Attch 03 GFP List_20200709.xlsx

XLSX spreadsheet 9 MB Posted

Attached to
DRAFT RFP: Gunnery Training Systems
Solicitation number
W900KK21R0055
Issued by

About this file

This document provides details on a draft request for proposal for a gunnery training systems contract. The U.S. Army Materiel Command Contracting Command Orlando Contracting Center will award an indefinite-delivery/indefinite-quantity contract with a five-year ordering period and $104.5 million ceiling to implement technology refresh upgrades, produce current systems, incorporate concurrency upgrades, and recertify risk management frameworks for multiple gunnery trainer programs for both the U.S. Army and U.S. Marine Corps. The anticipated award date is fourth quarter of fiscal year 2021. The contract will utilize a single-source acquisition approach to provide timely delivery of supplies to Army and Marine Corps customers.

View the file

Other files

File Type Posted
20210114 Updated Responses to Industry Questions.xlsx XLSX spreadsheet
20210112 Updated Responses to Industry Questions.xlsx XLSX spreadsheet
20201030 Responses to Industry Questions.xlsx XLSX spreadsheet
20201030 Question 12 Response.zip ZIP file
Attch 04 QASP_07012020.docx DOCX document
Attch 12 DO 01 US Army M1A1 C-AGTS SS Rev F (80D-CAM1A1-E001).docx DOCX document
Attch 11 DO 01 US Army M1A2 SEP PIDS Rev P (139053-3).docx DOCX document
Attch 16 DO 02 PIDS Stryker MGS AGTS Rev K (74D-STMGS-B001).docx DOCX document
Attch 06 Performance Assessment Questionnaire.docx DOCX document
Attch 22 DO 04 CDRLs_LAV-25_20200715.pdf PDF
Attch 17 DO 03 SOW_Bradley_202000817.docx DOCX document
Attch 01_IQID SOW_20200817.docx DOCX document
Attch 09 DO 01 CDRLs_Abrams_20200709.pdf PDF
Exhibits A-C CDRLs_IDIQ_20200901.pdf PDF
Attch 07 Solicitation Question and Comment Form.docx DOCX document
Attch 10 DO 01 Section F_ Abrams_20200702.docx DOCX document
Attch 24 DO 04 USMC LAV-25 PIDS Rev F (23D-MCLAV25-A007).docx DOCX document
Attch 23 DO 04 Section F_LAV-25_20200728.docx DOCX document
Attch 15 DO 02 Section F_Stryker_20200616.docx DOCX document
Attch 19 DO 03 Section F_Bradley_20200702.docx DOCX document
Attch 14 DO 02 CDRLs_Stryker_20200709.pdf PDF
Attch 20 DO 03 Bradley-COFT System Spec Rev J (PRF-PT-00514).docx DOCX document
Attch 18 DO 03 CDRLs_Bradley_20200709.pdf PDF
Attch 13 DO 02 SOW_Stryker_20200817.docx DOCX document
Attch 02 DD 254.pdf PDF
GTS Draft RFP_W900KK-21-R-0055_20200915.docx DOCX document
Attch 21 DO 04 SOW_LAV-25_2020017.docx DOCX document
Attch 08 DO 01 SOW_Abrams_20200817.docx DOCX document
Attch 05 Proposed Prices Spreadsheet 20200911.xlsx XLSX spreadsheet
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT INFO

ERROR:#REF! GOVERNMENT FURNISHED PROPERTY * denotes a required field

Attachment Number* Attachment Date*

GOVERNMENT CONTRACTING OFFICER

Name Email Phone

Document Description* Contract Award Mod Number Amendment No.

CUSTODIAL PROCUREMENT INSTRUMENT IDENTIFICATION

Contract Number Type* DoD Contract (FAR)

SOLICITATION, CONTRACT or UNIFORM PIID NUMBER*Order NumberOR
PIID FORMAT (FY16+)Old Order Format

Issuing Office DoDAAC Issuing Year Contract Type Sequence Number Issuing Office DoDAAC Issuing Year Contract Type Sequence Number

Consolidated GFP Attachment Version 2.1

Requisitioned /xl/drawings/drawing1.xml#Requisition!A1NON-Serially Managed /xl/drawings/drawing1.xml#'NON-Serially%20Managed%20Items'!A1Serially Managed /xl/drawings/drawing1.xml#'Serially%20Managed%20Items'!A1 Serially Managed Items

* denotes a required field † A minimum of one of these fields is required for each item record †† If either "Mfr CAGE" or "Part Number" is entered, the other is required.

If any one of duration, time unit, or delivery event are populated, all 3 must be populated.

Serially Managed Items

LINE NUMBER*ITEM NAME*ITEM DESCRIPTION*NSN†MFR CAGE†,††PART NUMBER†,††MODEL NUMBER†QTY*UNIT OF MEASURE*UNIT ACQ COSTUSE AS-IS*DELIVERY DATEDURATIONTIME UNITDELIVERY EVENTNOTES
1Abrams AGTSM1A2 SEPv2 AGTS - Mobile6910-01-582-869416331310316331-6403052G21.00000EachtrueDevice #17-178A
2Stryker MGS AGTSStryker MGS AGTS - Permanent692001595971616331180416331-6403004G11.00000EachtrueDevice #17-261
3Bradley COFTBradley COFT - Mobile6920-01-589-85900YFC231022097031.00000EachtrueDevice #07-179/A
4Bradley COFTBradley COFT - Mobile6920-01-589-85900YFC231452097031.00000EachtrueDevice #07-179/A
5Bradley COFT TTTBradley COFT Table Top Trainer6920-01-589-96350YFC241127210416-21.00000EachtrueDevice #07-179/B
6M1A1 SA C-AGTSM1A1 C-AGTS - Permanent6910-01-582-86941633114081.00000EachtrueDevice #17-224B
7M1A2 SEP v2 PAARM1A2 SEP v2 Relocatable PAAR6910-01-582-86941633120051.00000EachtrueDevice #17-177(P)
8USMC LAV-25 RAGTSUSMC LAV -25 Relocatable AGTS6920-01-589-96351.00000Eachtrue
9USMC LAV-25 DAGTSUSMC LAV -25 Deployable AGTS6920-01-675-85411.00000Eachtrue
10USMC LAV-25 TAGTSUSMC LAV -25 TableTop AGTS1633150011.00000EachtrueNSN: 6920-01-672-9776

Requisitioned /xl/drawings/drawing2.xml#Requisition!A1NON-Serially Managed /xl/drawings/drawing2.xml#'NON-Serially%20Managed%20Items'!A1Contract Information /xl/drawings/drawing2.xml#'CONTRACT%20INFO'!A1 Non-Serially Managed Items

* denotes a required field † A minimum of one of these fields is required for each item record †† If either "Mfr CAGE" or "Part Number" is entered, the other is required.

If any one of duration, time unit, or delivery event are populated, all 3 must be populated.

NON-Serially Managed Items

LINE NUMBER* ITEM NAME* ITEM DESCRIPTION* NSN† MFR CAGE†,†† PART NUMBER†,†† MODEL NUMBER† QTY* UNIT OF MEASURE* UNIT ACQ COST USE AS-IS* DELIVERY DATE DURATION TIME UNIT DELIVERY EVENT NOTES

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .