ATTACHMENT - VOLUME 9A_Plumbing Updated 07.11.13.pdf
PDF 286 KB Posted
- Solicitation number
- 36C24825R0025-0001
About this file
This is a plumbing plan drawing for Level 1, Area D, Zone 4 of a new VA Medical Center hospital project in Orlando, Florida (Building Number 673-950). The drawing, dated June 4, 2010 with subsequent revisions through March 15, 2013, shows detailed plumbing layouts for various medical spaces including MRI rooms, CT rooms, nuclear medicine areas, and associated support spaces.
The plan includes specifications for roof drainage systems (15" and 8" RW up/down lines serving different square footages), condensate drain connections to plumbing systems, and cold water supply lines for air conditioning unit humidifiers. The drawing indicates the building is fully sprinklered and includes specific plumbing fixtures and floor drains throughout the medical spaces. Key technical details include 1" pumped condensate connections to plumbing drains in the interstitial space and 3/4" cold water supply lines to floor-mounted air conditioning units for humidifiers. The drawing is part of Bid Alternate No. 3 for the project and was prepared by RLF architects/engineers.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PM
C
PM
C
15" SECONDARY
ROOF DRIANAGE.
24" ABOVE
FINISHED GRADE
(39170 S.F.)
15" RW UP &
DN (39170 S.F.)
8" RW UP &
DN (9705 S.F.)
15" SRW UP
(39170 S.F.)
P-528
P-528
P-528
P-401
P-528
P-401
P-401
P-701 P-401
P-401
P-528B P-505
P-528
P-528
P-528
P-560C
P-401
P-102
P-102
P-102
P-102
FLOOR
C.O.
FLOOR
C.O.
FLOOR
C.O.
FLOOR
C.O.
P-528
P-528
P-560C
P-803
P-803
6" CD UP & DN
FLOOR C.O.
FLOOR C.O.
2" W UP
& DN
1 1/2" V
UP & DN
1 1/2" V
UP & DN
H -P
L1 .1
FD
5-
A
H -P
L1 .1
FD
4-
A
H -P
L1 .1
FD
5-
A
H -P
L1 .1
FD
4-
A
C.T. (ED)
1E702
IMAGING RM-2
1K505c-2
MRI EQUIP
1E206a
HAC
1A609
WAIT
1M702
BIO MED OFFICE
1M204
NUC MED WAIT
1K510
VEST
1F201
CLEAN SUPPLY
1E604
NURSE
1F212
NURSE
1F214
IV PREP
1E304
STORAGE
1E402
ECG CUBICLE
1F404
ECG: CUBICLE
1F408
ECG CUBICLE
1F406
STRETCHER
HOLD
1E301
RECEPTION
1E305
MRI WAIT
1E501
STAFF PHYSICIAN
1K802
STAFF PHYSICIAN
1K804
STAFF PHYSICIAN
1K806
C.T. (#2)
1E605
C.T.
1E601
NURSE
1F206
NURSE
1F204
NURSE
1F202
NURSE
1F208
NURSE
1F210
CORRIDOR
1MC02
COMPUTER
EQUIPMENT
1E201
CLEAN SUPPLY
1E205
SOILED UTILITY
1E203
PHYSICIAN
1F301
CORRIDOR
1EC07
CONTROL RM
1E603
NURSE
PRACTIONER
1K705
TLT
1E404
DRESS
1E403
DRESS
1E401
CORRIDOR
1EC03
CLEAN SUPPLY
1K203
PATIENT DOSE
1K205
READING/CONSULT
1K502
RECEPTION
1K508
RSO/PHYSICIST
OFFICE
1K504
EXAM RM
1K509
TLT
1K511
PASSAGE
1KC08
CHIEF NUC MED
OFFICE
1K807
PROFESS
NON-PHYSICIAN
1K805
STAFF PHYSICIAN
1K803
CORRIDOR
1EC05
CHEST RM
1M206
COMMON
VIEWING RM
1K801
STAFF TLT
1F402
ENTRY
1K505
THYROID UPTAKE
1K503
TECH WORK
AREA
1K505d
CORRIDOR
1KC05
TLT
1K513
CORRIDOR
1KC06
ELEC
1E610
CORRIDOR
1EC06
CORRIDOR
1KC07
EQUIP
1KC06a
CORRIDOR
1FC02
IMAGING RM
1K505a
IMAGING RM
1K505b
CORRIDOR
1EC04
CRASH CART
1E306
WHEELCHAIR &
STRETCHER
WAITING
1E608
MRI ROOM
1E202
MRI CONTROL
1E302
MRI CONTROL
1E204
CORRIDOR
1EC02
MRI ROOM
1E206
NUC WASTE STOR
1K202
IV PREP
1K214a
PET SIM UPTAKE
1K212
PET UPTAKE
1K210
UPTAKE
1K208
UPTAKE
1K206
CORRIDOR
1KC02
CORRIDOR
1EC01
10" SECONDARY ROOF DRIANAGE. 24"
ABOVE FINISHED GRADE (18616 SF)
3" RW UP & DN (1297 S.F.)
3" V UP & DN
P-806
MOUNT 1'-6" O.C. ABOVE
ASSOCIATED LEVEL.
1" CW DN
1" CW DN
FLOOR C.O.
FLOOR C.O.
FOR EXACT LOCATION
OF 3/4" CW UP TO
YARD HYDRANT FOR
MOBILE MRI VECHICLE
SEE CIVIL DRAWING
WALL C.O.
FD-V
H-PL1.1FE1
H-PL1.1FD4-A
H-PL1.1FE1
H-PL1.1FD4-A
H-PL1.1FD4-A
H-PL1.1FD1
H-PL1.1FD4-A
H-PL1.1FD1
H -P
L1 .1
FE
2-
A
H -P
L1 .1
FE
3738394041
C
D
E
F
G
D.9
D.7
F.4
E.4
C.7
E.6
D.6
40.6 39.440.5
37.2
39.7
H-CRAC-12
H-CRAC-13
H-CRAC-14
FOR EXACT LOCATION
OF 3/4" CW UP TO
YARD HYDRANT FOR
MOBILE MRI VECHICLE
SEE CIVIL DRAWING
FD-C
FD-C
FLOOR
C.O.
ROUTE CONDENSATE
TO FLOOR DRAIN
MAINTAIN 2" AIR GAP
ROUTE
CONDENSATE TO
FLOOR DRAIN
MAINTAIN 2" AIR GAP
FLOOR
CO
N
1/8" = 1'-0" GRAPHIC SCALE
4' 8' 24'16'
A1
C2
KEY PLAN
C1
D3
D4
E2
A2 A3
B1 B2
AREA D, ZONE 4
D2
D5 D6
E1 E3
D1
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS: ARCHITECT/ENGINEERS:
OFFICE OF
FACILITIES
MANAGEMENT
on e ei gh th in ch o ne f oo t
B
A
C
D
E
F th re e in ch es o ne f oo t
6"
6" on e an d on e ha lf in ch es o ne f oo t on e in ch o ne f oo t
6" 6" th re e qu ar te rs in ch o ne f oo t on e ha lf in ch o ne f oo t th re e ei gh th s in ch o ne f oo t on e qu ar te r in ch o ne f oo t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
BUILDING IS FULLY SPRINKLERED
A NEW HOSPITAL FOR
VAMC ORLANDO, FLORIDA
Orlando, Florida
673-950
04 JUNE, 2010
Professional Seals:
EB / RLF
NOTES:
SHEET NOTES:
01 AND 02
4322Dwg. ofGO/PPG
ZONE 4 PLUMBING PLAN
BID ALTERNATE NO. 3
HOSPITAL/CLINIC LEVEL 1, AREA D,
H-PL1.1FD4-A
1. 1" PUMPED CONDENSATE TO PLUMBING DRAIN
LOCATED IN INTERSTITIAL SPACE BY
MECHANICAL.
2. 3/4" COLD WATER SUPPLY TO FLOOR MOUNTED
AIR CONDITIONING UNIT FOR HUMIDIFIERS.
No. Description Date
1 CPR 122 09/16/11
2 CPR 234 02/16/12
3 CPR 236 03/09/12
4 CPR 382 03/15/13
File details come from the government source that posted it. Updated .