The key details are:
- For Pennsylvania accounts, Pennsylvania GRT shall not be included in the offered unit prices and will be billed separately. The cost of UDC system losses and UFE will be passed through to the government as a gross up to metered usage.
- For Illinois accounts, ComEd's 2022 tariff distribution loss and transmission loss factors of 0.72% and 1.60% respectively will be used, resulting in a combined loss factor of 2.33%. This loss factor will be applied to the ComEd metered kWh and billed at the weighted average Commodity Price. All other loss related cost components must be included in the Fixed Peak and Off-Price prices.
- Direct pass-through of Reliability Must Run and FERC Order 745 charges is allowed.
View the file
Other files
Show 40 more
Latest 50 of 59 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PJM CFE 2024 Attachment X Page 1 of 1 SP0604-24-R-0421 PA GRT and ComEd Loss Information
1. For all Pennsylvania Accounts:
• Pennsylvania Gross Receipts Tax (GRT) shall not be included in the offered unit prices. It shall be billed as a separate line item.
• The cost to procure UDC system losses and UFE assessed to each account by the UDC pursuant to the UDC’s delivery tariff and retail supplier coordination tariff shall be passed through to the Government as a gross up to metered usage.
2. For all Illinois Accounts:
COMED DISTRIBUTION AND TRANSMISSION LOSSES
ComEd’s 2022 tariff distribution loss (“DLF)” and transmission loss (“TLF”) factors are 0.72% and 1.60%, respectively. The combined loss factor is 2.33% [(1 + 0.0072) x (1 + 0.0160) = 1.0233].
Formula:
2.16% x ComEd metered kWh x weighted average Commodity Price in the billing period.
All other loss related cost components must be included in the Fixed Peak and Off-Price prices.
This includes ComEd’s Unaccounted For Energy (“UFE”) and PJM’s loss deration.
Direct Pass-Through Reliability Must Run and FERC Order 745: Direct pass-through of these charges.
i. Offerors may submit prices on all, some or none of the line items contained in the solicitation.