B08_Att_17_Drainage_Calculations_CLIN_18.pdf

PDF 733 KB Posted

Attached to
GETT 250272 & Et Al. , Rehabilitate Little Round To
Solicitation number
140P2022R0001
Issued by

About this file

This document contains drainage calculations for a federal contract opportunity to repave Warren Avenue at Gettysburg National Military Park. The calculations include runoff calculations using the Rational Method to determine flow rates. Culvert sizing calculations using Manning's equation are provided in Appendix A to determine pipe capacity for four culverts. Riprap apron designs for culvert outfalls are presented in Appendix B based on 10-year peak design flows. The related federal contract opportunity is for project number 140P2022R0001 to rehabilitate the Little Round Top Visitor Use Area and various routes at Gettysburg National Military Park in Gettysburg, Pennsylvania. The work will be awarded by the National Park Service National Office within the Department of the Interior.

View the file

Other files

File Type Posted
Second_RFI_Reponses_0005.pdf PDF
Sol_140P2022R0001_Amd_0005.pdf PDF
RFI_Responses_0004.pdf PDF
Sol_140P2022R0001_Amd_0004.pdf PDF
Attachment_25_General_References_0003.doc DOC document
Attachment_23_-_Implementation_of_Certification_0003.pdf PDF
Attachment_24_-_Certification_of_Vaccination_Form_0003.pdf PDF
Pre-Bid_Sign_In_Sheet_0003.docx DOCX document
Sol_140P2022R0001_Amd_0003.pdf PDF
GETT_250272_CLIN_1-17-Specifications_20211214_Amend02_0002.pdf PDF
GETT_250272_-_Contract_Price_Schedule_20211214_0002.xlsx XLSX spreadsheet
Sol_140P2022R0001_Amd_0002.pdf PDF
GETT_250272_CLIN_1-17_BidSet_211214_Amendment_02_0002.pdf PDF
B08_Att_5_Drawings_CLIN_1-17_Sheets_1-17.pdf PDF
B08_Att_21_Proposal_Submission_Package.pdf PDF
B08_Att_12_Drawings_CLIN_1-17_Sheets_129-148.pdf PDF
B08_Att_18_Geotechnical_Report_CLIN_20-38.pdf PDF
B08_Att_13_Drawings_CLIN_18_Sheets_1-19.pdf PDF
B08_Att_4_Specifications_CLIN_20-38_Revised.pdf PDF
B08_Att_22_GETT_250272_-_PreBid_Site_Visit_Map.pdf PDF
B08_Att_8_Drawings_CLIN_1-17_Sheets_40-58.pdf PDF
B08_Att_20_Wage_Determination.pdf PDF
B08_Att_10_Drawings_CLIN_1-17_Sheets_76-103.pdf PDF
B08_Att_15_Drawings_CLIN_20-38_Sheets_1-27.pdf PDF
B08_Att_19_Environmental_Assessment.pdf PDF
B08_Att_6_Drawings_CLIN_1-17_Sheets_18-24.pdf PDF
Sol_140P2022R0001.pdf PDF
B08_Att_1_Specifications_CLIN_1-17_Revised.pdf PDF
B08_Att_3_Specifications_CLIN_19_Revised.pdf PDF
B08_Att_9_Drawings_CLIN_1-17_Sheets_59-75.pdf PDF
B08_Att_16_Reports_CLIN_1-17.pdf PDF
B08_Att_2_Specifications_CLIN_18_Revised.pdf PDF
B08_Att_14_Drawings_CLIN_19_Sheets_1-19.pdf PDF
B08_Solicitation_140P2022R0001.pdf PDF
B08_Att_7_Drawings_CLIN_1-17_Sheets_25-39.pdf PDF
B08_Att_11_Drawings_CLIN_1-17_Sheets_104-128.pdf PDF
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NATIONAL PARK SERVICE

GETTYSBURG NATIONAL MILITARY PARK

PAVEMENT MANAGEMENT – REPAVE

WARREN AVENUE (FHWA RT.016)

NPS CONTRACT NO. P15PC00039

TASK ORDER NUMBER 140P2020F0133

PMIS: GETT 318022

D R A I N A G E C A L C U L A T I O N S

WSP USA

412 MOUNT KEMBLE AVENUE

MORRISTOWN, NJ 07960

TEL.: +1 973 407-1000

WSP.COM

WSP PROJECT NO.: LF2042267.007

DATE: JUNE 29, 2021

PAVEMENT MANAGEMENT – REPAVE WARREN AVENUE (FHWA RT.016)

Project No. LF2042267.007

National Park Service

WSP

Page iii

TABLE OF

CONTENTS

1 DRAINAGE CALCULATIONS DESIGN

1.1 Runoff Calculations

1.2 Culvert Sizing Calculations

1.3 Riprap Apron Design Calculations

APPENDICES

A CULVERT SIZING CALCULATIONS

B RIPRAP APRON DESIGN CALCULATIONS

PAVEMENT MANAGEMENT – REPAVE WARREN AVENUE (FHWA RT.016)

Project No. LF2042267.007

National Park Service

WSP

1 DRAINAGE CALCULATIONS DESIGN

1.1 RUNOFF CALCULATIONS

Runoff calculations to calculation flow rates in support of the drainage system design were performed using the Rational Method, Q = ciA, in accordance with Chapter 5 of the Pennsylvania Department of Environmental Protection Erosion and Sediment Pollution Control Manual (The Manual), dated March 2012. Where “Q” is flow rate in cubic feet per second, “c” is the weighted runoff coefficient, “i” is rainfall intensity in inches per hour, and “A” is the drainage area in acres. The weighted runoff coefficient is calculated using 0.95, 0.6 and 0.3 for impervious, compacted earth and wooded covered areas, respectively. In accordance with The Manual, the 10-year design storm was utilized, and rainfall intensities determined.

1.2 CULVERT SIZING CALCULATIONS

Culvert sizing calculations are presented in Appendix B. Calculations are performed using Manning’s equation to determine pipe capacity. Consistent with The Manual, the culverts are sized for the 10-year design storm.

1.3 RIPRAP APRON DESIGN CALCULATIONS

Riprap aprons for outfalls are designed in accordance with The Manual and presented in Appendix C. The have been calculated based on the 10-year peak design flow at each outfall. Stone class size selected is based on The Manual’s riprap gradation.

APPENDIX

A CULVERT SIZING

CALCULATIONS

Project: By: TC Checked: RM

Location: Date: 3/31/2021 Date: 4/5/2021

PMIS No.: Sheet:

Runoff Coefficient Calculations

Total Area

C = 0.95 C = 0.6 C = 0.3 Acres

0.080 0.54

2.510 0.33

4.930 0.36

0.400 0.46

RUNOFF COEFFICIENT CALCULATIONS

Pavement Management - Repave Warren Avenue

Gettysburg National Military Park, Adams County, PA

318022

Drainage Area Imp. Compacted Earth Heavy Brush/Woods CW =

Σ(AxC)/ADesignation

Culvert 01 0.030 0.00 0.050

Culvert 02 0.070 0.06 2.380

Culvert 03 0.420 0.11 4.400

Culvert 04 0.100 0.000 0.300

PROJECT: DESIGN STORM = 10 YR. CAL. BY: DATE:

PMIS NO.: TYPE OF PIPES: MANNING'S N= CHK. BY: DATE:

N O

F R

O M

T O

L E

N G

T H

F

T

A C

R E

S A

(A C

R E

S

R U

N O

F F

C O

E F

T

IM

E O

F C

O N

(M

IN

R A

IN

I N

T E

N S

IT

Y

(I N

/H R

IN

L

E

Q

(C

S

S U

M

X

C

T O

T A

L T

IM

R A

IN

I N

T E

N S

H

R

P

IP

D

IS

C H

A R

G

S

S L

O P

D

IA

M E

T

R

F U

L L

F L

O W

P A

C

S

P E

R C

E N

T F

U L

N O

R M

A L

D E

P

H

N O

R M

V

L O

C

(F

S

E C

T R

A V

E L

T

IM

G R

O U

N D

E L

E V

U P

P E

R E

IN

V

E R

T E

L E

V

U P

P E

R E

IN

V

E R

T E

L E

V

L O

W E

R E

C O

V E

R A

T U

P P

E V

A T

IO

Culvert 01 Inlet 1 Headwall 1 30 0.080 0.544 5 6.96 0.30 0.044 5.00 6.96 0.30 1.67% 12 4.98 0.070 2.08 3.43 0.15 507.00 506.50

Culvert 02 Inlet 2 Headwall 3 50 2.510 0.325 5 6.96 5.68 0.817 5.00 6.96 5.68 4.00% 12 7.72 0.740 7.61 8.45 0.10 520.00 518.00

Culvert 03 Inlet 3 Headwall 4 27 4.930 0.362 5 6.96 12.42 1.785 5.00 4.2 7.50 1.85% 15 9.54 0.790 9.96 6.69 0.07 540.50 540.00

Culvert 04 Inlet 4 Headwall 2 28 0.400 0.463 5 6.96 1.29 0.185 5.00 6.96 1.29 0.50% 15 4.96 0.260 5.10 3.35 0.14 568.80 568.66

PIPE SECTION CULVERT CALCULATIONS CULVERT CALCULATIONS ELEVATIONS & COVER

C U L V E R T C A L C U L A T I O N S

Pavement Management - Repave Warren Avenue KTC 3/31/2021

318022 RCP / HDPE 0.012 RM 4/5/2021

APPENDIX

B RIPRAP APRON

DESIGN

CALCULATIONS

STANDARD E&S WORKSHEET # 20

Riprap Apron Outlet Protection

PROJECT NAME: Pavement Management – Repave Warren Avenue (FHWA RT.016) LOCATION: Gettysburg National Military Park, Adams County Pennsylvania

PREPARED BY: K T C DATE: 03/31/2021

CHECKED BY: R M DATE: 04/05/2021

NO.

PIPE

DIA.

Do (in.)

TAIL

WATER

COND.

(Max or

Min)

MAN.

“n”

FOR

SLOPE

(FT/FT)

(CFS)

V*

(FPS)

RIPRAP

SIZE

Rt (in)

Al (ft)

3Pd

Atw

Apron 1 15 Min 0.012 .005 4.96 3.35 R-3 12 8 3.75 12

Apron 2 15 Min 0.012 .019 9.54 6.69 R-3 15 11 3.75 15

*:The anticipated velocity (V) should not exceed the maximum permissible shown in Table 6.6 for the proposed riprap protection. Adjust for less than full pipe flow. Use Manning’s equation to calculate velocity for pipe slopes > 0.05 ft/ft.

-2

-0

/ M a rc h

, 2

/ P a g e

IG

U R

E

.3 ip ra p

A p ro n

D e s ig n

, M in im u m T a ilw a te r C o n d itio n d a p te d fro m U

S D

A

- N

R

S o t to b e u s e d fo r B o x C u lv e rts

O

T E

: D o n o t e x tra p o la te

USKC675920

Line

USKC675920

Line

USKC675920

Text Box Apron 1

USKC675920

Line

USKC675920

Line

USKC675920

Line

USKC675920

Text Box Apron 2

USKC675920

Line

363-2134-008 / March 31, 2012 / Page 135

TABLE 6.6

Riprap Gradation, Filter Blanket Requirements, Maximum Velocities

Percent Passing (Square Openings)

Class, Size

NO.

R-8

R-7

R-6

R-5

R-4

R-3 Rock Size (Inches)

42 100

30 100

24 15-50 100

18 15-50 100

15 0-15

12 0-15 15-50 100

9 15-50

6 0-15 15-50 100

4 0-15

3 0-15 15-50

2 0-15

Nominal Placement Thickness (inches)

Filter

Stone1

AASHTO #1

AASHTO #3

AASHTO #3

AASHTO #57

Vmax (ft/sec)

17.0

14.5

13.0

11.5

9.0

6.5

Adapted from PennDOT Pub. 408, Section 703.2(c), Table C

1 This is a general standard. Soil conditions at each site should be analyzed to determine actual filter size. A suitable woven or non-woven geotextile underlayment, used according to the manufacturer's recommendations, may be substituted for the filter stone for gradients < 10%.

TABLE 6.7

Comparison of Various Gradations of Coarse Aggregates

Total Percent Passing

AASHTO

NUMBER

6 ½ 4" 3 ½" 2 ½ 2" 1 ½ " 1" 3/4 " 1/2" 3/8" #4 #8 #16 #30 #100

1 100 90-100 25-60 0-15 0-5

3 100 90-100 35-70 0-15 0-5

5 100 90-100 20-55 0-10 0-5

57 100 90-100 25-60 0-10 0-5

67 100 90-100 20-55 0-10 0-5

7 100 90-100 40-70 0-15 0-5

8 100 85-100 10-30 0-10 0-5

10 100 75-100 10-30

PennDOT Publication 408, Section 703.2(c), Table C

Tables 6.6 and 6.7 should be placed on the plan drawings of all sites where riprap channel linings are proposed.