Attch 14 DO 02 CDRLs_Stryker_20200709.pdf

PDF 475 KB Posted

Attached to
DRAFT RFP: Gunnery Training Systems
Solicitation number
W900KK21R0055
Issued by

About this file

This document is a draft Request for Proposal for an Indefinite-Delivery/Indefinite-Quantity contract to provide Gunnery Training Systems for the U.S. Army and U.S. Marine Corps. The contract will have a five-year ordering period and a ceiling value of $104.5 million. It will be used to implement technology refreshes, produce current systems, upgrade concurrency requirements, and recertify Risk Management Frameworks for multiple gunnery trainer programs. The anticipated award date is fourth quarter Fiscal Year 2021. Responses are due based on the final solicitation. The previous related posting was an RFI issued in 2018. The contract will be awarded and administered by the Department of the Army Materiel Command Contracting Command Orlando Contracting Center.

View the file

Other files

File Type Posted
20210114 Updated Responses to Industry Questions.xlsx XLSX spreadsheet
20210112 Updated Responses to Industry Questions.xlsx XLSX spreadsheet
20201030 Responses to Industry Questions.xlsx XLSX spreadsheet
20201030 Question 12 Response.zip ZIP file
Attch 04 QASP_07012020.docx DOCX document
Attch 12 DO 01 US Army M1A1 C-AGTS SS Rev F (80D-CAM1A1-E001).docx DOCX document
Attch 11 DO 01 US Army M1A2 SEP PIDS Rev P (139053-3).docx DOCX document
Attch 16 DO 02 PIDS Stryker MGS AGTS Rev K (74D-STMGS-B001).docx DOCX document
Attch 06 Performance Assessment Questionnaire.docx DOCX document
Attch 22 DO 04 CDRLs_LAV-25_20200715.pdf PDF
Attch 17 DO 03 SOW_Bradley_202000817.docx DOCX document
Attch 01_IQID SOW_20200817.docx DOCX document
Attch 09 DO 01 CDRLs_Abrams_20200709.pdf PDF
Exhibits A-C CDRLs_IDIQ_20200901.pdf PDF
Attch 07 Solicitation Question and Comment Form.docx DOCX document
Attch 10 DO 01 Section F_ Abrams_20200702.docx DOCX document
Attch 24 DO 04 USMC LAV-25 PIDS Rev F (23D-MCLAV25-A007).docx DOCX document
Attch 23 DO 04 Section F_LAV-25_20200728.docx DOCX document
Attch 15 DO 02 Section F_Stryker_20200616.docx DOCX document
Attch 03 GFP List_20200709.xlsx XLSX spreadsheet
Attch 19 DO 03 Section F_Bradley_20200702.docx DOCX document
Attch 20 DO 03 Bradley-COFT System Spec Rev J (PRF-PT-00514).docx DOCX document
Attch 18 DO 03 CDRLs_Bradley_20200709.pdf PDF
Attch 13 DO 02 SOW_Stryker_20200817.docx DOCX document
Attch 02 DD 254.pdf PDF
GTS Draft RFP_W900KK-21-R-0055_20200915.docx DOCX document
Attch 21 DO 04 SOW_LAV-25_2020017.docx DOCX document
Attch 08 DO 01 SOW_Abrams_20200817.docx DOCX document
Attch 05 Proposed Prices Spreadsheet 20200911.xlsx XLSX spreadsheet
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SFAE-STRI-ST-VTS

6. REQUIRING OFFICE

SOW 3.1

5. CONTRACT REFERENCE

DI-MGMT-80227

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

See Block 16

2. TITLE OF THE DATA ITEM

A001

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-D-XXX3

E. CONTRACT/PR NO.

GTS Stryker MGS AGTS

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

MNTHLY

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

Block 2: Contractors Progress, Status and Management Report

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO

OPERATIONAL USE, EFFECTIVE (award date). OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS.

3. BLOCK 12: INITIAL SUBMISSION SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT ON A MONTHLY BASIS.

5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL,

MARY.G.RYAN10.CIV@MAIL.MIL AND SCOTT.A.TURNER1.CIV@MAIL.MIL

6. CONTRACTOR FORMAT IS ACCEPTABLE.

7. THE GOVERNMENT WILL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

17. PRICE GROUP

Page 1 of 1 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001

SOW 3.1.2

5. CONTRACT REFERENCE

DI-MGMT-81861A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

INTEGRATED MASTER SCHEDULE FORMAT 6Integrated Program Management Report (IPMR)

2. TITLE OF THE DATA ITEM

A002

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-D-XXX3

E. CONTRACT/PR NO.

GTS Stryker MGS AGTS

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

MNTHLY

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND

U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS.

3. BLOCK 12: INITIAL SUBMISSION SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT ON A MONTHLY BASIS.

5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL, MARY.G.RYAN10.CIV@MAIL.MIL

AND SCOTT.A.TURNER1.CIV@MAIL.MIL

6. CONTRACTOR FORMAT IS ACCEPTABLE.

7. THE GOVERNMENT WILL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.1.3

5. CONTRACT REFERENCE

DI-MGMT-81651

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Contract Invoicing and Payment Report

2. TITLE OF THE DATA ITEM

A003

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-D-XXX3

E. CONTRACT/PR NO.

GTS Stryker MGS AGTS

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

MNTHLY

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND

U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS.

3. BLOCK 12: INITIAL SUBMISSION SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT ON A MONTHLY BASIS.

5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL, MARY.G.RYAN10.CIV@MAIL.MIL

AND SCOTT.A.TURNER1.CIV@MAIL.MIL

6. CONTRACTOR FORMAT IS ACCEPTABLE.

7. THE GOVERNMENT WILL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.1.5.8

5. CONTRACT REFERENCE

DI-SESS-81022D

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

See Block 16

2. TITLE OF THE DATA ITEM

A004

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-D-XXX3

E. CONTRACT/PR NO.

GTS Stryker MGS AGTS

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SESSA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

N/A

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

1TIME

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

Block 2: Configuration Audit Summary Report and Certification

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO

OPERATIONAL USE, EFFECTIVE (award date). OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI,

SFAE-STRI-ST-VTS. WARNING - THIS DOCUMENT CONTAINS TECHNICAL

DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS-EXPORT CONTROL ACT

(TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION

ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401, ET SEQ.

VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL

PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS OF DOD

DIRECTIVE 5230.25.

3. BLOCK 12: SHALL BE DUE 10 DAYS AFTER COMPLETION OF THE PHYSICAL

CONFIGURATION AUDIT.

4. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL,

MARY.G.RYAN10.CIV@MAIL.MIL, ANDREW.B.RICHARDS.CIV@MAIL.MIL AND

SCOTT.A.TURNER1.CIV@MAIL.MIL

5. CONTRACTOR FORMAT IS ACCEPTABLE.

6. THE GOVERNMENT WILL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR REJECTION.

7. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.1.5.13

5. CONTRACT REFERENCE

DI-SESS-80639D

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Engineering Change Proposal (ECP)

2. TITLE OF THE DATA ITEM

A005

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-D-XXX3

E. CONTRACT/PR NO.

GTS Stryker MGS AGTS

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SESSA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE

AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO

OPERATIONAL USE, EFFECTIVE (award date). OTHER REQUESTS FOR THIS

DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI,

SFAE-STRI-ST-VTS. WARNING - THIS DOCUMENT CONTAINS TECHNICAL

DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS-EXPORT CONTROL ACT

(TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION

ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401, ET SEQ.

VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL

PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS OF DOD

DIRECTIVE 5230.25.

3. BLOCK 12: SHALL BE DUE 5 DAYS AFTER COMPLETION OF AN ECP REVIEW.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT AS REQUIRED.

5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL,

MARY.G.RYAN10.CIV@MAIL.MIL, ANDREW.B.RICHARDS.CIV@MAIL.MIL AND

SCOTT.A.TURNER1.CIV@MAIL.MIL

6. CONTRACTOR FORMAT IS ACCEPTABLE.

7. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.1.5.14, 3.1.8, 3.2.7, & 3.5.1

5. CONTRACT REFERENCE

DI-ADMN-81505

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Report, Record of Meeting/Minutes

2. TITLE OF THE DATA ITEM

A006

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-D-XXX3

E. CONTRACT/PR NO.

GTS Stryker MGS AGTS

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER ADMNA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

A

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: APPROVED FOR PUBLIC RELEASE.

3. BLOCK 12: SHALL BE DUE 5 DAYS AFTER COMPLETION OF A MEETING.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT AS REQUIRED.

5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL, MARY.G.RYAN10.CIV@MAIL.MIL

AND SCOTT.A.TURNER1.CIV@MAIL.MIL

6. CONTRACTOR FORMAT IS ACCEPTABLE.

7. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.1.5.15

5. CONTRACT REFERENCE

DI-SESS-80640D

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Request for Variance (RFV)

2. TITLE OF THE DATA ITEM

A007

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-D-XXX3

E. CONTRACT/PR NO.

GTS Stryker MGS AGTS

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SESSA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BY

15-MAY-2019

H. DATEG. PREPARED BY

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER SUBMITTING

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

REQUIRED FOR EVERY DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT

SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND

U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS. WARNING - THIS

DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE

ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE

EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP.

2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS

OF DOD DIRECTIVE 5230.25.

3. BLOCK 12: SHALL BE DUE WHEN A REQUEST FOR VARIANCE IS PROPOSED

TO THE ESTABLISHED CONFIGURATION MANAGEMENT BASELINE.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT AS REQUIRED.

5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL, MARY.G.RYAN10.CIV@MAIL.MIL,

ANDREW.B.RICHARDS.CIV@MAIL.MIL AND SCOTT.A.TURNER1.CIV@MAIL.MIL

6. CONTRACTOR FORMAT IS ACCEPTABLE.

7. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.1.7

5. CONTRACT REFERENCE

DI-MGMT-81809

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Risk Management Status Report

2. TITLE OF THE DATA ITEM

A008

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-D-XXX3

E. CONTRACT/PR NO.

GTS Stryker MGS AGTS

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

MNTHLY

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND

U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,

EFFECTIVE 9 MAY 19. OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS. WARNING - THIS

DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE

ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE

EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP.

2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS

OF DOD DIRECTIVE 5230.25.

3. BLOCK 12: INITIAL SUBMISSION SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT ON A MONTHLY BASIS, AS REQUIRED.

5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL, MARY.G.RYAN10.CIV@MAIL.MIL

AND SCOTT.A.TURNER1.CIV@MAIL.MIL

6. CONTRACTOR FORMAT IS ACCEPTABALE.

7. THE GOVERNMENT WILL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.1.8 & 3.2.7

5. CONTRACT REFERENCE

DI-MGMT-81605

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Briefing Material

2. TITLE OF THE DATA ITEM

A009

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-D-XXX3

E. CONTRACT/PR NO.

GTS Stryker MGS AGTS

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND

U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS. WARNING - THIS

DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE

ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE

EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP.

2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS

OF DOD DIRECTIVE 5230.25.

3. BLOCK 12: SHALL BE DUE 10 DAYS PRIOR TO MEETINGS.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT AS REQUIRED.

5. BLOCK 14: SUBMITTED MATERIAL TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL, MARY.G.RYAN10.CIV@MAIL.MIL

AND SCOTT.A.TURNER1.CIV@MAIL.MIL

6. CONTRACTOR FORMAT IS ACCEPTABLE.

7. THE GOVERNMENT WILL HAVE 5 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

8. THE CONTRACTOR SHALL HAVE 5 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.2

5. CONTRACT REFERENCE

DI-SESS-81785A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

Systems Engineering Management Plan (SEMP)

2. TITLE OF THE DATA ITEM

A00A

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-D-XXX3

E. CONTRACT/PR NO.

GTS Stryker MGS AGTS

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SESSA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

A

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

N/A

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

1TIME

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER SUBMITTING

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

REQUIRED FOR EVERY DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT

SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: APPROVED FOR PUBLIC RELEASE.

3. BLOCK 12: SHALL BE DUE 20 DAYS AFTER AWARD OF CONTRACT.

4. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL, MARY.G.RYAN10.CIV@MAIL.MIL

AND ANDREW.B.RICHARDS.CIV@MAIL.MIL

5. CONTRACTOR FORMAT IS ACCEPTABLE.

6. THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE OR REJECTION.

7. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.2.5.1

5. CONTRACT REFERENCE

DI-MGMT-82001

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

See Block 16

2. TITLE OF THE DATA ITEM

A00B

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-D-XXX3

E. CONTRACT/PR NO.

GTS Stryker MGS AGTS

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

N/A

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

1TIME

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

Block 2: DOD Risk Management Framework (RMF) Package Deliverables

1. BLOCK 4: PARAGRAPHS 2.1.1, 2.1.4, 2.1.6, 2.1.7, 2.1.8, 2.1.9, 2.1.10,

2.1.11, 2.1.13 (SCORECARD), 2.1.14, 2.1.15 & 2.1.17 ARE NOT APPLICABLE.

FOR PARAGRAPH

2.1.16, A SINGLE DEVIATION REPORT (DR) IN SPREADSHEET FORMAT SHALL

BE UTILIZED INSTEAD OF MULTIPLE CYBER SECURITY WAIVER REQUEST DOCUMENTS.

2. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER SUBMITTING

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

REQUIRED FOR EVERY DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT

SUBMISSIONS) TO THE GOVERNMENT.

3. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND

U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS. WARNING - THIS

DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE

ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE

EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP.

2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS

OF DOD DIRECTIVE 5230.25.

4. BLOCK 12: SHALL BE DUE 10 DAYS AFTER SECURITY CONTROL

ASSESSMENT (SCA) EVENT.

5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL, ANDREW.B.RICHARDS.CIV@MAIL.MIL

6. THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE OR REJECTION.

7. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.2.6.3

5. CONTRACT REFERENCE

DI-ADMN-80925A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

See Block 16REVISIONS TO EXISTING GOVERNMENT DOCUMENTS

2. TITLE OF THE DATA ITEM

A00C

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-D-XXX3

E. CONTRACT/PR NO.

GTS Stryker MGS AGTS

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER ADMNA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

1TIME/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

Block 3: (SAR) SAFETY ASSESSMENT REPORT (STRYKER MGS AGTS)

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND

U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS. WARNING - THIS

DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE

ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE

EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP.

2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS

OF DOD DIRECTIVE 5230.25.

3. BLOCK 12: SHALL BE DUE 60 DAYS PRIOR TO THE TEST READINESS REVIEW.

4. BLOCK 13: REVISIONS AS REQUIRED THROUGH LIFE OF THE CONTRACT.

5. BLOCK 14: A FINAL REPRODUCIBLE, ELECTRONIC COPY SHALL BE FURNISHED VIA

ELECTRONIC EMAIL: ANDREW.B.RICHARDS.CIV@MAIL.MIL

6. THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

7. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORTATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.2.6.4

5. CONTRACT REFERENCE

DI-SAFT-80106C

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

HEALTH HAZARD ASSESSMENT REPORT (HHAR)

2. TITLE OF THE DATA ITEM

A00D

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-D-XXX3

E. CONTRACT/PR NO.

GTS Stryker MGS AGTS

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER SAFTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

N/A

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

1TIME

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND

U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS. WARNING - THIS

DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE

ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE

EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP.

2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS

OF DOD DIRECTIVE 5230.25.

3. BLOCK 12: SHALL BE DUE 60 DAYS PRIOR TO THE TEST READINESS REVIEW.

4. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL, ANDREW.B.RICHARDS.CIV@MAIL.MIL

5. CONTRACTOR FORMAT IS ACCEPTABLE.

6. THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE OR REJECTION.

7. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.2.6.6.1

5. CONTRACT REFERENCE

DI-MISC-81622

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

TEST PROBLEM REPORT (TPR)

2. TITLE OF THE DATA ITEM

A00E

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-D-XXX3

E. CONTRACT/PR NO.

GTS Stryker MGS AGTS

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MISCA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

ASREQ

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND

U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS. WARNING - THIS

DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE

ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE

EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP.

2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS

OF DOD DIRECTIVE 5230.25.

3. BLOCK 12: SHALL BE DUE 10 DAYS AFTER COMPLETION OF CONTRACTOR

AND/OR GOVERNMENT TEST EVENTS.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT AS REQUIRED.

5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL, MARY.G.RYAN10.CIV@MAIL.MIL

AND ANDREW.B.RICHARDS.CIV@MAIL.MIL

6. CONTRACTOR FORMAT IS ACCEPTABLE.

7. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMITTAL.

8. THE CONTRACTOR SHALL HAVE 5 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.3.3

5. CONTRACT REFERENCE

DI-MGMT-81804A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

See Block 16

2. TITLE OF THE DATA ITEM

A00F

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-D-XXX3

E. CONTRACT/PR NO.

GTS Stryker MGS AGTS

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER MGMTA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

A

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

1TIME/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

Block 2: Item Unique Identification (IUID) Marking Activity, Validation and Verification Report

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER SUBMITTING

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

REQUIRED FOR EVERY DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT

SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: APPROVED FOR PUBLIC RELEASE.

3. BLOCK 12: SHALL BE DUE 20 DAYS PRIOR TO THE TEST READINESS REVIEW.

4. BLOCK 13: REVISIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT AS REQUIRED.

5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE

SHALL BE DELIVERED VIA ELECTRONIC MAIL, MARY.G.RYAN10.CIV@MAIL.MIL,

ANDREW.B.RICHARDS.CIV@MAIL.MIL AND SCOTT.A.TURNER1.CIV@MAIL.MIL

6. CONTRACTOR FORMAT IS ACCEPTABLE.

7. THE GOVERNMENT SHALL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.5

5. CONTRACT REFERENCE

DI-NDTI-80603A

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

(IPAT/PQT/OSAT)Test Procedure

2. TITLE OF THE DATA ITEM

A00G

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-D-XXX3

E. CONTRACT/PR NO.

GTS Stryker MGS AGTS

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER NDTIA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

1TIME/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER

SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF

RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION

(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND

U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS. WARNING - THIS

DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE

ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE

EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP.

2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS

OF DOD DIRECTIVE 5230.25.

3. BLOCK 12: SHALL BE DUE 20 DAYS PRIOR TO THE TEST READINESS REVIEW.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT AS REQUIRED.

5. BLOCK 14: A FINAL REPRODUCIBLE ELECTRONIC COPY COMPATIBLE WITH

MICROSOFT OFFICE OR ADOBE ACROBAT SHALL BE FURNISHED VIA

ELECTRONIC MAIL: ANDREW.B.RICHARDS.CIV@MAIL.MIL

6. CONTRACTOR FORMAT IS ACCEPTABLE.

7. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.5

5. CONTRACT REFERENCE

DI-NDTI-80809B

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

(IPAT/PQT/OSAT)Test/Inspection Report

2. TITLE OF THE DATA ITEM

A00H

1. DATA ITEM NO.

F. CONTRACTOR

W900KK-21-D-XXX3

E. CONTRACT/PR NO.

GTS Stryker MGS AGTS

D. SYSTEM/ITEM

TDP

C. CATEGORY

TM OTHER NDTIA

B. EXHIBITA. CONTRACT LINE ITEM NO.

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

Form Approved OMB No. 0704-0188

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

N/A

8. APP CODE

DD

7. DD 250 REQ

D

9. DIST STATEMENT

REQUIRED

13.DATE OF SUBSEQUENT

SUBMISSION

SEE BLOCK 16

11. AS OF DATE

N/A

SEE BLOCK 16

12.DATE OF FIRST

SUBMISSION

1TIME/R

10. FREQUENCY

ReproReg

Final

Draft

b. COPIES

a. ADDRESSEE

14. DISTRIBUTION

J. DATEI. APPROVED BYH. DATEG. PREPARED BY

1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING

REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER SUBMITTING

THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF RECEIVING REPORT IS

REQUIRED FOR EVERY DATA ITEM SUBMISSION (INITIAL AND SUBSEQUENT

SUBMISSIONS) TO THE GOVERNMENT.

2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND

U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,

EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE

REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS. WARNING - THIS

DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE

ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE

EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP.

2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE

CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS

OF DOD DIRECTIVE 5230.25.

3. BLOCK 12: SHALL BE DUE 10 DAYS AFTER COMPLETION OF AN IN-PLANT

ACCEPTANCE TEST/PRODUCTION QUALIFICATION TEST/ON-SITE ACCEPTANCE TEST.

4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE

CONTRACT AS REQUIRED.

5. BLOCK 14: A FINAL REPRODUCIBLE ELECTRONIC COPY COMPATIBLE WITH

MICROSOFT OFFICE OR ADOBE ACROBAT SHALL BE FURNISHED VIA

ELECTRONIC MAIL: ANDREW.B.RICHARDS.CIV@MAIL.MIL

6. CONTRACTOR FORMAT IS ACCEPTABLE.

7. THE GOVERNMENT WILL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR

REJECTION OF EACH SUBMISSION.

8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.

16. REMARKS 1ST VTS

100 15. TOTAL

18.ESTIMATED

TOTAL PRICE

SOW 3.3.1.1

5. CONTRACT REFERENCE

DI-PSSS-80134B

4. AUTHORITY (Data Acquisition Document No.)

3. SUBTITLE

PROPOSED SPARE…

This is the start of the file's text. The full file is on GovTribe.