This geotechnical data report provides subsurface exploration results for the proposed rehabilitation of various routes at Gettysburg National Military Park in Gettysburg, Pennsylvania. Terracon Consultants, Inc. conducted a field exploration program consisting of 15 Kessler Dynamic Cone Penetrometer tests to depths ranging from approximately refusal to 30 inches below existing grades, and collection of 24 asphalt cores. Laboratory testing included Atterberg limits and grain size analyses. The report describes site conditions, the project scope involving repair or replacement of existing two-lane paved asphalt roadways, and characterizes subsurface conditions encountered. Pavement thicknesses, estimated California Bearing Ratios from DCP tests, and observations of asphalt cores are documented for each route. The appendices provide standard procedures, boring logs and test data, and the Unified Soil Classification System chart.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPORT COVER PAGE
Geotechnical Data Report
GETT: Rehabilitation of Various Routes at Gettysburg National Military Park Gettysburg, Adams County, Pennsylvania
March 31, 2020 Terracon Project No. JD195236
Prepared for:
VHB
Richmond, Virginia
Prepared by:
Terracon Consultants, Inc.
Ashburn, Virginia
Terracon Consultants, Inc. 19955 Highland Vista Dr, Ste 170 Ashburn, Virg in ia 20147 P (703) 726 8030 F (703) 726 8032 terracon.com
REPORT COVER LET TER T O SIGN
March 31, 2020
VHB
115 South 15th Street Richmond, Virginia 23219
Attn: Mr. Tyson Rosser/Director of Transportation Engineering P: (757) 233-3241 E: TRosser@VHB.com
Re: Geotechnical Data Report GETT: Rehabilitation of Various Routes at Gettysburg National Military Park Gettysburg National Military Park Gettysburg, Adams County, Pennsylvania Terracon Project No. JD195236
Dear Mr. Rosser:
We have completed the Geotechnical Data services for the above referenced project. This study was performed in general accordance with Terracon Proposal No. PJD195236 dated September 16, 2019. This report presents the findings of the subsurface exploration and provides laboratory testing for the proposed project.
We appreciate the opportunity to be of service to you on this project. If you have any questions concerning this report or if we may be of further service, please contact us.
Sincerely, Terracon Consultants, Inc.
Braque Mathson, EIT Deniz Karadeniz, PhD, PG, PE Senior Project Manager Senior Engineer
Responsive ■ Resourceful ■ Reliable 1
REPORT TOPICS
INTRODUCTION
SITE CONDITIONS
PROJECT DESCRIPTION
GEOTECHNICAL CHARACTERIZATION
GEOLOGIC OVERVIEW
GROUNDWATER
PAVEMENT
GENERAL COMMENTS
Note: This report was originally delivered in a web-based format. Orange Bold text in the report indicates a referenced section heading. The PDF version also includes hyperlinks which direct the reader to that section and clicking on the GeoReport logo will bring you back to this page. For more interactive features, please view your project online at client.terracon.com.
ATTACHMENTS
EXPLORATION AND TESTING PROCEDURES
SITE LOCATION AND EXPLORATION PLANS
EXPLORATION RESULTS
SUPPORTING INFORMATION
Note: Refer to each individual Attachment for a listing of contents.
http://client.terracon.com/
Responsive ■ Resourceful ■ Reliable 2
INTRODUC TION
Geotechnical Data Report GETT: Rehabilitation of Various Routes at Gettysburg National
Military Park Gettysburg National Military Park
Gettysburg, Adams County, Pennsylvania Terracon Project No. JD195236
March 31, 2020
INTRODUCTION
This report presents the results of our subsurface exploration and laboratory testing performed for the proposed road improvements at the subject project. The geotechnical engineering Scope of Services for this project included the advancement of 15 Kessler Dynamic Cone Penetrometer (DCP) tests to depths ranging from approximately refusal to 30 inches below existing site grades and collecting 24 asphalt cores.
Maps showing the site and boring locations are shown in the Site Location and Exploration Plan sections, respectively. The results of the laboratory testing performed on soil samples obtained from the site during the field exploration are included on the boring logs and DCP test data logs in the Exploration Results section.
SITE CONDITIONS
The following description of site conditions is derived from our site visit in association with the field exploration and our review of publicly available geologic and topographic maps.
Item Description
Parcel Information
The project is located at four roads: Route 200 (US Cavalry Avenue), Route 201 (Confederate Cavalry Avenue – Gregg Avenue), Route 15 (North Sickles Avenue), and Route 12 (South Confederate Avenue – Sykes Avenue) located in the Gettysburg National Military Park in Gettysburg, Adams County, Pennsylvania. See Site Location
Existing Improvements Paved roads and grassland.
Existing Topography (Google Earth)
Approximate elevation ranges of the roads:
■ Route 200 – EL 550 to EL 556
■ Route 201 – EL 541 to EL 620
■ Route 15 – EL 565 to EL 575
■ Route 12 – EL 475 to EL 650
GETT: Rehabilitation of Various Routes at Gettysburg National Military Park Gettysburg, Adams County, Pennsylvania March 31, 2020 ■ Terracon Project No. JD195236
Responsive ■ Resourceful ■ Reliable
We also collected photographs of the asphalt pavement cores at the time of our field exploration program. Representative photos are provided in our Exploration Results.
PROJECT DESCRIPTION
Our initial understanding of the project was provided in our proposal and was discussed during project planning. A period of collaboration has transpired since the project was initiated, and our final understanding of the project conditions is as follows:
Item Description
Information Provided Scope of services (SOS) dated 5/1/2019 and boring location chart provided on 11/27/2019.
Project Description The areas are existing two-lane paved asphalt roadway. The roadway has been patched numerous times with asphalt and concrete.
Proposed Construction Repair or replacement of the existing road to handle the average daily traffic.
Proposed Elevation Similar to the current elevation.
Estimated Start of Construction 2020
GEOTECHNICAL CHARACTERIZATION
We have developed a general characterization of the subsurface conditions based upon our review of the subsurface exploration, laboratory data, geologic setting and our understanding of the project. Conditions encountered at each exploration point are indicated on the individual logs.
The individual logs can be found in the Exploration Results section of this report.
As part of our analyses, we identified the following model layers within the subsurface profile.
Model Layer Layer Name General Description
1 Existing Fill
Brown, gray, dark gray, black, dark red, fine to coarse, SILTY
SAND WITH GRAVEL (SM), SILTY GRAVEL WITH SAND (GM),
CLAYEY GRAVEL WITH SAND (GC), loose to medium dense, moist
2 Residual
Red, dark red-brown, mottled brown with light olive, gray, dark gray, fine to coarse, SANDY LEAN CLAY (CL), GRAVELLY LEAN CLAY (CL), FAT CLAY WITH SAND (CH), SANDY SILT (ML), stiff, moist
Gettysburg, Adams County, Pennsylvania March 31, 2020 ■ Terracon Project No. JD195236
Responsive ■ Resourceful ■ Reliable
GEOLOGIC OVERVIEW
The Gettysburg NMP Road Rehabilitation project site lies within the Gettysburg-Newark Lowland Section of the Piedmont Physiographic Province of Pennsylvania. Specifically, the site is located in the Gettysburg Basin, a fault bounded basin, or graben (dropped block), that is one of a series of rift basins that comprise the Newark Supergroup rocks. Regionally, the various basins of the Newark Supegroup run from northeast to southwest, parallel with the eastern edge of the Appalachian Mountains, and are the result of tectonic activity associated with the break-up (rifting) of the super-continent of Pangaea during the Triassic and Early Jurassic Geologic Periods. Over time, the Gettysburg Basin filled with lacustrine (lake bed) and alluvial fan deposits, a result of the erosion of the Appalachian Mountains to the west. Subsequent erosion of these deposits exposed a sequence of non-durable siltstones and shales in the central portion of the basin and conglomerates and sandstones along the margins. These sedimentary deposits were periodically intruded by igneous magma forming sills and dikes of diabase. Surrounding these intrusions are zones of contact metamorphism, or aureoles, where the heat and pressure from the intruding igneous body recrystallized the host material into more durable rock types (e.g. quartzite, metasiltstone, greywacke, etc.), usually referred to as hornfels. In general, the hornfels are more durable than their parent material. The final episode of igneous activity occurred during the Early Jurassic Period, when flows of basalt were extruded onto the surface. Thermally altered rocks are also associated with the basalt flows, but are not as extensive as the intrusion associated hornfels.
The project concerns the planned rehabilitation of four individual road segments within the environs of Gettysburg NMP, specifically:
1. Route 200 (US Cavalry Avenue also known as E. Cavalry Avenue)
2. Route 201 (Confederate Cavalry Avenue/Gregg Avenue)
3. Route 15 (North Sickles Avenue)
4. Route 12 (South Confederate-Sykes Avenue)
Route 200, Route 201, and Route 15, and the westernmost 1,200-feet of Route 12, are mapped as entirely underlain by the Gettysburg Formation, a sedimentary unit consisting of reddish-brown to maroon silty mudstone and shale, with thin strata of interbedded sandstone and several thin beds of impure limestone. The Gettysburg Formation is dated to the Triassic Geologic Period. The majority of Route 12 is mapped as diabase bedrock dating from the early Jurassic Geologic Period. Observations of surface bedrock exposures compared favorably with the mapped geology as consisting of gray or light buff, medium to coarse-grained diabase bedrock.
The diabase in the location is a large sheet that extends across Adams County from northeast to southwest. The diabase is resistant to erosion, and forms the chain of small hills at the Gettysburg battlefield including Cemetery Ridge, Culps Hill, and the Round Tops.
The soils underlying Route 200, Route 201, and Route 15, and the western 1,200-feet of Route 12 are mapped as colluvium and residuum derived from Triassic shale. These soils tend to range
Gettysburg, Adams County, Pennsylvania March 31, 2020 ■ Terracon Project No. JD195236
Responsive ■ Resourceful ■ Reliable from 40 to 60-inches to hard, lithic bedrock, and are often contain abundant rock fragments (“channers”). Over half of the soils types in these areas have seasonal high-water tables (November – March) ranging from less than5-inches to 20-inches below the surface. One of the soils (the Croton silt loam) is prone to ponding during periods of water table elevation and/or heavy precipitation. In contrast, the majority of Route 12 is mapped as underlain by soils derived from the chemical and physical weathering of diabase or other dark-colored igneous rocks and averaging 5-feet in depth. Several of these soils can have shallow water tables averaging less than 2-feet below the surface year round, with seasonal high water tables at or near the surface.
The General Comments section provides an understanding of the report limitations.
GROUNDWATER
Groundwater level observations were made in the field during drilling of the 15 DCP tests. The holes were 4.75 inches to 55 inches in depth or auger refusal as measured from the top of asphalt.
Groundwater was not encountered in the holes at the time of our exploration.
The groundwater observations presented herein are considered to be an indication of the groundwater levels at the dates and times indicated. Where more impervious silt and clay soils are encountered, the amount of water seepage into the borings is limited, and it is generally not possible to establish the location of the groundwater table through short term water level observations. Also, fluctuations in groundwater levels should be expected with seasons of the year, construction activity, changes to surface grades, precipitation, or other similar factors.
PAVEMENT
A total of 24 asphalt pavement cores were obtained from each borehole. Below are the ranges of the thicknesses of the pavement and subbase when encountered.
■ Route 200 – Asphalt thickness ranged from 4.75 to 6.25 inches or auger refusal; Subbase thickness ranged from 0 to 4.0 inches.
■ Route 201 – Asphalt thickness ranged from 5.25 to 7.0 inches or auger refusal; Subbase thickness ranged from 0 to 18.0 inches.
■ Route 15 – Asphalt thickness ranged from 6.5 to 7.5 inches or auger refusal; Subbase was not encountered.
■ Route 12 – Asphalt thickness ranged from 5.25 to 9.0 inches or auger refusal; the park did not want the subbase material to be disturbed; therefore the subbase material was not measured.
The asphalt core pictures are in in the Exploration Results section.
Gettysburg, Adams County, Pennsylvania March 31, 2020 ■ Terracon Project No. JD195236
Responsive ■ Resourceful ■ Reliable
Kessler DCP blowcounts were utilized to estimate an average California Bearing Ratio (CBR) within 30-inch below subgrade when no refusal encountered. There were seven locations (B- 03, B-04, B-5, B-07, B-08, B-14, and B-15) where the DCP encountered refusal and was not able to be advanced into the subgrade. DCP results and estimated average CBR values are provided in the Exploration Results section.
DCP ID
Asphalt
Thickness (Inches)A
Subbase Thickness (Inches)B
*Start Depth (Inches)A+B
*Bottom Depth
(Inches) DCP Remarks
B-01 4.75 2 6.75 36.75 No refusal B-02 6.25 4 10.25 40.25 No refusal B-03 4.75 0 4.75 4.75 Refusal B-04 5.25 0 5.25 5.25 Refusal B-05 5.75 0 5.75 5.75 Refusal B-06 7.0 18 25 55 No refusal B-07 7.0 12 19 19 Refusal B-08 5.75 0 5.75 33.25 Refusal B-09 6.25 0 6.25 36.25 No refusal B-10 5.75 12 17.75 47.75 No refusal B-11 5.25 0 5.25 35.25 No refusal B-12 5.5 0 5.5 35.5 No refusal B-13 7.5 0 7.5 37.5 No refusal B-14 6.5 0 6.5 6.5 Refusal B-15 7.5 0 7.5 7.5 Refusal
* Measured from top of asphalt.
GENERAL COMMENTS
Our opinions are based upon our understanding of the project, the geotechnical conditions in the area, and the data obtained from our site exploration. Natural variations will occur between exploration point locations or due to the modifying effects of construction or weather. The nature and extent of such variations may not become evident until during construction. If variations appear, we can provide further evaluation and supplemental recommendations.
Our Scope of Services does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the potential for such contamination or pollution, other studies should be undertaken.
Gettysburg, Adams County, Pennsylvania March 31, 2020 ■ Terracon Project No. JD195236
Responsive ■ Resourceful ■ Reliable
Our services and any correspondence or collaboration through this system are intended for the sole benefit and exclusive use of our client for specific application to the project discussed and are accomplished in accordance with generally accepted geotechnical engineering practices with no third-party beneficiaries intended. Any third-party access to services or correspondence is solely for information purposes to support the services provided by Terracon to our client.
Reliance upon the services and any work product is limited to our client, and is not intended for third parties. Any use or reliance of the provided information by third parties is done solely at their own risk. No warranties, either express or implied, are intended or made.
Site characteristics as provided are for design purposes and not to estimate excavation cost. Any use of our report in that regard is done at the sole risk of the excavating cost estimator as there may be variations on the site that are not apparent in the data that could significantly impact excavation cost. Any parties charged with estimating excavation costs should seek their own site characterization for specific purposes to obtain the specific level of detail necessary for costing.
Site safety, and cost estimating including, excavation support, and dewatering requirements/design are the responsibility of others. If changes in the nature, design, or location of the project are planned, our conclusions and recommendations shall not be considered valid unless we review the changes and either verify or modify our conclusions in writing.
Responsive ■ Resourceful ■ Reliable
ATTACHMENTS
GETT: Rehabilitation of Various Routes at Gettysburg National Military Park ■ Gettysburg, Adams County, Pennsylvania March 31, 2020 ■ Terracon Project No. JD195236
Responsive ■ Resourceful ■ Reliable EXPLORATION AND TESTING PROCEDURES 1 of 2
EXPLORATION AND TESTING PROCEDURES
Field Exploration
Number of Test Holes DCP Depth Planned Location
15 (DCP) 4.75 to 55 inches as measured from top of asphalt or auger refusal
Pavement
9 Asphalt cores ONLY Pavement
Boring Layout and Elevations: Unless otherwise noted, Terracon personnel provided the boring layout. Coordinates were obtained with a handheld GPS unit (estimated horizontal accuracy of about ±10 feet) and approximate elevations were obtained by interpolation from Google Earth. If elevations and a more precise boring layout are desired, we recommend borings be surveyed following completion of fieldwork.
Subsurface Exploration Procedures: The Kessler Dynamic Cone Penetrometer (DCP) sampling procedure, a standard 5/8-inch diameter rod was driven into the ground by a 17.6-pound hammer falling a distance of 22.6 inches. The number of blows required to advance the 0.79 inch cone every 2 inches (50 millimeters) is recorded. The DCP values, are indicated on the DCP Test Data logs at the test depths. We observed and recorded groundwater levels during drilling and sampling. For safety purposes, all borings were backfilled with auger cuttings after their completion. Pavements were patched with Aquaphalt and/or pre-mixed concrete, as appropriate.
The sampling depths, penetration distances, and other sampling information was recorded on the DCP test data logs. The samples were placed in appropriate containers and taken to our soil laboratory for testing and classification by a Geotechnical Engineer. Our exploration team prepared field logs as part of the drilling operations. These field logs included visual classifications of the materials encountered during drilling and our interpretation of the subsurface conditions between samples. Final DCP logs were prepared from the field logs. The final DCP logs represent the Geotechnical Engineer's interpretation of the field logs and include modifications based on observations and tests of the samples in our laboratory.
Laboratory Testing
The project engineer reviewed the field data and assigned laboratory tests to understand the engineering properties of the various soil strata, as necessary, for this project. Procedural standards noted below are for reference to methodology in general. In some cases, variations to methods were applied because of local practice or professional judgment. Standards noted below include reference to other, related standards. Such references are not necessarily applicable to describe the specific test performed.
GETT: Rehabilitation of Various Routes at Gettysburg National Military Park ■ Gettysburg, Adams County, Pennsylvania March 31, 2020 ■ Terracon Project No. JD195236
Responsive ■ Resourceful ■ Reliable EXPLORATION AND TESTING PROCEDURES 2 of 2
■ ASTM D2216 Standard Test Methods for Laboratory Determination of Water (Moisture) Content of Soil and Rock by Mass
■ ASTM D4318 Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils
■ ASTM D422 Standard Test Method for Particle-Size Analysis of Soils
The laboratory testing program often included examination of soil samples by an engineer. Based on the material’s texture and plasticity, we described and classified the soil samples in accordance with the Unified Soil Classification System.
Responsive ■ Resourceful ■ Reliable
SITE LOCATION AND EXPLORATION PLANS
Contents:
Site Location Plan (6 pages) Exploration Plan (6 pages)
Note: All attachments are one page unless noted above.
SITE LOCATION
Gettysburg National Military Park Rehabilitation MSA #33944-16 ■ Gettysburg, PA March 31, 2020 ■ Terracon Project No. JD195236
TOPOGRAPHIC MAP IMAGE COURTESY OF THE U.S. GEOLOGICAL SURVEY
QUADRANGLES INCLUDE: GETTYSBURG, PA (1/1/1994).
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS
NOT INTENDED FOR CONSTRUCTION PURPOSES
SITE
dkaradeniz Text Box
SITE LOCATION - ROUTE 200
bdmathson Polygon Line bdmathson Text Box Route 200 (US Cavalry Avenue)
EXPLORATION PLAN
March 31, 2020 ■ Terracon Project No. JD195236
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS
NOT INTENDED FOR CONSTRUCTION PURPOSES
AERIAL PHOTOGRAPHY PROVIDED
BY MICROSOFT BING MAPS
dkaradeniz
EXPLORATION PLAN - ROUTE 200
March 31, 2020 ■ Terracon Project No. JD195236
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT
INTENDED FOR CONSTRUCTION PURPOSES
TOPOGRAPHIC MAP IMAGE COURTESY OF THE U.S. GEOLOGICAL SURVEY
QUADRANGLES INCLUDE: GETTYSBURG, PA (1/1/1994).
SITE
bdmathson Text Box
SITE LOCATION - ROUTE 201
bdmathson Polygon Line bdmathson
Route 201 (Confederate Cavalry Avenue – Gregg Avenue)
March 31, 2020 ■ Terracon Project No. JD195236
AERIAL PHOTOGRAPHY PROVIDED BY
MICROSOFT BING MAPS
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT
INTENDED FOR CONSTRUCTION PURPOSES
bdmathson
EXPLORATION PLAN - ROUTE 201
March 31, 2020 ■ Terracon Project No. JD195236
TOPOGRAPHIC MAP IMAGE COURTESY OF THE U.S. GEOLOGICAL SURVEY
QUADRANGLES INCLUDE: GETTYSBURG, PA (1/1/1994).
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS
NOT INTENDED FOR CONSTRUCTION PURPOSES
SITE
bdmathson Text Box
SITE LOCATION - ROUTE 201
bdmathson Polygon Line bdmathson Polygon Line bdmathson
Route 201 (Confederate Cavalry Avenue – Gregg Avenue)
March 31, 2020 ■ Terracon Project No. JD195236
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS
NOT INTENDED FOR CONSTRUCTION PURPOSES
AERIAL PHOTOGRAPHY PROVIDED
BY MICROSOFT BING MAPS
bdmathson
EXPLORATION PLAN - ROUTE 201
March 31, 2020 ■ Terracon Project No. JD195236
TOPOGRAPHIC MAP IMAGE COURTESY OF THE U.S. GEOLOGICAL SURVEY
QUADRANGLES INCLUDE: FAIRFIELD, PA (1/1/1994) and GETTYSBURG, PA
(1/1/1994).
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS
NOT INTENDED FOR CONSTRUCTION PURPOSES
SITE
bdmathson Text Box
SITE LOCATION - ROUTE 15
bdmathson Polygon Line bdmathson
Route 15 (North Sickles Avenue)
March 31, 2020 ■ Terracon Project No. JD195236
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS
NOT INTENDED FOR CONSTRUCTION PURPOSES
AERIAL PHOTOGRAPHY PROVIDED
BY MICROSOFT BING MAPS
bdmathson
EXPLORATION PLAN - ROUTE 15
March 31, 2020 ■ Terracon Project No. JD195236
TOPOGRAPHIC MAP IMAGE COURTESY OF THE U.S. GEOLOGICAL SURVEY
QUADRANGLES INCLUDE: FAIRFIELD, PA (1/1/1994) and GETTYSBURG, PA
(1/1/1994).
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS
NOT INTENDED FOR CONSTRUCTION PURPOSES
SITE
bdmathson Text Box
SITE LOCATION - ROUTE 12
bdmathson Polygon Line bdmathson
Route 12 (South Confederate Avenue – Sykes Avenue)
March 31, 2020 ■ Terracon Project No. JD195236
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS
NOT INTENDED FOR CONSTRUCTION PURPOSES
AERIAL PHOTOGRAPHY PROVIDED
BY MICROSOFT BING MAPS
bdmathson
EXPLORATION PLAN - ROUTE 12
March 31, 2020 ■ Terracon Project No. JD195236
TOPOGRAPHIC MAP IMAGE COURTESY OF THE U.S. GEOLOGICAL SURVEY
QUADRANGLES INCLUDE: FAIRFIELD, PA (1/1/1994) and GETTYSBURG, PA
(1/1/1994).
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS
NOT INTENDED FOR CONSTRUCTION PURPOSES
SITE
bdmathson Text Box
SITE LOCATION - ROUTE 12
bdmathson Polygon Line bdmathson
Route 12 (South Confederate Avenue – Sykes Avenue)
March 31, 2020 ■ Terracon Project No. JD195236
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS
NOT INTENDED FOR CONSTRUCTION PURPOSES
AERIAL PHOTOGRAPHY PROVIDED
BY MICROSOFT BING MAPS
bdmathson
EXPLORATION PLAN - ROUTE 12
EXPLORATION RESULTS
Contents:
Pavement Core Photograph (24 pages) DCP Test Data (B-01, B-02, B-06, B-08 through B-13) Laboratory Test Results includes Atterberg Limits, and Grain Size Distribution (20 pages)
Project Number: JD195236
Project Name: GETT: Rehabilitation of Various Roads at Gettysburg National Military Park
Project Location: Gettysburg, Pennsylvania
Road Name Boring #
Total Asphalt
Thickness (inch)
Subbase
Thickness (inch)
Subbase Material
Total in
Place1 (inches)
US Cavalry Ave (Route 200) B-01 4.75 2.00
Crushed Aggregate
6.75
1. Borehole Thickness – Measured from the Subgrade (soil) to the Top of the Asphalt.
Surface Mix Thickness
(Inches) = 2.0 Moderate stripping from
0 to 2.0 inches
Severe stripping from
2.0 to 4.75 inches
Base Mix Thickness
(Inches) = 2.75
Thickness (inch)
Subbase Thickness
(inch)
Subbase Material
Total in Place1
(inches) US Cavalry Ave
(Route 200) B-02 6.25 4.00 Crushed
Aggregate 10.25
(Inches) = 2.5 Little to no stripping from
0 to 2.5 inches
Severe stripping from
2.5 to 6.25 inches
(Inches) = 3.75
Thickness (inch)
Subbase Thickness
(inch)
Subbase Material
Total in Place1
(inches) US Cavalry Ave
(Route 200) B-03 4.75 N/E N/A 4.75
2. N/E = None encountered, N/A = Not applicable
(Inches) = 2.0
(Inches) = 2.75
(Inches) = 1.75
Little to no stripping from
0 to 2.0 inches
Little to moderate stripping from
2.0 to 4.75 inches
Thickness (inch)
Subbase Thickness
(inch)
Subbase Material
Total in Place1
(inches) Gregg Ave (Route 201) B-04 5.25 N/E N/A 5.25
(Inches) = 2.25
(Inches) = 3.0
Little to moderate stripping from
0 to 2.25 inches
Little to no stripping from
2.25 to 5.25 inches
Thickness (inch)
Subbase Thickness
(inch)
Subbase Material
Total in Place1
(inches) Gregg Ave (Route 201) B-05 5.75 N/E N/A 5.75
(Inches) = 3.25
Little to moderate stripping from
0 to 2.5 inches
Little stripping from
2.5 to 5.75 inches
Thickness (inch)
Subbase Thickness
(inch)
Subbase Material
Total in Place1
(inches)
Gregg Ave (Route 201) B-06 7.00 18.00
Crushed Aggregate
25.0
(Inches) = 2.25
(Inches) = 4.75
Moderate stripping from
0 to 2.25 inches
Little stripping from
2.5 to 7.0 inches
Debonding from
2.0 to 2.5 inches
Thickness (inch)
Subbase Thickness
(inch)
Subbase Material
Total in Place1
(inches)
Gregg Ave (Route 201) B-07 7.00 12.00
Crushed Aggregate
19.0
0 to 2.25 inches
Surface Mix Thickness
(Inches) = 2.25
Moderate stripping from
2.25 to 7.0 inches
(Inches) = 4.75
Project Name: Gettysburg National Military Park
Thickness (inch)
Subbase Thickness
(inch)
Subbase Material
Total in Place1
(inches) Gregg Ave (Route 201) B-08 5.75 N/E N/A 5.75
0 to 2.25 inches Surface Mix Thickness
(Inches) = 1.75
Little stripping from
2.25 to 5.75 inches
Base Mix Thickness
(Inches) = 3.75
Wear Layer Thickness
(Inches) = 0.25
1.75 to 2.25 inches
Thickness (inch)
Subbase Thickness
(inch)
Subbase Material
Total in Place1
(inches) Gregg Ave (Route 201) B-09 6.25 N/E N/A 6.25
Little stripping from
0 to 2.5 inches
Moderate stripping from
2.5 to 6.25 inches
Thickness (inch)
Subbase Thickness
(inch)
Subbase Material
Total in Place1
(inches)
Gregg Ave (Route 201) B-10 5.75 12.00
Crushed Aggregate
17.75
Wear Layer Thickness
(Inches) = 0.25
Little to moderate stripping from
0 to 2.5 inches
Severe stripping from
2.5 to 5.75 inches
Base Mix Thickness
(Inches) = 3.75
(Inches) = 0.25-2.5
Thickness (inch)
Subbase Thickness
(inch)
Subbase Material
Total in Place1
(inches) Gregg Ave (Route 201) B-11 5.25 N/E N/A 5.25
Moderate stripping from
0 to 1.5 inches
Severe stripping from
2.5 to 5.25 inches
Base Mix Thickness
(Inches) = 2.75
1.5 to 2.5 inches
Thickness (inch)
Subbase Thickness
(inch)
Subbase Material
Total in Place1
(inches) Gregg Ave (Route 201) B-12 5.5 N/E N/A 5.5
Little to moderate stripping from
0 to 3.75 inches
Moderate stripping from
3.75 to 5.0 inches
(Inches) = 3.0
Thickness (inch)
Subbase Thickness
(inch)
Subbase Material
Total in Place1
(inches) N Sickles Ave
(Route 15) B-13 7.50 N/E N/A 7.5
0 to 0.5 inches
Little to no stripping from
2.5 to 6.0 inches
Base Mix Thickness
(Inches) = 3.5
Surface Mix Thickness
(Inches) = 4.0
Little stripping from
6.0 to 7.5 inches
Tension cracks from
1.25 to 2.25 inches
Thickness (inch)
Subbase Thickness
(inch)
Subbase Material
Total in Place1
(inches) N Sickles Ave
(Route 15) B-14 6.50 N/E N/A 6.5
0 to 1.25 inches Surface Mix observed through entire core.
Little stripping from
3.0 to 6.5 inches
1.75 to 3.0 inches
Thickness (inch)
Subbase Thickness
(inch)
Subbase Material
Total in Place1
(inches) N Sickles Ave
(Route 15) B-15 7.50 N/E N/A 7.5
Surface Mix observed through entire core.
0 to 2.75 inches
Little to moderate stripping from
2.75 to 3.25 inches
4.0 to 4.5 inches
Thickness (inch)
Subbase Thickness
(inch)
Subbase Material
Total in Place1
(inches) S Confederate Ave
(Route 12) B-16 8.75 -- -- 8.75
2. Per the parks request the subbase material was not to be disturbed; therefore it was not measured.
(Inches) = 5.75
Little to no stripping from
0 to 1.5 inches
Severe stripping from
5.25 to 8.75 inches
Little stripping from
1.5 to 3.0 inches
Moderate stripping from
3.0 to 5.25 inches
Debonding from
2.75 to 3.25 inches
Base Mix Thickness
(Inches) = 3.0 Debonding from
7.0 to 7.75 inches
DRAFT
Project Name: GETT: Rehabilitation of Various Roads at Gettysburg National Military Park
Pavement Core Photograph
Road Name Boring # Total Asphalt
Thickness (inch)
Subbase Thickness
(inch) Subbase Material
Total in Place1
(inch) S Confederate
Ave B-17 7.75 -- -- 7.75
2. Subbase material was not recovered.
Thickness (inch)
Subbase Thickness
(inch)
Subbase Material
Total in Place1
(inches) S Confederate Ave
(Route 12) B-18 7.00 -- -- 7.0
2. Per the parks request the subbase material was not to be disturbed; therefore it was not measured.
(Inches) = 5.25
Little to no stripping from
0 to 2.0 inches
Severe stripping from
5.25 to 7.0 inches
Moderate stripping from
3.25 to 5.25 inches
Thickness (inch)
Subbase Thickness
(inch)
Subbase Material
Total in Place1
(inches) S Confederate Ave
(Route 12) B-19 7.25 -- -- 7.25
1. Borehole Thickness – Measured from the Subgrade (soil) to the Top of the Asphalt.
2. Per the parks request the subbase material was not to be disturbed; therefore it was not measured.
Surface Mix Thickness
(Inches) = 4.75
Little to no stripping from
0 to 1.25 inches
Severe stripping from
4.5 to 7.25 inches
Moderate stripping from
1.25 to 4.5 inches
Debonding from
2.5 to 3.0 inches
4.5 to 5.0 inches
Thickness (inch)
Subbase Thickness
(inch)
Subbase Material
Total in Place1
(inches) S Confederate Ave
(Route 12) B-20 5.25 -- -- 5.25
2. Per the parks request the subbase material was not to be disturbed; therefore it was not measured.
No stripping from
0 to 1.5 inches
Moderate stripping from
1.5 to 5.25 inches
3.25 to 3.75 inches
Project Name: Gettysburg National Military
Thickness (inch)
Subbase Thickness
(inch)
Subbase Material
Total in Place1
(inches) S Confederate Ave
(Route 12) B-21 8.0 -- -- 8.0
2. Per the parks request the subbase material was not to be disturbed; therefore it was not measured.
0 to 1.5 inches
Surface Mix observed through entire core.
Little to no stripping from
3.0 to 5.5 inches
Little to moderate stripping from
1.5 to 3.0 inches
Moderate to severe stripping from
5.5 to 8.0 inches
Thickness (inch)
Subbase Thickness
(inch)
Subbase Material
Total in Place1
(inches) S Confederate Ave
(Route 12) B-22 5.50 -- -- 5.5
2. Per the parks request the subbase material was not to be disturbed; therefore it was not measured.
0 to 2.5 inches
Surface Mix observed through entire core.
Little to moderate stripping from
2.5 to 4.5 inches
Debonding from
3.75 to 4.75 inches
4.5 to 5.5 inches
Thickness (inch)
Subbase Thickness
(inch)
Subbase Material
Total in Place1
(inches) S Confederate Ave
(Route 12) B-23 5.50 -- -- 5.5
2. Per the parks request the subbase material was not to be disturbed; therefore it was not measured.
0 to 1.5 inches
1.5 to 5.5 inches
3.25 to 3.75 inches
Thickness (inch)
Subbase Thickness
(inch)
Subbase Material
Total in Place1
(inches) S Confederate Ave
(Route 12) B-24 9.0 -- -- 9.0
2. Per the parks request the subbase material was not to be disturbed; therefore it was not measured.
0 to 5.25 inches Surface Mix Thickness
(Inches) = 5.25
Debonding from
2.75 to 3.5 inches
Severe stripping from
5.25 to 9.0 inches
DCP TEST DATA
Project: JD195236 Date: 6-Dec-19 Location: B-01 Soil Type(s): Lean Clay (CL)
Avg. CBR = 5%
No. of Accumulative Blows Penetration
(mm)*
0 171 CL
2 220 CL
2 270 CL
3 320 CL
2 370 CL
2 420 CL
1 470 CL
1 520 CL
1 570 CL
2 620 CL
1 670 CL
1 720 CL
3 770 CL
4 820 CL
3 870 CL
5 920 CL
USCS
Classification
*The DCP readings start below the asphalt and subbase at 6.75 inches.
0.1 1.0 10.0 100.0
0.1 1.0 10.0 100.0
D
EP
TH
,i n.
CBR
D
EP
TH
,m m
Location: B-02 Soil Type(s): Sandy Lean Clay with Gravel (CL)
Avg. CBR = 9%
No. of Accumulative Blows Penetration
(mm)*
0 260 CL
4 310 CL
3 360 CL
2 410 CL
2 460 CL
1 510 CL
2 560 CL
3 610 CL
4 660 CL
2 710 CL
5 760 CL
4 810 CL
6 860 CL
5 910 CL
5 960 CL
6 1010 CL
*The DCP readings start below the asphalt and subbase at 10.25 inches.
USCS
Classification
0.1 1.0 10.0 100.0
0.1 1.0 10.0 100.0
D
EP
TH
,i n.
CBR
D
EP
TH
Location: B-03 **Soil Type(s): Non recovered
#Avg. CBR = N/A
No. of Accumulative Blows Penetration
(mm)*
#N/A = not applicable due to DCP refusal on rock.
DCP Refusal
*The DCP readings start below the asphalt at 4.75 inches.
**Soil was not able to be recovered due to the refusal of the DCP.
USCS
Classification
0.1 1.0 10.0 100.0
0.1 1.0 10.0 100.0
D
EP
TH
,i n.
CBR
D
EP
TH
Project: JD195236 Date: 5-Dec-19 Location: B-04 **Soil Type(s): Non recovered
#Avg. CBR = N/A
No. of Accumulative Blows Penetration
(mm)*
**Soil was not able to be recovered due to the refusal of the DCP.
#N/A = not applicable due to DCP refusal on rock.
DCP Refusal
*The DCP readings start below the asphalt at 5.25 inches.
USCS
Classification
0.1 1.0 10.0 100.0
0.1 1.0 10.0 100.0
D
EP
TH
,i n.
CBR
D
EP
TH
Location: B-05 **Soil Type(s): Non recovered
#Avg. CBR = N/A
No. of Accumulative Blows Penetration
(mm)*
**Soil was not able to be recovered due to the refusal of the DCP.
#N/A = not applicable due to DCP refusal on rock.
DCP Refusal
*The DCP readings start below the asphalt at 5.75 inches.
USCS
Classification
0.1 1.0 10.0 100.0
0.1 1.0 10.0 100.0
D
EP
TH
,i n.
CBR
D
EP
TH
Location: B-06 Soil Type(s): Silty Gravel with Sand (GM)
Avg. CBR = 15%
No. of Accumulative Blows Penetration
(mm)*
0 635 GM
13 685 GM
10 735 GM
3 785 GM
2 835 GM
3 885 GM
2 935 GM
3 985 GM
2 1035 GM
3 1085 GM
4 1135 GM
5 1185 GM
5 1235 GM
4 1285 GM
7 1335 GM
13 1385 GM
USCS
Classification
*The DCP readings start below the asphalt and subbase at 25.0 inches.
0.1 1.0 10.0 100.0
0.1 1.0 10.0 100.0
D
EP
TH
,i n.
CBR
D
EP
TH
Location: B-07 **Soil Type(s): Non recovered
#Avg. CBR = N/A
No. of Accumulative Blows Penetration
(mm)*
#N/A = not applicable due to DCP refusal on rock.
DCP Refusal
USCS
Classification
*The DCP readings start below the asphalt and subbase at 19.0 inches.
**Soil was not able to be recovered due to the refusal of the DCP.
0.1 1.0 10.0 100.0
0.1 1.0 10.0 100.0
D
EP
TH
,i n.
CBR
D
EP
TH
Location: B-08 Soil Type(s): Clayey Sand (SC)
Avg. CBR = 15% (Refusal)
No. of Accumulative Blows Penetration
(mm)*
0 146 SC
5 195 SC
4 245 SC
2 295 SC
3 345 SC
2 395 SC
3 445 SC
4 495 SC
8 545 SC
11 595 SC
13 645 SC
14 695 SC
20 745 SC
25 795 SC
30 845 SC
USCS
Classification
DCP Refusal
*The DCP readings start below the asphalt at 5.75 inches.
0.1 1.0 10.0 100.0
0.1 1.0 10.0 100.0
D
EP
TH
,i n.
CBR
D
EP
TH
Location: B-09 Soil Type(s): Silt with Sand (ML)
Avg. CBR = 10%
No. of Accumulative Blows Penetration
(mm)*
0 159 ML
3 210 ML
4 260 ML
4 310 ML
2 360 ML
3 410 ML
2 460 ML
3 510 ML
2 560 ML
2 610 ML
2 660 ML
2 710 ML
3 760 ML
3 810 ML
3 860 ML
3 910 ML
USCS
Classification
*The DCP readings start below the asphalt at 6.25 inches.
0.1 1.0 10.0 100.0
0.1 1.0 10.0 100.0
D
EP
TH
,i n.
CBR
D
EP
TH
Location: B-10 Soil Type(s): Clayey Gravel with Sand (GC)
Avg. CBR = 12%
No. of Accumulative Blows Penetration
(mm)*
0 451 GC
3 500 GC
3 550 GC
5 600 GC
3 650 GC
2 700 GC
2 750 GC
2 800 GC
4 850 GC
8 900 GC
11 950 GC
13 1000 GC
19 1050 GC
15 1100 GC
11 1150 GC
12 1200 GC
USCS
Classification
*The DCP readings start below the asphalt and subbase at 17.75 inches.
0.1 1.0 10.0 100.0
0.1 1.0 10.0 100.0
D
EP
TH
,i n.
CBR
D
EP
TH
Location: B-11 Soil Type(s): Gravelly Lean Clay (CL)
Avg. CBR = 10%
No. of Accumulative Blows Penetration
(mm)*
0 133 CL
5 185 CL
2 235 CL
2 285 CL
2 335 CL
1 385 CL
3 435 CL
3 485 CL
5 535 CL
5 585 CL
4 635 CL
6 685 CL
7 735 CL
8 785 CL
10 835 CL
8 885 CL
USCS
Classification
*The DCP readings start below the asphalt at 5.25 inches.
0.1 1.0 10.0 100.0
0.1 1.0 10.0 100.0
D
EP
TH
,i n.
CBR
D
EP
TH
Location: B-12 Soil Type(s): Fat Clay with Sand (CH)
Avg. CBR = 18%
No. of Accumulative Blows Penetration
(mm)*
0 140 CH
4 190 CH
2 240 CH
2 290 CH
2 340 CH
2 390 CH
3 440 CH
3 490 CH
2 540 CH
3 590 CH
4 640 CH
5 690 CH
8 740 CH
10 790 CH
15 840 CH
14 890 CH
USCS
Classification
*The DCP readings start below the asphalt at 5.5 inches.
0.1 1.0 10.0 100.0
0.1 1.0 10.0 100.0
D
EP
TH
,i n.
CBR
D
EP
TH
Location: B-13 Soil Type(s): Lean Clay with Sand (CL)
Avg. CBR = 15%
No. of Accumulative Blows Penetration
(mm)*
0 190 CL
6 240 CL
2 290 CL
3 340 CL
4 390 CL
4 440 CL
6 490 CL
6 540 CL
6 590 CL
7 640 CL
6 690 CL
8 740 CL
6 790 CL
7 840 CL
6 890 CL
9 940 CL
USCS
Classification
*The DCP readings start below the asphalt at 7.5 inches.
0.1 1.0 10.0 100.0
0.1 1.0 10.0 100.0
D
EP
TH
,i n.
CBR
D
EP
TH
Location: B-14 **Soil Type(s): Non recovered
#Avg. CBR = N/A
No. of Accumulative Blows Penetration
(mm)*
#N/A = not applicable due to DCP refusal on rock.
USCS
Classification
DCP Refusal
*The DCP readings start below the asphalt at 6.5 inches.
**Soil was not able to be recovered due to the refusal of the DCP.
0.1 1.0 10.0 100.0
0.1 1.0 10.0 100.0
D
EP
TH
,i n.
CBR
D
EP
TH
Location: B-15 **Soil Type(s): Non recovered
#Avg. CBR = N/A
No. of Accumulative Blows Penetration
(mm)*
#N/A = not applicable due to DCP refusal on rock.
USCS
Classification
DCP Refusal
*The DCP readings start below the asphalt at 7.5 inches.
**Soil was not able to be recovered due to the refusal of the DCP.
0.1 1.0 10.0 100.0
0.1 1.0 10.0 100.0
D
EP
TH
,i n.
CBR
DE
PT
H
0 20 40 60 80 100
CH
o r
OH
CL
OL
ML or OL
MH or OH
"U " L ine
"A " L ine
ATTERBERG LIMITS RESULTS
ASTM D4318
P L A S T I C I T Y
I N D E X
LIQUID LIMIT
PROJECT NUMBER: JD195236
PROJECT: Gettysburg National Military Park
Rehabilitation of Various Routes
SITE: 1195 Baltimore Pike Gettysburg, PA
CLIENT: VHB Inc Richmond, VA
EXHIBIT: B-1
19955 Highland Vista Dr Ste 170 Ashburn, VA
LA
B
O R
A T
O R
Y T
E S
T S
A R
E N
O T
V A
LI
D
IF
S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R T
A
T E
R B
E R
G L
IM
IT
S J
D
G E
T T
Y S
B U
R G
N A
T
IO
N A
L M
IL
IT
A R
Y P
A R
K R
E H
A B
A N
D G
E T
T Y
S B
U R
G V
IS
IT
O R
S C
E N
T E
R C
O M
B
IN
E D
.G P
J T
E R
R A
C O
N _D
A T
A T
E M
P
LA
T E
.G D
T
/1 9/
B-01
LL
82230
Boring ID Depth PL PI
0.4 - 2.4 CL SANDY LEAN CLAY
DescriptionUSCSFines
66.7
CL-ML
bdmathson
6.75 - 28.75
0 20 40 60 80 100
CH
MH or OH
"U " L ine
"A " L ine
ATTERBERG LIMITS RESULTS
ASTM D4318
P L A S T I C I T Y
I N D E X
LIQUID LIMIT
PROJECT NUMBER: JD195236
PROJECT: Gettysburg National Military Park
Rehabilitation of Various Routes
SITE: 1195 Baltimore Pike Gettysburg, PA
CLIENT: VHB Inc Richmond, VA
EXHIBIT: B-2
19955 Highland Vista Dr Ste 170 Ashburn, VA
LA
B
O R
A T
O R
Y T
E S
T S
A R
E N
O T
V A
LI
D
IF
S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R
T E
R B
E R
G L
IM
IT
S J
D
G E
T T
Y S
B U
R G
N A
T
IO
N A
L M
IL
IT
A R
Y P
A R
K R
E H
A B
A N
D G
E T
T Y
S B
U R
G V
IS
IT
O R
S C
E N
T E
R C
O M
B
IN
E D
.G P
J T
E R
R A
C O
N _D
A T
A T
E M
P
LA
T E
.G D
T
/1 9/
B-02
LL
172138
Boring ID Depth PIPL
0.5 - 2.5 CL SANDY LEAN CLAY with GRAVEL
DescriptionUSCSFines
62.4
CL-ML
bdmathson
10.25 - 30.0
0 20 40 60 80 100
CH
MH or OH
"U " L ine
"A " L ine
ATTERBERG LIMITS RESULTS
ASTM D4318
P L A S T I C I T Y
I N D E X
LIQUID LIMIT
PROJECT NUMBER: JD195236
PROJECT: Gettysburg National Military Park
Rehabilitation of Various Routes
SITE: 1195 Baltimore Pike Gettysburg, PA
CLIENT: VHB Inc Richmond, VA
EXHIBIT: B-3
19955 Highland Vista Dr Ste 170 Ashburn, VA
LA
B
O R
A T
O R
Y T
E S
T S
A R
E N
O T
V A
LI
D
IF
S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R
T E
R B
E R
G L
IM
IT
S J
D
G E
T T
Y S
B U
R G
N A
T
IO
N A
L M
IL
IT
A R
Y P
A R
K R
E H
A B
A N
D G
E T
T Y
S B
U R
G V
IS
IT
O R
S C
E N
T E
R C
O M
B
IN
E D
.G P
J T
E R
R A
C O
N _D
A T
A T
E M
P
LA
T E
.G D
T
/1 9/
B-06
LL
NPNPNP
Boring ID Depth PIPL
2.1 - 4.1 GM SILTY GRAVEL with SAND
DescriptionUSCSFines
26.8
CL-ML
bdmathson
25.0 - 49.0
0 20 40 60 80 100
CH
MH or OH
"U " L ine
"A " L ine
ATTERBERG LIMITS RESULTS
ASTM D4318
P L A S T I C I T Y
I N D E X
LIQUID LIMIT
PROJECT NUMBER: JD195236
PROJECT: Gettysburg National Military Park
Rehabilitation of Various Routes
SITE: 1195 Baltimore Pike Gettysburg, PA
CLIENT: VHB Inc Richmond, VA
EXHIBIT: B-4
19955 Highland Vista Dr Ste 170 Ashburn, VA
LA
B
O R
A T
O R
Y T
E S
T S
A R
E N
O T
V A
LI
D
IF
S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R
T E
R B
E R
G L
IM
IT
S J
D
G E
T T
Y S
B U
R G
N A
T
IO
N A
L M
IL
IT
A R
Y P
A R
K R
E H
A B
A N
D G
E T
T Y
S B
U R
G V
IS
IT
O R
S C
E N
T E
R C
O M
B
IN
E D
.G P
J T
E R
R A
C O
N _D
A T
A T
E M
P
LA
T E
.G D
T
/1 9/
B-07
LL
51722
Boring ID Depth PIPL
0.6 - 1.6 GP-GC POORLY GRADED GRAVEL with SILTY CLAY and SAND
DescriptionUSCSFines
11.3
CL-ML
bdmathson
6.75 - 18.0
0 20 40 60 80 100
CH
MH or OH
"U " L ine
"A " L ine
ATTERBERG LIMITS RESULTS
ASTM D4318
P L A S T I C I T Y
I N D E X
LIQUID LIMIT
PROJECT NUMBER: JD195236
PROJECT: Gettysburg National Military Park
Rehabilitation of Various Routes
SITE: 1195 Baltimore Pike Gettysburg, PA
CLIENT: VHB Inc Richmond, VA
EXHIBIT: B-5
19955 Highland Vista Dr Ste 170 Ashburn, VA
LA
B
O R
A T
O R
Y T
E S
T S
A R
E N
O T
V A
LI
D
IF
S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R
T E
R B
E R
G L
IM
IT
S J
D
G E
T T
Y S
B U
R G
N A
T
IO
N A
L M
IL
IT
A R
Y P
A R
K R
E H
A B
A N
D G
E T
T Y
S B
U R
G V
IS
IT
O R
S C
E N
T E
R C
O M
B
IN
E D
.G P
J T
E R
R A
C O
N _D
A T
A T
E M
P
LA
T E
.G D
T
/1 9/
B-08
LL
112334
Boring ID Depth PIPL
1.5 - 3.5 SC CLAYEY SAND
DescriptionUSCSFines
21.7
CL-ML
bdmathson
5.75 - 17.75
0 20 40 60 80 100
CH
MH or OH
"U " L ine
"A " L ine
ATTERBERG LIMITS RESULTS
ASTM D4318
P L A S T I C I T Y
I N D E X
LIQUID LIMIT
PROJECT NUMBER: JD195236
PROJECT: Gettysburg National Military Park
Rehabilitation of Various Routes
SITE: 1195 Baltimore Pike Gettysburg, PA
CLIENT: VHB Inc Richmond, VA
EXHIBIT: B-6
19955 Highland Vista Dr Ste 170 Ashburn, VA
LA
B
O R
A T
O R
Y T
E S
T S
A R
E N
O T
V A
LI
D
IF
S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R
T E
R B
E R
G L
IM
IT
S J
D
G E
T T
Y S
B U
R G
N A
T
IO
N A
L M
IL
IT
A R
Y P
A R
K R
E H
A B
A N
D G
E T
T Y
S B
U R
G V
IS
IT
O R
S C
E N
T E
R C
O M
B
IN
E D
.G P
J T
E R
R A
C O
N _D
A T
A T
E M
P
LA
T E
.G D
T
/1 9/
B-09
LL
102535
Boring ID Depth PIPL
1.5 - 3.5 ML SILT with SAND
DescriptionUSCSFines
70.6
CL-ML
bdmathson
18.5 - 35.0
0 20 40 60 80 100
CH
MH or OH
"U " L ine
"A " L ine
ATTERBERG LIMITS RESULTS
ASTM D4318
P L A S T I C I T Y
I N D E X
LIQUID LIMIT
PROJECT NUMBER: JD195236
PROJECT: Gettysburg National Military Park
Rehabilitation of Various Routes
SITE: 1195 Baltimore Pike Gettysburg, PA
CLIENT: VHB Inc Richmond, VA
EXHIBIT: B-7
19955 Highland Vista Dr Ste 170 Ashburn, VA
LA
B
O R
A T
O R
Y T
E S
T S
A R
E N
O T
V A
LI
D
IF
S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R
T E
R B
E R
G L
IM
IT
S J
D
G E
T T
Y S
B U
R G
N A
T
IO
N A
L M
IL
IT
A R
Y P
A R
K R
E H
A B
A N
D G
E T
T Y
S B
U R
G V
IS
IT
O R
S C
E N
T E
R C
O M
B
IN
E D
.G P
J T
E R
R A
C O
N _D
A T
A T
E M
P
LA
T E
.G D
T
/1 9/
B-10
LL
142135
Boring ID Depth PIPL
1.5 - 3.5 GC CLAYEY GRAVEL with SAND
DescriptionUSCSFines
47.5
CL-ML
bdmathson
17.75 - 41.25
0 20 40 60 80 100
CH
MH or OH
"U " L ine
"A " L ine
ATTERBERG LIMITS RESULTS
ASTM D4318
P L A S T I C I T Y
I N D E X
LIQUID LIMIT
PROJECT NUMBER: JD195236
PROJECT: Gettysburg National Military Park
Rehabilitation of Various Routes
SITE: 1195 Baltimore Pike Gettysburg, PA
CLIENT: VHB Inc Richmond, VA
EXHIBIT: B-8
19955 Highland Vista Dr Ste 170 Ashburn, VA
LA
B
O R
A T
O R
Y T
E S
T S
A R
E N
O T
V A
LI
D
IF
S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R
T E
R B
E R
G L
IM
IT
S J
D
G E
T T
Y S
B U
R G
N A
T
IO
N A
L M
IL
IT
A R
Y P
A R
K R
E H
A B
A N
D G
E T
T Y
S B
U R
G V
IS
IT
O R
S C
E N
T E
R C
O M
B
IN
E D
.G P
J T
E R
R A
C O
N _D
A T
A T
E M
P
LA
T E
.G D
T
/1 9/
B-11
LL
272148
Boring ID Depth PIPL
1.4 - 3.4 CL GRAVELLY LEAN CLAY
DescriptionUSCSFines
64.0
CL-ML
bdmathson
5.25 - 17.25
0 20 40 60 80 100
CH
MH or OH
"U " L ine
"A " L ine
ATTERBERG LIMITS RESULTS
ASTM D4318
P L A S T I C I T Y
I N D E X
LIQUID LIMIT
PROJECT NUMBER: JD195236
PROJECT: Gettysburg National Military Park
Rehabilitation of Various Routes
SITE: 1195 Baltimore Pike Gettysburg, PA
CLIENT: VHB Inc Richmond, VA
EXHIBIT: B-9
19955 Highland Vista Dr Ste 170 Ashburn, VA
LA
B
O R
A T
O R
Y T
E S
T S
A R
E N
O T
V A
LI
D
IF
S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R
T E
R B
E R
G L
IM
IT
S J
D
G E
T T
Y S
B U
R G
N A
T
IO
N A
L M
IL
IT
A R
Y P
A R
K R
E H
A B
A N
D G
E T
T Y
S B
U R
G V
IS
IT
O R
S C
E N
T E
R C
O M
B
IN
E D
.G P
J T
E R
R A
C O
N _D
A T
A T
E M
P
LA
T E
.G D
T
/1 9/
B-12
LL
322456
Boring ID Depth PIPL
0.5 - 2.5 CH FAT CLAY with SAND
DescriptionUSCSFines
73.7
CL-ML
bdmathson
5.5 - 29.5
0 20 40 60 80 100
CH
MH or OH
"U " L ine
"A " L ine
ATTERBERG LIMITS RESULTS
ASTM D4318
P L A S T I C I T Y
I N D E X
LIQUID LIMIT
PROJECT NUMBER: JD195236
PROJECT: Gettysburg National Military Park
Rehabilitation of Various Routes
SITE: 1195 Baltimore Pike Gettysburg, PA
CLIENT: VHB Inc Richmond, VA
EXHIBIT: B-10
19955 Highland Vista Dr Ste 170 Ashburn, VA
LA
B
O R
A T
O R
Y T
E S
T S
A R
E N
O T
V A
LI
D
IF
S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R
T E
R B
E R
G L
IM
IT
S J
D
G E
T T
Y S
B U
R G
N A
T
IO
N A
L M
IL
IT
A R
Y P
A R
K R
E H
A B
A N
D G
E T
T Y
S B
U R
G V
IS
IT
O R
S C
E N
T E
R C
O M
B
IN
E D
.G P
J T
E R
R A
C O
N _D
A T
A T
E M
P
LA
T E
.G D
T
/1 9/
B-13
LL
182543
Boring ID Depth PIPL
0.6 - 2.6 CL LEAN CLAY with SAND
DescriptionUSCSFines
75.1
CL-ML
bdmathson
7.5 - 31.25
0.0010.010.1110100
3/4 1/23/8 30 403 60
HYDROMETERU.S. SIEVE OPENING IN INCHES
16 20
U.S. SIEVE NUMBERS
44 10063 2 10 14 506 2001.5 81 140
P E
R C
E N
T F
IN
E
R B
Y W
E
IG
H T
P E
R C
E N
T C
O A
R S
E R
B Y
W E
IG
H
T
GRAIN SIZE DISTRIBUTION
ASTM D422 / ASTM C136
PROJECT NUMBER: JD195236
PROJECT: Gettysburg National Military Park
Rehabilitation of Various Routes
SITE: 1195 Baltimore Pike Gettysburg, PA
CLIENT: VHB Inc Richmond, VA
EXHIBIT: B-1
19955 Highland Vista Dr Ste 170 Ashburn, VA
LA
B
O R
A T
O R
Y T
E S
T S
A R
E N
O T
V A
LI
D
IF
S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R
G R
A
IN
S
IZ
E : U
S C
S
J D
G
E T
T Y
S B
U R
G N
A T
IO
N
A L
M
IL
IT
A
R Y
P A
R K
R E
H A
B A
N D
G E
T T
Y S
B U
R G
V
IS
IT
O
R S
C E
N T
E R
C O
M B
IN
E
D .G
P J
T E
R R
A C
O N
_D A
T A
T E
M P
LA
T
E .G
D T
/1
9/
D30
% SAND% GRAVEL% COBBLES
COEFFICIENTS
coarse
BORING ID
CU
SOIL DESCRIPTION
66.7
REMARKS
GRAIN SIZE
DEPTH
SILT OR CLAYCOBBLES
GRAVEL SAND
mediumfine coarse fine
SieveSieveSieve
100.0 97.1 89.54 79.29 73.42 71.14 69.68 68.62 66.75
% Finer% Finer% Finer
% SILT
CC
D10
22.80.0B-01
USCS% CLAY% FINES
D60
0.4 - 2.4 10.5
SANDY LEAN CLAY (CL)
CL
3/4" 3/8" #4 #10 #20 #40 #60 #100 #200 bdmathson Typewriter
6.75 - 28.75
0.0010.010.1110100
3/4 1/23/8 30 403 60
HYDROMETERU.S. SIEVE OPENING IN INCHES
16 20
U.S. SIEVE NUMBERS
44 10063 2 10 14 506 2001.5 81 140
P E
R C
E N
T F
IN
E
R B
Y W
E
IG
H T
P E
R C
E N
T C
O A
R S
E R
B Y
W E
IG
H
T
GRAIN SIZE DISTRIBUTION
ASTM D422 / ASTM C136
PROJECT NUMBER: JD195236
PROJECT: Gettysburg National Military Park
Rehabilitation of Various Routes
SITE: 1195 Baltimore Pike Gettysburg, PA
CLIENT: VHB Inc Richmond, VA
EXHIBIT: B-2
19955 Highland Vista Dr Ste 170 Ashburn, VA
LA
B
O R
A T
O R
Y T
E S
T S
A R
E N
O T
V A
LI
D
IF
S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R
A
IN
S
IZ
E : U
S C
S
J D
G
E T
T Y
S B
U R
G N
A T
IO
N
A L
M
IL
IT
A
R Y
P A
R K
R E
H A
B A
N D
G E
T T
Y S
B U
R G
V
IS
IT
O
R S
C E
N T
E R
C O
M B
IN
E
D .G
P J
T E
R R
A C
O N
_D A
T A
T E
M P
LA
T
E .G
D T
/1
9/
D30
% SAND% GRAVEL% COBBLES
COEFFICIENTS
coarse
BORING ID
CU
SOIL DESCRIPTION
62.4
REMARKS
GRAIN SIZE
DEPTH
SILT OR CLAYCOBBLES
GRAVEL SAND
mediumfine coarse fine
SieveSieveSieve
100.0 92.56 83.28 74.81 69.5 66.6 64.89 63.58 62.35
% Finer% Finer% Finer
% SILT
CC
D10
20.90.0B-02
USCS% CLAY% FINES
D60
0.5 - 2.5 16.7
SANDY LEAN CLAY with GRAVEL (CL)
CL
3/4" 3/8" #4 #10 #20 #40 #60 #100 #200 bdmathson
10.25 - 30.0
0.0010.010.1110100
3/4 1/23/8 30 403 60
HYDROMETERU.S. SIEVE OPENING IN INCHES
16 20
U.S. SIEVE NUMBERS
44 10063 2 10 14 506 2001.5 81 140
P E
R C
E N
T F
IN
E
R B
Y W
E
IG
H T
P E
R C
E N
T C
O A
R S
E R
B Y
W E
IG
H
T
GRAIN SIZE DISTRIBUTION
ASTM D422 / ASTM C136
PROJECT NUMBER: JD195236
PROJECT: Gettysburg National Military Park
Rehabilitation of Various Routes
SITE: 1195 Baltimore Pike Gettysburg, PA
CLIENT: VHB Inc Richmond, VA
EXHIBIT: B-3
19955 Highland Vista Dr Ste 170 Ashburn, VA
LA
B
O R
A T
O R
Y T
E S
T S
A R
E N
O T
V A
LI
D
IF
S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R
A
IN
S
IZ
E : U
S C
S
J D
G
E T
T Y
S B
U R
G N
A T
IO
N
A L
M
IL
IT
A
R Y
P A
R K
R E
H A
B A
N D
G E
T T
Y S
B U
R G
V
IS
IT
O
R S
C E
N T
E R
C O
M B
IN
E
D .G
P J
T E
R R
A C
O N
_D A
T A
T E
M P
LA
T
E .G
D T
/1
9/
D30
% SAND% GRAVEL% COBBLES
COEFFICIENTS
coarse
BORING ID
CU
SOIL DESCRIPTION
26.8
REMARKS
GRAIN SIZE
DEPTH
SILT OR CLAYCOBBLES
GRAVEL SAND
mediumfine coarse fine
SieveSieveSieve
100.0 59.74 57.19 48.07 41.29 35.8 32.57 30.68 29.13 26.81
% Finer% Finer% Finer
% SILT
CC
D10
19.084
0.2
21.30.0B-06
USCS% CLAY% FINES
D60
2.1 - 4.1 51.9
SILTY GRAVEL with SAND (GM)
GM
1 1/2" 3/4" 3/8" #4 #10 #20 #40 #60 #100 #200 bdmathson
25.0 - 49.0
0.0010.010.1110100
3/4 1/23/8 30 403 60
HYDROMETERU.S. SIEVE OPENING IN INCHES
16 20
U.S. SIEVE NUMBERS
44 10063 2 10 14 506 2001.5 81 140
P E
R C
E N
T F
IN
E
R B
Y W
E
IG
H T
P E
R C
E N
T C
O A
R S
E R
B Y
W E
IG
H
T
GRAIN SIZE DISTRIBUTION
ASTM D422 / ASTM C136
PROJECT NUMBER: JD195236
PROJECT: Gettysburg National Military Park
Rehabilitation of Various Routes
SITE: 1195 Baltimore Pike Gettysburg, PA
CLIENT: VHB Inc Richmond, VA
EXHIBIT: B-4
19955 Highland Vista Dr Ste 170 Ashburn, VA
LA
B
O R
A T
O R
Y T
E S
T S
A R
E N
O T
V A
LI
D
IF
S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R
A
IN
S
IZ
E : U
S C
S
J D
G
E T
T Y
S B
U R
G N
A T
IO
N
A L
M
IL
IT
A
R Y
P A
R K
R E
H A
B A
N D
G E
T T
Y S
B U
R G
V
IS
IT
O
R S
C E
N T
E R
C O
M B
IN
E
D .G
P J
T E
R R
A C
O N
_D A
T A
T E
M P
LA
T
E .G
D T
/1
9/
D30
% SAND% GRAVEL% COBBLES
COEFFICIENTS
coarse
BORING ID
154.44CU
SOIL DESCRIPTION
11.3
REMARKS
GRAIN SIZE
DEPTH
SILT OR CLAYCOBBLES
GRAVEL SAND
mediumfine coarse fine
SieveSieveSieve
100.0 75.07 65.6 47.59 33.85 23.79 18.76 15.81 13.59 11.34
% Finer% Finer% Finer
% SILT
CC
D10
5.47
7.657
1.441
36.20.0B-07
USCS% CLAY% FINES
D60
0.6 - 1.6 52.4
POORLY GRADED GRAVEL with SILTY CLAY and SAND (GP-GC)
GP-GC
1 1/2" 3/4" 3/8" #4 #10 #20 #40 #60 #100 #200 bdmathson
6.75 - 18.0
0.0010.010.1110100
3/4 1/23/8 30 403 60
HYDROMETERU.S. SIEVE OPENING IN INCHES
16 20
U.S. SIEVE NUMBERS
44 10063 2 10 14 506 2001.5 81 140
P E
R C
E N
T F
IN
E
R B
Y W
E
IG
H T
P E
R C
E N
T C
O A
R S
E R
B Y
W E
IG
H
T
GRAIN SIZE DISTRIBUTION
ASTM D422 / ASTM C136
PROJECT NUMBER: JD195236
PROJECT: Gettysburg National Military Park
Rehabilitation of Various Routes
SITE: 1195 Baltimore Pike Gettysburg, PA
CLIENT: VHB Inc Richmond, VA
EXHIBIT: B-5
19955 Highland Vista Dr Ste 170 Ashburn, VA
LA
B
O R
A T
O R
Y T
E S
T S
A R
E N
O T
V A
LI
D
IF
S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R
A
IN
S
IZ
E : U
S C
S
J D
G
E T
T Y
S B
U R
G N
A T
IO
N
A L
M
IL
IT
A
R Y
P A
R K
R E
H A
B A
N D
G E
T T
Y S
B U
R G
V
IS
IT
O
R S
C E
N T
E R
C O
M B
IN
E
D .G
P J
T E
R R
A C
O N
_D A
T A
T E
M P
LA
T
E .G
D T
/1
9/
D30
% SAND% GRAVEL% COBBLES
COEFFICIENTS
coarse
BORING ID
CU
SOIL DESCRIPTION
21.7
REMARKS
GRAIN SIZE
DEPTH
SILT OR CLAYCOBBLES
GRAVEL SAND
mediumfine coarse fine
SieveSieveSieve
100.0 98.62 90.45 71.87 52.69 38.79 30.59 25.3 21.67
% Finer% Finer% Finer
% SILT
CC
D10
1.178
0.236
68.80.0B-08
USCS% CLAY% FINES
D60
1.5 - 3.5 9.6
CLAYEY SAND (SC)
SC
3/4" 3/8" #4 #10 #20 #40 #60 #100 #200 bdmathson
5.75 - 17.75
0.0010.010.1110100
3/4 1/23/8 30 403 60
HYDROMETERU.S. SIEVE OPENING IN INCHES
16 20
U.S. SIEVE NUMBERS
44 10063 2 10 14 506 2001.5 81 140
P E
R C
E N
T F
IN
E
R B
Y W
E
IG
H T
P E
R C
E N
T C
O A
R S
E R
B Y
W E
IG
H
T
GRAIN SIZE DISTRIBUTION
ASTM D422 / ASTM C136
PROJECT NUMBER: JD195236
PROJECT: Gettysburg National Military Park
Rehabilitation of Various Routes
SITE: 1195 Baltimore Pike Gettysburg, PA
CLIENT: VHB Inc Richmond, VA
EXHIBIT: B-6
19955 Highland Vista Dr Ste 170 Ashburn, VA
LA
B
O R
A T
O R
Y T
E S
T S
A R
E N
O T
V A
LI
D
IF
S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R
A
IN
S
IZ
E : U
S C
S
J D
G
E T
T Y
S B
U R
G N
A T
IO
N
A L
M
IL
IT
A
R Y
P A
R K
R E
H A
B A
N D
G E
T T
Y S
B U
R G
V
IS
IT
O
R S
C E
N T
E R
C O
M B
IN
E
D .G
P J
T E
R R
A C
O N
_D A
T A
T E
M P
LA
T
E .G
D T
/1
9/
D30
% SAND% GRAVEL% COBBLES
COEFFICIENTS
coarse
BORING ID
CU
SOIL DESCRIPTION
70.6
REMARKS
GRAIN SIZE
DEPTH
SILT OR CLAYCOBBLES
GRAVEL SAND
mediumfine coarse fine
SieveSieveSieve
100.0 97.45 90.78 82.31 76.87 74.42 73.12 71.97 70.64
% Finer% Finer% Finer
% SILT
CC
D10
20.10.0B-09
USCS% CLAY% FINES
D60
1.5 - 3.5 9.2
SILT with SAND (ML)
ML
3/4" 3/8" #4 #10 #20 #40…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .