B08_Att_21_Proposal_Submission_Package.pdf

PDF 947 KB Posted

Attached to
GETT 250272 & Et Al. , Rehabilitate Little Round To
Solicitation number
140P2022R0001
Issued by

About this file

This solicitation package includes instructions and templates for responding to solicitation number 140P2022R0001 from the National Park Service seeking proposals to rehabilitate the Little Round Top Visitor Use Area and various routes at Gettysburg National Military Park in Gettysburg, Pennsylvania. Offerors must submit a technical volume addressing technical approach, schedule, project experience, management approach, key personnel resumes, key trades experience, and past performance, along with a business and price volume comprising the SF-1442, price schedule, bid bond, representations and certifications, and report on limitation of subcontracting. Proposals are due by an unspecified date. The opportunity is not set aside for any socioeconomic group. The incumbent is unspecified.

View the file

Other files

File Type Posted
Second_RFI_Reponses_0005.pdf PDF
Sol_140P2022R0001_Amd_0005.pdf PDF
RFI_Responses_0004.pdf PDF
Sol_140P2022R0001_Amd_0004.pdf PDF
Attachment_25_General_References_0003.doc DOC document
Attachment_23_-_Implementation_of_Certification_0003.pdf PDF
Attachment_24_-_Certification_of_Vaccination_Form_0003.pdf PDF
Pre-Bid_Sign_In_Sheet_0003.docx DOCX document
Sol_140P2022R0001_Amd_0003.pdf PDF
GETT_250272_CLIN_1-17-Specifications_20211214_Amend02_0002.pdf PDF
GETT_250272_-_Contract_Price_Schedule_20211214_0002.xlsx XLSX spreadsheet
Sol_140P2022R0001_Amd_0002.pdf PDF
GETT_250272_CLIN_1-17_BidSet_211214_Amendment_02_0002.pdf PDF
B08_Att_5_Drawings_CLIN_1-17_Sheets_1-17.pdf PDF
B08_Att_17_Drainage_Calculations_CLIN_18.pdf PDF
B08_Att_12_Drawings_CLIN_1-17_Sheets_129-148.pdf PDF
B08_Att_18_Geotechnical_Report_CLIN_20-38.pdf PDF
B08_Att_13_Drawings_CLIN_18_Sheets_1-19.pdf PDF
B08_Att_4_Specifications_CLIN_20-38_Revised.pdf PDF
B08_Att_22_GETT_250272_-_PreBid_Site_Visit_Map.pdf PDF
B08_Att_8_Drawings_CLIN_1-17_Sheets_40-58.pdf PDF
B08_Att_20_Wage_Determination.pdf PDF
B08_Att_10_Drawings_CLIN_1-17_Sheets_76-103.pdf PDF
B08_Att_15_Drawings_CLIN_20-38_Sheets_1-27.pdf PDF
B08_Att_19_Environmental_Assessment.pdf PDF
B08_Att_6_Drawings_CLIN_1-17_Sheets_18-24.pdf PDF
Sol_140P2022R0001.pdf PDF
B08_Att_1_Specifications_CLIN_1-17_Revised.pdf PDF
B08_Att_3_Specifications_CLIN_19_Revised.pdf PDF
B08_Att_9_Drawings_CLIN_1-17_Sheets_59-75.pdf PDF
B08_Att_16_Reports_CLIN_1-17.pdf PDF
B08_Att_2_Specifications_CLIN_18_Revised.pdf PDF
B08_Att_14_Drawings_CLIN_19_Sheets_1-19.pdf PDF
B08_Solicitation_140P2022R0001.pdf PDF
B08_Att_7_Drawings_CLIN_1-17_Sheets_25-39.pdf PDF
B08_Att_11_Drawings_CLIN_1-17_Sheets_104-128.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

PAST PERFORMANCE QUESTIONNAIRE

INSTRUCTIONS: Offeror to complete Sections A and B and transmit questionnaire to reference.

Reference to complete Sections C and D and transmit back to Contracting Officer listed in section E.

A. CONTRACTOR INFORMATION

Company Name

Company

Street Address

Address

City

City

State

State

Zip Code

XXXXX

DUNS Number

XXXXXXX

Point of Contact

Name, Email, Phone

B. CONTRACT INFORMATION

Project Title

Title

Contract Number

XXXXXXXXXX

Contract Type

Firm Fixed Price / Time & Materials / Cost Reimbursable / Other

Awarded Contract Price

$X,XXX,XXX

Current / Final Price

$X,XXX,XXX

Contract Award Date

XX/XX/XXXX

Contract Completion Date

XX/XX/XXXX

Period of Performance

XX/XX/XXX – XX/XX/XXX

Project Location

Park or Street address, City, State

Client / Owner

Company

Brief description of the contract & work effort:

Scope of work description

C. REFERENCE:

Name

First, Last

Position / Title

Title

Organization

Agency or Company

Phone Number

XXX-XXX-XXXX

Email Address

Email

Signature

Signature

Date

XX/XX/XXXX

D. EVALUATION

Rating

Definition

Exceptional

Performance met contractual requirements and exceeded many to the owner’s benefit. The element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.

Very Good

Performance met contractual requirements and exceeded some to the owner’s benefit. The element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.

Satisfactory

Performance met contractual requirements. The element being assessed contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

Marginal

Performance did not meet some contractual requirements. The element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions.

Unsatisfactory

Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The element being assessed contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

Evaluation Area

Rating

Quality

Quality of workmanship (including subcontractors)?

Choose an item.

Quality of and adherence to quality control plan?

Choose an item.

Quality of informational and technical submittals?

Choose an item.

Overall Quality Rating

Choose an item.

Comments (Please provide comments supporting the above ratings. Comments supporting ratings of excellent, marginal, & unsatisfactory are especially helpful.):

Schedule (& Time Management)

Met project schedule milestones?

Choose an item.

Responded to owner requests in a timely manner?

Choose an item.

Informational and technical submittals submitted timely?

Choose an item.

Promptly addressed scheduling issues?

Choose an item.

Overall Schedule (& Time Management) Rating

Choose an item.

Comments (Please provide comments supporting the above ratings. Comments supporting ratings of excellent, marginal, & unsatisfactory are especially helpful.):

Cost Control

Addressed differing & unforeseen site conditions so as to minimize additional costs?

Choose an item.

Provided fair and reasonable pricing for contract modifications?

Choose an item.

Submitted accurate and complete invoices?

Choose an item.

Promptly paid subcontractors and suppliers?

Choose an item.

Overall Cost Control Rating

Choose an item.

Comments (Please provide comments supporting the above ratings. Comments supporting ratings of excellent, marginal, & unsatisfactory are especially helpful.):

Management

General oversight by project manager and superintendent?

Choose an item.

Coordination with and control of subcontractors?

Choose an item.

Avoidance of accidents & safety violations?

Choose an item.

Addressed location factors (especially remote locations)?

Choose an item.

Maintained good working relationship with owner representatives?

Choose an item.

Demonstrated flexibility, innovativeness and cooperation in resolving potential problems?

Choose an item.

Overall Management Rating

Choose an item.

Comments (Please provide comments supporting the above ratings. Comments supporting ratings of excellent, marginal, & unsatisfactory are especially helpful.):

Small Business Subcontracting (& Labor Standards)

Met regulatory and contractual labor standards?

Choose an item.

Successfully contracted with small and socio-economically disadvantaged businesses?

Choose an item.

Quality and adherence to applicable subcontracting plans?

Choose an item.

Overall Small Business Subcontracting (& Labor Standards) Rating

Choose an item.

Comments (Please provide comments supporting the above ratings. Comments supporting ratings of excellent, marginal, & unsatisfactory are especially helpful.):

Regulatory Compliance

Met building and life safety codes?

Choose an item.

Overall Regulatory Compliance Rating

Choose an item.

Overall Recommendation:

Given what I know today about the contractor's ability to perform in accordance with the contract’s most significant requirements, I would recommend them for similar contracts:

Choose an item.

Overall Comments:

E. RETURN:

Return by

Time / Date

Name

CO or CS name

Title

Contracting Officer / Contract Specialist

Organization

National Park Service – Denver Service Center

Email

First_Last@nps.gov

Project Experience Questionnaire

Solicitation: 140P2021R0001

Submit responses to the questions below that address experience relative to the elements noted under the Project Experience evaluation subfactor in solicitation section L. Limit submittals to the quantity of projects and timeframes required in the solicitation. Expand the response sections shown below as needed to adequately address each question (this questionnaire may be expanded to multiple pages if needed).

Offeror

REFERENCED PROJECT INFORMATION

Project Title

Project Location

Brief Project Description

Project Owner

POC:

Phone:

CONTRACTOR LIST

List Contractor(s) whose experience on the referenced project is being submitted for evaluation on this proposed project. If more than one contractor is listed (i.e. prime and subcontractors), provide information specific to that contractor.

Contractor Name

Role on Referenced Project

(Prime or Sub)

Trade

Price

(list for each contractor’s specific work)

Performance Period

(calendar days)

(list for each contractor’s specific work)

Original

Final

Original

Final

PROJECT EXPERIENCE QUESTIONS

1. Describe the project work performed by all contractors listed above.

2. Identify which Project Experience elements listed in section L of the solicitation each contractor’s work addresses.

3. Describe & provide reasons for any changes to the original price for the work described in question 2 above.

4. Describe and provide reasons for any changes to the original schedule for the work described in question 2 above.

5. Describe problems, associated with the work described in question 2 above, which were encountered and how they were resolved. Describe how the offeror’s proposal accounts for similar issues.

6. Describe the means and methods, associated with the work described in question 2 above, which were successful. Would you implement the same means and methods on the proposed project? Why or why not?

7. Provide any other additional project information you believe should be presented.

GETTYSBURG NATIONAL

MILITARY PARK

Solicitation #140P2021R0001

REHABILITATE LITTLE ROUND TOP VISITOR USE

AREA & REHABILITATION OF VARIOUS ROUTES

GETT – 250272 & Et Al.

REQUEST FOR PROPOSAL

(RFP)

Proposal Submission Package

NATIONAL PARK SERVICE

DENVER SERVICE CENTER

For Technical Volume I:

1. Technical Approach

2. Schedule

3. Project Experience (Project Experience Questionnaire)

4. Management Approach

5. Key Personnel Resumes

6. Key Trades (Project Experience Questionnaire)

7. Past Performance Questionnaire (or PPIRS/CPARS Reports)

For Business & Price Volume II:

1. Standard Form 1442, Solicitation, Offer, and Award

2. Amendment(s) Acknowledgement(s)

3. Section B Price Schedule

4. SF 24 Bid Bond

5. Section K Representations and Certifications

6. General References

7. Report on Limitation on Subcontracting

BID BOND

(See instructions on reverse)

OMB Control Number: 9000-0045 Expiration Date: 8/31/2022

PRINCIPAL (Legal name and business address) TYPE OF ORGANIZATION ("X" one)

STATE OF INCORPORATION

SURETY(IES) (Name and business address)

PERCENT

OF BID

PRICE

PENAL SUM OF BOND

AMOUNT NOT TO EXCEED

MILLION(S) THOUSAND(S) HUNDRED(S) CENTS

BID IDENTIFICATION

BID DATE INVITATION NUMBER

PRINCIPAL

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1. 2.

2.

3.

3.

(Seal) (Seal) (Seal) Corporate Seal

INDIVIDUAL SURETY(IES)

NAME(S)

(Seal) (Seal)

CORPORATE SURETY(IES)

SU

R

ET

Y

A

NAME &

ADDRESS

STATE OF INCORPORATION LIABILITY LIMIT ($)

2. Corporate

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is NOT usable

STANDARD FORM 24 (REV. 8/2016)

Prescribed by GSA - FAR (48 CFR) 53.228(a)

FOR (Construction, Supplies or Services)

OBLIGATION:

We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum.

CONDITIONS:

The Principal has submitted the bid identified above.

THEREFORE:

The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid.

Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government.

Notice to the surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid.

WITNESS:

The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.

DATE BOND EXECUTED (Must not be later than bid opening date)

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0045. We estimate that it will take 1 hour to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

JOINT VENTURE

OTHER (Specify)

PARTNERSHIPINDIVIDUAL

CORPORATION

INSTRUCTIONS

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).

4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the LIABILITY LIMIT block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.

(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY(IES)." In the space designated "SURETY(IES)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.

(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond.

The Government may require the surety to furnish additional substantiating information concerning its financial capability.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "offeror."

B

STATE OF INCORPORATION LIABILITY LIMIT ($)

2. Corporate

Corporate

LIABILITY LIMIT ($)STATE OF INCORPORATION

1.NAME(S) &

C

LIABILITY LIMIT ($)

D

E

F

G

STANDARD FORM 24 (REV. 8/2016) BACK

BID BOND

(See instructions on reverse)

OMB Control Number: 9000-0045 Expiration Date: 8/31/2022

PRINCIPAL (Legal name and business address)

TYPE OF ORGANIZATION ("X" one)

STATE OF INCORPORATION

SURETY(IES) (Name and business address)

PERCENT OF BID PRICE

PENAL SUM OF BOND

AMOUNT NOT TO EXCEED

MILLION(S)

THOUSAND(S)

HUNDRED(S)

CENTS

BID IDENTIFICATION

BID DATE

INVITATION NUMBER

PRINCIPAL

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1.

2.

2.

3.

3.

(Seal)

(Seal)

(Seal)

Corporate Seal

INDIVIDUAL SURETY(IES)

SIGNATURE(S)

NAME(S)

(Typed)

1.

1.

2.

2.

(Seal)

(Seal)

CORPORATE SURETY(IES)

SURETY A

NAME & ADDRESS

STATE OF INCORPORATION

LIABILITY LIMIT ($)

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1.

2.

2.

Corporate Seal

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is NOT usable

STANDARD FORM 24 (REV. 8/2016)

Prescribed by GSA - FAR (48 CFR) 53.228(a)

FOR (Construction, Supplies or

Services)

OBLIGATION: We, the Principal and Surety(ies) are firmly bound to the United States of America (hereinafter called the Government) in the above penal sum. For payment of the penal sum, we bind ourselves, our heirs, executors, administrators, and successors, jointly and severally. However, where the Sureties are corporations acting as co-sureties, we, the Sureties, bind ourselves in such sum "jointly and severally" as well as "severally" only for the purpose of allowing a joint action or actions against any or all of us. For all other purposes, each Surety binds itself, jointly and severally with the Principal, for the payment of the sum shown opposite the name of the Surety. If no limit of liability is indicated, the limit of liability is the full amount of the penal sum. CONDITIONS: The Principal has submitted the bid identified above. THEREFORE: The above obligation is void if the Principal - (a) upon acceptance by the Government of the bid identified above, within the period specified therein for acceptance (sixty (60) days if no period is specified), executes the further contractual documents and gives the bond(s) required by the terms of the bid as accepted within the time specified (ten (10) days if no period is specified) after receipt of the forms by the principal; or (b) in the event of failure to execute such further contractual documents and give such bonds, pays the Government for any cost of procuring the work which exceeds the amount of the bid. Each Surety executing this instrument agrees that its obligation is not impaired by any extension(s) of the time for acceptance of the bid that the Principal may grant to the Government. Notice to the surety(ies) of extension(s) is waived. However, waiver of the notice applies only to extensions aggregating not more than sixty (60) calendar days in addition to the period originally allowed for acceptance of the bid. WITNESS: The Principal and Surety(ies) executed this bid bond and affixed their seals on the above date.

DATE BOND EXECUTED (Must not be later than bid opening date)

Paperwork Reduction Act Statement - This information collection meets the requirements of 44 USC § 3507, as amended by section 2 of the Paperwork Reduction Act of 1995. You do not need to answer these questions unless we display a valid Office of Management and Budget (OMB) control number. The OMB control number for this collection is 9000-0045. We estimate that it will take 1 hour to read the instructions, gather the facts, and answer the questions. Send only comments relating to our time estimate, including suggestions for reducing this burden, or any other aspects of this collection of information to: General Services Administration, Regulatory Secretariat Division (M1V1CB), 1800 F Street, NW, Washington, DC 20405.

INSTRUCTIONS

1. This form is authorized for use when a bid guaranty is required. Any deviation from this form will require the written approval of the Administrator of General Services.

2. Insert the full legal name and business address of the Principal in the space designated "Principal" on the face of the form. An authorized person shall sign the bond. Any person signing in a representative capacity (e.g., an attorney-in-fact) must furnish evidence of authority if that representative is not a member of the firm, partnership, or joint venture, or an officer of the corporation involved.

3. The bond may express penal sum as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).

4. (a) Corporations executing the bond as sureties must appear on the Department of the Treasury's list of approved sureties and must act within the limitations listed therein. The value put into the LIABILITY LIMIT block is the penal sum (i.e., the face value) of the bond, unless a co-surety arrangement is proposed.

(b) When multiple corporate sureties are involved, their names and addresses shall appear in the spaces (Surety A, Surety B, etc.) headed "CORPORATE SURETY(IES)." In the space designated "SURETY(IES)" on the face of the form, insert only the letter identifier corresponding to each of the sureties. Moreover, when co-surety arrangements exist, the parties may allocate their respective limitations of liability under the bond, provided that the sum total of their liability equals 100% of the bond penal sum.

(c) When individual sureties are involved, a completed Affidavit of Individual Surety (Standard Form 28) for each individual surety, shall accompany the bond. The Government may require the surety to furnish additional substantiating information concerning its financial capability.

5. Corporations executing the bond shall affix their corporate seals. Individuals shall execute the bond opposite the word "Corporate Seal"; and shall affix an adhesive seal if executed in Maine, New Hampshire, or any other jurisdiction requiring adhesive seals.

6. Type the name and title of each person signing this bond in the space provided.

7. In its application to negotiated contracts, the terms "bid" and "bidder" shall include "proposal" and "offeror."

SURETY B

NAME & ADDRESS

STATE OF INCORPORATION

LIABILITY LIMIT ($)

SIGNATURE(S)

NAME(S) &

TITLE(S)

(Typed)

1.

1.

2.

2.

Corporate Seal

Corporate Seal

LIABILITY LIMIT ($)

STATE OF INCORPORATION

2.

2.

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME & ADDRESS

SURETY C

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INCORPORATION

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME & ADDRESS

SURETY D

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INCORPORATION

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME & ADDRESS

SURETY E

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INCORPORATION

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME & ADDRESS

SURETY F

Corporate Seal

LIABILITY LIMIT ($)

2.

2.

STATE OF INCORPORATION

1.

1.

NAME(S) &

TITLE(S)

(Typed)

SIGNATURE(S)

NAME & ADDRESS

SURETY G

STANDARD FORM 24 (REV. 8/2016) BACK

8.2.0.3062.1.452232.445150

Standard Form 24 - Bid Bond

DATE BOND EXECUTED. Enter 2 digit month, 2 digit day and 4 digit year.:

PRINCIPAL (Legal Name and business Address):

STATE OF INCORPORATION :

SURETY(IES) (Name and business address):

PERCENT OF BID PRICE:

PENAL SUM OF BOND. AMOUNT NOT TO EXCEED. THOUSAND(S):

PENAL SUM OF BOND. AMOUNT NOT TO EXCEED. HUNDRED(S):

DATE Enter 2 digit month, 2 digit day and 4 digit year.:

BID IDENTIFICATION INVITATION NUMBER:

FOR (CONSTRUCTION SUPPLIES, OR SERVICES):

1. Name(s) and title(s) (types):

2. Name(s) and title(s) (types):

3. Name(s) and title(s) (types):

INDIVIDUAL SURETY(IES) 1. NAME(S) (TYPED) :

INDIVIDUAL SURETY(IES) 2. NAME(S) (TYPED) :

CORPORATE SURETY(IES), SURETY A NAME AND ADDRESS:

STATE OF INC.:

CORPORATE SURETY(IES), SURETY A 1.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY A 2.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES) LIABILITY LIMIT(S):

If Other was selected, specify here. :

PENAL SUM OF BOND. AMOUNT NOT TO EXCEED. CENTS:

CORPORATE SURETY(IES), SURETY B 2.SIGNATURES:

CORPORATE SURETY(IES), SURETY B NAME AND ADDRESS:

CORPORATE SURETY(IES), SURETY B STATE OF INC.:

CORPORATE SURETY(IES), SURETY B 1.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY E 2.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY C 2.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY C STATE OF INC.:

CORPORATE SURETY(IES), SURETY C 1.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY C NAME AND ADDRESS:

CORPORATE SURETY(IES), SURETY D 2.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY D STATE OF INC.:

CORPORATE SURETY(IES), SURETY D 1.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY D NAME AND ADDRESS:

CORPORATE SURETY(IES), SURETY E STATE OF INC.:

CORPORATE SURETY(IES), SURETY E 1.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY E NAME AND ADDRESS:

CORPORATE SURETY(IES), SURETY F 2.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY F STATE OF INC.:

CORPORATE SURETY(IES), SURETY F 1.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY F NAME AND ADDRESS:

CORPORATE SURETY(IES), SURETY G 2.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY G STATE OF INC.:

CORPORATE SURETY(IES), SURETY G 1.NAME(S) AND TITLE(S):

CORPORATE SURETY(IES), SURETY G NAME AND ADDRESS:

CORPORATE SURETY(IES) B LIABILITY LIMIT(S):

CORPORATE SURETY(IES) C LIABILITY LIMIT(S):

CORPORATE SURETY(IES) D LIABILITY LIMIT(S):

CORPORATE SURETY(IES) E LIABILITY LIMIT(S):

CORPORATE SURETY(IES) F LIABILITY LIMIT(S):

CORPORATE SURETY(IES) G LIABILITY LIMIT(S):

3. The bond may express penal sun as a percentage of the bid price. In these cases, the bond may state a maximum dollar limitation (e.g., 20% of the bid price but the amount not to exceed dollars).:

Template for Contracts and Indi

Report on Limitations on Subcontracting [Template Version 7/25/19]

This report is required for small business, 8(a) or other socio-economic set-aside service contracts (including construction) priced at or above $150,000.

Contract Number: [Insert contract #]

Prime Contractor: [Insert prime contractor's company name]

Current Total Contract Price: [Insert the amount of the original contract + all excuted contract modifications]

Type of Set Aside: [Insert type of set-aside: Small Business, HUBZone, SDVOSB, WOSB, 8(a), etc.]

Period of Performance MM/DD/YYYY - MM/DD/YY

Type of Service (Required Participation): [Put an X in the applicable box below per clause 52.219-3, 14, 27,29,30]

1) Services (except construction). 50% maximum may be subcontracted to non-similary situated Subcontractors

2) General construction. 85% maximum may be subcontracted to non-similary situated Subcontractors

3) Construction by special trade contractors. 75% maximum may be subcontracted to non-similary situated Subcontractors

Participartion Calculation as of the Current Invoice

Amounts shown below shall include amounts from all previous invoices and the current invoice. Exclude the cost of materials.

1) Amount Invoiced by the Prime Contractor: $0

2) Portion of Amount Invoiced for All Similarly Situated Subcontractors (SSS)* $0

Total Amount Paid To: [Insert SSS company name] $0

Total Amount Paid To: [Insert SSS company name] $0

Total Amount Paid To: [Insert SSS company name] $0

Total Amount Paid To: [Insert SSS company name] $0

Total Amount Paid To: [Insert SSS company name] $0 Add additional rows if more than 5 SSS

3) Portion of Amount Invoiced for Non-Similarly Situated Subcontractors (NSS) $0

Total Amount Paid To: [Insert NSS company name] $0

Total Amount Paid To: [Insert NSS company name] $0

Total Amount Paid To: [Insert NSS company name] $0

Total Amount Paid To: [Insert SSS company name] $0

Total Amount Paid To: [Insert SSS company name] $0 Add additional rows if more than 5 NSS

4) Prime & SSS Participation % ERROR:#DIV/0! Modify formula if additional rows added above

5) % subcontracted to NSS ERROR:#DIV/0! Modify formula if additional rows added above

* Similarly Situated Subcontractor (SSS): is a small business subcontractor that is a participant of the same Small Business Administration (SBA) program that qualified the prime contractor as an eligible offeror and awardee of the contract as defined in 13 CFR 125.6 (i.e. Small Business, HUBZone Business, Service Disabled Veteran Owned Small Business (SDOVB), etc.)

** Limitation on Subcontracting Percentage = (Total amount invoiced by the Prime Contractor - Portion of total amount invoiced for Non-Similarly Situated Subcontractors (NSS)/ Total amount invoiced by the Prime Contractor)

Corrective Action Plan

If the NSS % noted in line 5 above is not in compliance with the % required by contract clause 52.219-3, 14, 27,29,30 then the prime contractor shall provide a written corrective action plan below:

Sheet2

Services (except construction)

General construction

Construction by special trade contractors

File details come from the government source that posted it. Updated .