Attch 2. Exhibit A-DoD WG Sports Requirements Workbook.xlsx
XLSX spreadsheet 75 KB Posted
- Attached to
- DEPARTMENT OF DEFENSE WARRIOR GAMES IDIQ
- Solicitation number
- W900KK-22-R-0010
About this file
This document is a Request for Proposal for a nonpersonal services contract to provide support services for the 2022 through 2027 Department of Defense Warrior Games.
The contract will be an Indefinite Delivery, Indefinite Quantity commercial Firm Fixed Price contract to manage all subcontracts for providing support at different Continental United States locations for the annual Warrior Games athletic competition led by the U.S. Army. Services will include venue management, medical support, transportation, food services, event production and other requirements. The basic contract will specify deliverables in accordance with the Performance Work Statement.
Questions regarding this solicitation must be submitted by April 7th, 2022 to the identified contracting officer and contract specialist. Award will be made as a single award IDIQ contract.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
All Sports
| ALL SPORTS REQUIREMENTS | |||||||
| LIN | CATEGORY | SUB-CATEGORY | DESCRIPTION | REQUIREMENT | PRIORITY | RESPONSIBLE ENTITY | REMARKS |
| 1 | Personnel | All Sports | Service Team Coaches | As applicable | Mandatory Requirement | Service Teams (All) | Service Teams will provide their own coaching staff for each sport. |
| 2 | Personnel | All Sports | Master of Ceremonies/Announcer | 1 | Mandatory Requirement | Government Contractor | ROS requirement. Can be a contracted SME in the sport but can be substituted by a sport-knowledgeable volunteer as applicable. |
| 3 | Personnel | All Sports | Protocol Liaison(s) for Medal Ceremonies | As applicable | Mandatory Requirement | DOD/Government | As applicable; WGSD, Sport Venue Manager, and Protocol coordination requirement with apporiate Medal Ceremony POC(s) |
| 4 | Personnel | Medical | Event Medical Personnel | Required | Mandatory Requirement | TBD | Part of overall Warrior Games medical support requirements. |
| 5 | Personnel | Medical | EMS Support | Required | Mandatory Requirement | TBD | Part of overall Warrior Games medical support requirements. |
| 6 | Personnel | Medical | Service Team Medical Personnel | As applicable | Optional Component | Service Teams (All) | Service Teams may/will provide their own trained medical staff to include but not limited to trainers, physical therapists, massage therapists, etc. |
| 7 | Personnel | Medical | Prosthetic Repair Services | Required | Mandatory Requirement | TBD | Part of overall Warrior Games medical support requirements. |
| 8 | Personnel | Volunteers | Non-sport related support | As applicable | TBD | TBD/DOD or Government Contractor | Coordinated by WGSD, Sport Venue Manager, Volunteer Coordinator and Contractor. |
| 9 | Venue-General | Comp. Equipment | DOD Athlete Competition Equipment | As applicable | Mandatory Requirement | Service Teams (All) | Service Teams are responsible for all individual and team sports equipment for their athletes unless specifically identified within each sport. |
| 10 | Venue-General | Comp. Equipment | International Athlete Competition Equipment | As applicable | Mandatory Requirement | DOD Service Teams | Support requirement for International Athletes without associated competition equipment; DOD Sponsor Teams |
| 11 | Venue-General | Comp. Equipment | Athlete Competition Equipment (Augmented) | As applicable | TBD | NPO/3rd Party | Options: NPOs, VSOs, and/or local community sport programs, etc. may provide support for equipment shortages. |
| 12 | Venue-General | Comp. Equipment | Athlete Equipment Collection/Storage at Lodging | As applicable | Mandatory Requirement | TBD/DOD or Government Contractor | Athletes arriving with Competition equipment may/will require local temporary storage at lodging until transported to Competition Venues. |
| 13 | Venue-General | Comp. Equipment | Competition Maintenance Items (Consumables) | As applicable | Mandatory Requirement | Service Teams (All) | Service Teams will bring their own items for athlete equipment maintenance. Can be augmented with Event Technician requirements as applicable to each sport. |
| 14 | Venue-General | Custodial | Restrooms, ADA Accessible, Permanent | Required | Mandatory Requirement | Government Contractor | Prexisting facility/structure within or in immediate vicinity of venue. |
| 15 | Venue-General | Custodial | Restrooms, ADA Accessible, Temporary | As applicable | TBD | Government Contractor | A requirement only exists if total forecasted attendance number exceeds pre-existing facility/structure accomodations. |
| 16 | Venue-General | Custodial | Service Animal Relief Area | Required | Mandatory Requirement | Government Contractor | Placement determined by Contractor and/or Venue Management. |
| 17 | Venue-General | Custodial | Trash Collection Points | Required | Mandatory Requirement | Government Contractor | Placement determined by Contractor and/or Venue Management. |
| 18 | Venue-General | Food & Beverage | Athlete Meal Plan | Required | Mandatory Requirement | DOD/Government | Developed by DWG Planners; Meal schedule and locations will be posted in the vicinity the venues and lodging location(s). |
| 19 | Venue-General | Food & Beverage | Meal and or Rest Area/Services | Required | Mandatory Requirement | Government Contractor | Meals are allowed in the bleachers and Team Zones if dining area in not near this venue. |
| 20 | Venue-General | Food & Beverage | Water, Ice, Cooler Services | Required | Mandatory Requirement | TBD | As determined by need; either planned or emergent. |
| 21 | Venue-General | Logistics | External Storage Solutions (Option 1) | As applicable | TBD | DOD Service Teams | DOD Service Teams may/will ship Program Equipment in CONNEX container(s) for equipment storage and event operations. |
| 22 | Venue-General | Logistics | External Storage Solutions (Option 2) | As applicable | TBD | DOD Service Teams | Some DOD Service Teams will ship Program Equipment in rented PODS container(s) for equipment storage and event operations. |
| 23 | Venue-General | Logistics | External Storage Solutions (Option 3) | As applicable | TBD | DOD Service Teams | Some DOD Service Teams will ship Program Equipment in rented box trucks for equipment storage and event operations. |
| 24 | Venue-General | Logistics | External Storage Solutions/International Teams | As applicable | Mandatory Requirement | Government Contractor | Storage solution for International Team Equipment storage at Connex Village. |
| 25 | Venue-General | Logistics | Internal Storage Solutions (All Teams) | As applicable | Mandatory Requirement | Government Contractor | Venue-specific/by sport. Any Service Team equipment left inside a venue requires a storage solution (lockable room, chain-link cage etc.) |
| 26 | Venue-General | Logistics | 10k+ Forklift w/Operator | Required | Mandatory Requirement | TBD/DOD or Government Contractor | Contracted or Military Heavy Forklift with Operator w/8ft Fork spread capability; offload/placement/upload requirements for Connex Village. |
| 27 | Venue-General | Medical | COVID-19 Mitigation/Sterilization Plan: DOD | Required | Mandatory Requirement | DOD/Government | Part of overall Warrior Games medical requirements as related to DOD policies, protocols, and procedures. |
| 28 | Venue-General | Medical | COVID-19 Mitigation/Sterilization Plan: Contractor | Required | Mandatory Requirement | Government Contractor | Part of overall Warrior Games medical requirements as related to the Contractor and/or Venue policies, protocols, and procedures. |
| 29 | Venue-General | Medical | Updated Classification Assessment | As applicable | Mandatory Requirement | Government Contractor | Classifiers will review all athletes for potential conflicts with their classification categories. |
| 30 | Venue-General | Medical | Cooling Management: Ice Baths | As applicable | Mandatory Requirement | TBD | Part of overall Warrior Games medical requirements as determined by sport; ice baths are not required for this sport. |
| 31 | Venue-General | Medical | Cooling Management: Misting Fans | As applicable | Mandatory Requirement | TBD | Part of overall Warrior Games medical requirements as determined by sport; misting fans are not required for this sport. |
| 32 | Venue-General | Medical | Athlete Decompression Area | As applicable | Mandatory Requirement | Government Contractor | Part of overall Warrior Games medical requirements; a decompression area is not required within the Archery Venue. |
| 33 | Venue-General | Medical | Emergency/Shelter-In-Place Area | Required | Mandatory Requirement | Government Contractor | Part of overall Warrior Games medical and operational requirements; Separate plan needed for all venues. |
34 Venue-General Other Venue Security Required Mandatory Requirement Government Contractor All venues require some form of security inspections, protocols, and routine checks; venue-specific.
| 35 | Venue-General | Production - 1 | Athlete Medal Requirements | Required | Mandatory Requirement | Government Contractor | Contractor (with oversight by WGSD) will provide accurate forecast of exact medal requirements for each sport upon completion of team registration. |
| 36 | Venue-General | Production - 1 | Public Address/Audio System | 1/per sport event | Mandatory Requirement | Government Contractor | Required for all Sport ROS operations, MC annoucments, and/or venue music. Can be in-house/part of existing structure or portable; venue-specific. |
| 37 | Venue-General | Production - 1 | Medal Ceremony Stage | TBD | TBD | Government Contractor | As/if required if there is not a central medal ceremony stage is nearby. |
| 38 | Venue-General | Production - 1 | Spectator Jumbo Screen(s) | TBD | TBD | Government Contractor | Venue capabilities, layout, and bleachers placement drive quantity and placement of screens for each sport venue. |
| 39 | Venue-General | Production - 1 | Large Screen TVs | TBD | TBD | Government Contractor | Venue capabilities, layout, and bleachers placement drive quantity and placement of screens for each sport venue. |
| 40 | Venue-General | Production - 1 | External Video Feed of Event | TBD | TBD | Government Contractor | Live/streamed broadcast of competition event for remote viewing; requirements TBD. |
| 41 | Venue-General | Production - 1 | Bleachers/Spectators Seating | Required | Mandatory Requirement | Government Contractor | Seating capacity requirement based upon venue size restrictions; estimate 500 seats for Individual Sports/1500-2000 seats for team sports. |
| 42 | Venue-General | Production - 1 | ADA Access and Seating Consideration | Required | Mandatory Requirement | Government Contractor | Taken into consideration during the venue design and layout process for staff and spectators. |
| 43 | Venue-General | Production - 1 | Go/No-Go/Off-Limits/Controlled Access Zones | As applicable | Mandatory Requirement | Government Contractor | Clearly defined zones of access as related to spectators/family, staff, media, etc. as defined by WGSD, Sport Venue Manager and Contractor. |
| 44 | Venue-General | Production - 1 | Additional Power/Generators | Required | Mandatory Requirement | Government Contractor | Additional/external power required to support sport operations, scoring/timing solutions, and/or maintenance tech services. |
| 45 | Venue-General | Production - 1 | Additional Lighting | As applicable | TBD | Government Contractor | No additional lighting requirements for this sport. Training opportunities at dawn/dusk will be assesed at a later date by WGSD, Sport Venue Manager, and Contractor. |
| 46 | Venue-General | Production - 1 | IT Support/Scoring System Private WiFi | TBD | TBD | Government Contractor | Unknown requirement for this sport; not a typical requirement in previous years. |
| 47 | Venue-General | Production - 1 | Printer (Heats, Scores, and Results) | 1 | Mandatory Requirement | Government Contractor | Used by the Cycling Timing and Results System Operator(s). |
| 48 | Venue-General | Production - 1 | Pens, Paper, Clipboards, Butcher Pads, Easels, etc. | As applicable | Mandatory Requirement | Government Contractor | Requirements dependent on sport additional support requests through the Contractor; Rolling Stock Items |
| 49 | Venue-General | Production - 2 | Tents (Sport Operations) | Required | Mandatory Requirement | Government Contractor | As defined within each sport. |
| 50 | Venue-General | Production - 2 | Tables, 6ft to 8ft (Sport Operations) | Required | Mandatory Requirement | Government Contractor | As defined within each sport. |
| 51 | Venue-General | Production - 2 | Chairs (Sport Operations) | Required | Mandatory Requirement | Government Contractor | As defined within each sport. |
| 52 | Venue-General | Production - 2 | Tents (Service Team Areas) | As applicable | Mandatory Requirement | Government Contractor | As defined within each sport; not all sports require a Service Team Area. |
| 53 | Venue-General | Production - 2 | Tables, 6ft to 8ft (Service Team Areas) | As applicable | Mandatory Requirement | Government Contractor | As defined within each sport; not all sports require a Service Team Area. |
| 54 | Venue-General | Production - 2 | Chairs (Service Team Areas) | As applicable | Mandatory Requirement | Government Contractor | As defined within each sport; not all sports require a Service Team Area. |
| 55 | Venue-General | Production - 2 | Tents (Meals/Rest Areas) | As applicable | Mandatory Requirement | Government Contractor | A requirement only exists if a meal/rest area is not nearby/within walking distance. |
| 56 | Venue-General | Production - 2 | Tables (Meals/Rest Areas) | As applicable | Mandatory Requirement | Government Contractor | A requirement only exists if a meal/rest area is not nearby/within walking distance. |
| 57 | Venue-General | Production - 2 | Chairs (Meals/Rest Areas) | As applicable | Mandatory Requirement | Government Contractor | A requirement only exists if a meal/rest area is not nearby/within walking distance. |
| 58 | Venue-General | Production - 2 | Tents or other Shade Solutions (Spectators) | As applicable | TBD | Government Contractor | As defined within each sport. |
| 59 | Venue-General | Production - 2 | Tables (Spectators) | As applicable | TBD | Government Contractor | As defined within each sport. |
| 60 | Venue-General | Production - 2 | Chairs (Spectators) | As applicable | TBD | Government Contractor | As defined within each sport. |
| 61 | Venue-General | Production - 2 | Tents (Additional or Undefined Requirements) | TBD | TBD | Government Contractor | As/if required for unforecasted emmergent requirements. |
| 62 | Venue-General | Production - 2 | Tables (Additional or Undefined Requirements) | TBD | TBD | Government Contractor | As/if required for unforecasted emmergent requirements. |
| 63 | Venue-General | Production - 2 | Chairs (Additional or Undefined Requirements) | TBD | TBD | Government Contractor | As/if required for unforecasted emmergent requirements. |
| 64 | Venue-General | Production - 3 | Pipe and Drape | As applicable | TBD | Government Contractor | As defined within each sport. |
| 65 | Venue-General | Production - 3 | Floor Protection | As applicable | TBD | Government Contractor | As defined within each sport. |
| 66 | Venue-General | Production - 3 | Carpeted Walkways | As applicable | TBD | Government Contractor | As defined within each sport. |
| 67 | Venue-General | Production - 3 | Ropes & Stanchions | As applicable | TBD | Government Contractor | As defined within each sport. |
| 68 | Venue-General | Production - 3 | Cones (Traffic-control and/or scoring-specific) | As applicable | TBD | TBD/DOD or Government Contractor | As defined within each sport. |
| 69 | Venue-General | Production - 3 | Barriers Portable (Metal; aka bike rack barrier) | As applicable | TBD | Government Contractor | As defined within each sport. |
| 70 | Venue-General | Production - 3 | Barriers Portable (Plastic; Empty, Water or sand-filled) | As applicable | TBD | Government Contractor | As defined within each sport. |
| 71 | Venue-General | Production - 3 | Barriers (Concrete) | As applicable | TBD | Government Contractor | As defined within each sport; Forklift needed for this requirement. |
| 72 | Venue-General | Signage | Warrior Games Signage | Required | Mandatory Requirement | Government Contractor | Warrior Games Specific Signage; includes schedules and key location/information-related signage. |
| 73 | Venue-General | Signage | Warrior Games Signage w/ Sponsor Logos | As applicable | Optional Component | TBD | As applicable. |
| 74 | Venue-General | Signage | Sponsor Signages | As applicable | Optional Component | TBD | As applicable. |
| 75 | Venue-General | Signage | Sport Specific and Directional Signage | Required | Mandatory Requirement | Government Contractor | Signage exclusive to the safety and operational execution of the Sport ROS. |
| 76 | Venue-General | Transportation | DOD Athletes Transportation | Required | Mandatory Requirement | TBD | All DOD Athlete transportation support requirements. |
| 77 | Venue-General | Transportation | DOD Athletes Competition Equipment Transportation | Required | Mandatory Requirement | DOD Service Teams | All DOD Athlete competition equipment collection/transportation requirements. May be relied upon to support International Teams with similar requirements. |
| 78 | Venue-General | Transportation | International Teams Collected Transportation Support | Required | Mandatory Requirement | TBD | International Teams may require a US licensed operator if not in possession of an international drivers license; typically performed by US military. |
| 79 | Venue-General | Transportation | Family and Friends Transportation | Required | Mandatory Requirement | TBD | Transportation requirement for all Family and Friends attendees. |
| 80 | Venue-General | Transportation | DOD Event Staff | As applicable | Mandatory Requirement | DOD/Government | Transportation requirement for all DOD WG Event Staff. |
| 81 | Venue-General | Transportation | Contracted Staff | As applicable | Mandatory Requirement | Government Contract | Transportation requirements for personnel contracted by Govt Contractor. |
| 82 | Venue-General | Transportation | Spectators, General | N/A | N/A | N/A | There is no requirement for transportation of general spectators. |
| 83 | Venue-General | Transportation | Volunteers, All | N/A | N/A | N/A | There is no requirement for transportation of volunteers. |
Archery
| ARCHERY REQUIREMENTS | |||||||
| LIN | CATEGORY | SUB-CATEGORY | DESCRIPTION | REQUIREMENT | PRIORITY | RESPONSIBLE ENTITY | REMARKS |
| 1 | Personnel | Archery | Archery Venue Manager | 1 | Mandatory Requirement | Government Contractor | Senior Manager of the Archery Event and Venue; World Archery/Para Archery Certification or acceptable equivalent associated with sport NGB. |
| 2 | Personnel | Archery | Judges/Range Safeties | 3 | Mandatory Requirement | Government Contractor | (1) Official/Range Safety every 10 targets; World Archery/Para Archery Certification or acceptable equivalent associated with sport NGB. |
| 3 | Personnel | Archery | Additional Range Safeties | N/A | Mandatory Requirement | DOD Service Teams | Service Team Coaches/Assistant Coaches all serve as additional range safeties when not performing coaching duties. |
| 4 | Personnel | Archery | Electronic Scoring System Operator | 1 to 2 | Mandatory Requirement | Government Contractor | ROS requirement; Number of operators is predicated by scoring system mechanics and accuracy redundancy |
| 5 | Personnel | Archery | Bow Technician | 1 | Mandatory Requirement | Government Contractor | ROS requirement; World Archery/Para Archery Trained or acceptable equivalent associated with sport NGB. |
6 Personnel Volunteers Scorers/Arrow Pullers 2 per target Mandatory Requirement Government Contractor ROS requirement; Coordinated by WGSD, Sport Venue Manager, Volunteer Coordinator, and Contractor. Based on total nubmer of targets in play; Local Archery Pros preferred.
| 7 | Venue-Specific | Archery | Archery Venue | Required | Mandatory Requirement | Government Contractor | Venue must be indoor and large enough to hold at least 30 targets at a spacing distance of "6ft on center." |
| 8 | Venue-Specific | Archery | Protective Wall / Wood Panel System (Option 1) | Required | Mandatory Requirement | Government Contractor | Option 1 System requires considerable fabrication and assembly; wood prices may/will be impacted by COVID and hurricane season |
| 9 | Venue-Specific | Archery | Protective Wall / Arrow Curtain (Option 2) | Required | Mandatory Requirement | Government Contractor | Option 2 System would require early sourcing to secure one. |
| 10 | Venue-Specific | Archery | FITA MAT; 54" Archery Target | 30+ | Mandatory Requirement | Government Contractor | Targets mats come in different sizes; it is important that they are large enough to hold (4) paper target faces at one time and all look the same. |
| 11 | Venue-Specific | Archery | FITA Archery Target Stand | 30+ | Mandatory Requirement | Government Contractor | Target stands come in different shapes and materials. They should all be the same make/model/materials. |
| 12 | Venue-Specific | Archery | FITA Target, Compound, 40cm Stop-Light | 1000 | Mandatory Requirement | Government Contractor | Estimate covers both training and competition requirements up to 100 athletes; 10 targets per athlete. |
| 13 | Venue-Specific | Archery | FITA Target, Recurve, 40cm Stop-Light | 1000 | Mandatory Requirement | Government Contractor | Estimate covers both training and competition requirements up to 100 athletes; 10 targets per athlete. |
| 14 | Venue-Specific | Archery | FITA Target, Visually Impaired, 60cm Stop-Light | 80 | Mandatory Requirement | Government Contractor | Estimate covers both training and competition requirements up to 8 athletes; 10 targets per athlete. |
| 15 | Venue-Specific | Archery | Electronic Scoring System | 1 | Mandatory Requirement | Government Contractor | Computer w/competition software (1) and iPads with competition scoring app (30+); Back-up paper scoring will also be in place. |
| 16 | Venue-Specific | Archery | Bow Vice/Bow Maintenance Items (Consumables) | Required | Mandatory Requirement | Government Contractor | Part of Bow Technician Personnel Requirement; otherwise Service Team Coaches will bring their own items for athlete equipment maintenance. |
| 17 | Venue-Specific | Comp. Equipment | Archery Athlete Competition Equipment | Required | Mandatory Requirement | Service Teams (All) | Service Teams are responsible for all bows, arrows, and support equipment/special adaptive equipment for their athletes. |
| 18 | Venue-Specific | Comp. Equipment | Archery Maintenance Items (Consumables) | Required | Mandatory Requirement | Service Teams (All) | Service Teams will bring their own items for athlete equipment maintenance. Event Bow Technician will support with upper-level repair requirements as/if applicable. |
| 19 | Venue-Specific | Logistics | Internal Storage Solutions | Required | Mandatory Requirement | Government Contractor | Individual/securable spaces for athletes to store their competition equipment; chain link. (1ea per Service Team); Lockable rooms are authorized substitutes for this requirement. |
| 20 | Venue-Specific | Production - 1 | Additional Power/Generators | N/A | N/A | N/A | Standard facilities power/110v must meet Sport Event requirements. |
| 21 | Venue-Specific | Production - 1 | Additional Lighting | N/A | N/A | N/A | Standard facilities lighting must meet Sport Event requirements. |
| 22 | Venue-Specific | Production - 1 | IT Support/Scoring System Private WiFi | Required | Mandatory Requirement | Government Contractor | Password protected WiFi for production company direct link for realtime results output to venue displays; Free/public WiFi prone to failure. |
| 23 | Venue-Specific | Production - 1 | Printer (Heats, Scores, and Results) | 1 | Mandatory Requirement | Government Contractor | Used by the Archery Operations/Electronic Scoring System Operator(s). |
| 24 | Venue-Specific | Production - 2 | Tables, 6ft to 8ft (Archery Operations) | 4 to 6 | Mandatory Requirement | Government Contractor | Part of Venue Operations requirements. |
| 25 | Venue-Specific | Production - 2 | Chairs (Archery Operations) | 8 to 12 | Mandatory Requirement | Government Contractor | Part of Venue Operations requirements. |
| 26 | Venue-Specific | Production - 2 | Tables, 6ft to 8ft (Bow Technician) | 1 to 2 | Mandatory Requirement | Government Contractor | # as needed for Bow Technician. |
| 27 | Venue-Specific | Production - 2 | Chairs (Bow Technician) | 2 to 4 | Mandatory Requirement | Government Contractor | # as needed for Bow Technician. |
| 28 | Venue-Specific | Production - 2 | Tables, 6ft to 8ft (Service Team Areas) | 1 to 2/per Team | Mandatory Requirement | Government Contractor | Service Team Staging/Rest Area; actual numbers/dimensions TBD; Venue may not be large enough to support this requirement. |
| 29 | Venue-Specific | Production - 2 | Chairs (Service Team Areas) | TBD | Mandatory Requirement | Government Contractor | Service Team Staging/Rest Area; actual numbers/dimensions TBD; Venue may not be large enough to support this requirement. Single row bleachers may serve as subsitutes. |
| 30 | Venue-Specific | Production - 2 | Tables (Firing Line ) | N/A | N/A | N/A | Tables are not required on the firing line. |
| 31 | Venue-Specific | Production - 2 | Chairs (Firing Line) | 120+ | Mandatory Requirement | Government Contractor | 4 chairs per target; seating for up to 3 other athletes not on firing line. |
| 32 | Venue-Specific | Production - 3 | Pipe and Drape | As applicable | Mandatory Requirement | Government Contractor | As applicable; may be identifed as venue dressing to hide unsightly elements of the location. |
| 33 | Venue-Specific | Production - 3 | Floor Protection | As applicable | Optional Component | Government Contractor | This is only a requirement if the sourced venue is carpeted and requires it to prevent damage from atypical use associated with an Archery range. |
| 34 | Venue-Specific | Production - 3 | Carpeted Walkways | As applicable | Optional Component | Government Contractor | Has been used in past DWG as venue dressing. |
| 35 | Venue-Specific | Production - 3 | Ropes & Stanchions | Required | Mandatory Requirement | Government Contractor | Required to mark off field of play and/or off-limits areas associated with the active Archery range. |
| 36 | Venue-Specific | Production - 3 | Cones (Traffic-control) | As applicable | Optional Component | TBD/DOD or Government Contractor | Has been used in past DWG to mark entry and exit points with the Archery range. |
| 37 | Venue-Specific | Production - 3 | Barriers Portable (Metal; aka bike rack barrier) | As applicable | Mandatory Requirement | Government Contractor | Required to mark off field of play and/or off-limits areas; acceptable substitute for Ropes & Stanchions. |
Cycling
| CYCLING REQUIREMENTS | |||||||
| LIN | CATEGORY | SUB-CATEGORY | DESCRIPTION | REQUIREMENT | PRIORITY | RESPONSIBLE ENTITY | REMARKS |
| 1 | Personnel | Cycling | Cycling Venue Manager | 1 | Mandatory Requirement | Government Contractor | Senior Manager of the Cycling Event and Venue; UCI/Para Cycling Certification or acceptable equivalent associated with sport NGB. |
| 2 | Personnel | Cycling | US Cycling Officials/Race Management | TBD | Mandatory Requirement | Government Contractor | ROS requirement; UCI/Para Cycling Certification or acceptable equivalent associated with sport NGB. Final requirements needed based upon venue and number of athletes. |
| 3 | Personnel | Cycling | Start/Lap/Finish Line Timing and Results System Operator(s) | 2 to 3 | Mandatory Requirement | Government Contractor | ROS requirement; # of personnel subject to change based upon manning requirements of sub-contracted company. |
| 4 | Personnel | Cycling | Cycling Technicians | 2 to 4 | Optional Component | Government Contractor | ROS requirement; Appropriate Training Required (UCI/Para Cycling, Shimano SRAM, etc). Also perform similar duties at Track for Racing Wheelchairs. |
| 5 | Personnel | Volunteers | Lap Notification Support | As applicable | Mandatory Requirement | Service Teams (All) | ROS requirement; Coordinated by WGSD, Sport Venue Manager, Volunteer Coordinator and Contractor (and Service Teams). |
| 6 | Personnel | Volunteers | Road Closure/Road Access Safeties | As applicable | Mandatory Requirement | Government Contractor | ROS requirement; Coordinated by WGSD, Sport Venue Manager, Volunteer Coordinator, and Contractor. No special training needed for this requirement. |
| 7 | Venue-Specific | Cycling | Cycling Venue | Required | Mandatory Requirement | Government Contractor | Collected outdoor location to hold a Cycling Competition/Time Trial; may be two separate locations (Ex. WG19). Single location is preferred. |
| 8 | Venue-Specific | Cycling | Cycling Route for Time Trial | Required | Mandatory Requirement | Government Contractor | Course lengths of 5km and 10km. |
| 9 | Venue-Specific | Cycling | Cycling Route for Road race | Required | Mandatory Requirement | Government Contractor | Course lengths of 10km, 20km, and 30km; 2.5k loop minimum course distance recommendation to reduced excessive lap requirement. |
| 10 | Venue-Specific | Cycling | Start/Lap/Finish Line Race Operations Center | Required | Mandatory Requirement | Government Contractor | Part of Timing Company contracted solution(s); Contracted asset typically provides their own tentage/shade solutions (trailered operations with portable generator). |
| 11 | Venue-Specific | Cycling | Cycling Venue Joint Tech Services Area | Required | Mandatory Requirement | Government Contractor | Central location for general cycling support not available from Service Teams; historical donated/sponsored/NPO support. |
| 12 | Venue-Specific | Cycling | Bicycle Racks (DOD Service Teams) | As applicable | Mandatory Requirement | DOD Service Teams | DOD Service Teams are responsible for meeting any/all bicycle rack needs. |
| 13 | Venue-Specific | Cycling | Bicycle Racks (International Teams) | As applicable | Mandatory Requirement | Government Contractor | International Support Team Requirement; low-cost associated with this need; Gated road barriers can serve as an upright bicycle rack. |
| 14 | Venue-Specific | Cycling | Hay Bails and/or other crash safety mechanisms | Required | Mandatory Requirement | Government Contractor | Requirements and placement as determined by WGSD, Cycling Venue Manager and Contractor. |
| 15 | Venue-Specific | Cycling | Road Closure/Traffic Control Operations | Required | Mandatory Requirement | Government Contractor | Component of overall Cycling Course Safety; exact requirements cannot be determined without course location and route. |
| 16 | Venue-Specific | Cycling | Lead Vehicle/Course Start Vehicle/Chase Vehicles | As applicable | Optional Requirement | TBD/DOD or Government Contractor | Component of overall Cycling Course Safety; exact requirements and options can be determined at a later date. |
| 17 | Venue-Specific | Cycling | Stop Watches (Backup Timing) | Required | Mandatory Requirement | Government Contractor | ROS requirement; Used in case of Timing System failure. |
| 18 | Venue-Specific | Comp. Equipment | Cycling Athlete Competition Equipment | Required | Mandatory Requirement | Service Teams (All) | Service Teams are responsible for all cycle types, trainers, and support equipment/special adaptive equipment for their athletes. |
| 19 | Venue-Specific | Comp. Equipment | Cycling Maintenance Items (Consumables) | Required | Mandatory Requirement | Service Teams (All) | Service Teams will bring their own items for athlete equipment maintenance. Event Cycle Technicians will support with upper-level repair requirements as/if applicable. |
| 20 | Venue-Specific | Logistics | External Storage Solutions (Option 1) | As applicable | TBD | DOD Service Teams | DOD Service Teams may/will ship Program Equipment in CONNEX container(s) for equipment storage and event operations; Attempt to locate Connex Village in close proximity. |
| 21 | Venue-Specific | Logistics | External Storage Solutions (Option 2) | As applicable | TBD | DOD Service Teams | Some DOD Service Teams will ship Program Equipment in rented PODS container(s) for equipment storage and event operations; Attempt to locate Connex Village in close proximity. |
| 22 | Venue-Specific | Logistics | External Storage Solutions (Option 3) | As applicable | TBD | DOD Service Teams | Some DOD Service Teams will ship Program Equipment in rented box trucks for equipment storage and event operations; Attempt to locate Connex Village in close proximity. |
| 23 | Venue-Specific | Logistics | External Storage Solutions/International Teams | As applicable | Mandatory Requirement | Government Contractor | Storage solution for International Team Equipment storage at the Cycling Venue; Option to co-locate equipment with DOD Service Teams' storage solutions. |
| 24 | Venue-Specific | Logistics | Internal Storage Solutions | As applicable | Optional Requirement | Government Contractor | Internal Storage Solution of all Cycling Equipment (Ex. Warehouse within close vicinity of Cycling Venue. |
| 25 | Venue-Specific | Production - 1 | Additional Power/Generators | Required | Mandatory Requirement | Government Contractor | Additional/external power required to support race/operations and/or maintenance tech services |
| 26 | Venue-Specific | Production - 1 | Additional Lighting | N/A | N/A | N/A | No additional lighting requirements for this sport. Training opportunities at dawn/dusk will be assesed at a later date by WGSD, Sport Venue Manager, and Contractor. |
| 27 | Venue-Specific | Production - 1 | IT Support/Scoring System Private WiFi | TBD | TBD | Government Contractor | Unknown requirement for this sport; not a requirement in previous years. |
| 28 | Venue-Specific | Production - 1 | Printer (Heats, Scores, and Results) | 1 | Mandatory Requirement | Government Contractor | Used by the Cycling Operations/Timing and Results System Operator(s). |
| 29 | Venue-Specific | Production - 2 | Tents (Sport Operations/Timing and Results) | 2 to 3 | Mandatory Requirement | Government Contractor | Cycling Operations; actual numbers/dimensions TBD by Contractor. |
| 30 | Venue-Specific | Production - 2 | Tables, 6ft to 8ft (Sport Operations/Timing and Results) | 4 to 6 | Mandatory Requirement | Government Contractor | # as needed for Race Operations/Officials; final # dependent on Cycling Venue Manager requirements. |
| 31 | Venue-Specific | Production - 2 | Chairs (Sport Operations/Timing and Results) | 8 to 12 | Mandatory Requirement | Government Contractor | # as needed for Race Operations/Officials; final # dependent on Cycling Venue Manager requirements. |
| 32 | Venue-Specific | Production - 2 | Tents (Cycling Technicians) | 1 to 2 | Mandatory Requirement | Government Contractor | # as needed for Cycling Technicians. |
| 33 | Venue-Specific | Production - 2 | Tables, 6ft to 8ft (Cycling Technicians) | 3 to 6 | Mandatory Requirement | Government Contractor | # as needed for Cycling Technicians. |
| 34 | Venue-Specific | Production - 2 | Chairs (Cycling Technicians) | 6 to 8 | Mandatory Requirement | Government Contractor | # as needed for Cycling Technicians. |
| 35 | Venue-Specific | Production - 2 | Tents 20ft x20ft (Service Team Areas) | 2/per team | Mandatory Requirement | Government Contractor | Service Team Staging/Rest Area; actual numbers/dimensions TBD/based upon number of teams/athletes per team. |
| 36 | Venue-Specific | Production - 2 | Tables, 6ft to 8ft (Service Team Areas) | 3 to 4/per team | Mandatory Requirement | Government Contractor | Service Team Staging/Rest Area; actual numbers/dimensions TBD/based upon number of teams/athletes per team. |
| 37 | Venue-Specific | Production - 2 | Chairs (Service Team Areas) | 20 to 25/per team | Mandatory Requirement | Government Contractor | Service Team Staging/Rest Area; actual numbers/dimensions TBD/based upon number of teams/athletes per team. |
| 38 | Venue-Specific | Production - 2 | Tents or other Shade Solutions (Spectators) | Required | Mandatory Requirement | Government Contractor | Shaded areas for spectators. May not be required based upon natural shade at the venue. |
| 39 | Venue-Specific | Production - 2 | Tables (Spectators) | TBD | TBD | Government Contractor | Unknown requirement for this sport; dependent on bleacher solutions or the absence thereof. |
| 40 | Venue-Specific | Production - 2 | Chairs (Spectators) | TBD | TBD | Government Contractor | Unknown requirement for this sport; history of table requirements for water/drinks services for Friends & Family. |
| 41 | Venue-General | Production - 2 | Tents (Additional or Undefined Requirements) | TBD | Mandatory Requirement | Government Contractor | As/if required for unforecasted emmergent requirements. |
| 42 | Venue-Specific | Production - 2 | Chairs (Additional Undefined Requirements) | TBD | Mandatory Requirement | Government Contractor | As/if required for unforecasted emmergent requirements. |
| 43 | Venue-Specific | Production - 2 | Tables (Additional or Undefined Requirements) | TBD | Mandatory Requirement | Government Contractor | As/if required for unforecasted emmergent requirements. |
| 44 | Venue-Specific | Production - 3 | Ropes & Stanchions | Required | Mandatory Requirement | Government Contractor | May be needed to mark off field of play, venue operations, and/or off-limits areas. Preferred solution instead of cones. |
| 45 | Venue-Specific | Production - 3 | Cones (Traffic-control) | Required | Mandatory Requirement | Government Contractor | May be needed to mark off field of play, venue operations, and/or off-limits areas; some cones are in GFE storage. |
| 46 | Venue-Specific | Production - 3 | Barriers Portable (Metal; aka Bike Rack Barrier) | Required | Mandatory Requirement | Government Contractor | Required to mark off field of play and/or off-limits areas; primary use is to prevent spectators from entering the course. Can also be used as a bike rack for all cycle types. |
| 47 | Venue-Specific | Production - 3 | Barriers Portable (Plastic) | As applicable | TBD | Government Contractor | Required to mark off field of play and/or off-limits areas; acceptable substitute for Portable Metal Barriers. |
| 48 | Venue-Specific | Production - 3 | Barriers (Concrete) | As applicable | TBD | Government Contractor | Required to mark off field of play and/or off-limits areas; may be required to block off larger/high traffic streets. Forklift required for emplacement. |
Golf
| GOLF REQUIREMENTS | |||||||
| LIN | CATEGORY | SUB-CATEGORY | DESCRIPTION | REQUIREMENT | PRIORITY | RESPONSIBLE ENTITY | REMARKS |
| 1 | Personnel | Golf | Golf Venue Manager | 1 | Mandatory Requirement | Government Contractor | Senior Manager of the Golf Event and Venue; USGA Certification or acceptable equivalent associated with sport NGB. |
| 2 | Personnel | Golf | Golf Judges/ Officials | TBD | Mandatory Requirement | Government Contractor | ROS requirement; USGA Certification or acceptable equivalent associated with sport NGB. Final requirements needed based upon venue and number of athletes. |
| 3 | Personnel | Golf | Caddies | TBD | Optional Component | Government Contractor | ROS requirement. May be performed by a Service Team Staff Member, fellow athlete, NMA, or any other person authorized within the field of ppay. |
| 4 | Personnel | Golf | Golf Cart Operators | TBD | Optional Component | Government Contractor | ROS requirement. May be performed by a Service Team Staff Member, fellow athlete, NMA, or any other person authorized within the field of ppay. |
5 Personnel Volunteers Golf Support TBD TBD TBD/DOD or Government Contractor ROS requirement; Coordinated by WGSD, Sport Venue Manager, Volunteer Coordinator and Contractor; Local or Venue Golf Pros preferred. (Caddies and Golf Cart Operators).
| 6 | Venue-Specific | Golf | Golf Venue | 1 | Mandatory Requirement | Government Contractor | Location TBD; 18-Hole Golf Course; will only use 9-holes unless competition format changes |
| 7 | Venue-Specific | Golf | Golf Carts | 1/per athlete | Mandatory Requirement | Government Contractor | Each athlete is assigned their own golf cart. |
| 8 | Venue-Specific | Golf | ADA Motorized Golf Assisted Device/Vehicle | Required | Mandatory Requirement | Government Contractor | SoloRider; May not be available locally and difficult to source at last minute. Some courses have 1-2 on-hand. |
| 9 | Venue-Specific | Golf | Golf Maintenance Items and Consumables | N/A | N/A | Government Contractor | Examples: Golf Balls and Golf Tees. |
| 10 | Venue-Specific | Comp. Equipment | Golf Athlete Competition Equipment (Contracted) | Required | Mandatory Requirement | Government Contractor | The Contractor will secure a venue that offers rental golf equipment (club sets, golf shoes, golf carts, etc.) as the primary solution for these requirements. |
| 11 | Venue-Specific | Comp. Equipment | Golf Athlete Competition Equipment (Personal) | As applicable | N/A | Service Teams (All) | Some Service Teams athletes may have their own or Service Program equipment to use; personal golf carts are not allowed. |
| 12 | Venue-Specific | Logistics | Internal Storage Solutions | As applicable | TBD | Government Contractor | Golf Venue Manager may have minimal equipment storage requirements |
| 13 | Venue-Specific | Production - 1 | Additional Power/Generators | N/A | N/A | N/A | Standard facilities lighting must meet Sport Event requirements. |
| 14 | Venue-Specific | Production - 1 | Additional Lighting | N/A | N/A | N/A | Standard facilities lighting meets Sport Event requirements. |
| 15 | Venue-Specific | Production - 1 | IT Support/Scoring System Private WiFi | 1 | TBD | Government Contractor | Venue must be able to support all of its WiFi requirements as/if applicable. |
| 16 | Venue-Specific | Production - 1 | Printer (Heats, Scores, and Results) | As applicable | Mandatory Requirement | Government Contractor | Used by the Golf Operations/Results System Operator(s). |
| 17 | Venue-Specific | Production - 2 | Tents (Golf Operations) | 2 | Mandatory Requirement | Government Contractor | # as needed for Golf Operations; final # dependent on Golf Venue Manager requirements. |
| 18 | Venue-Specific | Production - 2 | Tables, 6ft to 8 ft (Golf Operations) | 3 to 4 | Mandatory Requirement | Government Contractor | # as needed for Golf Operations; final # dependent on Golf Venue Manager requirements. |
| 19 | Venue-Specific | Production - 2 | Chairs (Golf Operations) | 6 to 8 | Mandatory Requirement | Government Contractor | # as needed for Golf Operations; final # dependent on Golf Venue Manager requirements. |
| 20 | Venue-Specific | Production - 2 | Tents (Service Team Areas) | 1 per team | Mandatory Requirement | Government Contractor | Service Team Staging/Rest Area; actual numbers/dimensions TBD. |
| 21 | Venue-Specific | Production - 2 | Tables, 6ft to 8 ft (Service Team Areas) | 2 per team | Mandatory Requirement | Government Contractor | Service Team Staging/Rest Area; actual numbers/dimensions TBD. |
| 22 | Venue-Specific | Production - 2 | Chairs (Service Team Areas) | 10 to 12 | Mandatory Requirement | Government Contractor | Service Team Staging/Rest Area; actual numbers/dimensions TBD. |
| 23 | Venue-Specific | Production - 2 | Tents or other Shade Solutions (Spectators) | TBD | Mandatory Requirement | Government Contractor | Shaded areas for spectators. May not be required based upon natural shade at the venue. |
| 24 | Venue-Specific | Production - 3 | Pipe and Drape | As applicable | Mandatory Requirement | Government Contract | As applicable; may be identifed as venue dressing to hide unsightly elements of the location or backdrop for medal ceremony space. |
| 25 | Venue-Specific | Production - 3 | Ropes & Stanchions | As applicable | Mandatory Requirement | Government Contract | May be needed to mark off field of play, venue operations, and/or off-limits areas. These items should be on-hand at the Golf Venue (assumption). |
| 26 | Venue-Specific | Production - 3 | Cones (Traffic-control) | As applicable | Mandatory Requirement | Government Contract | May be needed to mark off field of play, venue operations, and/or off-limits areas; some cones are in GFE storage. |
Indoor Rowing
| INDOOR ROWING REQUIREMENTS | |||||||
| LIN | CATEGORY | SUB-CATEGORY | DESCRIPTION | REQUIREMENT | PRIORITY | RESPONSIBLE ENTITY | REMARKS |
| 1 | Personnel | Indoor Rowing | Indoor Rowing Venue Manager | 1 | Mandatory Requirement | Government Contractor | Senior Manager of the Indoor Rowing Event and Venue; World Rowing/FISA Certification or acceptable equivalent associated with sport NGB. |
| 2 | Personnel | Indoor Rowing | USA Rowing Judges/Officials | TBD | Mandatory Requirement | Government Contractor | ROS requirement; World Rowing/FISA Certification or acceptable equivalent associated with sport NGB. |
| 3 | Personnel | Indoor Rowing | Electronic Race Results System Operator(s) | 1 | Mandatory Requirement | Government Contractor | ROS requirement; Appropriate Training Required (Concept2). |
| 4 | Personnel | Indoor Rowing | ERG Technician/Equipment Support | 1 | Mandatory Requirement | Government Contractor | ROS requirement; Appropriate Training Required (Concept2). |
| 5 | Personnel | Volunteers | ERG Station Support (Coxswain) | 28 (1/per ERG) | Mandatory Requirement | Government Contractor | ROS requirement; Coordinated by WGSD, Sport Venue Manager, Volunteer Coordinator, and Contractor; Local Rowing community is preferred. |
| 6 | Venue-Specific | Indoor Rowing | Indoor Rowing Venue | Required | Mandatory Requirement | Government Contractor | Venue must be indoor and large enough to hold at least 28 ERGS Competition ERGs & 28 Training ERGS "6ft on center." |
| 7 | Venue-Specific | Indoor Rowing | Concept2 ERG Model D/E w/PM5 (Competion) | 28 | Mandatory Requirement | Government Contractor | Specific equipment required for this event. Exact number of Model D vs. Model E is based upon athlete classification analysis. |
| 8 | Venue-Specific | Indoor Rowing | Concept2 ERG Model D/E w/PM4 or PM5 (Training) | 28 | Mandatory Requirement | Government Contractor | Specific equipment required for this event. Exact number of Model D vs. Model E is based upon athlete classification analysis. |
| 9 | Venue-Specific | Indoor Rowing | Electronic Timing/Results System | 1 | Mandatory Requirement | Government Contractor | ROS requirement; computer w/competition software/hardware with visual output capability to spectators |
| 10 | Venue-Specific | Indoor Rowing | Adaptive Seating (Para/Quad Seats/Tractor Seats) | Required | Mandatory Requirement | Government Contractor | ROS requirement; Service Teams will bring all of their seats to WG21 as well if required. |
| 11 | Venue-Specific | Indoor Rowing | Adaptive Hand Grip (Injured Grip/Amputee Use) | Required | Mandatory Requirement | Government Contractor | ROS requirement; Service Teams will bring all of their adaptive grips to DWG as well if required for their athletes. |
| 12 | Venue-Specific | Indoor Rowing | ERG Maintenance Items (Consumables) | Required | Mandatory Requirement | Government Contractor | Misc. parts needed to repair failed/worn ERG components and PM modules. |
| 13 | Venue-Specific | Indoor Rowing | D-Cell Batteries | As applicable | Mandatory Requirement | Government Contractor | All PM Modules will have new batteries installed on venue setup and checked for replacement requirement for competition day. |
| 14 | Venue-Specific | Indoor Rowing | Emergency Buckets (3gal) with trash can liners | 1/per ERG | Mandatory Requirement | DOD/Government | For the purposes of catching vomit during training and competition. Items are stored with GFE. |
| 15 | Venue-Specific | Indoor Rowing | Equipment Cleaning Items (Sets) | 56 | Mandatory Requirement | Government Contractor | ROS Requirement; simple cleaning/sterilization items emplaced at each Training and Competition ERG. |
| 16 | Venue-Specific | Comp. Equipment | Indoor Rowing Athlete Competition Equipment | As required | Mandatory Requirement | Service Teams (All) | Service Teams is possession of special Indoor Rowining adaptive equipment are required to bring it. (Wintech seats/Tractor seats/adaptive grips, etc.) |
| 17 | Venue-Specific | Logistics | Internal Storage Solutions | Required | Mandatory Requirement | Government Contractor | Individual spaces for athletes to store their competition equipment; chain link or pipe and drape areas approx 8'x8' sq ft minimum per service team. Minimal space is needed. |
| 18 | Venue-Specific | Production - 1 | Additional Power/Generators | N/A | N/A | N/A | Standard facilities lighting must meet Sport Event requirements. |
| 19 | Venue-Specific | Production - 1 | Additional Lighting | N/A | N/A | N/A | Standard facilities lighting meets Sport Event requirements. |
| 20 | Venue-Specific | Production - 1 | IT Support/Scoring System Private WiFi | Required | Mandatory Requirement | Government Contractor | Password protected WiFi for production company direct link for realtime results output to venue displays. |
| 21 | Venue-Specific | Production - 1 | Printer (Heats, Scores, and Results) | 1 | Mandatory Requirement | Government Contractor | Used by the Indoor Rowing Operations/Race Results System Operator(s). |
| 22 | Venue-Specific | Production - 2 | Tables, 6ft to 8ft (Indoor Rowing Operations) | 3 to 4 | Mandatory Requirement | Government Contractor | # as needed for Indoor Rowing Operations and Timing System Operator(s); final # dependent on Indoor Rowing Venue Manager requirements. |
| 23 | Venue-Specific | Production - 2 | Chairs (Indoor Rowing Operations) | 6 to 8 | Mandatory Requirement | Government Contractor | # as needed for Indoor Rowing Operations and Timing System Operator(s); final # dependent on Indoor Rowing Venue Manager requirements. |
| 24 | Venue-Specific | Production - 2 | Tables, 6ft to 8ft (Service Team Areas) | 1 to 2 | Mandatory Requirement | Government Contractor | Service Team Staging/Rest Area; actual numbers/dimensions TBD; Venue may not be large enough to support this requirement. |
| 25 | Venue-Specific | Production - 2 | Chairs (Service Team Areas) | 20/per team | Mandatory Requirement | Government Contractor | Service Team Staging/Rest Area; actual numbers/dimensions TBD; Venue may not be large enough to support this requirement. Single row bleachers may serve as subsitutes. |
| 26 | Venue-Specific | Production - 3 | Pipe and Drape | Required | Mandatory Requirement | Government Contractor | Needed for team equipment storage and/or venue training privacy masking. |
| 27 | Venue-Specific | Production - 3 | Floor Protection | Required | Mandatory Requirement | Government Contractor | As/if needed depending on competition floor type. |
| 28 | Venue-Specific | Production - 3 | Carpeted Walkways | Required | Mandatory Requirement | Government Contractor | Has been used in past DWG as venue dressing. |
| 29 | Venue-Specific | Production - 3 | Ropes & Stanchions | Required | Mandatory Requirement | Government Contractor | Required to mark off field of play and/or off-limits areas. |
| 30 | Venue-Specific | Production - 3 | Cones (Traffic-control and/or Scoring) | As applicable | Mandatory Requirement | Government Contractor | May be needed to mark off field of play, venue operations, and/or off-limits areas; some cones are in GFE storage |
| 31 | Venue-Specific | Production - 3 | Barriers Portable (Metal; aka Bike Rack Barrier) | As applicable | Mandatory Requirement | Government Contractor | Required to mark off field of play and/or off-limits areas; acceptable substitute for Ropes & Stanchions. |
Powerlifting
| POWERLIFTING REQUIREMENTS | |||||||
| LIN | CATEGORY | SUB-CATEGORY | DESCRIPTION | REQUIREMENT | PRIORITY | RESPONSIBLE ENTITY | REMARKS |
| 1 | Personnel | Powerlifting | Powerlifting Venue Manager | 1 | Mandatory Requirement | Government Contractor | Senior Manager of the Poweringlifting Event and Venue; World Para Powerlifting Certification or acceptable equivalent associated with sport NGB. |
| 2 | Personnel | Powerlifting | USA ParaPowerlifting Judges/Officials | 2/per station | Mandatory Requirement | Government Contractor | ROS requirement; World Para Powerlifting Certification or acceptable equivalent associated with sport NGB. |
| 3 | Personnel | Powerlifting | USA Powerlifting Spotters/Loaders | 2/per station | Mandatory Requirement | Government Contractor | ROS requirement; World Para Powerlifting Certification or acceptable equivalent associated with sport NGB. |
| 4 | Personnel | Powerlifting | Scoring and Results System Operator(s) | 1 to 2 | Mandatory Requirement | Government Contractor | ROS requirement. |
5 Personnel Volunteers Spotters/Loaders (Exception to Powerlifting Rules) 2/per station Optional Component Government Contractor ROS requirement; Coordinated by WGSD, Sport Venue Manager, Volunteer Coordinator, and Contractor; Local Powerlifting Community preferred.
| 6 | Venue-Specific | Powerlifting | Powerlifting Venue | Required | Mandatory Requirement | Government Contractor | Venue must be indoor and large enough to hold at least 3 Competition bench stations & 10 Training bench stations safetly spaced apart from each other. |
| 7 | Venue-Specific | Powerlifting | Official Weigh-in Area | Required | Mandatory Requirement | Government Contractor | Private area for officials to weigh-in athletes prior to competition to validate weight class; privacy requirements. Adajcent restroom can be used. |
| 8 | Venue-Specific | Powerlifting | WPPO ParaPowerlifting Benches | 13 | Mandatory Requirement | Government Contractor | Preferred equipment required for this event; (Eleiko brand preferred). Difficult to get on short notice and may be substituted with IPF Powerlifting Bench w/Overlay. |
| 9 | Venue-Specific | Powerlifting | IPF Powerlifting Benches | 13 | Optional Component | Government Contractor | Optional configuration used in lieu of WPPO ParaPowerlifting Bench; used in conjuction with Overlay. |
| 10 | Venue-Specific | Powerlifting | Powerlifting Bench Overlays | 13 | Optional Component | Government Contractor | Optional configuration used in lieu of WPPO ParaPowerlifting Bench; used in conjuction with IPF Powerlifting Bench. |
| 11 | Venue-Specific | Powerlifting | Powerlifting Bench Straps | 13 | Mandatory Requirement | Government Contractor | Component of each bench system. |
| 12 | Venue-Specific | Powerlifting | Powerlifting Weight Belts | Required | Mandatory Requirement | Government Contractor | This is an apparel item and should be source by all DOD Service Teams per DWG R&R; International Team requirements/considerations may apply. Contractor will source as well. |
| 13 | Venue-Specific | Powerlifting | Results Record System | 1 | Mandatory Requirement | Government Contractor | ROS requirement; computer w/competition software/hardware with output capability to spectators. |
| 14 | Venue-Specific | Powerlifting | Equipment Maintenance Items (Consumables) | As applicable | Mandatory Requirement | Government Contractor | Misc. parts needed to repair failed/damaged benches. |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .