This is an electrical power plan drawing for Level 1, Area E, Zone 2 of a new VA Medical Center hospital project in Orlando, Florida. The drawing shows the detailed electrical layout including receptacles, junction boxes, conduits, and other electrical components for various clinical spaces including waiting rooms, corridors, examination rooms, offices, and other medical facilities.
The drawing provides specific installation requirements through 35 detailed notes covering items such as conduit routing to branch racks, device mounting heights, connections to automatic doors, security systems, and medical equipment. Key spaces shown include VRE offices, interview rooms, corridors, reception areas, and testing rooms. The drawing is part of bid alternate #1 and includes revisions through December 2012 (CPR 366). The plan indicates the building is fully sprinklered and was prepared by RLF architectural firm under VA project number 673-950.
View the file
Other files
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J
J
J
J
J
J
J
J J
J
M
J
J
J
J
J J
J
J J J
J
J
J
PP
PP
PP
PP
PP
PP
EE
J J
JJ
JJ
JJ
JJ
JJ
JJ
J
G
G
G
G
G
G
GG
G
G
G
G
G
G
G
G
H1E2LS1- 1,3
H1E2LC1- 2,4
H1E2LN1-
7,9,11
H1E2LN1- 4,6
H1E2LC1-
20,22
H1E2LC1- 15
H1E2LN1- 12
H1E2LN1-
15,17
H1E2LN1-
18,20
H1E2LN1-
21,23
H1E2LN1- 28
H1E2LN1-
24,26
H1E2LN2- 1,3
H1E2LN2- 2
H1E2LN2- 4
H1E2LN2- 5
H1E2LC1- 17
H1E2LN2- 6
H1E2LC3- 4
H1E2LN3- 2,4
H1E2LN3- 5,7
G
H1E2LN3- 12
H1E2LN3-
14,16
H1E2LN3-
13,15
G
H1E2LN3-
18,20
H1E2LN3-
17,19,21
H1E2LN3- 22
H1E2LN3-
24,26
H1E2LN3-
23,25
H1E2LN3-
28,30
H1E2LN4- 2,4
H1E2LN4- 5,7
H1E2LN4- 1,3
H1E2LN4- 6
H1E2LN4-
10,12
H1E2LC3- 1
H1E2LN4- 8
H1E3LN1- 1,3
H1E2LN4- 9
H1E2LN4- 14
H1E2LN4-
11,16
H1E2LN4- 13
H1E1LC2- 25
H1E1LN2-
16,14
H1E1LN2- 13
H1E2LC1- 5
H1E2LN2-
14,16
VRE OFFICE
1C908
H -E
P 1.
1F E
3- A
H -E
P 1.
1F E
2- A
H -E
P 1.
1F E
2- A
H -E
P 1.
1F E
H1E2LN1- 13
TV
TV
12H1E2LN2- 8
H1E2LN2- 10
H1E2LN3- 32
EX
EX
EX
H1E3LN1- 35
EX
EX
EX
G
G
8 8
G G
WAITING
1C102
CORRIDOR
1CC01
RECEPTION
1C101
HEARING RM
1C202
CLOSET
1C104
CLOSET
1C106
HAC
1C108
TESTING RM
1C110
INTERVIEW
1C203
JOB LAB
1C403
CUBICLES
1C606
CORRIDOR
1CC04
MAIL ROOM
1C112a
CORRIDOR
1CC02
INTERVIEW
1C201
VRE OFFICE
1C401
CORRIDOR
1CC06
VRE OFFICE
1C904
VRE OFFICE
1C902
VRE
SUPERVISOR
1C901
CORRIDOR
1CC09
ALCOVE
1CC09c
VRE OFFICE
1C903
VRE OFFICE
1C907
H1E2LN4- 18
H1E2LN1- 10
H1E2LN1- 14
H1D5LE3- 10
H1D5LE3- 9
EWC
H1E2LN1- 25
H1E2LS1- 11
H1E2LS1- 12
H1E2LS1- 13
7.1
2.2
C.2
A.2
D.2
B.2
C.1
A.1
D.1
B.1
1.2
8.1
A
B
2.0
7.3
30.2
A.05
32.2
A.04
2.8
1.4
32333435
A7
A7
6.7
7.7
B.3
A.01
35.4 31.7
D.3
A.02
32.8
A.03
33.8
A.07
0' - 4 1/2"
3' - 0"
H1E2LC3-
3,10
H1E2LN2- 22
H1E2LN2- 23
H1E2LN2- 24
7' - 9 1/2"
5' - 1"
14' - 3"
7' - 4"
17' - 6"
8' - 2 1/2"
3' - 11 1/2"
12' - 1"
9' - 7"
10' - 0"
3' - 8"
0' - 6 1/2"
+66"
OC OC
OC
OC
+66"
+48"
+48"
+48"
+48"
OC
OC
+66"
TV
OC
OC
OC
OC
H1E2LN4- 20
H1E2LN3-
8,10
H1E2LN3-
11,9
B
B
H1E2LS1- 10
H1E2LS1- 9
H-DVC
H-H-FACU
B
B
B
B
B
B B
17 19,21
H1E2LN1- 8
EWC
H1E2LN1- 16
H1E2LN1- 1
H1E2LS1- 8
H-FAAP
H-FCU-1.17
ST-H-FCU-1.17
+48"
+48"
H1E2LN1- 22
H1E2LN3- 31
G
G G
OC
H1E2LN2- 20
H1E2LN2-
13,11
H1E1LC2- 40
H1E1LN1-
19,21
H1E2LN4- 17
H1E2LC1- 26
H1E2LC1- 24
H1E2LC3- 6
H1E2LN1- 29
G +48"
OC
11 8
AUTOMATIC
DOOR
AUTOMATIC
DOOR
H1E2LN1- 19
H1E2LC1- 6,8
H1E2LC1-
12,14
H1E2LS1- 6
H1E2LC1- 1,3
H1E2LN2-26
H1E2LN2-27,29
P
H1E2LS1-14
H-EP4.007
25 27
H1E2LS2-1
H1E2LS2-3
H1E2LC1-
30,32
30 30
H1E2LC1- 7,9
TV
H1E2LN2-
18,15
33 H1E2LS1-17
N2 N1 E2 E1
N2 N1 E2 E1
N1N2
E2 E1
H1E2LC1- 29
H1E1LN2- 50
H 1E
3L N
1-
TR
PUBLIC TLT
MALE
1B603
PUBLIC TLT
FEMALE
1B601
HAC
1B604
ELEC
1C102aADMISSIONS
CHECK IN
1B204
PROCEDURE
CHECK IN
1B205
ADMISSIONS
CHECK IN
1B202
PROCEDURE
CHECK IN
1B203
PHONE
1A501
ED TLT
FEMALE
1A504
ED TLT MALE
1A502
ELEC
1B201aVENDING
1A121a
WAITING
1A121
TRIAGE
1A718
TRIAGE
1A119
ISOLATION
1A721ANTE RM
1A719
ISOLATION
1A717
OFFICE
1A801
OFFICE
1A803
PATIENT TLT
1A115
PHYSICIAN
1F507
CONSULT
1A124
PHYSICIAN
1F505
PHYSICIAN
1F503
FIRE
COMMAND
1B505
EQ. ALCOVE
1AC08a
GYN EXAM/
TREAT
1A122
PATIENT TLT
1A714
EXAM/TREAT
1A715
COMM
1B201b
MAS WORKRM
1B201
SECURITY
SCREENING
1B403c
CORRIDOR
1BC06
PHONE
1B602
KIOSK
CHECK-IN
1BC04a
CORRIDOR
1BC02
VESTIBULE
1B303
CORRIDOR
1BC03
CORRIDOR
1AC08
CORRIDOR
1AC05
LOBBY
1B403
ELEVATOR
1BE04
ELEVATOR
1BE02
EQ. ALCOVE
1AC08b
ELEC
1C102a
ELEC
1C102a
ELEC
1C102a
ELEC
1C102a
ELEVATOR
1BE03
HOLDING
1B303b
WAITING
1B403d
ESCORT
SERVICES
1B701
OFFICE OF
DECEDENT
AFFAIRS
1B703
CORRIDOR
1BC07
CORRIDOR
1BC05
ELEVATOR
LOBBY
1B405
CORRIDOR
1BC04
RECEPTION
1B403a
ARMORY
WORKRM
1B303c
WAITING
1B403b
WHEEL CHAIR
STOR
1B401a
VESTIBULE
1B401
MECH
1B401b
OPERATIONS
1B303a
VESTIBULE
1B301
CORRIDOR
1AC07
CORRIDOR
1AC01
ELEVATOR
1BE01
EXTERIOR
ARCADE
1A198 EXTERIOR
ARCADE
1C198
VESTIBULE
1BCO1a
WAITING
1A121
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.
CONSULTANTS: ARCHITECT/ENGINEERS:
OFFICE OF
FACILITIES
MANAGEMENT
on e ei gh th in ch o ne fo ot
B
A
C
D
E
F th re e in ch es o ne fo ot
6"
6" on e an d on e ha lf in ch es o ne fo ot on e in ch o ne fo ot
6" 6" th re e qu ar te rs in ch o ne fo ot on e ha lf in ch o ne fo ot th re e ei gh th s in ch o ne fo ot on e qu ar te r in ch o ne fo ot
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
A NEW HOSPITAL FOR
VAMC ORLANDO, FLORIDA
Orlando, Florida
673-950Professional Seals:
EB / RLF of04 JUNE, 2010
BUILDING IS FULLY SPRINKLERED
01 AND 02
HOSPITAL / CLINIC
H-EP1.1FE2-A
LEVEL 1, AREA E, ZONE 2
POWER PLAN BID ALTERNATE NO. 1
SIN 3849
N
1/8" = 1'-0" GRAPHIC SCALE
4' 8' 24'16'
A1
C2
KEY PLAN
C1
D3
D4
E2
A2 A3
B1 B2
AREA E, ZONE 2
D2
D5 D6
E1 E3
D1
D7
CLINIC
HOSPITAL
P-W P-E
A4
E4
W
NOTES:
GENERAL NOTES
1. ALL HOMERUNS SHALL BE ROUTED FROM THE DEVICE OR FIXTURE
INDICATED UP TO THE BRANCH CONDUIT RACK LOCATED IN THE "S4"
ZONE OF INTERSTITIAL SPACE. EXTEND CONDUIT ALONG THE RACK IN
THE "S4" ZONE AND THEN TRANSITION UP THE MAIN DISTRIBUTION
WIREWAYS TO THE PANELBOARD LOCATED IN THE ELECTRICAL ROOM.
SEE H-EP-5.504 FOR DETAIL REFERENCE.
2. COORDINATE THE LOCATION AND MOUNTING HEIGHT OF ALL
DEVICES WITH ARCHITECTURAL AND INTERIOR ELEVATION.
3. PROVIDE 1" CONDUIT FOR DATA ROUTE FROM FLOOR BOX AS
SHOWN. TURN UP CONDUITS IN NEAREST WALL AND STUB UP TO
ABOVE CEILING.
No. Description Date
8 CPR 132 10/17/2011
9 CPR 169 10/31/2011
10 CPR 177 11/16/2011
11 CPR 211 01/06/2012
12 CPR 230 02/23/2012
13 CPR 278 05/04/2012
14 CPR 312 07/27/2012
15 CPR 366 12/20/2012
4. WHERE DEVICES ARE INDICATED "OC" TO BE MOUNTED ABOVE A
COUNTERTOP,MOUNT DEVICE SUCH THAT BOTTOM OF
COVERPLATE IS (2") ABOVE TOP OF BACK SPLASH. IF THERE IS NO
BACK SPLASH, MOUNT DEVICE (2") ABOVE FINISHED COUNTER TOP
SURFACE TO BOTTOM OF DEVICE COVERPLATE.
23 CONNECTION TO WON FIRE DOOR. PROVIDE
CONDUIT, JUNCTION BOXES AND WIRING PER
MANUFACTURER REQUIREMENTS.
24 PROVIDE BACKBOX, CONDUIT AND WIRE TO KEYED
CONTROL STATION PER MANUFACTURER
REQUIREMENTS. MOUNT AT +60"AFF.
25 PROVIDE BACKBOX, CONDUIT AND WIRE TO SINGLE
DOOR DISPLAY PER MANUFACTURER
REQUIREMENTS. MOUNT AT +60"AFF.
26 PROVIDE BACKBOX, CONDUIT AND WIRE TO
OBSTRUCTION DETECTOR PER MANUFACTURER
REQUIREMENTS. MOUNT AT +60"AFF.
27 3/4" CONDUIT FOR LOW VOLTAGE WIRING.
28 CONNECTION TO AUTODOOR OPERATOR. PROVIDE
CONDUIT, JUNCTION BOXES AND WIRING PER
MANUFACTURER REQUIREMENTS.
29 CONNECTION TO POWER STRIP IN SECURITY
EQUIPMENT CABINET. PROVIDE ALL CONDUCTORS,
CONDUIT, FLEXIBLE CONDUIT, JUNCTION BOXES,
CONNECTORS, FITTING, ETC. REQUIRED FOR
PROPER CONNECTION.
30 TERMINATE CONDUITS AT SECURITY SYSTEM
EQUIPMENT CABINET. COORDINATE EXACT
TERMINATION LOCATION IN FIELD, BASED ON
EQUIPMENT MANUFACTURER REQUIREMENTS.
31 PROVIDE 1" EMPTY CONDUIT ROUTED TO NEAREST
SECURITY SYSTEM CABLE TRAY IN INTERSTITIAL
SPACE.
32 PROVIDE 1" EMPTY CONDUIT ROUTED TO LADDER
RACK IN COMMUNICATIONS ROOM 1B201b.
33 CONNECTION TO AIR PRESSURIZATION MONITORING
PANEL. PROVIDE ALL CONDUCTORS, CONDUIT,
FLEXIBLE CONDUIT, JUNCTION BOXES,
CONNECTORS, FITTINGS, ETC. REQUIRED FOR
PROPER CONNECTION.
34 CONNECTION TO PTZ CCTV CAMERA. PROVIDE ALL
CONDUCTORS, CONDUIT, FLEXIBLE CONDUIT,
JUNCTION BOXES, CONNECTORS, FITTINGS, ETC.
REQUIRED FOR PROPER CONNECTION.
35 PROVIDE RECEPTACLE WALL PLATE WITH TAMPER
PROOF SCREWS AND BEVELED EDGES.
1 MOUNT THIS RECEPTACLE FLUSH IN CEILING,
WITHIN 24" OF PATIENT LIFT TRACK. COORDINATE
EXACT LOCATION WITH PATIENT LIFT SYSTEM
MANUFACTURER. TYPICAL FOR ALL
CEILING-MOUNTED RECEPTACLES IN
EXAM/TREATMENT ROOMS.
2 PROVIDE CEILING MOUNTED JUNCTION BOX FOR
EXAM LIGHTS. TYPICAL FOR EACH EXAM ROOM.
COORDINATE WITH RCP FOR ACTUAL LOCATION.
3 REFER TO H-AI2 SERIES DRAWINGS FOR DEVICE
LOCATIONS ON HEADWALL FOR THIS ROOM.
4 NOT USED.
5 NOT USED.
6 NOT USED
7 PROVIDE JUNCTION BOX FOR POWER CONNECTION
TO THE FIRE ALARM ANNUCIATOR PANEL. FOR
LOCATION COORDINATE AT SITE.
8 PROVIDE GFI RECEPTACLES IN ELEVATOR PIT AND
CONNECT TO THE SAME CIRCUIT THAT SERVE THE
ELEVATOR PIT LIGHT AHEAD OF THE LIGHT SWITCH.
FOR EXACT LOCATION COORDINATE AT SITE WITH
ELEVATOR PIT DRAWING.
10 EXTEND THE WIRE FROM THIS RECEPTACLE TO THE
FIXTURE AS SHOWN ON THE LIGHTING PLAN
H-EL1.1FE2. CONNECT TO THE 120V, SINGLE PHASE
CIRCUITS SHOWN ON THIS DRAWING.
12 LOCATION FOR STUB UP CONDUITS FOR POWER,
DATA, VOICE AND TASK LIGHT FOR POWER
CONNECTIONS TO RECEPTION DESK. FOR DETAILS
COORDINATE WITH INTERIOR/MILWORK DETAILS.
13 NOT USED
14 NOT USED
15 REFER TO MOTOR STARTER SCHEDULE ON SHEET
H-EP7.000 FOR FEEDER INFORMATION.
16 SEE SHEET H-EP1.1FE3-A FOR CONTINUATION.
17 SEE SHEET H-EP1.1FE1 FOR CONTINUATION.
18 PROVIDE JUNCTION BOX FOR THE SIGNAGE. REFER
TO ARCHITECTURAL DRAWING FOR EXACT
LOCATION.
19 PROVIDE MULTI ASSEMBLY OUTLETS WITH ONE
OUTLET EVERY 1 FEET. MOUNT AT +4'-0" AFF.
20 CONNECTION TO CLEAN AGENT CONTROL PANEL
21 TO MANUAL MOTOR RATED SWITCH SERVIING
EXHAUST FAN H-EF-45 ON SHEET H-EP1.1NE.
22 SWITCH WITH RED LED PILOT LIGHT. LIGHT SHALL
ILLUMINATE WHEN SWITCH IS IN THE "ON" POSITION.
PROVIDE ENGRAVED LAMINATED NAMEPLATE WITH
RED FACE AND WHITE 1/4" HIGH LETTERING
INDICATING "FIRE EXTINGUISHING EXHAUST FAN
CONTROL".
File details come from the government source that posted it. Updated .