This is a draft Request for Proposal (RFP) for a Gunnery Training Systems (GTS) Indefinite-Delivery/Indefinite-Quantity (ID/IQ) contract. The five-year contract valued at $104.5 million will provide for tech refresh upgrades, current system production, concurrency upgrades, and Risk Management Framework recertification for multiple gunnery trainer programs for the U.S. Army and U.S. Marine Corps. The contract will utilize an acquisition approach to timely deliver supplies to all customers. The anticipated award is fourth quarter FY2021, with final deliveries required no later than two years beyond the ordering period end. The Department of the Army Materiel Command Contracting Command Orlando Contracting Center will issue the RFP.

View the file

Other files

File Type Posted
20210114 Updated Responses to Industry Questions.xlsx XLSX spreadsheet
20210112 Updated Responses to Industry Questions.xlsx XLSX spreadsheet
20201030 Responses to Industry Questions.xlsx XLSX spreadsheet
20201030 Question 12 Response.zip ZIP file
Attch 04 QASP_07012020.docx DOCX document
Attch 12 DO 01 US Army M1A1 C-AGTS SS Rev F (80D-CAM1A1-E001).docx DOCX document
Attch 11 DO 01 US Army M1A2 SEP PIDS Rev P (139053-3).docx DOCX document
Attch 16 DO 02 PIDS Stryker MGS AGTS Rev K (74D-STMGS-B001).docx DOCX document
Attch 06 Performance Assessment Questionnaire.docx DOCX document
Attch 17 DO 03 SOW_Bradley_202000817.docx DOCX document
Attch 01_IQID SOW_20200817.docx DOCX document
Attch 09 DO 01 CDRLs_Abrams_20200709.pdf PDF
Exhibits A-C CDRLs_IDIQ_20200901.pdf PDF
Attch 07 Solicitation Question and Comment Form.docx DOCX document
Attch 10 DO 01 Section F_ Abrams_20200702.docx DOCX document
Attch 24 DO 04 USMC LAV-25 PIDS Rev F (23D-MCLAV25-A007).docx DOCX document
Attch 23 DO 04 Section F_LAV-25_20200728.docx DOCX document
Attch 15 DO 02 Section F_Stryker_20200616.docx DOCX document
Attch 03 GFP List_20200709.xlsx XLSX spreadsheet
Attch 19 DO 03 Section F_Bradley_20200702.docx DOCX document
Attch 14 DO 02 CDRLs_Stryker_20200709.pdf PDF
Attch 20 DO 03 Bradley-COFT System Spec Rev J (PRF-PT-00514).docx DOCX document
Attch 18 DO 03 CDRLs_Bradley_20200709.pdf PDF
Attch 13 DO 02 SOW_Stryker_20200817.docx DOCX document
Attch 02 DD 254.pdf PDF
GTS Draft RFP_W900KK-21-R-0055_20200915.docx DOCX document
Attch 21 DO 04 SOW_LAV-25_2020017.docx DOCX document
Attch 08 DO 01 SOW_Abrams_20200817.docx DOCX document
Attch 05 Proposed Prices Spreadsheet 20200911.xlsx XLSX spreadsheet
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MCSC PM TRASYS

6. REQUIRING OFFICE

SOW 3.1

5. CONTRACT REFERENCE

DI-MGMT-80227

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

See Block 16

2. TITLE OF THE DATA ITEM

A001

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-D-XXX4

E. CONTRACT/PR NO.

GTS LAV-25 AGTS

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMT

A

B. EXHIBIT

A. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13. DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

12. DATE OF FIRST

MNTHLY

10. FREQUENCY

Repro Reg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATE

I. APPROVED BY

H. DATE

G. PREPARED BY

Block 2: Contractors Progress, Status and Management Report

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER SUBMITTING

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

REQUIRED FOR EVERY DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT

SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND

U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO MARINE CORPS SYSTEM COMMAND (MCSC), PROGRAM MANAGER, TRAINING

SYSTEM (PM TRASYS), 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

3. BLOCK 12: INITIAL SUBMISSION SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT ON A MONTHLY BASIS.

5. BLOCK 14: SUBMITTED REPORTS TO MCSC PM TRASYS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL, DANIEL.LOTH@USMC.MIL AND

HUY.NGUYEN@NAVY.MIL.

6. CONTRACTOR FORMAT IS ACCEPTABLE.

7. THE GOVERNMENT WILL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS

1 MCSC PM TRASYS

1 0 0 15. TOTAL

18. ESTIMATED

TOTAL PRICE

17. PRICE GROUP

Page 1 of 1 Pages PREVIOUS EDITION MAY BE USED. DD FORM 1423-1, FEB 2001

15 July 2010

SOW 3.1.2

DI-MGMT-81861A

INTEGRATED MASTER SCHEDULE FORMAT 6

Integrated Program Management Report (IPMR)

A002

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

HUY.NGUYEN@NAVY.MIL

15 July 2020

SOW 3.1.3

DI-MGMT-81651

Contract Invoicing and Payment Report

A003

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

SOW 3.1.5.8

DI-SESS-81022DA

A004

TM OTHER SESS

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

1TIME

Block 2: Configuration Audit Summary Report and Certification

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO PROGRAM MANAGER, TRAINING SYSTEM (PM TRASYS), MARINE CORPS

SYSTEM COMMAND (MCSC), 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751,

ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50,

U.S.C., APP. 2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT

TO SEVERE CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE

PROVISIONS OF DOD DIRECTIVE 5230.25.

3. BLOCK 12: SHALL BE DUE 10 DAYS AFTER COMPLETION OF THE PHYSICAL

CONFIGURATION AUDIT.

4. BLOCK 14: SUBMITTED REPORTS TO MCSC PM TRASYS REPRODUCIBLE

5. CONTRACTOR FORMAT IS ACCEPTABLE.

6. THE GOVERNMENT WILL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR REJECTION.

7. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

SOW 3.1.5.13

DI-SESS-80639D

Engineering Change Proposal (ECP)

A005

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

ASREQ

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO PROGRAM MANAGER, TRAINING SYSTEM (PM TRASYS), MARINE CORPS

SYSTEM COMMAND (MCSC), 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751,

ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50,

U.S.C., APP. 2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT

3. BLOCK 12: SHALL BE DUE 5 DAYS AFTER COMPLETION OF AN ECP REVIEW.

CONTRACT AS REQUIRED.

7. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR

SOW 3.1.5.14, 3.1.8, 3.2.7 & 3.5.1

DI-ADMN-81505

Report, Record of Meeting/Minutes

A006

TM OTHER ADMN

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIAATELY AFTER SUBMITTING

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

2. BLOCK 9: APPROVED FOR PUBLIC RELEASE.

3. BLOCK 12: SHALL BE DUE 5 DAYS AFTER COMPLETION OF A MEETING.

SOW 3.1.5.15

DI-SESS-80640D

Request for Variance (RFV)

A007

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO PROGRAM MANAGER, TRAINING SYSTEM (PM TRASYS), MARINE CORPS

SYSTEM COMMAND (MCSC), 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751,

ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50,

U.S.C., APP. 2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT

PROVISIONS OF DOD DIRECTIVE 5230.25

3. BLOCK 12: SHALL BE DUE WHEN A REQUEST FOR VARIANCE IS PROPOSED

TO THE ESTABLISHED CONFIGURATION MANAGEMENT BASELINE.

SOW 3.1.5.15

DI-SESS-80640D

Request for Variance (RFV)

A007

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO PROGRAM MANAGER, TRAINING SYSTEM (PM TRASYS), MARINE CORPS

SYSTEM COMMAND (MCSC), 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751,

ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50,

U.S.C., APP. 2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT

PROVISIONS OF DOD DIRECTIVE 5230.25

3. BLOCK 12: SHALL BE DUE WHEN A REQUEST FOR VARIANCE IS PROPOSED

TO THE ESTABLISHED CONFIGURATION MANAGEMENT BASELINE.

SOW 3.1.7

DI-MGMT-81809

Risk Management Status Report

A008

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO PROGRAM MANAGER, TRAINING SYSTEM (PM TRASYS), MARINE CORPS

SYSTEM COMMAND (MCSC), 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751,

ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50,

U.S.C., APP. 2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT

CONTRACT ON A MONTHLY BASIS, AS REQUIRED.

5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-TRADE-VTS REPRODUCIBLE

6. CONTRACTOR FORMAT IS ACCEPTABALE.

SOW 3.1.8 & 3.2.7

DI-MGMT-81605

Briefing Material

A009

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO PROGRAM MANAGER, TRAINING SYSTEM (PM TRASYS), MARINE CORPS

SYSTEM COMMAND (MCSC), 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751,

ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50,

U.S.C., APP. 2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT

3. BLOCK 12: SHALL BE DUE 10 DAYS PRIOR TO MEETINGS.

5. BLOCK 14: SUBMITTED MATERIAL TO MCSC PM TRASYS REPRODUCIBLE

7. THE GOVERNMENT WILL HAVE 5 DAYS FOR REVIEW AND ACCEPTANCE OR

8. THE CONTRACTOR SHALL HAVE 5 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

SOW 3.2

DI-SESS-81785A

Systems Engineering Management Plan (SEMP)

A00A

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

3. BLOCK 12: SHALL BE DUE 20 DAYS AFTER AWARD OF CONTRACT.

4. BLOCK 14: SUBMITTED REPORTS TO MCSC PM TRASYS REPRODUCIBLE

6. THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE OR REJECTION.

7. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

SOW 3.2.5.1

DI-MGMT-82001

A00B

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

Block 2: DOD Risk Management Framework (RMF) Package Deliverables

1. BLOCK 4: PARAGRAPHS 2.1.1, 2.1.4, 2.1.6, 2.1.7, 2.1.8, 2.1.9, 2.1.10,

2.1.11, 2.1.13 (SCORECARD), 2.1.14, 2.1.15 & 2.1.17 ARE NOT APPLICABLE. FOR

PARAGRAPH 2.1.16, A SINGLE DEVIATION REPORT (DR) IN SPREADSHEET FORMAT SHALL

BE UTILIZED INSTEAD OF MULTIPLE CYBER SECURITY WAIVER REQUEST DOCUMENTS.

2. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

3. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO PROGRAM MANAGER, TRAINING SYSTEM (PM TRASYS), MARINE CORPS

SYSTEM COMMAND (MCSC), 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751,

ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50,

U.S.C., APP. 2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT

4. BLOCK 12: SHALL BE DUE 10 DAYS AFTER SECURITY CONTROL ASSESSMENT (SCA)

EVENT.

SOW 3.2.6.3

DI-ADMN-80925A

(SAR) SAFETY ASSESSMENT REPORT

REVISIONS TO EXISTING GOVERNMENT DOCUMENTS

A00C

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

1TIME/R

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO PROGRAM MANAGER, TRAINING SYSTEM (PM TRASYS), MARINE CORPS

SYSTEM COMMAND (MCSC), 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751,

ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50,

U.S.C., APP. 2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT

3. BLOCK 12: SHALL BE DUE 60 DAYS PRIOR TO THE TEST READINESS REVIEW.

4. BLOCK 13: REVISIONS AS REQUIRED THROUGH LIFE OF THE CONTRACT.

5. BLOCK 14: A FINAL REPRODUCIBLE, ELECTRONIC COPY COMPATIBLE WITH

MICROSOFT OFFICE OR ADOBE ACROBAT SHALL BE FURNISHED VIA

ELECTRONIC EMAIL: DANIEL.LOTH@USMC.MIL AND HUY.NGUYEN@NAVY.MIL

6. THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE OR

7. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORTATE GOVERNMENT COMMENTS.

SOW 3.2.6.3

(SAR) SAFETY ASSESSMENT REPORT

A00C

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO PROGRAM MANAGER, TRAINING SYSTEM (PM TRASYS), MARINE CORPS

SYSTEM COMMAND (MCSC), 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751,

ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50,

U.S.C., APP. 2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT

5. BLOCK 14: A FINAL REPRODUCIBLE, ELECTRONIC COPY COMPATIBLE WITH

ELECTRONIC EMAIL: DANIEL.LOTH@USMC.MIL AND HUY.NGUYEN@NAVY.MIL

6. THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE OR

7. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORTATE GOVERNMENT COMMENTS.

SOW 3.2.6.4

DI-SAFT-80106C

HEALTH HAZARD ASSESSMENT REPORT (HHAR)

A00D

TM OTHER SAFT

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO PROGRAM MANAGER, TRAINING SYSTEM (PM TRASYS), MARINE CORPS

SYSTEM COMMAND (MCSC), 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751,

ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50,

U.S.C., APP. 2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT

4. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-TRADE-VTS REPRODUCIBLE

SOW 3.2.6.6.1

DI-MISC-81622

TEST PROBLEM REPORT (TPR)

A00E

TM OTHER MISC

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO PROGRAM MANAGER, TRAINING SYSTEM (PM TRASYS), MARINE CORPS

SYSTEM COMMAND (MCSC), 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751,

ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50,

U.S.C., APP. 2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT

3. BLOCK 12: SHALL BE DUE 10 DAYS AFTER COMPLETION OF CONTRACTOR

AND/OR GOVERNMENT TEST EVENTS.

REJECTION OF EACH SUBMITTAL.

8. THE CONTRACTOR SHALL HAVE 5 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

SOW 3.3.3

DI-MGMT-81804A

A00F

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

Block 2: Item Unique Identification (IUID) Marking Activity, Validation and

Verification Report

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

3. BLOCK 12: SHALL BE DUE 20 DAYS PRIOR TO THE TEST READINESS REVIEW.

4. BLOCK 13: REVISIONS SHALL CONTINUE THROUGH THE END OF THE

7. THE GOVERNMENT SHALL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR

SOW 3.5

DI-NDTI-80603A

(IPAT/OSAT)

Test Procedure

A00G

TM OTHER NDTI

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO PROGRAM MANAGER, TRAINING SYSTEM (PM TRASYS), MARINE CORPS

SYSTEM COMMAND (MCSC), 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751,

ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50,

U.S.C., APP. 2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT

3. BLOCK 12: SHALL BE DUE 20 DAYS PRIOR TO THE TEST READINESS REVIEW.

5. BLOCK 14: A FINAL REPRODUCIBLE ELECTRONIC COPY COMPATIBLE WITH

ELECTRONIC MAIL: DANIEL.LOTH@USMC.MIL AND HUY.NGUYEN@NAVY.MIL

SOW 3.5

DI-NDTI-80809B

(IPAT/OSAT)

Test/Inspection Report

A00H

TM OTHER NDTI

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO PROGRAM MANAGER, TRAINING SYSTEM (PM TRASYS), MARINE CORPS

SYSTEM COMMAND (MCSC), 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751,

ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50,

U.S.C., APP. 2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT

3. BLOCK 12: SHALL BE DUE 10 DAYS AFTER COMPLETION OF AN IN-PLANT

ACCEPTANCE TEST/ON-SITE ACCEPTANCE TEST.

5. BLOCK 14: A FINAL REPRODUCIBLE ELECTRONIC COPY COMPATIBLE WITH

ELECTRONIC MAIL: DANIEL.LOTH@USMC.MIL AND HUY.NGUYEN@NAVY.MIL

SOW 3.3.1.1

DI-PSSS-80134B

PROPOSED SPARE PARTS LIST

A00I

TM OTHER PSSS

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

2TIME/R

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO PROGRAM MANAGER, TRAINING SYSTEM (PM TRASYS), MARINE CORPS

SYSTEM COMMAND (MCSC), 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751,

ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50,

U.S.C., APP. 2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT

3. BLOCK 12: DRAFT SUBMISSION SHALL BE DUE 20 DAYS PRIOR TO THE

CRITICAL DESIGN REVIEW (CDR).

4. BLOCK 13: FINAL SUBMISSION SHALL BE DUE 40 DAYS PRIOR TO THE

DELIVERY OF EACH SPARE PART CLIN.

5. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

6. BLOCK 14: SUBMITTED REPORTS TO MCSC PM TRASYS REPRODUCIBLE

7. CONTRACTOR FORMAT IS ACCEPTABLE.

8. SUBMISSION SHALL BE EDITABLE, SEARCHABLE, UNLOCKED, AND

REPRODUCIBLE IN NATIVE FORMAT.

9. THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE OR

10. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

1 1 MCSC PM TRASYS

2 0 1 15. TOTAL

SOW 3.1.14

DI-MGMT-80441C

GOVERNMENT PROPERTY INVENTORY REPORT

A00J

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

ANNLY

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

3. BLOCK 12: SHALL BE DUE 40 DAYS AFTER CONTRACT AWARD.

CONTRACT ON AN ANNUAL BASIS.

6. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR

7. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

SOW 3.2.2.1 & 3.2.3.1

B001

B

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

3TIME/R

Block 3: (PIDS) PRIME ITEM DEVELOPMENT SPECIFICATION (LAV-25 AGTS).

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO PROGRAM MANAGER, TRAINING SYSTEM (PM TRASYS), MARINE CORPS

SYSTEM COMMAND (MCSC), 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751,

ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50,

U.S.C., APP. 2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT

3. BLOCK 12: FIRST DRAFT SUBMISSION SHALL BE DUE 5 DAYS PRIOR TO THE

SYSTEM REQUIREMENTS REVIEW (SRR).

4. BLOCK 13: SECOND DRAFT SUBMISSION SHALL BE DUE 5 DAYS PRIOR TO

THE PRELIMINARY DESIGN REVIEW (PDR).

5. BLOCK 13: FINAL SUBMISSION SHALL BE DUE 20 DAYS PRIOR TO THE

6. BLOCK 13: REVISIONS AS REQUIRED THROUGH LIFE OF THE CONTRACT.

7. BLOCK 14: SUBMITTED REPORTS TO MCSC PM TRASYS REPRODUCIBLE

8. BLOCK 14: THE PIDS SHALL BE DELIVERED IN A DOORS IMPORTABLE FORMAT.

9. THE GOVERNMENT WILL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR

10. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORTATE GOVERNMENT COMMENTS.

1 2 MCSC PM TRASYS

1 0 2 15. TOTAL

SOW 3.2.1.1

DI-MGMT-82133

B002

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

3TIME/R

Block 2: REQUIREMENTS TRACEABILITY VERIFICATION MATRIX (RTVM).

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO PROGRAM MANAGER, TRAINING SYSTEM (PM TRASYS), MARINE CORPS

SYSTEM COMMAND (MCSC), 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751,

ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50,

U.S.C., APP. 2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT

3. BLOCK 12: FIRST DRAFT SUBMISSION SHALL BE DUE 5 DAYS PRIOR TO THE

SYSTEM REQUIREMENTS REVIEW (SRR).

4. BLOCK 13: SECOND DRAFT SUBMISSION SHALL BE DUE 5 DAYS PRIOR TO

THE PRELIMINARY DESIGN REVIEW (PDR).

5. BLOCK 13: FINAL SUBMISSION SHALL BE DUE 20 DAYS PRIOR TO THE

6. BLOCK 13: REVISIONS AS REQUIRED THROUGH LIFE OF THE CONTRACT.

7. BLOCK 14: SUBMITTED REPORTS TO MCSC PM TRASYS REPRODUCIBLE

8. BLOCK 14: THE RTVM SHALL BE DELIVERED IN A DOORS IMPORTABLE FORMAT.

9. THE GOVERNMENT WILL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR

10. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORTATE GOVERNMENT COMMENTS.

1 2 MCSC PM TRASYS

1 0 2 15. TOTAL

SOW 3.2.3.2

B003

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

Block 3: (CSPEI) COMPUTER SOFTWARE PRODUCT END ITEMS (LAV-25 AGTS).

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER SUBMITTING

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO PROGRAM MANAGER, TRAINING SYSTEM (PM TRASYS), MARINE CORPS

SYSTEM COMMAND (MCSC), 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751,

ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50,

U.S.C., APP. 2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT

3. BLOCK 12: SHALL BE DUE AT THE FIRST ON-SITE ACCEPTANCE TEST (OSAT).

5. BLOCK 14: SUBMISSION TO MCSC PM TRASYS SHALL INCLUDE SOURCE FILES,

ALL SOFTWARE NECESSARY TO OPERATE THE SYSTEM, AND ALL SOFTWARE

LICENSE DOCUMENTATION.

6. BLOCK 14: SUBMISSION TO LCCS LIBRARY SHALL INCLUDE ALL SOFTWARE

NECESSARY TO OPERATE AND MAINTAIN THE SYSTEM.

7. BLOCK 14: ONE HARD COPY PER MOBILE SYSTEM SHALL BE DELIVERED. ONE

HARD COPY PER PERMANENT/RELOCATABLE/DEPLOYABLE/TABLETOP SYSTEM PER SITE SHALL

BE DELIVERED.

8. THE GOVERNMENT WILL HAVE 5 DAYS FOR REVIEW AND ACCEPTANCE OR

9. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORTATE GOVERNMENT COMMENTS.

1 LCCS Library

1 SEE BLOCK 16

2 MCSC PM TRASYS

0 3 0 15. TOTAL

SOW 3.2.3.2

B004

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

Block 3: (CRISD) COMPUTER RESOURCES INTEGRATED SUPPORT DOCUMENT (LAV-25

AGTS).

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO PROGRAM MANAGER, TRAINING SYSTEM (PM TRASYS), MARINE CORPS

SYSTEM COMMAND (MCSC), 12211 SCIENCE DRIVE, ORLANDO, FL 32826-3224.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS

RESTRICTED BY THE ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751,

ET SEQ.) OR THE EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50,

U.S.C., APP. 2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT

3. BLOCK 12: SUBMISSION SHALL BE DUE 5 DAYS PRIOR TO THE TEST

READINESS REVIEW (TRR).

6. BLOCK 14: ONE HARD COPY PER MOBILE SYSTEM SHALL BE DELIVERED. ONE

HARD COPY PER PERMANENT/RELOCATABLE/DEPLOYABLE/TABLETOP PER SITE SHALL BE

DELIVERED.

8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORTATE GOVERNMENT COMMENTS.

1 SEE BLOCK 16

1 MCSC PM TRAYS

2 1 0 15. TOTAL

SOW 3.2.8

DI-SESS-81003E

COMMERCIAL DRAWINGS/MODELS AND ASSOCIATED LISTS

B005

X TM OTHER

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

EFFECTIVE

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .