Attch 12 - LOCRF 100 Specification Part 1 of 1.pdf
PDF 27 MB Posted
- Attached to
- F-22 Low Observable Component Repair Facility (LOCRF) Federal contract opportunity
- Solicitation number
- W9123621R2023
About this file
This solicitation is for the construction of a Low Observable Component Repair Facility to support additional F-22A aircraft relocated to Langley Air Force Base. The project includes construction of a 6,735 square meter facility with four bays, including three low observable critical repair bays and one wash rack. The facility will provide spaces for corrosion control hangars, a wash rack, shops, tools and support, staff administration, ready room, break room, and restrooms. Each hangar bay will be equipped with appropriate air filtration systems. Additional requirements include site utilities, pavements, security enhancements, and other supporting work to make the facility complete and useable. The construction contract duration is expected to be 730 calendar days. The solicitation is issued by the Department of the Army Corps of Engineers Norfolk District for the Department of Defense.
View the file
Other files for this federal contract opportunity
Show all 50
F-22 Low Observable Component Repair Facility (LOCRF) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LOW OBSERVABLE COMPONENT REPAIR FACILITY
Langley Air Force Base
W91236-XX-X-XXXX
PROJECT TABLE OF CONTENTS Page 1
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 LIST OF DRAWINGS
-Appendix to 00 01 15: Sheet Index
00 22 13.00 20 SUPPLEMENTARY INSTRUCTIONS TO OFFERORS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
-Appendix to 01 11 00: GFE List
01 14 00 WORK RESTRICTIONS
01 22 00.00 10 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
-Appendix to 01 33 29: AF Sustainability Scoresheet
01 35 13 SPECIAL PROJECT PROCEDURES
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 45 35 SPECIAL INSPECTIONS
-Appendix 1 to 01 45 35: Schedule of Special Inspections
-Appendix 2 to 01 45 35: Statement of Special Inspections
01 50 00 TEMPORARY CONSTRUCTION FACILITIES AND CONTROLS
01 57 13.00 22 EROSION AND SEDIMENT CONTROL
01 57 19 TEMPORARY ENVIRONMENTAL CONTROLS
-Appendix to 01 57 19: JBLE-Langley Environmental Special Conditions
01 58 00 PROJECT IDENTIFICATION
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 24.00 10 FACILITY DATA REQUIREMENTS
01 91 00.15 10 TOTAL BUILDING COMMISSIONING
-Appendix to 01 91 00: Construction Phase Commissioning Plan
DIVISION 02 - EXISTING CONDITIONS
02 41 00 DEMOLITION
02 42 91 REMOVAL AND SALVAGE OF HISTORIC CONSTRUCTION MATERIALS
02 81 00 TRANSPORTATION AND DISPOSAL OF HAZARDOUS MATERIALS
02 83 00 LEAD REMEDIATION
02 84 16 HANDLING OF LIGHTING BALLASTS AND LAMPS CONTAINING PCBs
AND MERCURY
DIVISION 03 - CONCRETE
03 30 00 CAST-IN-PLACE CONCRETE
03 45 00 PRECAST ARCHITECTURAL CONCRETE
DIVISION 04 - MASONRY
04 20 00 UNIT MASONRY
PROJECT TABLE OF CONTENTS Page 2
DIVISION 05 - METALS
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOIST FRAMING
05 30 00 STEEL DECKS
05 40 00 COLD-FORMED METAL FRAMING
05 50 13 MISCELLANEOUS METAL FABRICATIONS
05 51 33 METAL LADDERS
05 52 00 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 41 16.00 10 PLASTIC-LAMINATE-CLAD ARCHITECTURAL CABINETS
06 61 16 SOLID SURFACING FABRICATIONS
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 PRESSURE TESTING AN AIR BARRIER SYSTEM FOR AIR TIGHTNESS
07 17 00 BENTONITE WATERPROOFING
07 21 13 BOARD AND BLOCK INSULATION
07 21 16 MINERAL FIBER BLANKET INSULATION
07 22 00 ROOF AND DECK INSULATION
07 27 10.00 10 BUILDING AIR BARRIER SYSTEM
07 27 19.01 SELF-ADHERING AIR BARRIERS
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
07 42 63 FABRICATED WALL PANEL ASSEMBLIES
07 52 00 MODIFIED BITUMINOUS MEMBRANE ROOFING
07 60 00 FLASHING AND SHEET METAL
07 61 15.00 20 ALUMINUM STANDING SEAM ROOFING
07 71 00 ROOF SPECIALTIES
07 72 00 ROOF ACCESSORIES
07 84 00 FIRESTOPPING
07 92 00 JOINT SEALANTS
07 95 00 EXPANSION CONTROL
DIVISION 08 - OPENINGS
08 11 13 STEEL DOORS AND FRAMES
08 31 00 ACCESS DOORS AND PANELS
08 33 23 OVERHEAD COILING DOORS
08 34 16 CORROSION CONTROL HANGAR DOORS
08 34 73 SOUND CONTROL DOOR ASSEMBLIES
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 51 13 ALUMINUM WINDOWS
08 71 00 DOOR HARDWARE
-Appendix to 08 71 00: Hardware Set
08 81 00 GLAZING
08 91 00 METAL WALL AND DOOR LOUVERS
DIVISION 09 - FINISHES
09 22 00 SUPPORTS FOR PLASTER AND GYPSUM BOARD
09 29 00 GYPSUM BOARD
09 30 10 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 ACOUSTICAL CEILINGS
09 65 00 RESILIENT FLOORING
09 67 23.16 FUEL RESISTIVE RESINOUS FLOORING, 5-COAT SYSTEM
09 90 00 PAINTS AND COATINGS
09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES
PROJECT TABLE OF CONTENTS Page 3
DIVISION 10 - SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 00.10 EXTERIOR SIGNAGE
10 14 00.20 INTERIOR SIGNAGE
10 21 13 TOILET COMPARTMENTS
10 22 13 WIRE MESH PARTITIONS
10 26 00 WALL AND DOOR PROTECTION
10 28 13 TOILET ACCESSORIES
10 44 16 FIRE EXTINGUISHERS
10 51 13 METAL LOCKERS
10 56 26.13 MOBILE STORAGE SHELVING UNITS (MECHANICALLY-ASSISTED)
DIVISION 11 - EQUIPMENT
11 51 00 INSULATED PAINT BOOTH
DIVISION 12 - FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 50 00.13 10 FURNITURE AND FURNITURE INSTALLATION
DIVISION 13 - SPECIAL CONSTRUCTION
13 34 19 METAL BUILDING SYSTEMS
DIVISION 21 - FIRE SUPPRESSION
21 13 13.00 10 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION
21 13 25 HIGH-EXPANSION FOAM SYSTEM, FIRE PROTECTION
21 30 00 FIRE PUMPS
DIVISION 22 - PLUMBING
22 00 00 PLUMBING, GENERAL PURPOSE
22 05 48.00 20 MECHANICAL SOUND, VIBRATION, AND SEISMIC CONTROL
22 15 14.00 40 GENERAL SERVICE COMPRESSED-AIR SYSTEMS, LOW PRESSURE
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 15 COMMON PIPING FOR HVAC
23 05 48.00 40 VIBRATION AND SEISMIC CONTROLS FOR HVAC PIPING AND
EQUIPMENT
23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC
23 07 00 THERMAL INSULATION FOR MECHANICAL SYSTEMS
23 09 00 HVAC CONTROLS CONFIGURATION AND GENERAL REQUIREMENTS
23 09 13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC
23 09 23 DIRECT DIGITAL CONTROL FOR HVAC AND OTHER BUILDING
CONTROL SYSTEMS
23 11 20 FACILITY GAS PIPING
23 21 13.00 20 LOW TEMPERATURE WATER (LTW) HEATING SYSTEM
23 21 23 HYDRONIC PUMPS
23 30 00 HVAC AIR DISTRIBUTION
23 37 13.00 40 DIFFUSERS, REGISTERS, AND GRILLS
23 51 43 CENTRAL VACUUM DUST COLLECTION SYSTEM
23 52 00 HEATING BOILERS
23 64 10 WATER CHILLERS, VAPOR COMPRESSION TYPE
23 64 26 CHILLED, CHILLED-HOT, AND CONDENSER WATER PIPING SYSTEMS
23 65 00 COOLING TOWERS AND REMOTE EVAPORATIVELY-COOLED CONDENSERS
PROJECT TABLE OF CONTENTS Page 4
23 80 20.00 10 GAS-FIRED HEATING EQUIPMENT
23 81 00.00 20 UNITARY AIR CONDITIONING EQUIPMENT
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.01 CYBERSECURITY FOR FACILITY-RELATED HVAC CONTROL SYSTEMS
25 05 11.02 CYBERSECURITY FOR FACILITY-RELATED FIRE ALARM CONTROL
SYSTEMS
DIVISION 26 - ELECTRICAL
26 00 01 JBLE ADVANCED METER READING SYSTEM (AMRS)
26 08 00 APPARATUS INSPECTION AND TESTING
26 20 00 INTERIOR DISTRIBUTION SYSTEM
26 24 13 SWITCHBOARDS
-Appendix to 26 24 13 AMRS Meter Specifications
26 28 01.00 10 COORDINATED POWER SYSTEM PROTECTION
26 29 23 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS UNDER 600 VOLTS
26 36 23.00 20 GENERATOR QUICK CONNECT DOUBLE-THROW SAFETY SWITCH
26 41 00 LIGHTNING PROTECTION SYSTEM
26 42 14.00 10 CATHODIC PROTECTION SYSTEM (SACRIFICIAL ANODE)
26 51 00 INTERIOR LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 - COMMUNICATIONS
27 05 13.43 TELEVISION DISTRIBUTION SYSTEM
27 10 00 BUILDING TELECOMMUNICATIONS CABLING SYSTEM
27 40 10 AUDIO-VISUAL GENERAL
27 40 90.01 AUDIO-VISUAL PERFORMANCE VERIFICATION
27 41 06 AUDIO-VISUAL POWER DISTRIBUTION AND MANAGEMENT EQUIPMENT
27 41 10 MICROPHONES, CONFERENCING SYSTEM, AND AUDIO SOURCE
EQUIPMENT
27 41 11 AUTOMATED MIXING, PROCESSING AND AMPLIFICATION EQUIPMENT
27 41 13 REINFORCEMENT AND PROGRAM AUDIO LOUDSPEAKERS
27 41 23 VIDEO DISPLAY EQUIPMENT
27 41 31 AUDIO-VISUAL CONTROL SYSTEMS AND PROGRAMMING
27 41 32 AUDIO-VISUAL NETWORK EQUIPMENT
27 41 40 AUDIO-VISUAL CABLING AND CONNECTORS.
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM
DIVISION 31 - EARTHWORK
31 00 00 EARTHWORK
-Appendix to 31 00 00: Geotechnical Report
31 05 19 GEOTEXTILE
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 01 11.51 RUBBER AND PAINT REMOVAL FROM AIRFIELD PAVEMENTS
32 01 19.61 SEALING OF JOINTS IN RIGID PAVEMENT
32 05 33 LANDSCAPE ESTABLISHMENT
32 11 20 BASE COURSE FOR RIGID PAVING
32 11 23 AGGREGATE BASE COURSES
32 12 13 BITUMINOUS TACK COAT
32 12 16 HOT-MIX ASPHALT (HMA) FOR ROADS
32 13 13.06 PORTLAND CEMENT CONCRETE PAVEMENT FOR SITE FACILITIES
INCLUDING SIGNAGE
32 13 14.13 CONCRETE PAVING FOR AIRFIELDS AND OTHER HEAVY DUTY
PROJECT TABLE OF CONTENTS Page 5
PAVEMENTS
32 13 73.19 COMPRESSION CONCRETE PAVING JOINT SEALANT
32 16 19 CONCRETE CURBS, GUTTERS AND SIDEWALKS
32 17 23 PAVEMENT MARKINGS
32 92 23 SODDING
DIVISION 33 - UTILITIES
33 11 00 WATER UTILITY DISTRIBUTION PIPING
33 16 15 WATER STORAGE STEEL TANKS
33 30 00 SANITARY SEWERAGE
33 32 16 PACKAGED UTILITY WASTEWATER PUMPING STATIONS
33 40 00 STORM DRAINAGE UTILITIES
33 71 02 UNDERGROUND ELECTRICAL DISTRIBUTION
33 82 00 TELECOMMUNICATIONS OUTSIDE PLANT (OSP)
-- End of Project Table of Contents --
LOW OBSERVABLE COMPONENT REPAIR FACILITY W91236-XX-X-XXXX
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows listed in the Appendix at the end of this specification section. :
DRAWING NO. [REVISION NO.] NAVFAC DWG NO. TITLE
1.3 [ SUPPLEMENTARY DRAWINGSATA
These supplementary drawings Data may not be a part of the contract but are included with the drawings for information.
1.3.1 [ Reference Drawing[s]
The following reference drawing[s] [is] [are] intended only to show the original construction. Drawing[s] [is] [are] the property of the Government and shall not be used for any purpose other than that intended by the contract. [The drawing[s] [is] [are] [half] [full] size.
Full-size drawings are available at the bidder's or Contractor's expense.
[Information on procuring these full-size drawings may be obtained from the Contracting Officer.] [Full size drawings may be inspected during regular working hours at [the office of the Contracting Officer.] [the station.]]
NAVFAC DWG NO. TITLE
]] 1.3.1 [ Boring Logs
The Government does not guarantee that borings indicate actual conditions, except for the exact locations and the time that they were made. [ Subsurface data, not specified or indicated, have been obtained by the Government at this station. The data are available for examination by prospective bidders [in the office of the Contracting Officer] [at the station].]
DOCUMENT 00 01 15 Page 1
] 1.3.2 [ Subsurface Data
Subsurface data, not specified or indicated, have been obtained by the Government at the station. The data are available for examination by prospective bidders [in the office of the Contracting Officer] [at the station]. [ The soils report is included as part of the solicitation ] .
-- End of Document --
DOCUMENT 00 01 15 Page 2
SHEET NUMBER SHEET NAME
00. GENERAL
G-001 COVER SHEET
G-002 SHEET INDEX
G-003 CODE COMPLIANCE SUMMARY
G-004 CODE COMPLIANCE SUMMARY
G-005 CODE COMPLIANCE SITE PLAN
G-101 FIRST FLOOR LIFE SAFETY PLAN - OVERALL
PH101 PHASE 1 SITE DIAGRAM
PH102 PHASE 2 SITE DIAGRAM
PH103 PHASE 3 SITE DIAGRAM
02. SURVEY / MAPPING
VF001 LEGENDS AND NOTES
VF100 EXISTING CONDITIONS PLAN
VF101 EXISTING CONDITIONS PLAN
VF102 EXISTING CONDITIONS PLAN
VF103 EXISTING CONDITIONS PLAN
VF104 EXISTING CONDITIONS PLAN
VF105 EXISTING CONDITIONS PLAN
VF106 EXISTING CONDITIONS PLAN
VF107 EXISTING CONDITIONS PLAN
04.CIVIL
C-001 LEGEND AND GENERAL NOTES
C-002 CONSTRUCTION ACCESS PLAN
C-003 EROSION AND SEDIMENT CONTROL - PHASE 1 PLAN INITIAL
C-004 EROSION AND SEDIMENT CONTROL - PHASE 1 PLAN FINAL
C-005 EROSION AND SEDIMENT CONTROL - PHASE 2 PLAN INITIAL
C-006 EROSION AND SEDIMENT CONTROL - PHASE 2 PLAN FINAL
C-007 EROSION AND SEDIMENT CONTROL - PHASE 2A PLAN INITIAL
C-008 EROSION AND SEDIMENT CONTROL - PHASE 2A PLAN FINAL
C-009 EROSION AND SEDIMENT CONTROL - PHASE 3 PLAN INITIAL
C-010 EROSION AND SEDIMENT CONTROL - PHASE 3 PLAN FINAL
CD001 DEMOLITION LEGEND & NOTES
CD100 EXISTING CONDITIONS - OVERALL
CD101 DEMOLITION PLAN
CD102 DEMOLITION PLAN
CD103 DEMOLITION PLAN
CD104 DEMOLITION PLAN
CD105 DEMOLITION PLAN
CD106 DEMOLITION PLAN
CD107 DEMOLITION PLAN
CS001 SITE LAYOUT LEGEND & CONTROL POINTS
CS101 SITE LAYOUT PLAN
CS102 SITE LAYOUT PLAN
CS103 SITE LAYOUT PLAN
CS104 SITE LAYOUT PLAN
CS105 SITE LAYOUT PLAN
CS106 SITE LAYOUT PLAN
CS107 SITE LAYOUT PLAN
CG001 GRADING LEGEND & NOTES
CG002 STORM SCHEDULES & NOTES
CG101 GRADING PLAN
CG102 GRADING PLAN
CG103 GRADING PLAN
CG104 GRADING PLAN
CG105 GRADING PLAN
00 01 15 Appendix Sheet Index
CG106 GRADING PLAN
CG107 GRADING PLAN
CG201 STORM SEWER PROFILES
CG202 STORM SEWER PROFILES
CG203 STORM SEWER PROFILES
CG204 STORM SEWER PROFILES
CG205 STORM SEWER PROFILES
CG700 POST DEVELOPMENT DRAINAGE AREAS
CG701 STORMWATER MANAGEMENT CALCULATIONS
CG702 STORMWATER MANAGEMENT CALCULATIONS
CG703 STORMWATER MANAGEMENT CALCULATIONS
CU001 UTILITY LEGEND, CONTROL POINTS & SCHEDULES
CU101 UTILITIES PLAN
CU102 UTILITIES PLAN
CU103 UTILITIES PLAN
CU104 UTILITIES PLAN
CU105 UTILITIES PLAN
CU106 UTILITIES PLAN
CU107 UTILITIES PLAN
CU201 SANITARY FORCE MAIN PROFILE
CU202 SANITARY FORCE MAIN PROFILE
CU203 SANITARY FORCE MAIN PROFILE
CU204 SANITARY FORCE MAIN PROFILE
CU205 SANITARY FORCE MAIN PROFILE
CU206 SANITARY SEWER PROFILE
CU207 8" DOMESTIC WATER PROFILE
CU208 8" DOMESTIC WATER PROFILE
CU209 12" FIRE WATER PROFILE
C-501 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES
C-502 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES
C-503 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES
C-504 EROSION AND SEDIMENT CONTROL DETAILS AND NOTES
C-505 EROSION AND SEDIMENT CONTROL DETAILS
C-506 DETAILS
C-507 DETAILS
C-508 DETAILS
C-509 DETAILS
C-510 DETAILS
C-511 DETAILS
C-513 DETAILS
C-514 DETAILS
C-515 DETAILS
C-516 DETAILS
CP100 AIRFIELD PHASING PLAN
CP101 APRON AND TOWWAY GEOMETRY PLAN
CP201 APRON AND TOWWAY JOINT LAYOUT PLAN
CP301 APRON AND TOWWAY SPOT ELEVATION PLAN
CP401 APRON AND TOWWAY TYPICAL SECTIONS
CP501 APRON AND TOWWAY JOINT DETAILS
CP502 APRON AND TOWWAY JOINT DETAILS
CM101 APRON AND TOWWAY MARKING PLAN
CM501 APRON AND TOWWAY MARKING DETAILS
5.0 LANDSCAPE
L-101 LANDSCAPE PLAN
L-102 LANDSCAPE PLAN
L-103 LANDSCAPE PLAN
L-104 LANDSCAPE PLAN
L-105 LANDSCAPE PLAN
L-501 LANDSCAPE DETAILS
06. STRUCTURAL
S-001 GENERAL STRUCTURAL NOTES
S-002 GENERAL STRUCTURAL NOTES
S-003 WIND PRESSURE CHARTS & DIAGRAMS
S-101 FOUNDATION PLAN - OVERALL
S101A FOUNDATION PLAN - AREA A
S101B FOUNDATION PLAN - AREA B
S101C FOUNDATION PLAN - AREA C
S101D FOUNDATION PLAN - AREA D
S101E FOUNDATION PLAN - AREA E
S-102 LINTEL PLAN
S-103 ROOF FRAMING PLAN - OVERALL
S103A ROOF FRAMING PLAN - AREA A
S103B ROOF FRAMING PLAN - AREA B
S103C ROOF FRAMING PLAN - AREA C
S103D ROOF FRAMING PLAN - AREA D
S103E ROOF FRAMING PLAN - AREA E
S-201 ENTRY TOWER FRAMING ELEVATIONS
S-202 CHILLER ENCLOSURE FRAMING ELEVATIONS
S-301 FOUNDATION SECTIONS - I
S-302 FOUNDATION SECTIONS - II
S-311 LO BAY HANGAR SECTION
S-312 WASH BAY HANGAR SECTION
S-321 ROOF FRAMING SECTIONS - I
S-322 ROOF FRAMING SECTIONS - II
S-323 ROOF FRAMING SECTIONS - III
S-324 ENTRY TOWER SECTIONS & DETAILS - I
S-325 ENTRY TOWER SECTIONS & DETAILS - II
S-331 SITE SECTIONS & DETAILS - I
S-401 ENLARGED PLANS - I
S-402 ENLARGED PLANS - II
S-501 CONCRETE DETAILS - I
S-502 CONCRETE DETAILS - II
S-503 CONCRETE DETAILS - III
S-504 CONCRETE DETAILS - IV
S-511 ROOF FRAMING DETAILS - I
S-512 ROOF FRAMING DETAILS - II
S-513 MASONRY DETAILS - I
S-514 MASONRY DETAILS - II
S-601 SCHEDULES
S-700 H.E.F. DISCHARGE TANK PLAN
S-701 STORAGE TANK DETAILS
S-702 STORAGE TANK STRUCTURAL DETAILS
S-901 3D PERSPECTIVE VIEWS
07. ARCHITECTURAL
A-001 GENERAL NOTES, ABBREVIATIONS AND SYMBOLS
A-002 ABA ACCESSIBILITY GUIDELINES
A-003 ABA PLAN
A-004 SECURE AREAS PARTIAL PLANS
A-005 AIRCRAFT CLEARANCE REQUIREMENT PLAN & SECTIONS
A-006 PARTITION TYPES
A-007 PARTITION TYPES
A-008 PARTITION HEAD CONDITIONS
A-009 PENETRATION DETAILS
A-010 PENETRATION DETAILS
A-011 EQUIPMENT SCHEDULE - METALS TECH & SHOPS
A-020 BLDG 330 COMM ROOM - DEMO & NEW
AS101 ARCHITECTURAL SITE PLAN
AS401 ARCHITECTURAL SITE PLAN DETAILS - CHILLER
AS402 ARCHITECTURAL SITE PLAN DETAILS - DUMPSTER ENCLOSURE
A-101 FIRST FLOOR PLAN - OVERALL
A101A FIRST FLOOR PLAN - AREA A
A101B FIRST FLOOR PLAN - AREA B
A101C FIRST FLOOR PLAN - AREA C
A101D FIRST FLOOR PLAN - AREA D
A101E FIRST FLOOR PLAN - AREA E
A-102 ROOF PLAN - OVERALL
A102A ROOF PLAN - AREA A
A102B ROOF PLAN - AREA B
A102C ROOF PLAN - AREA C
A102D ROOF PLAN - AREA D
A102E ROOF PLAN - AREA E
A-111 FIRST FLOOR REFLECTED CEILING PLAN - OVERALL
A111A FIRST FLOOR REFLECTED CEILING PLAN - AREA A
A111B FIRST FLOOR REFLECTED CEILING PLAN - AREA B
A111C FIRST FLOOR REFLECTED CEILING PLAN - AREA C
A111D FIRST FLOOR REFLECTED CEILING PLAN - AREA D
A111E FIRST FLOOR REFLECTED CEILING PLAN - AREA E
A-141 AIR BARRIER PLAN & SECTIONS
A-201 BUILDING ELEVATIONS
A-202 BUILDING ELEVATIONS
A-203 PARTIAL BUILDING ELEVATIONS
A-204 PARTIAL BUILDING ELEVATIONS
A-205 PARTIAL BUILDING ELEVATIONS
A-206 PARTIAL BUILDING ELEVATIONS
A-207 PARTIAL BUILDING ELEVATIONS
A-301 BUILDING SECTION
A-302 BUILDING SECTION
A-303 BUILDING SECTION
A-304 BUILDING SECTION
A-305 BUILDING SECTIONS
A-311 EXTERIOR WALL SECTIONS
A-312 EXTERIOR WALL SECTIONS
A-313 EXTERIOR WALL SECTIONS
A-314 EXTERIOR WALL SECTIONS
A-401 ENLARGED PLANS
A-402 ENLARGED PLANS & CASEWORK ELEVATIONS & SECTIONS
A-403 ENLARGED PLANS - AIR SHOWERS
A-404 RESTROOM ELEVATIONS
A-405 LOCKERS/SHOWERS ELEVATIONS
A-406 TOWER - ENLARGED PLANS
A-501 PLAN DETAILS
A-511 CEILING DETAILS
A-512 OVERHEAD DOOR DETAILS
A-521 SECTION DETAILS - CTK ENCLOSURE
A-522 SECTION DETAILS
A-523 SECTION DETAILS
A-524 SECTION DETAILS
A-531 ROOF DETAILS
A-532 ROOF DETAILS
A-533 ROOF DETAILS
A-534 ROOF DETAILS
A-541 BUILDING ELEVATION DETAILS
A-542 BUILDING ELEVATION DETAILS
A-601 DOOR FRAMES & TYPES
A-602 DOOR SCHEDULE
A-603 EXTERIOR DOOR DETAILS
A-604 INTERIOR DOOR DETAILS
A-611 WINDOW & FRAME TYPES
A-612 WINDOW DETAILS
A-614 LOUVER DETAILS
A-651 STRIPING PLAN - OVERALL
A-701 LO BAY BOOTH FITOUT
A-801 EXTERIOR SIGNAGE
08. INTERIOR DESIGN
I-101 FIRST FLOOR INTERIOR FINISH PLAN - OVERALL
I101A FIRST FLOOR INTERIOR FINISH PLAN - AREA A
I101B FIRST FLOOR INTERIOR FINISH PLAN - AREA B
I101C FIRST FLOOR INTERIOR FINISH PLAN - AREA C
I101D FIRST FLOOR INTERIOR FINISH PLAN - AREA D
I101E FIRST FLOOR INTERIOR FINISH PLAN - AREA E
I-601 ROOM FINISH SCHEDULE, LEGEND AND NOTES
I-611 SIGNAGE SCHEDULE, ELEVATIONS AND NOTES
I831A PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA A
I831B PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA B
I831C PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA C
I831D PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA D
I831E PARTIAL FIRST FLOOR INTERIOR SIGNAGE PLAN - AREA E
08. INTERIORS
IF101 FIRST FLOOR INTERIOR FURNITURE PLAN - OVERALL
IF101A FIRST FLOOR INTERIOR FURNITURE PLAN - AREA A
IF101B FIRST FLOOR INTERIOR FURNITURE PLAN - AREA B
IF101C FIRST FLOOR INTERIOR FURNITURE PLAN - AREA C
IF101D FIRST FLOOR INTERIOR FURNITURE PLAN - AREA D
IF101E FIRST FLOOR INTERIOR FURNITURE PLAN - AREA E
10. FIRE ALARM
FA001 FIRE ALARM GENERAL NOTES, SYMBOLS & ABBREVIATIONS
FA101 FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - OVERALL
FA101A FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA A
FA101B FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA B
FA101C FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA C
FA101D FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA D
FA101E FIRST FLOOR FIRE ALARM REFLECTED CEILING PLAN - AREA E
FA501 FIRE ALARM DETAILS
FA502 FIRE ALARM DETAILS
FA601 FIRE ALARM SEQUENCE OF OPERATIONS
FA701 FIRE ALARM RISER DIAGRAMS
10. FIRE PROTECTION
FX001 FIRE PROTECTION GENERAL NOTES, SYMBOLS & ABBREVIATIONS
FX101 FIRST FLOOR FIRE SUPPRESSION PLAN - OVERALL
FX101A FIRST FLOOR FIRE SUPPRESSION PLAN - AREA A
FX101B FIRST FLOOR FIRE SUPPRESSION PLAN - AREA B
FX101C FIRST FLOOR FIRE SUPPRESSION PLAN - AREA C
FX101D FIRST FLOOR FIRE SUPPRESSION PLAN - AREA D
FX101E FIRST FLOOR FIRE SUPPRESSION PLAN - AREA E
FX401 FIRE PROTECTION ENLARGED PLANS
FX402 FIRE PROTECTION SECTIONS
FX501 FIRE PROTECTION DETAILS
FX901 FIRE PROTECTION ISOMETRICS
11. PLUMBING
P-001 PLUMBING GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
P-101 UNDERFLOOR PLUMBING PLAN - OVERALL
P101A UNDERFLOOR PLUMBING PLAN - AREA A
P101B UNDERFLOOR PLUMBING PLAN - AREA B
P101C UNDERFLOOR PLUMBING PLAN - AREA C
P101D UNDERFLOOR PLUMBING PLAN - AREA D
P101E UNDERFLOOR PLUMBING PLAN - AREA E
P-110 FIRST FLOOR PLUMBING PLAN - OVERALL
P110A FIRST FLOOR PLUMBING PLAN - AREA A
P110B FIRST FLOOR PLUMBING PLAN - AREA B
P110C FIRST FLOOR PLUMBING PLAN - AREA C
P110D FIRST FLOOR PLUMBING PLAN - AREA D
P110E FIRST FLOOR PLUMBING PLAN - AREA E
P-301 ENLARGED PLANS - PLUMBING
P-302 ENLARGED PLANS - PLUMBING
P-501 PLUMBING DETAILS
P-502 PLUMBING DETAILS
P-601 PLUMBING SCHEDULES
P-602 PLUMBING SCHEDULES
P-701 PLUMBING RISER DIAGRAMS
P-702 WASTE AND VENT RISER DIAGRAM
P-703 DOMESTIC WATER RISER DIAGRAM
13. MECHANICAL
M-001 MECHANICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
MP101 FIRST FLOOR PIPING PLAN - OVERALL
MP101A FIRST FLOOR PIPING PLAN - AREA A
MP101B FIRST FLOOR PIPING PLAN - AREA B
MP101C FIRST FLOOR PIPING PLAN - AREA C
MP101D FIRST FLOOR PIPING PLAN - AREA D
MP101E FIRST FLOOR PIPING PLAN - AREA E
MH101 FIRST FLOOR VENTILATION PLAN - OVERALL
MH101A FIRST FLOOR VENTILATION PLAN - AREA A
MH101B FIRST FLOOR VENTILATION PLAN - AREA B
MH101C FIRST FLOOR VENTILATION PLAN - AREA C
MH101D FIRST FLOOR VENTILATION PLAN - AREA D
MH101E FIRST FLOOR VENTILATION PLAN - AREA E
M-140 MECHANICAL ROOF PLAN
M-301 ENLARGED PLAN - MECHANICAL ROOM EQUIPMENT LAYOUT
M-302 ENLARGED PLAN - MECHANICAL ROOM PIPING
M-303 ENLARGED PLAN - MECHANICAL ROOM VENTILATION
M-401 LO BAY SECTION N-S
M-402 LO BAY SECTION E-W
M-403 SECTIONS - AIR HANDLING EQUIPMENT
M-404 SECTIONS - VACUUM DUST COLLECTION EQUIPMENT
M-405 MECHANICAL ROOM SECTIONS
M-406 SECTION - AHU-2 & AHU-3
M-407 SECTION - LO HALLWAY
M-408 SECTION-WASHRACK
M-501 DETAILS - HEATING
M-502 DETAILS - VENTILATION
M-503 DETAILS - HEATING
M-601 SCHEDULES - HEATING/COOLING
M-602 SCHEDULES - HEATING/COOLING
M-603 SCHEDULES - VENTILATION
M-604 SCHEDULES - VENTILATION
M-701 DIAGRAMS - HEATING/COOLING
M-702 DIAGRAMS - HEATING/COOLING
M-703 DIAGRAM -LO BAY AIRFLOW
M-801 CONTROL SEQUENCES
M-802 CONTROL SEQUENCES
M-803 CONTROL SEQUENCES
M-804 CONTROL SEQUENCES
M-805 CONTROL SEQUENCES
M-806 CONTROL SEQUENCES
M-807 CONTROL SEQUENCES
M-808 CONTROL SEQUENCES
M-809 CONTROL SEQUENCES
M-810 CONTROL SEQUENCES
M-811 CONTROL SEQUENCES
14. ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
E-002 HAZARDOUS CLASSIFICATION PLAN
ES100 ELECTRICAL SITE PLAN - OVERALL
ED101 ELECTRICAL DEMOLITION SITE PLAN - PARTIAL
ED102 ELECTRICAL DEMOLITION SITE PLAN - PARTIAL
ES101 ELECTRICAL SITE PLAN - PARTIAL
ES102 ELECTRICAL SITE PLAN - PARTIAL
ES501 ELECTRICAL SITE DETAILS
ES502 ELECTRICAL SITE DETAILS
EL100 OVERALL LIGHTING PLAN
EL101A LIGHTING PLAN - AREA A
EL101B LIGHTING PLAN - AREA B
EL101C LIGHTING PLAN - AREA C
EL101D LIGHTING PLAN - AREA D
EL101E LIGHTING PLAN - AREA E
EL102 LIGHTING PLAN - ROOF
EL501 LIGHTING CONTROL DETAILS
EL502 LIGHTING CONTROLS DETAILS
EL601 LUMINAIRE SCHEDULE
EL602 LUMINAIRE DETAILS
EL603 LUMINAIRE DETAILS
EP100 OVERALL POWER PLAN
EP101A POWER PLAN - AREA A
EP101B POWER PLAN - AREA B
EP101C POWER PLAN - AREA C
EP101D POWER PLAN - AREA D
EP101E POWER PLAN - AREA E
EP102 POWER PLAN - ROOF
EP103 BLDG 330 - LIGHTING AND POWER PLAN
EP401 ENLARGED POWER PLAN - ELECTRICAL ROOMS
EP402 ENLARGED POWER PLAN - MECHANICAL ROOM
EP501 POWER DETAILS
EP502 POWER DETAILS
EP503 POWER DETAILS
EP601 POWER RISER DIAGRAM
EP701 PANELBOARD SCHEDULES
EP702 PANELBOARD SCHEDULES
EP703 PANELBOARD SCHEDULES
EP704 PANELBOARD SCHEDULES
EP705 PANELBOARD SCHEDULES
EP706 PANELBOARD SCHEDULES
EP707 PANELBOARD SCHEDULES
EP708 PANELBOARD SCHEDULES
EP710 MECHANICAL EQUIPMENT SCHEDULE
EP711 EQUIPMENT SCHEDULE
EG101 GROUNDING PLAN
EG102 LIGHTNING PROTECTION PLAN
EG501 LIGHTNING PROTECTION DETAILS
EG502 LIGHTNING PROTECTION DETAILS
EG601 GROUNDING RISER DIAGRAM
16. TELECOMMUNICATIONS
T-001 TELECOMMUNICATIONS GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
TS100 TELECOMMUNICATIONS SITE PLAN - OVERALL
TD101 TELECOMMUNICATIONS DEMOLITIONS SITE PLAN - PARTIAL
TD102 TELECOMMUNICATIONS DEMOLITIONS SITE PLAN - PARTIAL
TS101 TELECOMMUNICATIONS DEMOLITION SITE PLAN - PARTIAL
TS102 TELECOMMUNICATIONS DEMOLITION SITE PLAN - PARTIAL
TS103 TELECOMMUNICATIONS DEMOLITION SITE PLAN - PARTIAL
TS104 TELECOMMUNICATIONS DEMOLITION SITE PLAN - PARTIAL
TS105 TELECOMMUNICATIONS DEMOLITION SITE PLAN - PARTIAL
TS501 TELECOMMUNICATIONS SITE DETAILS
T-100 OVERALL TELECOMMUNICATIONS PLAN
T101A TELECOMMUNICATIONS PLAN - AREA A
T101B TELECOMMUNICATIONS PLAN - AREA B
T101C TELECOMMUNICATIONS PLAN - AREA C
T101D TELECOMMUNICATIONS PLAN - AREA D
T101E TELECOMMUNICATIONS PLAN - AREA E
T-102 BLDG 330 - TELECOMMUNICATIONS PLAN
T-401 ENLARGED TELECOMMUNICATIONS PLANS
T-501 TELECOMMUNICATION DETAILS
T-502 TELECOMMUNICATION DETAILS
T-503 TELECOMMUNICATION DETAIL
T-601 TELECOMMUNICATIONS RISER DIAGRAMS
X-001 SECURITY LEGEND AND ABBREVIATIONS
X101A SECURITY SYSTEMS PLAN - AREA A
X101B SECURITY SYSTEMS PLAN - AREA B
X101C SECURITY SYSTEMS PLAN - AREA C
X101D SECURITY SYSTEMS PLAN - AREA D
X101E SECURITY SYSTEMS PLAN - AREA E
X-100 OVERALL SECURITY SYSTEMS PLAN
X-501 SECURITY SYSTEMS DETAILS
X-601 SECURITY SYSTEMS RISER DIAGRAM
17. AUDIO VISUAL
TA001 AUDIO VISUAL GENERAL NOTES, SYMBOLS AND ABBREVIATIONS
TA100 OVERALL AUDIO VISUAL PLAN
TA101A AUDIO VISUAL PLAN - AREA A
TA201 AUDIO VISUAL FIRST FLOOR RCP - AREA A
TA401 ENLARGED AUDIO VISUAL PLANS
TA501 AUDIO VISUAL DETAILS
DOCUMENT 00 22 13.00 20
SUPPLEMENTARY INSTRUCTIONS TO OFFERORS ( INCLUDED WITH COST PACKAGE)
02/14
-- End of Document --
DOCUMENT 00 22 13.00 20 Page 1
SECTION 01 11 00
SUMMARY OF WORK
08/15
PART 1 GENERAL
1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control approval.][for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.] Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section
01 33 00 SUBMITTAL PROCEDURES:
SD-01 Preconstruction Submittals
Utility Outage Requests
Utility Connection Requests
Borrow Permits
Excavation Permits
Welding Permits
Burning Permits
Salvage Plan ; G[, [_____]]
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
The work includes demolition of pavements, utilities and miscellaneous site features. Construction of the single-story Low Observable Component Repair Facility (LOCRF), pavements, utilities [_____] and incidental related work.
1.1.2 Location
The work is located at the [_____] along the flightline in the vicinity of the Langley AFB Fire and Emergency Facility at Langley Air Force Base/Joint Base Langley-Eustis (JBLE) , approximately as indicated. The exact location will be shown by the Contracting Officer.
1.2 CONTRACT DRAWINGS
The following drawings accompany this specification and are a part thereof.
Drawing No. [_____] Sheets 1 through [_____]
SECTION 01 11 00 Page 1
[Five] [_____] sets of full size contract drawings, maps, and specifications will be furnished to the Contractor without charge.
Reference publications will not be furnished. Immediately check furnished drawings and notify the Government of any discrepancies.
1.3 WORK RESCHEDULING
Allow for a maximum of [_____] calendar days in the construction schedule where construction activity is prohibited due to NASA operations. Where other construction activities are permitted impose a further allowance for [_____] calendar days in the schedule, of excavation and subsurface activity abeyance. Government will provide 24 hour notification each time the restrictions are invoked.
Normal duty hours for work are from [_____] a.m. to [_____] p.m., Monday through Friday. Requests for additional work requires written approval from the Contracting Officer 7 days in advance of the proposed work period.
1.4 OCCUPANCY OF PREMISES
Building(s) will be occupied during performance of work under this Contract.[ Occupancy notifications will be posted in a prominent location in the work area.]
Before work is started, arrange with the Contracting Officer a sequence of procedure, means of access, space for storage of materials and equipment, and use of approaches, corridors, and stairways.
[ 1.2 EXISTING WORK
In addition to FAR 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements:
a. Remove or alter existing work in such a manner as to prevent injury or damage to any portions of the existing work which remain.
b. Repair or replace portions of existing work which have been altered during construction operations to match existing or adjoining work, as approved by the Contracting Officer. At the completion of operations, existing work must be in a condition equal to or better than that which existed before new work started.
] 1.3 ON-SITE PERMITS
1.3.1 Utility Outage Requests and Utility Connection Requests
Schedule work to minimize outages. For utility outages and connections required during the execution of work that affect existing systems, schedule outside the regular working hours or on weekends, as approved by the Contracting Officer. Schedule utility outages and connections to minimize disruptions tothe Government. No additional payment will be provided for utility outages and connections required to be performed outside the regular work hours.
Submit requests for utility outages and connections in writing to the Contracting Officer for approval at least [_____] calendar days in advance of the time required. In each request, state the system involved, area involved, approximate duration of outage, and the nature of work involved.
SECTION 01 11 00 Page 2
1.3.2 Borrow, Excavation, Welding, and Burning Permits
ACTIVITY SUBMISSION DATE SUBMISSION FORM
[ Borrow Permits ] [[_____] calendar days prior to work]
[ Burning Permits ] [[_____] calendar days prior to work]
[ Excavation Permits ] [[_____] calendar days prior to work]
[ Welding Permits ] [[_____] calendar days prior to work]
Post permits at a conspicuous location in the construction area.
Burning of trash or rubbish is [not] permitted at [_____] [on project site].[ Comply with requirements for burning of trash or rubbish, as established by the Authority having Jurisdiction .]
1.3 LOCATION OF UNDERGROUND UTILITIES
Obtain digging permits prior to start of excavation, and comply with Installation requirements for locating and marking underground utilities. [ Contact local utility locating service a minimum of [ 48 hours ][_____] prior to excavating, to mark utilities, and within sufficient time required if work occurs on a Monday or after a Holiday. ] Verify existing utility locations indicated on contract drawings, within area of work.
[ Identify and mark all other utilities not managed and located by the local utility companies. Scan the construction site with Ground Penetrating Radar (GPR), electromagnetic, or sonic equipment, and mark the surface of the ground [, pier deck] or paved surface where existing underground utilities [or utilities encased in pier structures ] are discovered. Verify the elevations of existing piping, utilities,and any type of underground [or encased ] obstruction not indicated, or specified to be removed, that is indicated or discovered during scanning, in locations to be traversed by piping, ducts, and other work to be conducted or installed. [ Verify elevations before installing new work closer than nearest manhole or other structure at which an adjustment in grade can be made. ]]
1.3.1 Notification Prior to Excavation
Notify the Contracting Officer at least [48 hours][ 15 days ][_____] prior to starting excavation work.
[ 1.4 GOVERNMENT-FURNISHED MATERIAL AND EQUIPMENT
Pursuant to Contract Clause FAR 52.245-1 Government Property, the Government will furnish the following materials and equipment for installation by the Contractor:
DESIGNATION NO. DESCRIPTION QUANTITY
This list is appended to this section.
SECTION 01 11 00 Page 3
Quantities indicated for the above-listed items marked with an asterisk are estimates. It is the intention of the Government to furnish all quantities of the asterisk items required to complete the work as specified, and the various quantities will be adjusted when necessary.
Quantities stated for the above items not marked with an asterisk are all that will be furnished by the Government. Provide any additional quantities that are required.
1.4.1 Delivery Schedule
[ Notify the Contracting Officer in writing at least [_____] 120 calendar days in advance of the date on which the materials and equipment are required. Pick up materials and equipment no later than 30 calendar days after such date. When materials and equipment are not picked up by the 30th day, the Contractor will be charged for storage at the rate of [_____] per 100 [pounds][cubic feet] per month or fraction thereof.
][ Materials and equipment will be available on or after [_____] calendar days after the award of contract.
] 1.4.2 Delivery Location
The materials and equipment [are located at [_____]] [ are located within [_____] 15 miles of the jobsite ] [will be delivered to [_____]][the salvage receiving point [_____]] .
][ 1.5 GOVERNMENT-INSTALLED WORK
] [ 1.6 NAVY AND MARINE CORPS (NMCI) COORDINATION REQUIREMENTS
1.6.1 NMCI Contractor Access
Allow the NMCI Contractor access to the facility towards the end of construction (finishes 90 percent complete, rough-in 100 percent complete, Inside Plant (ISP)/Outside Plant (OSP) infrastructure in place) to provide equipment in the telecommunications rooms and make final connections.
Coordinate efforts with the NMCI Contractor to facilitate joint use of building spaces during the final phases of construction. After the Contracting Officer has facilitated coordination meetings between the two contractors, within one week, incorporate the effort of additional coordination with the NMCI Contractor into the construction schedule to demonstrate a plan for maintaining the contract duration.
] 1.7 SALVAGE MATERIAL AND EQUIPMENT
Items designated by the Contracting Officer to be salvaged remain the property of the Government. Segregate, itemize, deliver and off-load the salvaged property at the [Government designated] storage area located within [_____] miles of the construction site.
Provide a salvage plan , listing material and equipment to be salvaged, and their storage location. Maintain property control records for material or equipment designated as salvage. Use a system of property control that is approved by the Contracting Officer. Store and protect salvaged materials and equipment until disposition by the Contracting Officer.
SECTION 01 11 00 Page 4
PART 2 PRODUCTS
Not used.
PART 3 EXECUTION
Not used.
Government Furnished Equipment List -- End of Section --
SECTION 01 11 00 Page 5
Government Furnished Equipment List
Item No. Description
1 Manual Hardinge Metal Lathe
2 Miller Dynasty Welder #1 (Table Only)
3 HAAS VF2 CNC Mill
4 Small Clausing Mill
5 Small Clausing Lathe
6 Large Vertical Band Saw
7 Large Power Press
8 Heat Treating Oven
9 Large Grinder/Wire Wheel
10 Large Power Sheer
11 Large Hand Break
12 S/M Table w/ Break, Roller
13 Large Accorn Weld Table
14 Metal Iron Worker
15 Baldor Grinder
16 Baldor Buffing Wheel
17 Thomas Cutting Saw
18 Turret Sheet Metal Punch
19 Snap-On Sand Blaster
20 Chop Saw Large Yellow
21 Table/Sensitive Drill Press/Hardness Tester 22 Miller XMT 450 Welder
23 Hypertherm Plasma Cutter
24 Machine Accy Tool Boxes
25 Sheet Metal Rack
26 Sound Stock Metal Rack
27 Long Metals Rack
28 Weld Shop Tig Table
29 Miller 252 Mig Welder
30 Kalamazoo Belt Sander
31 Sanding Booth Dustron Series Filter 1/DB-24-36-2x15 32 Industrial Walk-In Oven Benko Sahara Industrial Oven 33 Paint Spray Booth Spray Tech Junair JA509 5 Series 34 Respirator washer American Airworks / GS2400
Government Furnished / Contractor Installed Equipment
Item No. Nomenclature
1 Large Clausing Mill
2 Miller Dynasty Welder #1 (Fume Extractor)
3 Millermatic 211 Mig Welder
4 Assorted CTK's / Consumables / Lockers / Boxes 5 HAAS TL2 CNC Lathe
6 HAAS VF4 CNC Mill
7 OMAX Waterjet Cutter
8 Large Clausing Lathe
9 Small Horizontal Metal Saw
10 Large Arbor Press
11 Deburr Shaker Machine
12 Belt Sander/Burr King
13 Small Foot Sheer
14 Miller Dynasty Welder #2
15 Oxy-Aceytylene Rig
16 Miller Mini Mig Welder
17 Machine Shop Table
18 Flammible Lockers 19 Corrosive Locker
Government Furnished / Government Installed Equipment
SECTION 01 14 00
WORK RESTRICTIONS
11/11
PART 1 GENERAL
[ 1.1 SUBMITTALS
Government approval is required for submittals with a "G" designation;
submittals not having a "G" designation are [for Contractor Quality Control approval.][for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government.] Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for Contractor Quality Control approval. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. "G, AE" code is applied where Architect/Engineer review and approval is required. "G, RO" code is applied where Government, Resident Office review and approval is required. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.
Submit the following in accordance with Section 01 33 00 SUBMITTAL
PROCEDURES:
SD-01 Preconstruction Submittals
List of Contact Personnel ; G
][ 1.2 SPECIAL SCHEDULING REQUIREMENTS
a. [_____] must be ready for operation as approved by Contracting Officer before work is started on [_____] which would interfere with normal operation.
b. Have materials, equipment, and personnel required to perform the work at the site prior to the commencement of the work. Specific items of work to which this requirement applies include:
(1) [_____]
(2) [_____]
c. The [_____] Airfield and adjacent buildings will remain in operation during the entire construction period. The Contractor must conduct his operations so as to cause the least possible interference with normal operations of the activity.
See specification section 01 35 13 Special Project Procedures for additional information and restrictions.
d. Permission to interrupt any Activity roads, railroads, or utility service must be requested in writing a minimum of [15] [_____] calendar days prior to the desired date of interruption.
SECTION 01 14 00 Page 1
] 1.3 CONTRACTOR ACCESS AND USE OF PREMISES
1.3.1 Activity Regulations
Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.
1.3.1.1 Subcontractors and Personnel Contacts
Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.
1.3.1.2 No Smoking Policy
Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.
[ 1.3.2 Emergency Response Requirement
The Norfolk Naval Shipyard has instituted a requirement for all personnel to take shelter for personal safety in the event of certain emergencies.
This policy includes Contractors, Subcontractors, and any person who is employed by the Contractor.
The most appropriate protective action for certain emergencies is to take shelter. Personnel must immediately seek shelter while an assessment is made of the threat and determinations are being made regarding subsequent actions such as "all clear" or selected building evacuations. The following procedures have been put in place in the event of an emergent condition.
1. NOTIFICATION: The primary means of alerting personnel must be emergency alert signals. The alerting signal to seek shelter must be three steady tones that last for thirty seconds separated by ten seconds of silence. The notification for "all clear" must be three short tones repeated three times.
2. SHELTERING: When personnel hear the alert signal, the area of work must be secured in a manner that will leave the site in safe condition. Personnel must seek shelter in the nearest occupied building in calm and orderly manner. If possible, secure all windows and doors and shut off ventilation. If working aboard ship, proceed into the interior of the ship and wait for further directions from official personnel. If in a vehicle, park the vehicle so that it does not block the normally traveled portion of the road and proceed into the nearest occupied building.
3. EVACUATION: In the event of an evacuation, personnel must receive directions from team members of the Crowd Control Center (CCC) or the
SECTION 01 14 00 Page 2 building custodian acting on the directions from the CCC. Contract personnel must comply with instructions given at all times.
] [ 1.3.3 Shipyard Regulations
Ensure that Contractor personnel employed on the Shipyard become familiar with and obey Shipyard regulations. Wear hard hats in designated areas.
Do not enter any restricted areas unless required to do so and until cleared for such entry. The Contractor's equipment must be conspicuously marked for identification. Comply with the following conditions:
a. Restrict employees/representatives to the work site and control travel directly to and from the work site .
b. Restore all traffic/parking/security signs and markings, including space numbers, designations, and lines, to their original form if such signs/markings are defaced or deleted during construction/repair.
c. Be responsible for control and security of Contractor-owned equipment and materials at the work site. Report immediately missing/lost/stolen property to the Shipyard Police Department (phone 396-7266) as each case occurs.
d. Ensure that no material is stacked within 10 feet of the Controlled Industrial Area (CIA) perimeter. Remove from the work site, or secure ladders or other such equipment which could be used to climb the CIA perimeter fence. Ensure that no vehicles are parked within 10 feet of the CIA perimeter.
e. Ensure that no openings in the roof/walls/windows/fence of the building exist at the end of the workday and do not exist where penetration is possible during non-working hours. If the building cannot be secured at the end of the workday, coordinate action with the Contracting Office to notify the cognizant code to arrange for a security watch by their personnel.
f. Seventy-two hours prior to making any penetrations (such as tunneling under, cutting through a fence or building) in a restricted area, contact the Shipyard Security Office to make arrangements for a security guard or other measures required to meet all security requirements. Cost of security guard will be charged to the Contractor.
] 1.3.4 Entry to Radiologically Controlled Areas
Contractor personnel must not, under any circumstances, enter a radiologically controlled area or cross any posted radiological boundary.
This paragraph applies to all phases of contract work. Radiation areas are posted with signs consistent with OSHA requirements. Ensure that employees are familiar with the radiation signs and symbols. All personnel entering the shipyard for the first time are required to receive radiological indoctrination training.
Should contract workers encounter radiological postings or boundaries which appear to limit their ability to access or carry out their intended work, they must notify their contract administrator for resolution of the problem.
SECTION 01 14 00 Page 3
1.3.4.1 Radioactive Materials and Equipment
All testing equipment, containing a radioactive source, must be operated in accordance with an approved radioactive equipment plan. This plan must be submitted to the Contracting Officer and approved by the Radiation Officer (Code 105.5), prior to bringing the equipment into the shipyard.
This plan must include:
a. The name and type of equipment.
b. The type and size of radiation source.
c. The dates and locations of the equipment's usage.
d. The radiological controls that the Contractor will use while operating the equipment.
A different radioactive equipment plan will be required for each different type of equipment, type of radioactive source, or size of radioactive source. A data sheet of for each piece of new radioactive equipment must be submitted to the Contracting Officer to forward to the shipyard's Radiation Safety Officer. The data sheet must contain the following information:
a. Name of equipment.
b. Name and address of equipment manufacturer.
c. Type and size of radiation source.
d. The location of the installed radioactive equipment (i.e. building no., floor, code/shop area).
1.3.2 Working Hours
Regular working hours must may consist of a n [8 1/2 hour] [[_____] 10 hour ] period [established by the Contracting Officer] , between [ 7 a.m. and 3:30 5:00 p.m., ] [[_____] a.m. and [_____] p.m.,] Monday through Friday, [ and 7 a.m. to 3:30 p.m. on Saturday ] [[_____] a.m. and [_____] p.m.] , excluding Government holidays.
1.3.3 Work Outside Regular Hours
Work outside regular working hours requires Contracting Officer approval.
Make application [15] [_____] 30 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer may approve work outside regular hours.
During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer. [ Make utility cutovers after normal working hours or on Saturdays, Sundays, and Government holidays unless directed otherwise. ]
[ 1.3.4 Exclusionary Period
No work must be performed during the period [_____] to [_____], inclusive, without prior written approval of the Contracting Officer. This period has not been considered in computing the time allowed for the performance
SECTION 01 14 00 Page 4 of this contract.
][ 1.3.4 Occupied Building [ s]
The Contractor shall be working [in an existing building] [ around existing buildings ] which [is][ are ] occupied. [ Do not enter the building [ s] without prior approval of the Contracting Officer. ]
[ The existing buildings and their contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.
][ Provide dust covers or protective enclosures to protect existing work that remains, and Government material located in the [_____] during the construction period.
] [Relocate movable furniture [approximately [6 feet] [_____] away from the Contractor's working area] [as required to perform the work], protect the furniture, and replace the furniture in [its] [their] original location[s] upon completion of the work.][ Leave attached equipment in place, and protect [it] [them] against damage, or temporarily disconnect, relocate, protect, and reinstall [it] [them] at the completion of the work.]
[ The Government will remove [and relocate] other Government property in the areas of the building[s] scheduled to receive work.
] ] 1.3.5 Utility Cutovers and Interruptions
a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.
b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.
c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, and compressed air , and [_____] are considered utility cutovers pursuant to the paragraph WORK OUTSIDE REGULAR HOURS. [ Such interruptions are further limited to [_____] hours. This time limit includes time for deactivation and reactivation.]
[ d. Operation of Station Utilities: The Contractor must not operate nor disturb the setting of control devices in the station utilities system, including water, sewer, electrical, and steam services. The Government will operate the control devices as required for normal conduct of the work. The Contractor must notify the Contracting Officer giving reasonable advance notice when such operation is required.
] [ 1.3.6 Shipyard Area Work Clearance Request
[ 1.3.6.1 Shipyard Hazardous Areas
Do not enter into work areas where Shipyard personnel are using protective equipment such as respirator and masks or marked boundary areas without prior approval.
SECTION 01 14 00 Page 5
] ] [ 1.3.7 Restrictions on Use of Yellow[, Orange-Yellow, Red, and Magenta] Materials
[ Contractor must refrain from use of yellow or orange-yellow materials for the following purposes: sheeting, tarpaulins, polyethylene bottles or other containers, tapes, bags, banding of identification marks on tools, boundary markers such as ribbons. Contractor generated yellow waste materials such as torn foul weather gear must be disposed of by the Contractor off-yard. Shipyard dumpsters and trash cans must not be used for disposal of Contractor generated yellow waste materials. Yellow colored items such as described above are of specific significance within the shipyard and are subject to strict controls.
] ] [ 1.4 SECURITY REQUIREMENTS
[ Contract Clause FAR 52.204-2 Security Requirements and Alternate II and Contractor to follow requirements for secured spaces of secret collateral storage. Follow all applicable requirement as listed in document Technical Specifications for Construction and Managementof Sensitive Compartmented Information Facilities, Version 1.5. the following apply:
] [ 1.4.1 Norfolk Naval Shipyard, Portsmouth, VA
Contractor employees and representatives performing work under this contract are required to be United States citizens. If naturalized, the individual must present his naturalization papers to the Security Officer for inspection. Foreign born personnel must present evidence of citizenship regardless of citizenship of parents, as required by immigration laws.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .