This document contains a price schedule template for a federal contract solicitation seeking rehabilitation of visitor use areas and routes at Gettysburg National Military Park. The solicitation includes base line items and option line items for improvements such as pedestrian walkways, roadwork, retaining walls, excavation, and tree removal. Pricing is requested for the base scope of work as well as multiple options that could provide additional enhancements such as extending retaining walls, adding stone edging, temporary seeding, and trail construction. The solicitation instructs offerors to provide unit pricing and extended totals for line items and indicates that pricing will be evaluated for best value to the government. The National Park Service is the contracting agency, with an anticipated award date of 180 days after receipt of proposals.

View the file

Other files

File Type Posted
Second_RFI_Reponses_0005.pdf PDF
Sol_140P2022R0001_Amd_0005.pdf PDF
RFI_Responses_0004.pdf PDF
Sol_140P2022R0001_Amd_0004.pdf PDF
Attachment_25_General_References_0003.doc DOC document
Attachment_23_-_Implementation_of_Certification_0003.pdf PDF
Attachment_24_-_Certification_of_Vaccination_Form_0003.pdf PDF
Pre-Bid_Sign_In_Sheet_0003.docx DOCX document
Sol_140P2022R0001_Amd_0003.pdf PDF
GETT_250272_CLIN_1-17-Specifications_20211214_Amend02_0002.pdf PDF
Sol_140P2022R0001_Amd_0002.pdf PDF
GETT_250272_CLIN_1-17_BidSet_211214_Amendment_02_0002.pdf PDF
B08_Att_5_Drawings_CLIN_1-17_Sheets_1-17.pdf PDF
B08_Att_21_Proposal_Submission_Package.pdf PDF
B08_Att_17_Drainage_Calculations_CLIN_18.pdf PDF
B08_Att_12_Drawings_CLIN_1-17_Sheets_129-148.pdf PDF
B08_Att_18_Geotechnical_Report_CLIN_20-38.pdf PDF
B08_Att_13_Drawings_CLIN_18_Sheets_1-19.pdf PDF
B08_Att_4_Specifications_CLIN_20-38_Revised.pdf PDF
B08_Att_22_GETT_250272_-_PreBid_Site_Visit_Map.pdf PDF
B08_Att_8_Drawings_CLIN_1-17_Sheets_40-58.pdf PDF
B08_Att_20_Wage_Determination.pdf PDF
B08_Att_10_Drawings_CLIN_1-17_Sheets_76-103.pdf PDF
B08_Att_15_Drawings_CLIN_20-38_Sheets_1-27.pdf PDF
B08_Att_19_Environmental_Assessment.pdf PDF
B08_Att_6_Drawings_CLIN_1-17_Sheets_18-24.pdf PDF
Sol_140P2022R0001.pdf PDF
B08_Att_1_Specifications_CLIN_1-17_Revised.pdf PDF
B08_Att_3_Specifications_CLIN_19_Revised.pdf PDF
B08_Att_9_Drawings_CLIN_1-17_Sheets_59-75.pdf PDF
B08_Att_16_Reports_CLIN_1-17.pdf PDF
B08_Att_2_Specifications_CLIN_18_Revised.pdf PDF
B08_Att_14_Drawings_CLIN_19_Sheets_1-19.pdf PDF
B08_Solicitation_140P2022R0001.pdf PDF
B08_Att_7_Drawings_CLIN_1-17_Sheets_25-39.pdf PDF
B08_Att_11_Drawings_CLIN_1-17_Sheets_104-128.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule Template

CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER:
PARK - PMIS: GETT 250272, 318022, 318024, 2212017 and others
DEVELOPED AREA: Little Round Top
PROJECT TITLE: Rehabilitate Little Round Top Visitor Use Area
Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.
In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identity why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the Solicitation.
CONTRACT LINE ITEM NUMBER (CLIN)CONTRACT LINE ITEM (CLI) TITLEQUANTITYUNIT OF MEASUREUNIT PRICETOTAL PRICE
1aGettysburg Little Round Top Pedestrian Improvements (PMIS 250272)1LS
1bGettysburg Little Round Top Road Improvements (PMIS 250272)1LS
2Modified MSE Retaining Wall (PMIS 250272)1LS
3Demolition of Rock Outcroppings (PMIS 250272)1LS
4Excavation / Trenching Shallow Bedrock (PMIS 250272)1LS
5Tree Removal within Designated Areas of Grading Disturbance (PMIS 250272)1LS
6Restacking Historic Breastworks with Collected On-Site Stone (PMIS 250272)1LS
7Winter Work (PMIS 250272)1LS
TOTAL BASE PRICE (Contract Line Item Number 1 through 7) ------------------------------------$0.00
8Bid Option A: Restacking Historic Breastworks to 42” Height at All Locations with Imported Material (PMIS 250272)1LS
9Bid Option B: Stone Edging at Grade – Future Rail (PMIS 250272)1LS
10Bid Option C: Temporary Seeding (PMIS 250272)1LS
11Bid Option D: Tree Removal Selective Clearing (PMIS 250272)1LS
12Bid Option E: 20th Maine Area Improvements (PMIS 250272)1LS
13Bid Option F: 20th Maine Area Improvements Tree Removal within Designated Areas of Grading Disturbance (PMIS 250272)1LS
14Bid Option G: 20th Maine Area Improvements Tree Removal Selective Clearing (PMIS 250272)1LS
15Bid Option H: Trail, Northern Segment near Wheatfield Road (PMIS 250272)1LS
16Bid Option I: Trail, Northern Segment near Wheatfield Road Tree Removal Selective Clearing (PMIS 250272)1LS
17Bid Option J: Replace existing Stone Retaining Wall at Sykes Avenue Main Parking Lot with Stacked Block Granite Retaining Wall (PMIS 250272)1LS
TOTAL GETT-250272 OPTIONS PRICE (Contract Line Item Number 8 through 17) ------------------------------------$0.00
18Bid Option PA: Warren Avenue Paving Preservation (PMIS 318022)1LS
19Bid Option PB: Wright Avenue Paving Preservation (PMIS 318024)1LS
20Bid Option PC: Ayers Avenue (Rt. 044) Construction (PMIS 222018)1LS
21Bid Option PD: Berdan Avenue (Rt. 020) Construction (PMIS 221219)1LS
22Bid Option PE: Birney Avenue (Rt. 202) Construction (PMIS 268471)1LS
23Bid Option PF: Crawford Avenue (Rt. 017) Construction (PMIS 222017)1LS
24Bid Option PG: Cross-Brooke-DeTrobriand Avenue (Rt. 043) Construction (PMIS 268632)1LS
25Bid Option PH: Hancock Avenue (Rt. 010) Construction (PMIS 221224)1LS
26Bid Option PI: Howe Avenue (Rt. 054) Construction (PMIS 222016)1LS
27Bid Option PJ: Humphreys Avenue (Rt. 022) Construction (PMIS 221218)1LS
28Bid Option PK: North Sickles Avenue (Rt. 015) Construction (PMIS 221208)1LS
29Bid Option PL: Sedwick Avenue (Rt. 011) Construction (PMIS 221223)1LS
30Bid Option PM: South Confederate-Sykes Avenue (Rt. 012) Construction (PMIS 221222)1LS
31Bid Option PN: Big Round top Parking Area (Rt. 916) Construction (PMIS 311453)1LS
32Bid Option PO: South Sickles Avenue (Rt. 042) Construction (PMIS 222019)1LS
33Bid Option PP: Devils Den Parking Area (Rt. 914) Construction (PMIS 311454)1LS
34Bid Option PQ: United States Avenue (Rt. 014) Construction (PMIS 221220)1LS
35Bid Option PR: West Confederate Avenue (Rt. 018) Construction (PMIS 221207)1LS
36Bid Option PS: Virginia Memorial Loop Parking Area (Rt. 908) Construction (PMIS 311455)1LS
37Bid Option PT: Longstreet Tower Parking Area (Rt. 912) Construction (PMIS 311456)1LS
38Bid Option PU: Wheatfield Avenue (Rt. 013) Construction (PMIS 221221)1LS
TOTAL PRICE FOR PAVEMENT PRESERVATION OPTIONS (Contract Line Item Numbers 18 through 38) ------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 38) -----------$0.00
All measurement and payment information is included in the project specifications, Section 012700.

GETT 250272, 318022, 318024, 2212017 and others

CPS - &P

Design-Bid-Build Sample

CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER: N2011080811
PARK - PMIS: YELL 012345
DEVELOPED AREA: Old Faithful
PROJECT TITLE: Johnstonian Visitors Center
Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. For all unit-priced line items, provide the unit price and the extended total price. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in calculation of extended prices, the unit price governs. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.
In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identify why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the Solicitation.
CONTRACT LINE ITEM NUMBER (CLIN)CONTRACT LINE ITEM (CLI) TITLEQUANTITYUNIT OF MEASUREUNIT PRICETOTAL PRICE
1Visitors Center1Lump Sum$0.00
2Water Line400L.F.- 0
3Sanitary Sewer line200L.F.- 0
4Rock Excavation150C.Y.- 0
TOTAL BASE PRICE (Contract Line Item Number 1 through 4) ------------------------------------$0.00
5OPTION A, Geothermal Wells1Lump Sum$ - 0
6OPTION B, Photovoltaic system1Lump Sum- 0
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Numbers 5 and 6) -------------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 6) -------------$0.00
All measurement and payment information is included in the project specifications, Section 012700.

YELL - 012345

Design-Build Sample

CONTRACT PRICE SCHEDULE
SOLICITATION NUMBER: N2011080811
PARK - PMIS: YOSE 012345
DEVELOPED AREA: Yosemite Valley
PROJECT TITLE: Design and Build a New Structure
Notice: Refer to FAR Clause 52.217-5, Evaluation of Options, as prescribed in FAR 17. Offerors are required to submit, a minimum, an offer that conforms to the solicitation documents with pricing for Base line items and all option line items. Failure to do so may render the proposal unacceptable. On lump-sum line items, provide the total price only. If no specific line item exists for a portion of the work, include the costs in a related item. In case of error in summation, the total of the corrected amounts govern. Round totals and extended prices to whole dollars. The Government reserves the right to award any or no options at or after the time of award. At the option of the Government, the period for exercise of options at the proposed prices shall extend 180 calendar days from the date of award. Pricing will be evaluated based on what is determined to be the best value to the Government. Options may be exercised in any combination, order, or grouping deemed in the judgment of the Contracting Officer to offer the best value to the Government.
In addition to the offer that conforms to the solicitation documents, offerors are encouraged to submit alternate proposals that will result in cost savings to the Government. Such proposals shall clearly identity why the acceptance of the alternate proposal would be advantageous to the Government, see FAR Clause 52.215-1, Instructions to Offerors - Competitive Acquisition-Alternate II and DSC-36 Clause (Instructions for Submission of Offers and Other Information) in Section L of the Solicitation.
CONTRACT LINE ITEM NUMBER (CLIN)CONTRACT LINE ITEM (CLI) TITLEQUANTITYUNIT OF MEASUREUNIT PRICETOTAL PRICE
1Design1Lump Sum$0.00
2Construction1Lump Sum$0.00
TOTAL BASE PRICE (Contract Line Item Number 1 through 2) ---------------------------------------------------------$0.00
3OPTION A, Photovoltaic System1Lump Sum$0.00
TOTAL PRICE FOR ALL OPTIONS (Contract Line Item Number 3 ) -----------------------------------------------------$0.00
TOTAL PROPOSED PRICE - BASE PLUS ALL OPTIONS (Contract Line Item Numbers 1 through 3) ------------$0.00