQUIREMENT FOR ACCESSIBLE ROUTE TO THE SECOND FLOOR WOULD THREATEN OR DESTROY THE
HISTORICAL SIGNIFICANCE OF THE BUILDING.
EXCEPTION 2 (ABAS F202.3) ALSO APPEARS TO APPLY. DUE TO OVERRUN REQUIREMENTS OF AN ELEVATOR, THE ONLY POSSIBLE LOCATION IS DOWN THE CENTERLINE OF THE BUILDING. THIS ZONE THROUGH THE FIRST FLOOR WOULD RESULT IN AN ELEVATOR BLOCKING AN EXIT CORRIDOR, OR FALLING WITHIN AN HISTORICALLY IMPORTANT INTERIOR ROOM. THE REQUIREMENT FOR ACCESS TO THE SECOND FLOOR IS TECHNICALLY INFEASIBLE.
ACCESSIBILITY – FIRST FLOOR STORAGE
IN THE SOUTHWEST CORNER OF THE BUILDING IS A STORAGE AREA, THE AREA IS NOT REQUIRED TO BE ON AN ACCESSIBLE ROUTE, PER ABAS (ADVISORY F202.4). THE AREA IS FOR SUPPLIES STORAGE, AND DOES NOT NEED
TO BE CONSIDERED PART OF THE ‘PRIMARY FUNCTION AREA’.
ACCESSIBLE MEANS OF EGRESS:
NOT REQUIRED IN EXISTING BUILDINGS (IBC 1009.1, EXCEPTION 1).
ACCESSIBLE TOILET ROOMS:
EACH TOILET ROOM SHALL BE ACCESSIBLE (IBC 1109.2, ABA F213.2)
AT LEAST ONE OF EACH TYPE OF FIXTURE SHALL BE ACCESSIBLE (IBC 1109.2)
AMBULATORY ACCESSIBLE COMPARTMENT IS NOT REQUIRED PER IBC 1109.2.2
APPLICABLE CODES:
2015 IBC WITH APPENDICES
2015 IEBC WITH APPENDICES
2015 IECC
2015 IMC
2015 IPC
ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS, 2015
7 PRINCIPLES OF UNIVERSAL DESIGN
NFPA 101 (LIFE SAFETY) – USE WHERE IBC IS SILENT
NESC 2012
BUILDING AREA:
STEEL VC SNOW TUNNEL SUBTOTAL
BASEMENT: (455) (455)
(NOT REQUIRED TO BE INCLUDED IN ALLOWABLE BUILDING AREA, PER 506.1.3)
FIRST FLOOR: 3,460* 908 4,368*
SECOND FLOOR: 2,393 2,393
SUBTOTAL: 5,853* 908
TOTAL: 6,761*
(* 146 SF OF EXTERIOR COVERED PORCHES INCLUDED)
CONSTRUCTION TYPE:
TYPE V-B
USE & OCCUPANCY CLASSIFICATION:
B AUDITORIUM, SMALL ASSEMBLY <50 PEOPLE AND <750 SF (303.1.2, 1& 2)
M LOBBY/CLNHA SALES AREA
B ADMINISTRATION, BALANCE OF BUILDING
ALLOWABLE BUILDING HEIGHT & STORIES - MIXED OCCUPANCY:
B & M OCCUPANCIES: 60 FEET (TABLE 504.3) SPRINKLERED
M OCCUPANCIES: 2 STORY (TABLE 504.4) SPRINKLERED
B OCCUPANCY: 3 STORIES (TABLE 504.4) SPRINKLERED
ACTUAL BUILDING HEIGHT & STORIES - MIXED OCCUPANCY:
30 FEET
M OCCUPANCY: LIMITED TO FIRST STORY
B OCCUPANCY: 2 STORIES
ALLOWABLE AREA – MIXED-OCCUPANCY, MULTISTORY BUILDING:
EACH STORY OF A MIXED-OCCUPANCY BUILDING WITH MORE THAN ONE STORY SHALL INDIVIDUALLY COMPLY WITH REQUIREMENTS OF 508.1 (506.2.4). THE ALLOWABLE BUILDING AREA OF THE PORTION OF BUILDING SHALL
BE BASED ON THE MOST RESTRICTIVE ALLOWANCES FOR THE OCCUPANCY GROUP (508.3.2)
ALLOWABLE AREA
FACTOR (TBL 506.2) ACTUAL AREAS
BASEMENT
B 9000 SF (NS) 455 SF
FIRST STORY
M 9000 SF (NS) 927 SF
B 9000 SF (NS) 2533* SF
SECOND STORY
B 9000 SF (NS) 2393 SF
OCCUPANT LOAD CALCULATION:
BASEMENT AREA OLF OCCUPANT LOAD
MECHANICAL 455 SF 1/300 2
TOTAL PER FLOOR: 2
FIRST FLOOR
ASSEMBLY (AUDIT’M) (564 SF) 1/SEATS 49
MERCANTILE 1010 SF 1/60 17
STORAGE 94 SF 1/300 1
BUSINESS 1046 SF+ 1/100 10
TOTAL PER FLOOR: 65
(+ 1,054 SF OF EXTERIOR COVERED PORCHES AND SNOW TUNNEL EXCLUDED FROM DETERMINATION OF
OL WITHIN BUILDING)
SECOND FLOOR
INTERP WORKSHOP 488 SF ACTUAL OL 17
BUSINESS 1424 SF 1/100 14
LIBRARY 441 SF 1/50 9
STORAGE 53 SF 1/300 1
TOTAL PER FLOOR: 41
TOTAL: 108
STORIES WITH ONE EXIT:
BASEMENT (B OCCUPANCY) ALLOWED FOR <50 OCCUPANTS, MAXIMUM
COMMON PATH EGRESS TRAVEL 100 FT (TABLE
1006.3.2 (2), FOOTNOTE B – SPRINKLERED BUILDING)
EXIT ACCESS TRAVEL DISTANCE:
MEASURED FROM MOST REMOTE POINT, ALONG NATURAL PATH, TO THE ENTRANCE TO AN EXIT. (IBC TABLE 1017.2)
OCCUPANCY: WITH SPRINKLERS:
M 250 FT
B 300 FT
COMMON PATH OF EGRESS TRAVEL: (IBC TABLE 1006.2.1)
B OCCUPANCY (2ND FLOOR) OL<30 WITH SPRINKLERS: 100 FT
FIRE PROTECTION – SPRINKLER SYSTEM:
BUILDING NOT REQUIRED TO HAVE SPRINKLER, DUE TO OCCUPANCY 903.2.1.3 & 903.2.7
STANDPIPE SYSTEM NOT REQUIRED IN EXISTING BUILDINGS: 905.1
NOT REQUIRED FOR ALLOWABLE AREA FACTOR TABLE 506.2, NS FACTOR
SPRINKLER SYSTEM REQUIRED TO MEET STAIR SEPARATION 1007.1.1, EXCEPTION 2
CORRIDOR EGRESS WIDTH:
AREAS WITH OL <50 (SECOND FLOOR): 36” (TABLE 1020.2)
BALANCE OF FACILITY: 44” (TABLE 1020.2)
SHEET
PMIS/PKG NO.
DRAWING NO.
142813
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF 1521/
5/
2:
:5
A
M B
IM
.0
S
T E
E L
V
IS
IT
O
R C
E N
T E
R
-0
_C
R
LA
.r vt
M. BARTOLOME
Checker
B. KLUG
G1.2
CODE ANALYSIS
CRATER LAKE NATIONAL PARK
2020.11.20
198641
UP
UP
DN
UP
UP
COMMON PATH EGRESS TRAVEL
ACCESSIBLE ROUTE
FIRE EXTINGUISHER LOCATION
GENERAL FIRE / LIFE SAFETY NOTES
LEGEND
RM NO
ROOM
NAME
XXXXXX XXXX
X
NET SF
NUMBER OF OCCUPANTS
NUMBER OF EXITS REQUIRED
IBC OCCUPANCY CLASSIFICATION
42 OCCUPANT LOAD THRU EXIT
DOOR CLEARANCE PER ABA
TURNING RADIUS PER ABA
FE
DISTANCE
EXIT ACCESS TRAVEL DISTANCE
TERRACE
UP
DN
DN
DFDF NEW HANDRAILS
NEW RAMP 1:12
NEW LANDING
AUDITORIUM
B 49
495M
VISITOR'S
LOBBY /
SALES
122B
ENTRY 1
2 UP
103B
POST
OFFICE
119B
OFFICE
55S2
UTILITY
STOR ROOM
* OL BASED ON PRIMARILY B OCCUPANCY GROSS AREA
CORRIDOR
LAV
STAIR 1
STOR
73B
ED SPEC
371A3
PARK
LIBRARY
48B
QUIET
ROOM
160' - 3"
ACTUAL OL
45' - 1"
395S2
MECHANICAL
ROOM
159' - 1"
48' - 10"
SHEET
PMIS/PKG NO.
DRAWING NO.
142813
SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
OF 1521/
5/
2:
:0
A
M B
IM
.0
S
T E
E L
V
IS
IT
O
R C
E N
T E
R
-0
_C
R
LA
.r vt
M. BARTOLOME
Checker
B. KLUG
G1.3
LIFE SAFETY PLANS
CRATER LAKE NATIONAL PARK
2020.11.20
198641
G1.3
2 GROUND FLOOR PLAN
G1.3
1 SECOND FLOOR PLAN
G1.3
3 BASEMENT PLAN
BLDG.8 0 8 16
SCALE OF FEET
SNOW TUNNELVISITOR CENTER
KEY PLAN
CONTROL MONUMENTS USED THIS SURVEY
HORIZONTAL CONTROL:
VERTICAL CONTROL:
UTILITY NOTE:
SD
SD
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X
X X
X X
X X
X X
X
X
X
X
SAGER BUILDING
(ADMIN)
POLE
BARN
RI
M
D
RI
VE
STONE
HOUSE
STONE
HOUSE
CANFIELD
BUILDING
TRAILS
BUILDING
POLE
BARN
POLE
BARN
STEEL
VISITOR
CENTER
M
UN
SO
N
CR
EE
K
MAIN
ENTRY
ABA
ABA
TRAIL TO STONE HOUSES
LADY OF THE WOODS TRAIL
SNOW
TUNNEL
FFE: 6474.18'
FFE: 6473.06'
FFE: 6473.14'
FFE: 6474.16'
WAREHOUSE
BUILDING
(+/- 4,400 SF)
STAFF
ENTRY
ENTRY
SD
SD
SHEET
PMIS/PKG NO.
DRAWING NO.SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
1/2 9/2
0 1
:55 :15
P M
\\a nc
-fs \A
NC
-P ro jec ts\
\62
1-
\65
CA
D\ La nd sc ap e\_
CD
\P
LA
NS
\S
VC
\C
-E
CO
N.
dw g
P Gaynor
B Doggett
P Gaynor
CRATER LAKE NATIONAL PARK
2020.11.20
198641 of 152
142813
C1.0
EXISTING CONDITIONS
PLAN
PLAN LEGEND:
PROJECT CONSTRUCTION BOUNDARY (+/- 22,846 SF)
EXISTING ELECTRICAL SERVICE LINE
EXISTING WATER LINE
EXISTING SANITARY SEWER LINE
EXISTING 6" STORM DRAIN PIPE - REPLACE IF DAMAGED BY
CONSTRUCTION (LOCATION PER 1990 RENOVATION PLANS)
EXISTING 4" PVC LANDSCAPE AREA DRAIN LINES - REPLACE
IF DAMAGED BY CONSTRUCTION (LOCATION PER 1990
RENOVATION PLANS)
EXISTING ELECTRICAL VAULTS
EXISTING COMMUNICATIONS J-BOX
EXISTING 2" WATER VALVE
EXISTING SANITARY SEWER MANHOLE
EXISTING STORM CATCH BASIN
EXISTING SNOW DELINEATOR MOUNTING HOLE
EXISTING WATER FOUNTAIN
EXISTING SIGN / POST
EXISTING FLAGPOLE
EXISTING HEATED PAVING AREA
EXISTING CONIFER TREE TO REMAIN
(CANOPY DRIP-LINES ARE BASED ON AERIAL IMAGERY)
EXISTING SHRUB MASSING TO REMAIN
WETLAND
E E
W W
SS
SD
SD1
SD2
SD3
SD4
SD5
12" DIA. LOG BOLLARDS
(TYP BOTH SIDES)
ACCESS ROAD
FOOT BRIDGE
EXISTING 8" ALUMINUM PIPE
INV EL: 6468.88'
"LADY OF
THE WOODS"
TRAIL SIGN "ONE WAY"
SIGNS
"VISITOR CENTER"
SIGN
"STOP"
SIGN
"YIELD"
SIGN
FOOT BRIDGE
FEE AND PAMPHLET BOXES
EXISTING FLAGSTONE
PATIO AND SEATWALL
TRASH CAN
EXISTING 4" PVC BUILDING
CRAWL SPACE DRAINS
GID
UOYEROFEB
LLAC
OREGON UTILITY
NOTIFICATION CENTER
1-800-332-2344
UNDERGROUND UTILITY LOCATIONS SHOWN ARE
BASED UPON VARIOUS RECORD UTILITY MAPS IN
CONJUNCTION WITH VISIBLE EVIDENCE GATHERED
DURING THE TIME THE FIELD SURVEY WAS
PERFORMED. THEREFORE, ALL UNDERGROUND
UTILITY LOCATIONS SHOULD BE FIELD VERIFIED
PRIOR TO CONSTRUCTION.
EXISTING PARKING LOT:
(24) STANDARD STALLS
(2) ABA ACCESSIBLE STALLS
EXISTING PARKING LOT:
(10) STANDARD STALLS
HYDRANT
SS1
SS3
SS2
SS4
AC
C
ESS R
O
AD
EXISTING PARKING LOT FOR
SAGER BUILDING STAFF:
(17) STANDARD STALLS
(1) ADA STALL
WINTER ROAD ACCESS MAP
ORIGINAL IMAGE COPYRIGHT DOI NPS 2020
SITE INFORMATION
LOCATED WITHIN THE BOUNDARY OF CRATER LAKE NATIONAL PARK, KLAMATH COUNTY,
CRATER LAKE, OREGON.
DATUM
HORIZONTAL CONTROL:
COORDINATES ARE NAD83(2011) OREGON STATE PLANE SOUTH COORDINATES
EXPRESSED IN US SURVEY FEET. THE BASIS OF COORDINATES IS THE PUBLISHED NGS
OPUS VALUES FOR STATION "CL-10A", A BRASS DISK IN THE CONCRETE STAIRS TO THE
ADMINISTRATION BUILDING AT THE CRATER LAKE NATIONAL PARK VISITOR CENTER. ALL
GROUND DISTANCES WERE CONVERTED TO STATE PLANE GRID VALUES USING A
COMBINED SCALE FACTOR OF 0.99959951.
VERTICAL CONTROL:
ELEVATIONS ARE NAVD88 EXPRESSED IN US SURVEY FEET. THE BASIS OF ELEVATIONS
IS THE PUBLISHED GEOID 12B DERIVED ORTHOMETRIC HEIGHT FOR NGS OPUS DB
STATION ""CL-10A"", A BRASS DISK IN THE CONCRETE STAIRS TO THE ADMINISTRATION
BUILDING AT THE CRATER LAKE NATIONAL PARK VISITOR CENTER. ALL OTHER
ELEVATIONS WERE TRANSFERRED USING STATIC GNSS SURVEYING TECHNIQUES.
SD6
* Heavy Storms May Close Park HQ
UTILITY LOCATE
OPTIONS ARE LISTED IN
SPECIFICATIONS.
STORAGE AREAS
CRATER LAKE
UNION PEAK
CRATER LAKE HIG
HW
AY
ORIGINAL IMAGE COPYRIGHT GOOGLE 2020
POLE CREEK
LOCATION
(SOIL STORAGE)
SOUTH YARD
(LONG TERM
STORAGE)
R
IM
D R
IV
E
PROJECT SITE
R im
D riv e
THIS PROJECT
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X
X X
X X
X X
X X
X
X
X
X
W
W
W
W
W
SAGER BUILDING
(ADMIN)
STEEL
VISITOR
CENTER
M
UN
SO
N
CR
EE
K
MAIN
ENTRY
ABA
ABA
TRAIL TO STONE HOUSES
LADY OF THE WOODS TRAIL
SNOW
TUNNEL
FFE: 6474.18'
FFE: 6473.06'
FFE: 6473.14'
FFE: 6474.16'
(+/- 4,400 SF)
STAFF
ENTRY
ENTRY
SD
SD
SD
SD
SHEET
PMIS/PKG NO.
DRAWING NO.SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
1/2 9/2
0 1
:55 :15
P M
\\a nc
-fs \A
NC
-P ro jec ts\
\62
1-
\65
CA
D\ La nd sc ap e\_
CD
\P
LA
NS
\S
VC
\C
-P
RO
G.
dw g
P Gaynor
B Doggett
P Gaynor
CRATER LAKE NATIONAL PARK
2020.11.20
198641 of 152
142813
C2.0
SITE PROGRAM PLAN
SITE PROGRAM NOTES:
1 RESTORE THE SUB-GRADE AND FINISH GRADE SOIL
CONDITIONS FOR THE LANDSCAPE REHABILITATION
RE-INSTALL PAVING AT ALL FOUR BUILDING ENTRIES. THE
SUB-GRADE AND FINISH GRADE SOIL CONDITIONS FOR THE
LANDSCAPE REHABILITATION. HEATED PAVING SECTIONS
SHALL BE REMOVED WHERE HATCHED TO INSTALL
INSULATION UNDER THE PROPOSED HEATED CONCRETE SLAB.
3 PHOTO DOCUMENT AND INVENTORY FLAGSTONE PATIO AND
FIELDSTONE WALLS IN PLACE. REMOVE, INVENTORY,
STOCKPILE AND RE-INSTALL ANY PORTIONS AFFECTED BY
FOUNDATION EXCAVATION. INSTALL A NEW CONCRETE SLAB
UNDER THE RE-INSTALLED PATIO TO PROVIDE STRUCTURAL
SUPPORT FOR FLAGSTONES.
4 UTILITY CONNECTIONS TO INCLUDE: SEWER, ELECTRICAL,
AND COMMUNICATION MAY REQUIRE PARTIAL EXCAVATION
AND PROTECTION FOR THE DURATION OF THE CONSTRUCTION
PERIOD.
DURING OPEN TRENCH CONSTRUCTION, DISCONNECT AND
REMOVE THE EXISTING 2" WATER TAP, WATER LINES AND
ISOLATION VALVES SERVICING THE BUILDING. INSTALL A NEW
4-INCH WATER TAP ON PARK EXISTING 4" WATER MAIN
LOCATED IN THE ACCESS ROAD PAVING. INSTALL A NEW 4"
SERVICE LINE AND ISOLATION VALVES TO THE BUILDING
BASEMENT MECHANICAL ROOM. REFER TO UTILITY PLAN
SHEET C3.4 AND MECHANICAL DRAWINGS FOR ADDITIONAL
INFORMATION.
'ROADWAY ACCESS TO SAGER SNOW TUNNEL AND STONE
HOUSES WILL BE REQUIRED DURING THE CONSTRUCTION
PERIOD. ALL OPEN TRENCHES MUST BE COVERED AT THE END
OF EACH CONSTRUCTION DAY. CONTRACTOR TO SUPPLY A
PLAN FOR TRENCHING IN ROADWAY AREAS.'
REPLACE RAMP TRANSITION TO MEET ABAAS STANDARDS.
PLAN LEGEND:
PROJECT CONSTRUCTION BOUNDARY (+/- 22,846 SF)
PROJECTED LIMITS OF EXCAVATION FOR BUILDING
FOUNDATION SHORING +/- 6' FROM FOUNDATION
WALL. (+/- 1,698 SF)
ADDITIONAL EXCAVATION FOR UTILITY AND
HARDSCAPE UPGRADES, REPLACEMENT OR
REPAIR. (+/- 1,755 SF)
EXISTING ELECTRICAL SERVICE LINE
EXISTING 2" WATER LINE
EXISTING SANITARY SEWER LINE
EXISTING 6" STORM LINE - REPLACE IF DAMAGED BY
CONSTRUCTION. (LOCATION PER 1990 RENOVATION
PLANS)
EXISTING 4" PVC LANDSCAPE AREA DRAIN LINES:
REPLACE IF DAMAGED BY CONSTRUCTION
(LOCATION PER 1990 RENOVATION PLANS)
TEMPORARY SITE SECURITY FENCING: 6'
CHAIN-LINK MOUNTED ON STANDARD CONCRETE
BARRIER
EXISTING ELECTRICAL VAULTS
EXISTING COMMUNICATIONS J-BOX
EXISTING WATER VALVE
EXISTING SANITARY SEWER MANHOLE
EXISTING STORM CATCH
BASIN -REPLACE IF
DAMAGED
EXISTING SNOW
DELINEATOR MOUNTING
HOLE
EXISTING WATER FOUNTAIN
EXISTING SIGN / POST
EXISTING FLAGPOLE
EXISTING CONIFER TREE TO
REMAIN (CANOPY DRIP
-LINES ARE BASED ON
AERIAL IMAGERY)
EXISTING SHRUB MASSING
TO REMAIN
E E
W W
SS
SD
PROPOSED FLAGSTONE
PAVING
PROPOSED HEATED PAVING
PROPOSED EXPOSED
AGGREGATE PAVING
PROPOSED 4" C900 WATER
LINE (+/- 130 LF)
PROPOSED 4" WATER VALVE
ACCESSIBILITY ROUTE
W W
GENERAL NOTE:
'ROCKS ENCOUNTERED DURING THE
EXCAVATION PROCESS WILL BE REUSED AT THE
DISCRETION OF PROJECT CO AND NPS PARK
STAFF. ANY ROCKS NOT INTENDED FOR RE-USE
WILL BE TRANSPORTED TO POLE CREEK BRIDGE.'
BURIED UTILITIES
WILL LIKELY LIMIT
EXCAVATION TO
THE WEST. 15
AREA 1: CONTRACTOR
STAGING & STOCKPILE
(+/- 1,500 SF)
TEMPORARY
GATE ACCESS
ST
EE
L
VI
SI
TO
R C
EN
TE
R
SAGER BUILDING(ADMIN)
AREA 2 : CONTRACTOR STAGING & STOCKPILE
(PREFERRED TRAILER LOCATION)
( +/- 6,715 SF)
AREA 2 : CONTRACTOR
STAGING & STOCKPILE
AREA 3 : CONTRACTOR
STAGING & STOCKPILE
( +/- 3,190 SF)
AREA 1: CONTRACTOR
STAGING & STOCKPILE
(+/- 1,500 SF)
CONTRACTOR SNOW REMOVAL
AREA (+/- 370 SF)
CONTRACTOR SNOW
REMOVAL AREA (+/- 355 SF)
7 7
RIM
D
RIV
E
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X
X X
X X
X X
X X
X
X
X
X
W
W W
W
W
SAGER BUILDING
(ADMIN)
RI
M
D
RI
VE
STEEL
VISITOR
CENTER
M
UN
SO
N
CR
EE
K
MAIN
ENTRY
ABA
ABA
TRAIL TO STONE HOUSES
LADY OF THE WOODS TRAIL
SNOW
TUNNEL
FFE: 6474.18'
FFE: 6473.06'
FFE: 6473.14'
FFE: 6474.16'
(+/- 4,400 SF)
STAFF
ENTRY
ENTRY
6466 6469
SD
SD
SHEET
PMIS/PKG NO.
DRAWING NO.SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
1/2 9/2
0 1
:55 :15
P M
\\a nc
-fs \A
NC
-P ro jec ts\
\62
1-
\65
CA
D\ La nd sc ap e\_
CD
\P
LA
NS
\S
VC
\C
-L
SP
R.
dw g
P Gaynor
B Doggett
P Gaynor
CRATER LAKE NATIONAL PARK
2020.11.20
198641 of 152
142813
C3.0
LANDSCAPE
PROTECTION PLAN
FINISH GRADE
FINISH GRADE
PLAN LEGEND
TEMPORARY
GATE ACCESS
PROPOSED 4" C900 WATER LINE (+/- 130 LF)
PROPOSED 4" WATER VALVE
PROPOSED HEATED PAVING AREA
W W
TREE PROTECTION NOTES
CONTRACTOR TO PROTECT ALL TREES AND SHRUBS WITHIN
AND ADJACENT TO THE PROJECT CONSTRUCTION BOUNDARY.
TREE PROTECTION MEASURES SHALL REMAIN IN PLACE FOR
THE DURATION OF THE CONSTRUCTION PERIOD.
INSTALL TREE PROTECTION FENCING AS INDICATED ON PLAN
AND DETAIL 1 ON THIS SHEET.
GALVANIZED CHAIN-LINK
FENCING AND POLES TO BE
SET AROUND TREE OR
GROUPS OF TREES.
TREE DRIPLINE
DIAMETER VARIES
6'-0" MIN
EXISTING CONIFER TREE TO
REMAIN. REFER TO PLAN
SHEET FOR LOCATIONS.
DETAIL: TREE PROTECTION FENCING
SCALE: N.T.S.
INSTALL SHURB PROTECTION FENCING AS INDICATED ON
PLAN AND DETAIL 2 ON THIS SHEET.
SHRUB MASS IS ANTICIPATED FOR REMOVAL AND WILL NOT
BE SUBJECT TO PROTECTION MEASURES. REFER TO
DEMOLITION PLAN ON SHEET C3.1 FOR ADDITIONAL
INFORMATION. BUILDING FOUNDATION EXCAVATION MAY
IMPACT ROOTS OF THE EXISTING MOUNTAIN ASH. SHRUB
REPLACEMENT IS NOT A PART OF THE CURRENT
RESTORATION EFFORT. IF MOUNTAIN ASH IS REQUESTED TO
INFILL AGAINST THE FOUNDATION, THESE PLANTS WILL
REQUIRE SOURCING BY PARK STAFF BIOLOGISTS.
GALVANIZED CHAIN-LINK
FENCING AND POLES TO BE
SET AROUND TREE OR
GROUPS OF TREES.
SHRUB MASSING
DIAMETER VARIES
6'-0" MIN
EXISTING SHRUBS AND
UNDER-STORY PLANTINGS TO
REMAIN. REFER TO PLAN
SHEET FOR LOCATIONS.
DETAIL: SHRUB / UNDER-STORY PROTECTION FENCING
SCALE: N.T.S.
ADJUST FENCING UNDER THIS TREE TO ACCOUNT FOR THE
LIMITS OF BUILDING FOUNDATION EXCAVATION. NOTIFY
CONTRACTING OFFICER IF ANY TREE ROOTS ARE
ENCOUNTERED GREATER THAN 1.5" IN DIAMETER.
GENERAL NOTES:
1. PROVIDE CURB PROTECTION WHERE CONTRACTOR WILL NEED TO
MOUNT CURB TO DELIVER MATERIALS TO BUILDING. LOCATION TO BE
DETERMINED BY NATIONAL PARK STAFF AND APPROVED BY
CONTRACTING OFFICER. CONTRACTOR TO PROVIDE SPECIFIC CURB
PROTECTION METHODS IN THEIR WORK PLAN.
PROJECT CONSTRUCTION BOUNDARY (+/- 22,846 SF)
EXISTING 4" PVC LANDSCAPE AREA DRAIN LINES:
REPLACE IF DAMAGED BY CONSTRUCTION
(LOCATION PER 1990 RENOVATION PLANS)
TEMPORARY SITE SECURITY FENCING: 6' CHAIN-LINK
MOUNTED ON STANDARD CONCRETE BARRIER
EXISTING ELECTRICAL VAULTS
EXISTING COMMUNICATIONS J-BOX
EXISTING WATER VALVE
EXISTING SANITARY SEWER MANHOLE
EXISTING STORM CATCH BASIN - REPLACE IF
DAMAGED
EXISTING SNOW DELINEATOR MOUNTING HOLE
EXISTING WATER FOUNTAIN
EXISTING SIGN / POST
EXISTING FLAGPOLE
EXISTING CONIFER TREE TO REMAIN
(CANOPY DRIP-LINES ARE BASED ON AERIAL
IMAGERY)
EXISTING SHRUB MASSING TO REMAIN
WETLAND
PROPOSED PREP AREA
(PARK STAFF TO SEED AT A LATER DATE)
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X
X X
X
X
SAGER BUILDING
(ADMIN)
STEEL
VISITOR
CENTER
M
UN
SO
N
CR
EE
K
MAIN
ENTRY
ABA
ABA
TRAIL TO STONE HOUSES
LADY OF THE WOODS TRAIL
SNOW
TUNNEL
FFE: 6474.18'
FFE: 6473.06'
FFE: 6473.14'
FFE: 6474.16'
(+/- 4,400 SF)
STAFF
ENTRY
ENTRY
6466 6469
SD
SD
SD
CONTROL MONUMENTS USED THIS SURVEY
SHEET
PMIS/PKG NO.
DRAWING NO.SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
1/2 9/2
0 1
:55 :15
P M
\\a nc
-fs \A
NC
-P ro jec ts\
\62
1-
\65
CA
D\ La nd sc ap e\_
CD
\P
LA
NS
\S
VC
\C
-D
EM
O.
dw g
P Gaynor
B Doggett
P Gaynor
CRATER LAKE NATIONAL PARK
2020.11.20
198641 of 152
142813
C3.1
DEMOLITION PLAN
1. NOTIFY CONTRACTING OFFICER FIVE (5) BUSINESS DAYS BEFORE COMMENCEMENT OF WORK.
2. LOCATION OF EXISTING UTILITIES ARE BASED UPON AVAILABLE INFORMATION. IT IS THE CONTRACTOR'S RESPONSIBILITY TO FIELD VERIFY DEPTH AND LOCATION OF EXISTING UTILITIES
PRIOR TO CONSTRUCTION AND INFORM THE CONTRACTING OFFICER OF ANY DISCREPANCIES IN
THE PLANS. CALL FOR LOCATES AT LEAST 24 HOURS PRIOR TO COMMENCEMENT OF GRADING
(1-800-332-2344).
3. THE CONTRACTOR SHALL AT ALL TIMES ABIDE BY APPLICABLE SAFETY RULES OF OSHA.
4. THE CONTRACTOR SHALL AT ALL TIMES ABIDE BY ALL APPROPRIATE CODES, LAWS AND
REGULATIONS THAT GOVERN CONSTRUCTION WITHIN THE STATE OF OREGON.
5. THE CONTRACTOR IS RESPONSIBLE TO REPLACE ANY SURVEY MONUMENTS THAT ARE DISTURBED
DUE TO CONSTRUCTION.
6. ALL CONSTRUCTION SHALL CONFORM TO PROJECT PLAN DOCUMENTS AND SPECIFICATIONS.
7. THE CONTRACTOR IS RESPONSIBLE FOR MAKING ARRANGEMENTS FOR ALL INSPECTIONS AND
TESTING.
8. THE CONTRACTOR SHALL NOTIFY THE APPROPRIATE INSPECTION DEPARTMENT 24 HOURS PRIOR
TO CONSTRUCTION. CONCEALED CONSTRUCTION WITHOUT THE REQUIRED EXPOSURE SHALL BE
SUBJECT TO INSPECTION AT THE CONTRACTOR'S EXPENSE.
9. SIGNIFICANT VARIATION AND DEGREE OF EROSION CONTROL EFFORT WILL BE DICTATED BY
WEATHER CONDITIONS. THE CONTRACTOR SHOULD BE PREPARED TO PROVIDE EXTRA EROSION
CONTROL PROVISIONS AND EFFORT DURING WINTER AND WET WEATHER CONDITIONS BEYOND
WHAT IS REQUIRED DURING SUMMER AND DRY WEATHER CONDITIONS. FINE GRAINED AND
UNCONSOLIDATED SOILS ON GRADED SLOPES MAY BECOME UNSTABLE WHEN SUBJECT TO
EXCESSIVE MOISTURE.
10. DEMOLISH / REMOVAL NOT SPECIFICALLY LISTED, BUT REQUIRED TO COMPLETE SITE/UTILITY AND
GRADING PLANS SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR.
11. ALL CONSTRUCTION DEBRIS TO BE REMOVED FROM SITE AND RECYCLED / DISPOSED OF
ACCORDING TO LOCAL REGULATIONS.
12. CONTRACTOR TO COORDINATE WITH CONTRACTING OFFICER TO MAINTAIN SITE ACCESS AND
UTILITIES. NOTIFY CONTRACTING OFFICER PRIOR TO ANY TEMPORARY UTILITY SHUTDOWNS.
NOTIFY CONTRACTING OFFICER PRIOR TO ANY DEMOLITION WORK.
GENERAL DEMOLITION NOTES
EROSION CONTROL NOTES
CONTRACTOR TO INSTALL, INSPECT AND MAINTAIN EROSION CONTROL FENCING PER
THROUGHOUT CONSTRUCTION. REFER TO SHEET C4.0 FOR ADDITIONAL DETAILING.
TREE / SHRUB MASSING / UNDER-STORY NOTE
REFER TO TREE PROTECTION PLAN, SHEET C3.0, PRIOR TO
WORKING AROUND TREES, SHRUB MASSINGS AND UNDER-STORY
PLANTINGS. EXCAVATION AND DEMOLITION WORK AROUND TREES
MAY REQUIRE AN ARBORIST ONSITE TO ENSURE SURVIVABILITY OF
EXISTING TREES.
CONTRACTOR TO INSTALL, INSPECT AND MAINTAIN INLET PROTECTION MEASURES
THROUGHOUT CONSTRUCTION. REFER TO SHEET C4.0 FOR ADDITIONAL DETAILING.
CONTRACTOR TO PROVIDE CONCRETE WASHOUT. WASH ALL CONCRETE EQUIPMENT
PRIOR TO LEAVING PROJECT WORK AREA LIMITS. REFER TO SHEET C4.0 FOR
ADDITIONAL DETAILING.
DEMOLITION NOTES
EXISTING SHRUB MASSING OF MOUNTAIN ASH TO BE REMOVED. (+/- 120 SF)1
REMOVE EXISTING HEATED WALKWAY CONCRETE PAVING AND ALL BASE COURSE MATERIAL
FROM MAIN ENTRY WALKWAY. SALVAGE ANY WALKWAY ELECTRICAL COMPONENTS NOT
COMPROMISED BY CONCRETE SLAB EXCAVATION AND STORE FOR RE-INSTALLATION AT THE
COMPLETION OF FOUNDATION EXCAVATION AND CONSTRUCTION FOR SEISMIC UPGRADES.
(+/- 325 SF)
PHOTO DOCUMENT PRIOR TO REMOVING ANY EXISTING FLAGSTONE PATIO STONES, STONE
SEAT WALLS OR TIMBER RAILS. CATALOG STONES NUMERICALLY. STORE ALL STONE AND
WOOD TIMBERS FOR RE-INSTALLATION AT THE COMPLETION OF FOUNDATION EXCAVATION
AND CONSTRUCTION FOR SEISMIC UPGRADES. MINIMIZE REMOVAL / RECONSTRUCTION
EXTENTS.
REMOVE EXISTING SURFACE VEGETATION AND TOPSOIL LAYER, IF PRESENT. SALVAGE
ANY TOPSOIL ENCOUNTERED FOR RE-USE IN LANDSCAPE PLANTING AREAS. (+/- 2,548 SF)
REMOVE EXISTING WALKWAY CONCRETE PAVING AND ALL BASE COURSE MATERIAL. (+/- 212 SF)6
REFER TO M.E.P. PLANS FOR LIMITS OF HEATED PAVING AND HEAT TRACE INSTALLATION AT
SNOW TUNNEL ENTRY.
7 REMOVE EXISTING WATER LINE BETWEEN BUILDING AND GATE VALVE IN ROADWAY.
(TRENCHING IS FACTORED INTO BASE EXCAVATION LIMITS). 7-DAY ADVANCE NOTICE TO
NATIONAL PARK SERVICE IS NEEDED FOR DISRUPTIONS TO SITE ACCESS AND/OR UTILITIES.
TEMPORARY
GATE ACCESS
PLAN LEGEND
PROJECT CONSTRUCTION BOUNDARY (+/- 22,846 SF)
PROJECTED LIMITS OF EXCAVATION FOR BUILDING
FOUNDATION SHORING +/- 6' FROM FOUNDATION
WALL.(+/- 1,698 SF)
ADDITIONAL EXCAVATION FOR UTILITY AND HARDSCAPE
UPGRADES, REPLACEMENT OR REPAIR. (+/- 1,755 SF)
EXISTING ELECTRICAL SERVICE LINE
EXISTING 2" WATER LINE
EXISTING SANITARY SEWER LINE
EXISTING 6" STORM LINE - REPLACE IF DAMAGED BY
CONSTRUCTION. (LOCATION PER 1990 RENOVATION
PLANS)
EXISTING 4" PVC LANDSCAPE AREA DRAIN LINES:
REPLACE IF DAMAGED BY CONSTRUCTION
(LOCATION PER 1990 RENOVATION PLANS)
TEMPORARY EROSION CONTROL PROTECTION FENCING
TEMPORARY ON-GRADE TREE PROTECTION FENCING
TEMPORARY SITE SECURITY FENCING: 6' CHAIN-LINK
MOUNTED ON STANDARD CONCRETE BARRIER
EXISTING ELECTRICAL VAULTS
EXISTING COMMUNICATIONS J-BOX
EXISTING WATER VALVE
EXISTING SANITARY SEWER MANHOLE
EXISTING STORM CATCH BASIN - REPLACE IF DAMAGED
EXISTING SNOW DELINEATOR MOUNTING HOLE
EXISTING WATER FOUNTAIN
EXISTING SIGN / POST
EXISTING FLAGPOLE
EXISTING HEATED PAVING AREA
EXISTING FLAGSTONE
EXISTING CONCRETE PAVING
EXISTING CONIFER TREE TO REMAIN
(CANOPY DRIP-LINES ARE BASED ON AERIAL IMAGERY)
EXISTING SHRUB MASSING TO REMAIN
EXISTING CONTROL MONUMENTS
PROPOSED SHRUB REMOVAL
E E
W W
SS
SD
X X
EXISTING FIREHOUSE VALVE AND WATERLINE TO BE REMOVED FROM EXTERIOR FACE OF
STONEWALL AND CAPPED ON THE OUTSIDE OF THE SNOW TUNNEL.
REMOVE SANITARY SEWER CONNECTION BETWEEN MAINLINE AND BUILDING. CAP EXISTING
SANITARY SEWER MAINLINE TO PRESERVE FUNCTIONALITY AND INTEGRITY UNTIL THE
COMPLETION OF PROPOSED SANITARY SEWER IMPROVEMENTS. REFER TO MEP PLANS FOR
YARD CLEAN-OUT LOCATION.
REMOVE DRAIN LINE FROM GRATE TO EXTENT NECESSARY TO ACCOMMODATE FOR
EXCAVATION.
CL-10A
REMOVE EXPOSED AGGREGATE WALKWAY PAVING AND RAMP TRANSITION.11
REMOVE STONE CURB IN AREAS OF WALKWAY REPLACEMENT. REMOVE STONE CURB IN FULL
SEGMENTS, DO NOT SAW-CUT STONE. STOCKPILE STONE CURB SEGMENTS AT POLE CREEK
YARD.
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X
X X
X X
X X
X X
X
X
X
X
W
W W
W
W
SAGER BUILDING
(ADMIN)
RI
M
D
RI
VE
STEEL
VISITOR
CENTER
M
UN
SO
N
CR
EE
K
MAIN
ENTRY
ABA
ABA
TRAIL TO STONE HOUSES
LADY OF THE WOODS TRAIL
SNOW
TUNNEL
FFE: 6474.18'
FFE: 6473.06'
FFE: 6473.14'
FFE: 6474.16'
(+/- 4,400 SF)
STAFF
ENTRY
ENTRY
6466 6469
SD
SD
SHEET
PMIS/PKG NO.
DRAWING NO.SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
1/2 9/2
0 1
:55 :15
P M
\\a nc
-fs \A
NC
-P ro jec ts\
\62
1-
\65
CA
D\ La nd sc ap e\_
CD
\P
LA
NS
\S
VC
\C
-S
IT
E.
dw g
P Gaynor
B Doggett
P Gaynor
CRATER LAKE NATIONAL PARK
2020.11.20
198641 of 152
142813
C3.2
SITE PLAN
PLAN LEGEND
PROJECT CONSTRUCTION BOUNDARY (+/- 22,846 SF)
PROJECTED LIMITS OF EXCAVATION FOR BUILDING
FOUNDATION SHORING +/- 6' FROM FOUNDATION WALL.
(+/- 1,698 SF)
ADDITIONAL EXCAVATION FOR UTILITY AND HARDSCAPE
UPGRADES, REPLACEMENT OR REPAIR. (+/- 1,755 SF)
EXISTING ELECTRICAL SERVICE LINE
EXISTING 2" WATER LINE
EXISTING SANITARY SEWER LINE
EXISTING 6" STORM LINE - REPLACE IF DAMAGED BY
CONSTRUCTION. (LOCATION PER 1990 RENOVATION
PLANS)
EXISTING 4" PVC LANDSCAPE AREA DRAIN LINES:
REPLACE IF DAMAGED BY CONSTRUCTION
(LOCATION PER 1990 RENOVATION PLANS)
TEMPORARY EROSION CONTROL PROTECTION FENCING
TEMPORARY ON-GRADE TREE PROTECTION FENCING
TEMPORARY SITE SECURITY FENCING: 6' CHAIN-LINK
MOUNTED ON STANDARD CONCRETE BARRIER
EXISTING ELECTRICAL VAULTS
EXISTING COMMUNICATIONS J-BOX
EXISTING WATER VALVE
EXISTING SANITARY SEWER MANHOLE
EXISTING STORM CATCH BASIN - REPLACE IF DAMAGED
EXISTING SNOW DELINEATOR MOUNTING HOLE
EXISTING WATER FOUNTAIN
EXISTING SIGN / POST
EXISTING FLAGPOLE
EXISTING HEATED PAVING AREA
EXISTING FLAGSTONE PAVING
EXISTING CONCRETE PAVING
EXISTING CONIFER TREE TO REMAIN
(CANOPY DRIP-LINES ARE BASED ON AERIAL IMAGERY)
EXISTING SHRUB MASSING TO REMAIN
E E
W W
SS
SD
X
PROPOSED 4" C900 WATER LINE (+/- 130 LF)
PROPOSED 4" WATER VALVE
PROPOSED FLAGSTONE PAVING
PROPOSED HEATED PAVING
PROPOSED EXPOSED AGGREGATE PAVING
W W
CONSTRUCTION NOTES
1 CONSTRUCT NEW HEATED CONCRETE WALKWAY WITH FOAM
INSULATION LAYER. REFER TO M.E.P PLAN SET FOR LIMITS OF
HEATED PAVING AND HEAT TRACE AT SNOW TUNNEL ENTRY.
2 RE-INSTALL JUNCTION BOX FOR HEATED CONCRETE PAVING.
3 REPAIR AND REPLACE EXPOSED AGGREGATE SIDEWALK AND
RAMP TRANSITION AFFECTED BY REPLACEMENT OF HEATED
SIDEWALK.
4 REPAIR ANY ADA PARKING STALL, STRIPING, AND SIGNAGE IF
AFFECTED BY CONSTRUCTION. CONTRACTOR TO VERIFY GRADES
DO NOT EXCEED 2% IN ANY DIRECTION.
5 REINSTALL MAPPED FLAGSTONE PATIO AND STONE / WOOD SEAT
WALL IN ORIGINAL LOCATIONS. SET FLAGSTONES IN NEW 6"
THICK REINFORCED CONCRETE SLAB. REFER TO DETAIL ON
SHEET C4.1.
REPAIR ANY CURBING DAMAGED OR AFFECTED BY
CONSTRUCTION ACTIVITIES. REFER TO SHEET C4.2 FOR DETAILS.
DAMAGE TO ANY PORTIONS OF THE STONE CURB WILL REQUIRE
REPLACEMENT AND WILL BE AT THE CONTRACTOR'S EXPENSE.
REPAIR ANY PAVEMENT AREAS DAMAGED OR AFFECTED BY
CONSTRUCTION ACTIVITIES. REFER TO SHEET C4.2 FOR DETAILS.
8 CONCRETE PAD WITH POST FOR AUTOMATIC DOOR OPENER
PUSH PLATE. REFERENCE DETAILS 4A AND 4B ON SHEET C4.2.
ENLARGEMENT, SEE SHEET C3.3
ENLARGEMENT, SEE SHEET C3.3
GENERAL NOTE
CONTRACTOR WILL REFER TO SPEC SECTION 01 40 00 FOR
'ACCESSIBILITY INSPECTION REPORT' REQUIREMENTS, TO
DOCUMENT COMPLIANCE WITH ABAAS AT VARIOUS STAGES OF
CONSTRUCTION.
CONTRACTOR TO ALIGN EDGE OF NEW PAVING WHENEVER
ABUTTING EXISTING PAVING SECTIONS.
DIMENSIONS ARE APPROXIMATE FIELD VERIFY. EXTENTS AND
LOCATION OF FLATWORK TO MATCH EXISTING UNLESS NOTED
OTHERWISE.
17.97' 5.00' 8.03'
5.00'
5.75'
8.75'
1.50'
5.75'
9.10'
28.76'
1.48'
8.84'
13.59'
37.83'
13.57'
8.13'
8.35'
14.20'
6.04'
R28.44'
12.89'
21.22'
10.26'
6.50'
X
X
X
X
W
W
W
19.79'
15.18'
11.77'
11.20' 2.72'
5.97'
2.06'
5.04'
SHEET
PMIS/PKG NO.
DRAWING NO.SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
1/2 9/2
0 1
:55 :15
P M
\\a nc
-fs \A
NC
-P ro jec ts\
\62
1-
\65
CA
D\ La nd sc ap e\_
CD
\P
LA
NS
\S
VC
\C
-S
IT
E.
dw g
P Gaynor
B Doggett
P Gaynor
CRATER LAKE NATIONAL PARK
2020.11.20
198641 of 152
142813
C3.3
ENLARGED SITE PLAN
PLAN LEGEND
PROJECT CONSTRUCTION BOUNDARY (+/- 22,846 SF)
PROJECTED LIMITS OF EXCAVATION FOR BUILDING
FOUNDATION SHORING +/- 6' FROM FOUNDATION WALL.
(+/- 1,698 SF)
ADDITIONAL EXCAVATION FOR UTILITY AND HARDSCAPE
UPGRADES, REPLACEMENT OR REPAIR. (+/- 1,755 SF)
EXISTING ELECTRICAL SERVICE LINE
EXISTING 2" WATER LINE
EXISTING SANITARY SEWER LINE
EXISTING 6" STORM LINE - REPLACE IF DAMAGED BY
CONSTRUCTION. (LOCATION PER 1990 RENOVATION
PLANS)
EXISTING 4" PVC LANDSCAPE AREA DRAIN LINES:
REPLACE IF DAMAGED BY CONSTRUCTION
(LOCATION PER 1990 RENOVATION PLANS)
TEMPORARY EROSION CONTROL PROTECTION FENCING
TEMPORARY ON-GRADE TREE PROTECTION FENCING
TEMPORARY SITE SECURITY FENCING: 6' CHAIN-LINK
MOUNTED ON STANDARD CONCRETE BARRIER
EXISTING ELECTRICAL VAULTS
EXISTING COMMUNICATIONS J-BOX
EXISTING WATER VALVE
EXISTING SANITARY SEWER MANHOLE
EXISTING STORM CATCH BASIN - REPLACE IF DAMAGED
EXISTING SNOW DELINEATOR MOUNTING HOLE
EXISTING WATER FOUNTAIN
EXISTING SIGN / POST
EXISTING FLAGPOLE
EXISTING FLAGSTONE PAVING
EXISTING CONCRETE PAVING
EXISTING CONIFER TREE TO REMAIN
(CANOPY DRIP-LINES ARE BASED ON AERIAL IMAGERY)
EXISTING SHRUB MASSING TO REMAIN
E E
W W
SS
SD
X
W W
ENTRY
SNOW TUNNEL
MAIN ENTRYSTEEL VISITOR
CENTER
CONSTRUCTION NOTES
GENERAL NOTE
CONTRACTOR WILL REFER TO SPEC
SECTION 01 40 00 FOR 'ACCESSIBILITY
INSPECTION REPORT' REQUIREMENTS, TO
DOCUMENT COMPLIANCE WITH ABAAS AT
VARIOUS STAGES OF CONSTRUCTION.
CONTRACTOR TO ALIGN EDGE OF NEW
PAVING WHENEVER ABUTTING EXISTING
PAVING SECTIONS.
DIMENSIONS ARE APPROXIMATE FIELD
VERIFY. EXTENTS AND LOCATION OF
FLATWORK TO MATCH EXISTING UNLESS
NOTED OTHERWISE.
1 2
1 CONSTRUCT NEW HEATED CONCRETE WALKWAY WITH FOAM
INSULATION LAYER. REFER TO M.E.P PLAN SET FOR LIMITS OF
HEATED PAVING AND HEAT TRACE AT SNOW TUNNEL ENTRY.
2 RE-INSTALL JUNCTION BOX FOR HEATED CONCRETE PAVING.
3 REPAIR AND REPLACE EXPOSED AGGREGATE SIDEWALK AND
RAMP TRANSITION AFFECTED BY REPLACEMENT OF HEATED
SIDEWALK.
4 REPAIR ANY ADA PARKING STALL, STRIPING, AND SIGNAGE IF
AFFECTED BY CONSTRUCTION. CONTRACTOR TO VERIFY GRADES
DO NOT EXCEED 2% IN ANY DIRECTION.
5 REINSTALL MAPPED FLAGSTONE PATIO AND STONE / WOOD SEAT
WALL IN ORIGINAL LOCATIONS. SET FLAGSTONES IN NEW 6"
THICK REINFORCED CONCRETE SLAB. REFER TO DETAIL ON
SHEET C4.1.
REPAIR ANY CURBING DAMAGED OR AFFECTED BY
CONSTRUCTION ACTIVITIES. REFER TO SHEET C4.2 FOR DETAILS.
DAMAGE TO ANY PORTIONS OF THE STONE CURB WILL REQUIRE
REPLACEMENT AND WILL BE AT THE CONTRACTOR'S EXPENSE.
REPAIR ANY PAVEMENT AREAS DAMAGED OR AFFECTED BY
CONSTRUCTION ACTIVITIES. REFER TO SHEET C4.2 FOR DETAILS.
8 CONCRETE PAD WITH POST FOR AUTOMATIC DOOR OPENER
PUSH PLATE. REFERENCE DETAILS 4A AND 4B ON SHEET C4.2.
PROPOSED 4" C900 WATER LINE (+/- 130 LF)
PROPOSED 4" WATER VALVE
PROPOSED FLAGSTONE PAVING
PROPOSED HEATED PAVING
PROPOSED EXPOSED AGGREGATE PAVING
POINT OF
BEGINNING
TRAIL TO STONE HOUSES
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X
X
X
X X
X X
X X
X X
X X
X X
X X
W
W
W
W
W
W
W
W
SAGER BUILDING
(ADMIN)
STEEL
VISITOR
CENTER
M
UN
SO
N
CR
EE
K
MAIN
ENTRY
ABA
ABA
TRAIL TO STONE HOUSES
LADY OF THE WOODS TRAIL
SNOW
TUNNEL
FFE: 6474.18'
FFE: 6473.06'
FFE: 6473.14'
FFE: 6474.16'
(+/- 4,400 SF)
STAFF
ENTRY
ENTRY
1.8% 2.0%
2.3%
0.
1%
0.
7%
5.1% 2.3% 2.1%
2.
8%
3.
4%
3.1% 1.9%
1.
6%
1.
7%
2.
1%
3.
0%
1.
3%
4.
3%
2.
1%
2.
4%
1.0%
3.
4%
6.7%
1.5%
0.9%
2.1%
4.8
0.3% 2.7%
SD
SD
SD
1.
7%
6472.69
6472.65
6473.27
6473.38
6473.56 6473.20
6473.71
6472.57
6472.95
6473.01
1.8%
2.0%
0.
1%
1.
7%
4.8
6472.88
6472.71
6472.89
0.3%
6472.65
6472.95 6472.48
6473.13
6472.69
6472.82
6473.02
6473.59 6473.91
6474.02
BC
TFC
TFC
FC
BC
BC
2.7%
FC
BC
6473.09 BFC
6473.02 BFC
FC
BC
6472.15
BC
TFC
BFC
SD
SHEET
PMIS/PKG NO.
DRAWING NO.SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
1/2 9/2
0 1
:55 :15
P M
\\a nc
-fs \A
NC
-P ro jec ts\
\62
1-
\65
CA
D\ La nd sc ap e\_
CD
\P
LA
NS
\S
VC
\C
-G
RA
D.
dw g
P Gaynor
B Doggett
P Gaynor
CRATER LAKE NATIONAL PARK
2020.11.20
198641 of 152
142813
C3.4
GRADING PLAN
REPLACE HEATED WALKWAY, EXPOSED
AGGREGATE CONCRETE SIDEWALK AND
PARKING LOT RAMP TRANSITION.
GRADING NOTES
1.THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING EXISTING SITE AND
DRAINAGE PATTERNS AND PROTECTION OF EXISTING ENGINEERING DRAINAGE
FACILITIES.
2.CONTRACTOR SHALL EXERCISE CARE IN ALL OPERATIONS TO PROTECT EXISTING
UNDERGROUND UTILITIES. ANY DAMAGE RESULTING FROM THIS WORK MUST BE
RESTORED AT THE CONTRACTOR'S EXPENSE TO THE APPROVAL OF THE
CONTRACTING OFFICER.
3.CONTRACTOR SHALL REPLACE AND RESTORE AREAS NOT SCHEDULED FOR
CONSTRUCTION TO THEIR ORIGINAL CONDITION AND THE APPROVAL OF THE
CONTRACTING OFFICER.
4.CONTRACTOR SHALL EXERCISE EXTREME CAUTION WHEN WORKING IN AREAS
ADJACENT TO EXISTING TREES IN ORDER TO MINIMIZE DISTURBANCES TO TREE
ROOTS. SEE TREE PROTECTION PLAN FOR LIMITS OF FENCING AND ADDITIONAL
INFORMATION. NO STORAGE OF MATERIAL OR PARKING OF VEHICLES OR
EQUIPMENT UNDER TREE DRIP LINES.
5.THE CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION AND DISPOSAL OF
EXISTING AC, SIDEWALKS AND OTHER SITE ELEMENTS WITHIN THE PROJECT AREA.
6.ACTUAL LINES AND GRADES OF EXCAVATION SHALL BE STAKE BY QUALIFIED
SURVEYOR, BASED ON DIMENSION AND BEARING AS SHOWN ON THE PLANS.
7.ADJUST ALL INCIDENTAL STRUCTURES, MANHOLE LIDS, VALVE BOXES, ECT. TO
FINISHED GRADE.
8.CONTRACTOR TO ENSURE ALL ADA ROUTES MEET FEDERAL REGULATIONS.
NOTIFY CONTRACTING OFFICER IMMEDIATELY IF ADA GRADE REQUIREMENTS
CANNOT BE ACHIEVED.
PLAN LEGEND
PROJECT CONSTRUCTION BOUNDARY (+/- 25,938 SF)
PROJECTED LIMITS OF EXCAVATION FOR BUILDING
FOUNDATION SHORING +/- 6' FROM FOUNDATION
WALL. (+/- 1,698 SF)
ADDITIONAL EXCAVATION FOR UTILITY AND
HARDSCAPE UPGRADES, REPLACEMENT OR REPAIR.
(+/- 1,755 SF)
EXISTING ELECTRICAL SERVICE LINE
EXISTING 2" WATER LINE
EXISTING SANITARY SEWER LINE
EXISTING 6" STORM LINE - REPLACE IF DAMAGED BY
CONSTRUCTION. (LOCATION PER 1990 RENOVATION
PLANS)
EXISTING 4" PVC LANDSCAPE AREA DRAIN LINES:
REPLACE IF DAMAGED BY CONSTRUCTION
(LOCATION PER 1990 RENOVATION PLANS)
TEMPORARY EROSION CONTROL PROTECTION
FENCING
TEMPORARY SITE SECURITY FENCING: 6'
CHAIN-LINK MOUNTED ON STANDARD CONCRETE
BARRIER
EXISTING ELECTRICAL VAULTS
EXISTING COMMUNICATIONS J-BOX
EXISTING WATER VALVE
EXISTING SANITARY SEWER MANHOLE
EXISTING STORM CATCH BASIN - REPLACE IF
DAMAGED
EXISTING SNOW DELINEATOR MOUNTING HOLE
EXISTING WATER FOUNTAIN
EXISTING SIGN / POST
EXISTING FLAGPOLE
EXISTING CONIFER TREE TO REMAIN
(CANOPY DRIP-LINES ARE BASED ON AERIAL
IMAGERY)
EXISTING SHRUB MASSING TO REMAIN
E E
W W
SS
SD
X X
PROPOSED 4" C900 WATER LINE (+/- 130 LF)
PROPOSED 4" WATER VALVE
PROPOSED FLAGSTONE PAVING
PROPOSED HEATED PAVING
PROPOSED EXPOSED AGGREGATE PAVING
INLET PROTECTION
CONCRETE WASHOUT
W W
SEE ENLARGEMENT
ENLARGEMENT
C4.0
C4.0
GENERAL NOTE
CONTRACTOR WILL REFER TO SPEC SECTION 01 40 00 FOR
'ACCESSIBILITY INSPECTION REPORT' REQUIREMENTS, TO
DOCUMENT COMPLIANCE WITH ABAAS AT VARIOUS STAGES OF
CONSTRUCTION.
CONTRACTOR TO ALIGN EDGE OF NEW PAVING WHENEVER
ABUTTING EXISTING PAVING SECTIONS.
DIMENSIONS ARE APPROXIMATE FIELD VERIFY. EXTENTS AND
LOCATION OF FLATWORK TO MATCH EXISTING UNLESS NOTED
OTHERWISE.
W
W
W
W
W
W
W
SD
S72°32'30"E 25.19'
S19°56'11"W 22.38'
1+30.02
0+00.00
1+00.00
N90°00'00"W 10.87'
S60°48'16"W 58.15'
S20°00'23"W 50.42'
SD
SD
SD
0+00
0+
0+00
0+32
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X
X
X
X X
X X
X X
X X
X X
X X
X X
X
X X
X
X W
W
W
W
W
W
W
W
SAGER BUILDING
(ADMIN)
RI
M
D
RI
VE
STEEL
VISITOR
CENTER
M
UN
SO
N
CR
EE
K
MAIN
ENTRY
ABA
ABA
TRAIL TO STONE HOUSES
LADY OF THE WOODS TRAIL
SNOW
TUNNEL
FFE: 6474.18'
FFE: 6473.06'
FFE: 6473.14'
FFE: 6474.16'
(+/- 4,400 SF)
STAFF
ENTRY
ENTRY
6466 6469
SD
SD
SD
-5.99%
-5.49%
-6.11% -6.31%
-3.02% -2.12%
-5.59% -5.55%
GRADE BREAK STA = 0+00.00
ELEV = 6478.492
G R
AD
E
BR
EA
K
ST
A
1+
.2
EL
EV
3.
GRADE BREAK STA = 1+28.87
ELEV = 6472.321
4" C900 WATER LINE
4" GATE VALVE
EXISTING VALVE
SHEET
PMIS/PKG NO.
DRAWING NO.SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
1/2 9/2
0 1
:55 :15
P M
\\a nc
-fs \A
NC
-P ro jec ts\
\62
1-
\65
CA
D\ La nd sc ap e\_
CD
\P
LA
NS
\S
VC
\C
-U
TI
L.d wg
P Gaynor
B Doggett
P Gaynor
CRATER LAKE NATIONAL PARK
2020.11.20
198641 of 152
142813
C3.5
UTILITY PLAN
SD1
SD2
SD3
SD4 SD5
SS1
SS3
SS2
SD6
EXISTING FIRE HYDRANT
PLAN LEGEND
PROJECT CONSTRUCTION BOUNDARY (+/- 25,938 SF)
EXISTING ELECTRICAL SERVICE LINE
EXISTING 2" WATER LINE
EXISTING SANITARY SEWER LINE
EXISTING 6" STORM LINE - REPLACE IF DAMAGED BY
CONSTRUCTION. (LOCATION PER 1990 RENOVATION
PLANS)
EXISTING 4" PVC LANDSCAPE AREA DRAIN LINES:
REPLACE IF DAMAGED BY CONSTRUCTION
(LOCATION PER 1990 RENOVATION PLANS)
TEMPORARY EROSION CONTROL PROTECTION
FENCING
TEMPORARY SITE SECURITY FENCING: 6'
CHAIN-LINK MOUNTED ON STANDARD CONCRETE
BARRIER
EXISTING ELECTRICAL VAULTS
EXISTING COMMUNICATIONS J-BOX
EXISTING WATER VALVE
EXISTING SANITARY SEWER MANHOLE
EXISTING STORM CATCH BASIN - REPLACE IF
DAMAGED
EXISTING SNOW DELINEATOR MOUNTING HOLE
EXISTING WATER FOUNTAIN
EXISTING SIGN / POST
EXISTING FLAGPOLE
EXISTING CONIFER TREE TO REMAIN
(CANOPY DRIP-LINES ARE BASED ON AERIAL
IMAGERY)
EXISTING SHRUB MASSING TO REMAIN
E E
W W
SS
SD
X X
PROPOSED STORM LINE
PROPOSED 4" C900 WATER LINE (+/- 130 LF)
PROPOSED 4" WATER VALVE
PROPOSED HEATED PAVING AREA
W W
ENLARGEMENT, SEE SHEET C3.6
PROPOSED 4" C900 WATER LINE PROFILE
STORM CONSTRUCTION NOTES
REPLACE ANY SEGMENT OF LANDSCAPE AREA DRAIN LINES
AFFECTED BY FOUNDATION AND FLAGSTONE PATIO
EXCAVATION.
REPLACE ANY STORM CATCH BASINS AFFECTED BY
FOUNDATION AND FLAGSTONE PATIO EXCAVATION.
REPLACE ANY STORM LINES AFFECTED BY FOUNDATION
AND FLAGSTONE PATIO EXCAVATION.
REPLACE ANY FOUNDATION DRAIN LINES AFFECTED BY
FOUNDATION AND FLAGSTONE PATIO EXCAVATION.
CONNECT TO EXISTING DRAIN LINES.
INSTALL CATCH BASIN INLET STRUCTURES PER DETAIL ON
SHEET C4.0
SD
SANITARY SEWER CONSTRUCTION NOTES
RECONNECT SANITARY SEWER CONNECTION FROM BUILDING TO
PARK SYSTEM. REFER TO MEP PLANS FOR CONTINUATION WITHIN
BUILDING. LOCATION OF SEWER CONNECTION IS UNKNOWN AT
THIS TIME AND WILL REQUIRE ADDITIONAL IN-FIELD SURVEY
LOCATES PRIOR TO CONSTRUCTION. SEWER STUB LOCATION IS
APPROXIMATE AND WILL REQUIRES UTILITY LOCATE SERVICES.
INSTALLATION DETAILS AND CONSTRUCTION REQUIREMENTS
WILL BE INCLUDED IN THE CONSTRUCTION DETAILS.
WATER CONSTRUCTION NOTES
INSTALL 4" C900 WATER LINE FROM EXISTING VALVE LOCATED IN
ACCESS DRIVE. FULLY RESTRAIN WATER LINE TO BUILDING.
MATCH SLOPE AND ELEVATION OF EXISTING WATER LINE. REFER
TO MEP PLANS FOR CONTINUATION WITHIN BUILDING.
INSTALL 4" GATE VALVE ON PROPOSED C900 WATER LINE FOR
ISOLATION. FULLY RESTRAIN WATER LINE CONNECTION.
MATCH SLOPE AND ELEVATION OF EXISTING WATER LINE.
ELECTRICAL CONSTRUCTION NOTES
RECONNECT BUILDING ELECTRICAL CONNECTION. REFER
TO MEP PLANS FOR WORK WITHIN BUILDING.
RECONNECT JUNCTION BOX FOR HEATED CONCRETE
PAVING AREAS.
CONDUIT FOR ADO WIRING3
PROPOSED BASEMENT FOOTING DRAIN. REFER TO
ARCHITECTURAL FLOOR PLANS FOR ADDITIONAL
INFORMATION.
NEW FOOTING DRAIN AT BOTTOM OF NEW BASEMENT
WALLS. CAP 5'-0" BEYOND FACE OF EXTERIOR WALL.
W
W
W
W
W
W
W
W
W
W
W
W
W W
SD
SD
S72°32'30"E 25.19'
S19°56'11"W 22.38'
1+30.02
0+00.00
1+00.00
N90°00'00"W 10.87'
S60°48'16"W 58.15'
S20°00'23"W 50.42'
SD
SD
SD
SD
SD
SD
0+00
0+30
0+00
0+
0+00
0+32
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X X
X X
X X
X X
X X
X X
X
X
X
X
X
X
X X
X X
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W W
STEEL
VISITOR
CENTER
M
UN
SO
N
CR
EE
K
MAIN
ENTRY
ABA
ABA
TRAIL TO STONE HOUSES
OF THE WOODS TRAIL
SNOW
TUNNEL
FFE: 6474.18'
FFE: 6473.06'
FFE: 6473.14'
FFE: 6474.16'
(+/- 4,400 SF)
STAFF
ENTRY
ENTRY
SD
SD
SD
SD
SD
SD
SD
2.65% 3.19%
SS3
EXIST. SSMH
RIM = 6471.48
N INV = 6464.51 (6")
S INV=6463.06 (6")
EXIST. SSWR
-9.59%
-11.88% -5.73%
-6.03%
REPLACE ANY FOUNDATION
DRAIN LINES AFFECTED BY
EXCAVATION
SD1
EXIST. SD/CB/FD
RIM = 6472.52
S INV=6471.39 (6")
-3.93% 2.70%
REPLACE ANY FOUNDATION
DRAIN LINES AFFECTED BY
EXCAVATION
ENLARGED UTILITY
PLANC3.6
PLAN LEGEND
PROJECT CONSTRUCTION BOUNDARY (+/- 25,938 SF)
EXISTING ELECTRICAL SERVICE LINE
EXISTING 2" WATER LINE
EXISTING SANITARY SEWER LINE
EXISTING 6" STORM LINE - REPLACE IF DAMAGED BY
CONSTRUCTION. (LOCATION PER 1990 RENOVATION
PLANS)
EXISTING 4" PVC LANDSCAPE AREA DRAIN LINES:
REPLACE IF DAMAGED BY CONSTRUCTION
(LOCATION PER 1990 RENOVATION PLANS)
TEMPORARY EROSION CONTROL PROTECTION
FENCING
TEMPORARY SITE SECURITY FENCING: 6'
CHAIN-LINK MOUNTED ON STANDARD CONCRETE
BARRIER
EXISTING ELECTRICAL VAULTS
EXISTING COMMUNICATIONS J-BOX
EXISTING WATER VALVE
EXISTING SANITARY SEWER MANHOLE
EXISTING STORM CATCH BASIN - REPLACE IF
DAMAGED
EXISTING SNOW DELINEATOR MOUNTING HOLE
EXISTING WATER FOUNTAIN
EXISTING SIGN / POST
EXISTING FLAGPOLE
EXISTING CONIFER TREE TO REMAIN
(CANOPY DRIP-LINES ARE BASED ON AERIAL
IMAGERY)
EXISTING SHRUB MASSING TO REMAIN
E E
W W
SS
SD
X X
STORM LINE NORTH OF THIS POINT IS
NOT LOCATED ON SURVEY AND THE
LOCATION IS APPROXIMATE
STORM CONSTRUCTION NOTES
REPLACE ANY SEGMENT OF LANDSCAPE AREA DRAIN LINES
AFFECTED BY FOUNDATION AND FLAGSTONE PATIO
EXCAVATION.
REPLACE ANY STORM CATCH BASINS AFFECTED BY
FOUNDATION AND FLAGSTONE PATIO EXCAVATION.
REPLACE ANY STORM LINES AFFECTED BY FOUNDATION
AND FLAGSTONE PATIO EXCAVATION.
REPLACE ANY FOUNDATION DRAIN LINES AFFECTED BY
FOUNDATION AND FLAGSTONE PATIO EXCAVATION.
CONNECT TO NEW POSTING DRAIN LINES.
INSTALL CATCH BASIN INLET STRUCTURES PER DETAIL ON
SHEET C4.0
SANITARY SEWER CONSTRUCTION NOTES
RECONNECT SANITARY SEWER CONNECTION FROM
BUILDING TO PARK SYSTEM. REFER TO MEP PLANS FOR
CONTINUATION WITHIN BUILDING. LOCATION OF SEWER
CONNECTION IS UNKNOWN AT THIS TIME AND WILL
REQUIRE ADDITIONAL IN-FIELD SURVEY LOCATES PRIOR TO
CONSTRUCTION. SEWER STUB LOCATION IS APPROXIMATE
AND WILL REQUIRES UTILITY LOCATE SERVICES.
INSTALLATION DETAILS AND CONSTRUCTION
REQUIREMENTS WILL BE INCLUDED IN THE CONSTRUCTION
DETAILS.
WATER CONSTRUCTION NOTES
INSTALL 4" C900 WATER LINE FROM EXISTING VALVE LOCATED IN
ACCESS DRIVE. FULLY RESTRAIN WATER LINE TO BUILDING.
MATCH SLOPE AND ELEVATION OF EXISTING WATER LINE. REFER
TO MEP PLANS FOR CONTINUATION WITHIN BUILDING.
INSTALL 4" GATE VALVE ON PROPOSED C900 WATER LINE FOR
ISOLATION. FULLY RESTRAIN WATER LINE CONNECTION.
MATCH SLOPE AND ELEVATION OF EXISTING WATER LINE.
ELECTRICAL CONSTRUCTION NOTES
RECONNECT BUILDING ELECTRICAL CONNECTION. REFER
TO MEP PLANS FOR WORK WITHIN BUILDING.
RECONNECT JUNCTION BOX FOR HEATED CONCRETE
PAVING AREAS.
CONDUIT FOR ADO WIRING3
PROPOSED BASEMENT FOOTING DRAIN. REFER TO
ARCHITECTURAL FLOOR PLANS FOR ADDITIONAL
INFORMATION.
PROPOSED STORM LINE
PROPOSED 4" C900 WATER LINE (+/- 130 LF)
PROPOSED 4" WATER VALVE
PROPOSED HEATED PAVING AREA
W W
SD
SHEET
PMIS/PKG NO.
DRAWING NO.SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
1/2 9/2
0 1
:55 :15
P M
\\a nc
-fs \A
NC
-P ro jec ts\
\62
1-
\65
CA
D\ La nd sc ap e\_
CD
\P
LA
NS
\S
VC
\C
-U
TI
L.d wg
P Gaynor
B Doggett
P Gaynor
CRATER LAKE NATIONAL PARK
2020.11.20
198641 of 152
142813
PROPOSED SEWER CONNECTION PROFILE PROPOSED STORM DRAIN CONNECTION PROFILES
NEW FOOTING DRAIN AT BOTTOM OF NEW BASEMENT
WALLS. CAP 5'-0" BEYOND FACE OF EXTERIOR WALL.
DRAWING NO.SUB SHEET NO.DESIGNED:
CADD:
TECH REVIEW:
DATE:
TITLE OF SHEET
1/2 9/2
0 1
:55 :15
P M
\\a nc
-fs \A
NC
-P ro jec ts\
\62
1-
\65
CA
D\ La nd sc ap e\_
CD
\P
LA
NS
\S
VC
\C
-D
ET
L.d wg
P Gaynor
B Doggett
P Gaynor
CRATER LAKE NATIONAL PARK
2020.11.20
198641 of 152
142813
C4.0
EROSION CONTROL
DETAILS & UTILITY
NOTES
USE STITCHED LOOPS
OVER 2"x 2" POSTS
PROFILE VIEW
2'-6"
6'MAXIMUM SPACING
FRONT VIEW
FILTER FABRIC
MATERIAL 36"
NTS
NTS
NTS
6"
4'-0"
PLAN VIEW
INTERLOCKED
2"x 2" POSTS
AND ATTACH
2'-6" 6"
BURY BOTTOM OF FILTER FABRIC 6"
VERTICALLY BELOW FINISHED GRADE.
2"x 2" FIR, PINE OR STEEL
FENCE POSTS.
POSTS TO BE INSTALLED ON
UPHILL SIDE OF SLOPE.
1.
2.
3.
4.
NOTES:
COMPACT BOTH SIDES OF FILTER
FABRIC TRENCH.
3' minimum
PL
EROSION CONTROL FENCING
NOT TO SCALE
81 81
14 1/8
1.5 YARD
81 X 81 X 14 1/8
CONCRETE WASHOUT FOR CONCRETE PUMP
HOPPER OR READY MIX TRUCK CHUTES
CEMENTITIOUS MATERIALS ONLY
JOB SITE CONCRETE WASHOUT
CONTAINMENT AND RECYCLING
SERVICE. LID REQUIRED AT TIME
OF PICK-UP BY ECO-PAN TRUCK
ECO-PAN
888-326-7264
WWW.ECO-PAN.COM
CONCRETE WASHOUT
NOT TO SCALE
DUMP STRAP
CATCH BASIN INSERT BAG
REGULAR FLOW…