This is a Site Readiness Verification Form for General Water Technologies (GWT) Series Equipment installations. The document outlines mandatory infrastructure requirements that clients must satisfy before equipment deployment and specifies the verification process for confirming site readiness.

The form details three primary requirement categories: Water (Domestic) Feed requires a ¾" dedicated supply line per system with ¾" FNPT ball valve connections, minimum 50 PSI line pressure, and a pressure gauge positioned upstream of the ball valve for continuous verification. Drainage specifications call for a floor drain located within 6 feet of the system with a minimum capacity of 3 gallons per minute to accommodate equipment drainage of approximately 300-350 liters per hour, with the client indicating if water requires pumping to drain. Power requirements specify a dedicated 120 VAC/20 AMP circuit with surge protection of 2000 Joules or greater and a duplex receptacle per unit. Clients must provide photographic evidence of all site readiness requirements via email to service@genwater.com or brady@genwater.com. The document stipulates that equipment will not be shipped for future installations until readiness verification has been completed and confirmed by GWT.

View the file

Other files

File Type Posted
B05 Amdnment A0006-75H70126R00031.pdf PDF
B05 Amdnment A0005-75H70126R00031.pdf PDF
B05 Amdnment A0004-75H70126R00031.pdf PDF
B05 Amdnment A0003-75H70126R00031.pdf PDF
B01 Attachment J02 Statement of Work R1.pdf PDF
B01 RFP 75H70126R00031 updated by A0002.pdf PDF
B01 Attachment J02-e Santa Fe Plans Set.pdf PDF
B01 Attachment J02-h Taos Asbestos Inspection Report.pdf PDF
B01 Attachment J02-g Santa Fe Asbestos Inspection Report.pdf PDF
B05 Amdnment A0002-75H70126R00031.pdf PDF
B01 Attachment J02-f Taos Plans Set.pdf PDF
B01 Attachment J02-d TPSU_A2.1 Floor Plan.pdf PDF
B01 Attachment J02-c SFSU_Achitectural Detail Floor Plans A-27.1.pdf PDF
B05 Amdnment A0001-75H70126R00031.pdf PDF
B01 Attachment J06 IHS IEE Representation Form.pdf PDF
B01 RFP 75H70126R00031.pdf PDF
B01 Attachment J01-b Wage Determination NM20260031 20260518_Taos.pdf PDF
B01 Attachment J01-a Wage Determination NM20260048 20260518_Santa Fe.pdf PDF
B01 Attachment J05 Past Performance Questionnaire.docx DOCX document
B01 Attachment J02 Statement of Work.pdf PDF
B01 Attachment J03 Self Performed Calculation Sheet (Construction).docx DOCX document
B01 Attachment J02-a SOW Attachment A - cobas pure Site Requirements - Owner Facility Engineer Questions.pdf PDF
B01 Attachment J04 Company Specialized Experience Construction Form.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

900 North 400 West, Suite 11 North Salt Lake, UT 84054 Toll Free: 888-586-5654

Site Readiness Verification Form – GWT Series Equipment

GWT Site Requirements:

• Water (Domestic) Feed:

o ¾” Supply/feed line per system

§ ¾” dedicated line per system § ¾” FNPT ball valve connection from each drop o Minimum 50 PSI line pressure o Pressure gauge upstream side of ball valve connection for verification at all times

• Drainage:

o Floor drain near system (6 ft or closer preferred) o Drain capacity of 3 g/m flow recommended (equipment draining at approximately 300-350 l/h) o Client will indicate if water must be pumped to drain

• Power:

o Dedicated 120 VAC/20 AMP o Surge protection: 2000 Joules + o Duplex receptacle per unit

Client must confirm proof of site readiness items via photo attestation to service@genwater.com or brady@genwater.com. For future installations, equipment will not be shipped until readiness has been verified.