Attch 18 DO 03 CDRLs_Bradley_20200709.pdf
PDF 495 KB Posted
- Attached to
- DRAFT RFP: Gunnery Training Systems
- Solicitation number
- W900KK21R0055
About this file
This draft Request for Proposal (RFP) solicits proposals for the Gunnery Training Systems (GTS) Indefinite-Delivery/Indefinite-Quantity contract. The GTS ID/IQ contract will provide upgrades, production, concurrency upgrades, and Risk Management Framework recertification for multiple gunnery trainer programs for the U.S. Army and U.S. Marine Corps over five years, with final deliveries within two additional years. The aggregate estimated ceiling value is $104.5 million. Proposals are due in the fourth quarter of Fiscal Year 2021, with contract award anticipated then as well. The RFP seeks to timely deliver supplies for all Army and Marine Corps customers through an acquisition approach that utilizes this single-source ID/IQ contract.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SFAE-STRI-ST-VTS
6. REQUIRING OFFICE
SOW 3.1
5. CONTRACT REFERENCE
DI-MGMT-80227
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
See Block 16
2. TITLE OF THE DATA ITEM
A001
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-21-D-XXX2
E. CONTRACT/PR NO.
GTS Bradley COFT
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
DD
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
MNTHLY
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
Block 2: Contractors Progress, Status and Management Report
1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING
REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER
SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF
RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION
(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.
2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND
U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,
EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE
REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS.
3. BLOCK 12: INITIAL SUBMISSION SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD.
4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE
CONTRACT ON A MONTHLY BASIS.
5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE
SHALL BE DELIVERED VIA ELECTRONIC MAIL,
MARY.G.RYAN10.CIV@MAIL.MIL AND SCOTT.A.TURNER1.CIV@MAIL.MIL
6. CONTRACTOR FORMAT IS ACCEPTABLE.
7. THE GOVERNMENT SHALL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
16. REMARKS 1ST VTS
100 15. TOTAL
18.ESTIMATED
TOTAL PRICE
17. PRICE GROUP
Page 1 of 1 PagesPREVIOUS EDITION MAY BE USED.DD FORM 1423-1, FEB 2001
SOW 3.1.2
5. CONTRACT REFERENCE
DI-MGMT-81861A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
INTEGRATED MASTER SCHEDULE FORMAT 6Integrated Program Management Report (IPMR)
2. TITLE OF THE DATA ITEM
A002
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-21-D-XXX2
E. CONTRACT/PR NO.
GTS Bradley COFT
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
DD
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
MNTHLY
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING
REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER
SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF
RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION
(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.
2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND
U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,
EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE
REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS.
3. BLOCK 12: INITIAL SUBMISSION SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD.
4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE
CONTRACT ON A MONTHLY BASIS.
5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE
SHALL BE DELIVERED VIA ELECTRONIC MAIL,
MARY.G.RYAN10.CIV@MAIL.MIL AND SCOTT.A.TURNER1.CIV@MAIL.MIL
6. CONTRACTOR FORMAT IS ACCEPTABLE.
7. THE GOVERNMENT SHALL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
16. REMARKS 1ST VTS
100 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW 3.1.3
5. CONTRACT REFERENCE
DI-MGMT-81651
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Contract Invoicing and Payment Report
2. TITLE OF THE DATA ITEM
A003
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-21-D-XXX2
E. CONTRACT/PR NO.
GTS Bradley COFT
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
DD
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
MNTHLY
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING
REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER
SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF
RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION
(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.
2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND
U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,
EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE
REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS.
3. BLOCK 12: INITIAL SUBMISSION SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD.
4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE
CONTRACT ON A MONTHLY BASIS.
5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE
SHALL BE DELIVERED VIA ELECTRONIC MAIL,
MARY.G.RYAN10.CIV@MAIL.MIL AND SCOTT.A.TURNER1.CIV@MAIL.MIL
6. CONTRACTOR FORMAT IS ACCEPTABLE.
7. THE GOVERNMENT SHALL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
16. REMARKS 1ST VTS
100 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW 3.1.5.8
5. CONTRACT REFERENCE
DI-SESS-81022D
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
See Block 16
2. TITLE OF THE DATA ITEM
A004
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-21-D-XXX2
E. CONTRACT/PR NO.
GTS Bradley COFT
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER SESSA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
DD
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
N/A
11. AS OF DATE
N/A
See Block 16
12.DATE OF FIRST
SUBMISSION
1TIME
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
Block 2: Configuration Audit Summary Report and Certification
1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING
REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER
SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF
RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION
(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.
2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO
OPERATIONAL USE, EFFECTIVE (award date). OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI,
SFAE-STRI-ST-VTS. WARNING - THIS DOCUMENT CONTAINS TECHNICAL
DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS-EXPORT CONTROL ACT
(TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION
ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401, ET SEQ.
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL
PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS OF DOD
DIRECTIVE 5230.25.
3. BLOCK 12: SHALL BE DUE 10 DAYS AFTER COMPLETION OF THE PHYSICAL
CONFIGURATION AUDIT.
4. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE
SHALL BE DELIVERED VIA ELECTRONIC MAIL, MARY.G.RYAN10.CIV@MAIL.MIL
AND SCOTT.A.TURNER1.CIV@MAIL.MIL7.
5. CONTRACTOR FORMAT IS ACCEPTABLE.
6. THE GOVERNMENT WILL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF THE SUBMISSION.
7. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
16. REMARKS 1ST VTS
100 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW 3.1.5.13
5. CONTRACT REFERENCE
DI-SESS-80639D
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Engineering Change Proposal (ECP)
2. TITLE OF THE DATA ITEM
A005
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-21-D-XXX2
E. CONTRACT/PR NO.
GTS Bradley COFT
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER SESSA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
DD
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING
REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER
SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF
RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION
(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.
2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND
U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,
EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE
REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS. WARNING - THIS
DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE
ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE
EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP.
2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE
CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS
OF DOD DIRECTIVE 5230.25.
3. BLOCK 12: SHALL BE DUE 5 DAYS AFTER COMPLETION OF AN ECP REVIEW.
4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE
CONTRACT AS REQUIRED.
5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE
SHALL BE DELIVERED VIA ELECTRONIC MAIL, MARY.G.RYAN10.CIV@MAIL.MIL
AND SCOTT.A.TURNER1.CIV@MAIL.MIL
6. CONTRACTOR FORMAT IS ACCEPTABLE.
7. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
16. REMARKS 1ST VTS
100 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW 3.1.5.14, 3.1.8, 3.2.7, & 3.5.1
5. CONTRACT REFERENCE
DI-ADMN-81505
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Report, Record of Meeting/Minutes
2. TITLE OF THE DATA ITEM
A006
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-21-D-XXX2
E. CONTRACT/PR NO.
GTS Bradley COFT
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER ADMNA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
DD
7. DD 250 REQ
A
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING
REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER
SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF
RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION
(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.
2. BLOCK 9: APPROVED FOR PUBLIC RELEASE.
3. BLOCK 12: SHALL BE DUE 5 DAYS AFTER COMPLETION OF A MEETING.
4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE
CONTRACT AS REQUIRED.
5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE
SHALL BE DELIVERED VIA ELECTRONIC MAIL,
MARY.G.RYAN10.CIV@MAIL.MIL AND SCOTT.A.TURNER1.CIV@MAIL.MIL
6. CONTRACTOR FORMAT IS ACCEPTABLE.
7. THE GOVERNMENT SHALL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
16. REMARKS 1ST VTS
100 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW 3.1.5.15
5. CONTRACT REFERENCE
DI-SESS-80640D
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Request for Variance (RFV)
2. TITLE OF THE DATA ITEM
A007
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-21-D-XXX2
E. CONTRACT/PR NO.
GTS Bradley COFT
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER SESSA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
DD
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING
REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER
SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF
RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION
(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.
2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND
U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,
EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE
REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS. WARNING - THIS
DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE
ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE
EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP.
2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE
CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS
OF DOD DIRECTIVE 5230.25.
3. BLOCK 12: SHALL BE DUE WHEN A REQUEST FOR VARIANCE IS PROPOSED
TO THE ESTABLISHED CONFIGURATION MANAGEMENT BASELINE.
4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE
CONTRACT AS REQUIRED.
5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE
SHALL BE DELIVERED VIA ELECTRONIC MAIL, MARY.G.RYAN10.CIV@MAIL.MIL,
AND SCOTT.A.TURNER1.CIV@MAIL.MIL
6. CONTRACTOR FORMAT IS ACCEPTABLE.
7. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
16. REMARKS 1ST VTS
100 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW 3.1.7
5. CONTRACT REFERENCE
DI-MGMT-81809
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Risk Management Status Report
2. TITLE OF THE DATA ITEM
A008
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-21-D-XXX2
E. CONTRACT/PR NO.
GTS Bradley COFT
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
DD
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
MNTHLY
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING
REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER
SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF
RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION
(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.
2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO
OPERATIONAL USE, EFFECTIVE 9 MAY 19. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI,
SFAE-STRI-ST-VTS. WARNING - THIS DOCUMENT CONTAINS TECHNICAL
DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS-EXPORT CONTROL ACT
(TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION
ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401, ET SEQ.
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL
PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS OF DOD
DIRECTIVE 5230.25.
3. BLOCK 12: INITIAL SUBMISSION SHALL BE DUE 30 DAYS AFTER CONTRACT AWARD.
4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE
CONTRACT ON A MONTHLY BASIS, AS REQUIRED.
5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE
SHALL BE DELIVERED VIA ELECTRONIC MAIL,
MARY.G.RYAN10.CIV@MAIL.MIL AND SCOTT.A.TURNER1.CIV@MAIL.MIL
6. CONTRACTOR FORMAT IS ACCEPTABALE.
7. THE GOVERNMENT SHALL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
16. REMARKS 1ST VTS
100 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW 3.1.8 & 3.2.7
5. CONTRACT REFERENCE
DI-MGMT-81605
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Briefing Material
2. TITLE OF THE DATA ITEM
A009
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-21-D-XXX2
E. CONTRACT/PR NO.
GTS Bradley COFT
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
DD
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING
REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER
SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF
RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION
(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.
2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND
U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,
EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE
REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS. WARNING - THIS
DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE
ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE
EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP.
2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE
CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS
OF DOD DIRECTIVE 5230.25.
3. BLOCK 12: SHALL BE DUE 10 DAYS PRIOR TO MEETINGS.
4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE
CONTRACT AS REQUIRED.
5. BLOCK 14: SUBMITTED MATERIAL TO SFAE-STRI-ST-VTS REPRODUCIBLE
SHALL BE DELIVERED VIA ELECTRONIC MAIL,
MARY.G.RYAN10.CIV@MAIL.MIL AND SCOTT.A.TURNER1.CIV@MAIL.MIL
6. CONTRACTOR FORMAT IS ACCEPTABLE.
7. THE GOVERNMENT SHALL HAVE 5 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
8. THE CONTRACTOR SHALL HAVE 5 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
16. REMARKS 1ST VTS
100 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW 3.2
5. CONTRACT REFERENCE
DI-SESS-81785A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
Systems Engineering Management Plan (SEMP)
2. TITLE OF THE DATA ITEM
A00A
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-21-D-XXX2
E. CONTRACT/PR NO.
GTS Bradley COFT
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER SESSA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
DD
7. DD 250 REQ
A
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
N/A
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
1TIME
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING
REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER
SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF
RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION
(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.
2. BLOCK 9: APPROVED FOR PUBLIC RELEASE.
3. BLOCK 12: SHALL BE DUE 20 DAYS AFTER AWARD OF CONTRACT.
4. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE
SHALL BE DELIVERED VIA ELECTRONIC MAIL, MARY.G.RYAN10.CIV@MAIL.MIL
AND ANDREW.B.RICHARDS.CIV@MAIL.MIL
5. CONTRACTOR FORMAT IS ACCEPTABLE.
6. THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE OR REJECTION.
7. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
16. REMARKS 1ST VTS
100 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW 3.2.5.1
5. CONTRACT REFERENCE
DI-MGMT-82001
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
See Block 16
2. TITLE OF THE DATA ITEM
A00B
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-21-D-XXX2
E. CONTRACT/PR NO.
GTS Bradley COFT
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
DD
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
N/A
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
1TIME
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
Block 2: DOD Risk Management Framework (RMF) Package Deliverables
1. BLOCK 4: PARAGRAPHS 2.1.1, 2.1.4, 2.1.6, 2.1.7, 2.1.8, 2.1.9, 2.1.10,
2.1.11, 2.1.13 (SCORECARD), 2.1.14, 2.1.15 & 2.1.17 ARE NOT
APPLICABLE. FOR PARAGRAPH 2.1.16, A SINGLE DEVIATION REPORT (DR)
IN SPREADSHEET FORMAT SHALL BE UTILIZED INSTEAD OF MULTIPLE
CYBER SECURITY WAIVER REQUEST DOCUMENTS.
2. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING
REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER
SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF
RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION
(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.
3. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO
OPERATIONAL USE, EFFECTIVE (award date). OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI,
SFAE-STRI-ST-VTS. WARNING - THIS DOCUMENT CONTAINS TECHNICAL
DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS-EXPORT CONTROL ACT
(TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION
ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401, ET SEQ.
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL
PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS OF DOD
DIRECTIVE 5230.25.
4. BLOCK 12: SHALL BE DUE 10 DAYS AFTER SECURITY CONTROL
ASSESSMENT (SCA) EVENT.
5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE
SHALL BE DELIVERED VIA ELECTRONIC MAIL, MARY.G.RYAN10.CIV@MAIL.MIL
6. THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE OR REJECTION.
7. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
16. REMARKS 1ST VTS
100 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW 3.2.6.3
5. CONTRACT REFERENCE
DI-ADMN-80925A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
(SAR) SAFETY ASSESSMENT REPORTREVISIONS TO EXISTING GOVERNMENT DOCUMENTS
2. TITLE OF THE DATA ITEM
A00C
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-21-D-XXX2
E. CONTRACT/PR NO.
GTS Bradley COFT
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER ADMNA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
DD
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING
REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER
SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF
RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION
(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.
2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE
AND U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO
OPERATIONAL USE, EFFECTIVE 9 May 2019. OTHER REQUESTS FOR THIS
DOCUMENT SHALL BE REFERRED TO U.S. ARMY PEO STRI,
SFAE-STRI-ST-VTS. WARNING - THIS DOCUMENT CONTAINS TECHNICAL
DATA WHOSE EXPORT IS RESTRICTED BY THE ARMS-EXPORT CONTROL ACT
(TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE EXPORT ADMINISTRATION
ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP. 2401, ET SEQ.
VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL
PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS OF DOD
DIRECTIVE 5230.25.
3. BLOCK 12: SHALL BE DUE 60 DAYS PRIOR TO THE TEST READINESS REVIEW.
4. BLOCK 13: REVISIONS REQUIRED THROUGH THE LIFE OF THE CONTRACT.
5. BLOCK 14: A FINAL REPRODUCIBLE, ELECTRONIC COPY COMPATIBLE
WITH MICROSOFT OFFICE OR ADOBE ACROBAT SHALL BE FURNISHED VIA
ELECTRONIC EMAIL: MARY.G.RYAN10.CIV@MAIL.MIL
6. THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
7. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORTATE GOVERNMENT COMMENTS.
16. REMARKS 1ST VTS
100 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW 3.2.6.4
5. CONTRACT REFERENCE
DI-SAFT-80106C
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
HEALTH HAZARD ASSESSMENT REPORT (HHAR)
2. TITLE OF THE DATA ITEM
A00D
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-21-D-XXX2
E. CONTRACT/PR NO.
GTS Bradley COFT
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER SAFTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
DD
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
N/A
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
1TIME
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING
REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER
SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF
RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION
(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.
2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND
U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,
EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE
REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS. WARNING - THIS
DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE
ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE
EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP.
2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE
CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS
OF DOD DIRECTIVE 5230.25.
3. BLOCK 12: SHALL BE DUE 60 DAYS PRIOR TO THE TEST READINESS REVIEW.
4. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE
SHALL BE DELIVERED VIA ELECTRONIC MAIL, MARY.G.RYAN10.CIV@MAIL.MIL
5. CONTRACTOR FORMAT IS ACCEPTABLE.
6. THE GOVERNMENT WILL HAVE 20 DAYS FOR REVIEW AND ACCEPTANCE OR REJECTION.
7. THE CONTRACTOR SHALL HAVE 15 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
16. REMARKS 1ST VTS
100 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW 3.2.6.6.1
5. CONTRACT REFERENCE
DI-MISC-81622
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
TEST PROBLEM REPORT (TPR)
2. TITLE OF THE DATA ITEM
A00E
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-21-D-XXX2
E. CONTRACT/PR NO.
GTS Bradley COFT
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MISCA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
DD
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
ASREQ
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING
REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER
SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF
RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION
(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.
2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND
U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,
EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE
REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS. WARNING - THIS
DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE
ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE
EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP.
2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE
CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS
OF DOD DIRECTIVE 5230.25.
3. BLOCK 12: SHALL BE DUE 10 DAYS AFTER COMPLETION OF CONTRACTOR
AND/OR GOVERNMENT TEST EVENTS.
4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE
CONTRACT AS REQUIRED.
5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE
SHALL BE DELIVERED VIA ELECTRONIC MAIL, MARY.G.RYAN10.CIV@MAIL.MIL
6. CONTRACTOR FORMAT IS ACCEPTABLE.
7. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
8. THE CONTRACTOR SHALL HAVE 5 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
16. REMARKS 1ST VTS
100 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW 3.3.3
5. CONTRACT REFERENCE
DI-MGMT-81804A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
See Block 16
2. TITLE OF THE DATA ITEM
A00F
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-21-D-XXX2
E. CONTRACT/PR NO.
GTS Bradley COFT
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER MGMTA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
DD
7. DD 250 REQ
A
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
Block 2: Item Unique Identification (IUID) Marking Activity, Validation and Verification Report
1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING
REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER
SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF
RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION
(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.
2. BLOCK 9: APPROVED FOR PUBLIC RELEASE.
3. BLOCK 12: SHALL BE DUE 20 DAYS PRIOR TO THE TEST READINESS REVIEW.
4. BLOCK 13: REVISIONS SHALL CONTINUE THROUGH THE END OF THE
CONTRACT AS REQUIRED.
5. BLOCK 14: SUBMITTED REPORTS TO SFAE-STRI-ST-VTS REPRODUCIBLE
SHALL BE DELIVERED VIA ELECTRONIC MAIL, MARY.G.RYAN10.CIV@MAIL.MIL
AND SCOTT.A.TURNER1.CIV@MAIL.MIL
6. CONTRACTOR FORMAT IS ACCEPTABLE.
7. THE GOVERNMENT SHALL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
16. REMARKS 1ST VTS
100 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW 3.5
5. CONTRACT REFERENCE
DI-NDTI-80603A
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
(IPAT/OSAT)Test Procedure
2. TITLE OF THE DATA ITEM
A00G
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-21-D-XXX2
E. CONTRACT/PR NO.
GTS Bradley COFT
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER NDTIA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
DD
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING
REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER
SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF
RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION
(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.
2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND
U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,
EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE
REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS. WARNING - THIS
DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE
ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE
EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP.
2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE
CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS
OF DOD DIRECTIVE 5230.25.
3. BLOCK 12: SHALL BE DUE 20 DAYS PRIOR TO THE TEST READINESS REVIEW.
4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE
CONTRACT AS REQUIRED.
5. BLOCK 14: A FINAL REPRODUCIBLE ELECTRONIC COPY COMPATIBLE WITH
MICROSOFT OFFICE OR ADOBE ACROBAT SHALL BE FURNISHED VIA
ELECTRONIC MAIL: MARY.G.RYAN10.CIV@MAIL.MIL
6. CONTRACTOR FORMAT IS ACCEPTABLE.
7. THE GOVERNMENT WILL HAVE 10 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
16. REMARKS 1ST VTS
100 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW 3.5
5. CONTRACT REFERENCE
DI-NDTI-80809B
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
(IPAT/OSAT)Test/Inspection Report
2. TITLE OF THE DATA ITEM
A00H
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-21-D-XXX2
E. CONTRACT/PR NO.
GTS Bradley COFT
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER NDTIA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to the Department of Defense, Executive Services and Communications Directorate (07040188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.
Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
Form Approved OMB No. 0704-0188
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
N/A
8. APP CODE
DD
7. DD 250 REQ
D
9. DIST STATEMENT
REQUIRED
13.DATE OF SUBSEQUENT
SUBMISSION
SEE BLOCK 16
11. AS OF DATE
N/A
SEE BLOCK 16
12.DATE OF FIRST
SUBMISSION
1TIME/R
10. FREQUENCY
ReproReg
Final
Draft
b. COPIES
a. ADDRESSEE
14. DISTRIBUTION
J. DATEI. APPROVED BYH. DATEG. PREPARED BY
1. BLOCK 7: THE CONTRACTOR SHALL INITIATE A ZERO COST RECEIVING
REPORT IN WIDE AREA WORKFLOW (WAWF) IMMEDIATELY AFTER
SUBMITTING THE DATA IN ACCORDANCE WITH BLOCK 14. A WAWF
RECEIVING REPORT IS REQUIRED FOR EVERY DATA ITEM SUBMISSION
(INITIAL AND SUBSEQUENT SUBMISSIONS) TO THE GOVERNMENT.
2. BLOCK 9: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE AND
U.S. DEPARTMENT OF DEFENSE CONTRACTORS ONLY DUE TO OPERATIONAL USE,
EFFECTIVE (award date). OTHER REQUESTS FOR THIS DOCUMENT SHALL BE
REFERRED TO U.S. ARMY PEO STRI, SFAE-STRI-ST-VTS. WARNING - THIS
DOCUMENT CONTAINS TECHNICAL DATA WHOSE EXPORT IS RESTRICTED BY THE
ARMS-EXPORT CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ.) OR THE
EXPORT ADMINISTRATION ACT OF 1979, AS AMENDED, TITLE 50, U.S.C., APP.
2401, ET SEQ. VIOLATIONS OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE
CRIMINAL PENALTIES. DISSEMINATE IN ACCORDANCE WITH THE PROVISIONS
OF DOD DIRECTIVE 5230.25.
3. BLOCK 12: SHALL BE DUE 10 DAYS AFTER COMPLETION OF AN IN-PLANT
ACCEPTANCE TEST/ON-SITE ACCEPTANCE TEST.
4. BLOCK 13: SUBMISSIONS SHALL CONTINUE THROUGH THE END OF THE
CONTRACT AS REQUIRED.
5. BLOCK 14: A FINAL REPRODUCIBLE ELECTRONIC COPY COMPATIBLE WITH
MICROSOFT OFFICE OR ADOBE ACROBAT SHALL BE FURNISHED VIA
ELECTRONIC MAIL: MARY.G.RYAN10.CIV@MAIL.MIL
6. CONTRACTOR FORMAT IS ACCEPTABLE.
7. THE GOVERNMENT WILL HAVE 15 DAYS FOR REVIEW AND ACCEPTANCE OR
REJECTION OF EACH SUBMISSION.
8. THE CONTRACTOR SHALL HAVE 10 DAYS TO INCORPORATE GOVERNMENT COMMENTS.
16. REMARKS 1ST VTS
100 15. TOTAL
18.ESTIMATED
TOTAL PRICE
SOW 3.3.1.1
5. CONTRACT REFERENCE
DI-PSSS-80134B
4. AUTHORITY (Data Acquisition Document No.)
3. SUBTITLE
PROPOSED SPARE PARTS LIST
2. TITLE OF THE DATA ITEM
A00I
1. DATA ITEM NO.
F. CONTRACTOR
W900KK-21-D-XXX2
E. CONTRACT/PR NO.
GTS Bradley COFT
D. SYSTEM/ITEM
TDP
C. CATEGORY
TM OTHER PSSSA
B. EXHIBITA. CONTRACT LINE ITEM NO.
The public reporting burden for this collection of information is estimated…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .