Attachment_S_-_Drawings_-_Chiller_-_067196-12_Bid-Permit_Specs_Combined.pdf
PDF 19 MB Posted
- Attached to
- Chiller Replacement, Glen Burnie, MVA
- Solicitation number
- BPM047469
- Issued by
- Anne Arundel County, Maryland
About this file
This is a set of mechanical and electrical drawings for a chiller renovation project at the Maryland Department of Transportation Motor Vehicle Administration Building A in Glen Burnie, MD (Contract No. V-MUL-19010-AE-A). The project involves replacing two of three existing water-cooled chillers and associated mechanical/electrical systems in the building's penthouse mechanical room. The scope includes installation of new chillers CH-1 and CH-2 (250 tons each), piping modifications, refrigerant monitoring system upgrades, new chemical treatment systems, and lighting upgrades. The drawings detail demolition and new work for chilled water piping, condenser water piping, electrical power, and lighting systems.
The drawings specify detailed technical requirements including chiller capacities (250 tons each, using R-134A refrigerant), flow rates (599 GPM chilled water, 753 GPM condenser water), electrical requirements (460V/3-phase power, 253 MCA per chiller), and control system integration with the existing building automation system (Schneider Electric Eco-Struxture 2.0). The drawings include demolition plans, new work plans, piping diagrams, electrical one-line diagrams, and lighting layouts. Special considerations are given to maintaining existing services during construction, with requirements that power interruptions occur only outside of business hours (5:00 PM to 6:00 AM Monday-Friday and 1:30 PM to 6:00 AM Saturday-Monday) with prior written approval.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
10200 GRAND CENTRAL AVE, SUITE 310
OWINGS MILLS, MD 21117
L o c a l F ile
/1
/2
:1
:5
P
M
A u to d e s k D o c s /0
-M D
O T
M
V A
V
M
U L
/0
-1
A
C e n tr a l_
R
.r v t
C e n tr a l F ile B
IM
A c e n tr a l_
R .r v t
P ro je c t N u m b e r:
-1
PROJECT NUMBER: 067196-12
MARYLAND DEPARTMENT OF TRANSPORTATION
MOTOR VEHICLE ADMINISTARTION
6601 RITCHIE HIGHWAY NE, GLEN BURNIE, MD 21062
BID/PERMIT SUBMISSION
GLEN BURNIE BUILDING A
CHILLER RENOVATION
AUGUST 11, 2023
VICINITY MAP LOCATION MAP
SCALE: NTS SCALE: NTS
DRAWING INDEX
GENERAL
G001 COVER SHEET
G002 GENERAL NOTES
MECHANICAL
M001 LEGEND, GENERAL NOTES & ABBREVIATIONS
MD101 DEMOLITION FLOOR PLANS
MD301 PIPING RISER DIAGRAM – DEMOLITION
M101 NEW WORK FLOOR PLAN
M301 PIPING RISER DIAGRAM
M501 DETAILS
M601 SCHEDULES
M801 CONTROLS
ELECTRICAL
E001 GENERAL NOTES, SYMBOL LIST AND ABBREVIATIONS
E101 PARTIAL PENTHOUSE PLANS AND DIAGRAMS
E201 PENTHOUSE LIGHTING PLAN - DEMOLITION
E202 PENTHOUSE LIGHTING PLAN - NEW WORK
E601 DIAGRAM, LIGHTING AND PANEL SCHEDULES
CONTRACT NO. V-MUL-19010-AE-A
S
TA
T E
O F MARYLAN
D
A
R C H I T ECT
JA
M E S E . FICKES
N o . 1 9412
SCVTO
B
O N
Æ V
I K V B T A T U S T V Æ
C O
R O
N A
S T
I
NOS
1 6 3 2
1. UNOBSTRUCTED ACCESS TO EXISTING EMERGENCY EXISTS SHALL BE MAINTAINED AT ALL TIMES.
2. ALL DEBRIS AND UNUSED MATERIAL RESULTING FROM DEMOLITION SHALL BE DISPOSED OF OFF SITE IN COMPLIANCE WITH
ALL LOCAL, STATE, AND FEDERAL AUTHORITIES.
3. REMOVE EXISTING PARTITIONS, EQUIPMENT, & DEVICES AS INDICATED.
4. REMOVAL OF EXISTING HVAC & PLUMBING FIXTURES & SAFING TO BE BY APPROPRIATE TRADES.
5. COORDINATE LOCATION OF ALL NEW FLOOR & WALL PENETRATIONS WITH OWNER PRIOR TO CUTTING OR CORING.
COORDINATE LOCATION WITH CONSTRUCTION DRAWINGS. SEAL ALL PENETRATIONS.
6. ALL CONTRACTORS ARE TO REPORT ALL UNEXPECTED, UNCOVERED EXISTING CONDITIONS WHICH IMPACT LAYOUT OF NEW
WORK IMMEDIATELY TO ARCHITECT.
7. FOR EXTENT & SCOPE OF PLUMBING, MECHANICAL & ELECTRICAL REMOVALS, SEE INDIVIDUAL TRADE DRAWINGS.
8. SAW CUT ALL NEW OPENINGS IN EXISTING CONSTRUCTION. DO NOT HAMMER & CHISEL. CARE MUST BE TAKEN NOT TO DAMAGE EXISTING CONSTRUCTION. COORDINATE TIME OF LOUD/HEAVY NOISE CONSTRUCTION WITH OWNER TO LIMIT
DISTURBANCE.
9. ALL ELECTRICAL CIRCUITS, DEVICES, WIRING & LIGHTING TO BE REMOVED ARE TO BE DISCONNECTED AT SOURCE PANEL, WIRE REMOVED FROM CIRCUIT BREAKER, PRIOR TO DEMOLITION TAKING PLACE.
10. PROVIDE PORTABLE LIGHTING DURING DEMOLITION & CONSTRUCTION AS REQUIRED.
11. PROVIDE DUMPSTERS AND OTHER DEMOLITION EQUIPMENT AS REQUIRED.
12. REMOVE EXISTING WORK AS REQUIRED TO ACCOMMODATE NEW WORK, INCLUDING EXISTING WALL & FLOOR FINISHES IN
SPACES SCHEDULED TO BE REFINISHED.
13. PROVIDE APPROPRIATE FULL HEIGHT PROTECTION/TEMPORARY PARTITIONS PRIOR TO COMMENCING DEMOLITION. PLACED
IN LOCATIONS APPROVED BY OWNER.
14. ALL BUILDING ACCESS AND REMOVAL OF MATERIALS MUST BE APPROVED BY OWNER.
15. REMOVE EXISTING ELECTRICAL & PLUMBING FIXTURES AND DEVICES AS INDICATED ON DRAWINGS OR AS REQUIRED AND
ASSOCIATED WITH OTHER ITEMS OF DEMOLITION.
16. CONTRACTOR SHALL DETERMINE CONSTRUCTION OF EXISTING CONDITIONS CONCEALED BY GYPSUM BOARD OR OTHER MATERIALS. MATERIALS INDICATED ON DRAWINGS IS FROM BEST INFORMATION AVAILABLE. DIFFERING CONDITIONS SHALL
NOT FORM THE BASIS OF A CHANGE ORDER TO THE CONTRACT.
17. NOT ALL DEMOLITION IS INDICATED ON THE DEMOLITION PLAN DRAWING. DEMOLITION REQUIRED TO INSTALL NEW WORK THAT CAN BE RESONABLY INFERRED TO BE REQUIRED TO INSTALL THE NEW WORK SHALL BE PERFORMED WITHOUT
ADDITIONAL COST TO THE OWNER.
1. ALL WORK TO CONFORM TO REQUIREMENTS OF THE GOVERNING BUILDING CODE, OSHA AND ALL OTHER APPLICABLE CODES, RULES, REGULATIONS, ORDINANCES, ETC. IN THEIR LATEST EDITION. CONFORM ALL WORK TO REQUIREMENTS OF
ALL AUTHORITIES HAVING JURISDICTION.
2. ALL WORK THAT IS IMPLIED OR REASONABLY INFERRED BY THE DRAWINGS IS THE RESPONSIBILITY OF THE CONTRACTOR.
THE INCLUSION OF ANY AND ALL WORK BY MENTION, NOTATION, DETAIL, ITEMIZATION OR IMPLICATION, HOWEVER BRIEF, MEANS THAT THE CONTRACTOR TO PROVIDE AND INSTALL SAME AT NO ADDITIONAL COST OR BURDEN TO THE OWNER. ALL WORK PERFORMED TO INCLUDE ALL APPURTENANCES AND APPARATUS NORMALLY DEEMED TO BE PART OF A COMPLETE PACKAGE WITHIN THE DEFINITIONS OF ORDINARY INDUSTRY STANDARDS. ALL TRADES ARE RESPONSIBLE FOR REVIEWING THE ENTIRE SET OF DRAWINGS THEREBY NOTING AND INCLUDING THEIR WORK AS APPLICABLE. THE INTENT OF THE DRAWING SET IS TO RESULT IN A COMPLETE AND FINISHED PROJECT IN ALL REGARDS AT THE CONCLUSION OF THE WORK.
INCLUDE ALL WORK, WHETHER SHOWN OR NOT, AS MAY BE NECESSARY TO ACCOMPLISH THE INTENDED RESULT.
3. APPLY AND PAY FOR ALL PERMITS, INSPECTIONS, APPROVALS, ETC. ARRANGE AND COORDINATE ALL REQUIRED
INSPECTIONS AND SECURE ALL NECESSARY APPROVALS OF THE WORK.
4. BECOME FAMILIAR WITH THE PROJECT THROUGH INSPECTION OF THE SITE AND REVIEW OF THE DRAWINGS SO AS TO THOROUGHLY UNDERSTAND THE NATURE AND REQUIREMENTS OF THE WORK. ANY AND ALL DISCREPANCIES OR OMISSIONS TO BE REPORTED TO THE OWNER PRIOR TO THE COMMENCEMENT OF ANY WORK AFFECTED BY SUCH DISCREPANCY OR OMISSION. ENSURE THAT DISCREPANCIES OR OMISSIONS ARE REPORTED AND CLARIFICATION OBTAINED PRIOR TO WORK BEING PERFORMED. ANY AND ALL WORK PROCEEDING OTHERWISE AND THEN FOUND TO BE INCORRECT OR INCONSISTENT WITH THE INTENDED RESULT WILL BE REMOVED, REPLACED AND/OR CORRECTED BY THE CONTRACTOR AT NO ADDITIONAL COST OR BURDEN TO THE OWNER. VERIFY ALL DIMENSIONS AND LOCATIONS IN THE FIELD. COORDINATE ALL WORK WITH CONDITIONS ENCOUNTERED IN THE FIELD AND MAKE ALL NECESSARY ADJUSTMENTS ACCORDINGLY.
5. CONTRACTOR IS RESPONSIBLE FOR FINAL FIT, FINISH, APPEARANCE AND PERFORMANCE OF ALL WORK.
6. VERIFY ALL DIMENSIONS AND CONDITIONS AT THE WORK SITE PRIOR TO THE COMMENCEMENT OF WORK.
7. VERIFY EXISTING CONDITIONS AFFECTING THE WORK PRIOR TO BIDDING AND ALL ASPECTS OF THE WORK PRIOR TO
COMMENCEMENT.
8. APPLY, INSTALL OR UTILIZE ALL MATERIALS IN ACCORDANCE WITH MANUFACTURER’S PRINTED LITERATURE.
9. ALL WORK TO BE PERFORMED IN A FIRST-CLASS WORKMANLIKE MANNER, MATCHING AND ALIGNING ALL SURFACES SO AS TO AFFORD A NEAT FINISHED APPEARANCE. CLEAN ALL SURFACES FREE OF SOIL, DIRT, REFUSE AND DEBRIS RESULTANT FROM THE WORK. ALL ADJACENT SURFACES TO BE LEFT AS THEY APPEARED PRIOR TO COMMENCEMENT OF THE WORK. PROVIDE ADEQUATE PROTECTION OF ALL ADJACENT AND EXISTING SURFACES TO REMAIN SUFFICIENT TO ENSURE AGAINST DAMAGE DURING CONSTRUCTION OPERATIONS. AT CONCLUSION OF THE WORK, ALL FINISHED EXPOSED SURFACES INCLUDING GLASS, ALUMINUM AND FINISHED HARDWARE TO BE THOROUGHLY CLEANED TO THE SATISFACTION OF THE OWNER.
10. ALL WORK TO BE PROPERLY AND ADEQUATELY PROTECTED FROM DAMAGE AT ALL TIMES REGARDLESS OF THE STAGE OF COMPLETION. TAKE RESPONSIBILITY FOR SAFETY AT ALL TIMES, IN ALL PLACES AND UNDER ALL CONDITIONS AFFECTING OR AFFECTED BY THE WORK. ADHERE TO ALL ACCEPTED SAFETY PRACTICES AND PROVIDE ALL FENCES, BARRICADES, GUARDRAILS, PARTITIONS, ETC. AS MAY BE NECESSARY IN ORDER TO PROTECT LIFE AND PROPERTY FROM INJURY OR DAMAGE AND AS MAY BE REQUIRED BY ANY AND ALL AUTHORITIES HAVING JURISDICTION. REPAIR ANY AND ALL DAMAGE TO THE PREMISES ARISING FROM OR ASSOCIATED WITH WORK SITE OPERATIONS AND/OR ACTIVITIES CONNECTED TO THE
WORK.
11. LEAVE ALL CHASES, HOLES, OPENINGS, ETC. PLUMB LEVEL, TRUE AND OF A PROPER SIZE OR CUT SAME INTO EXISTING WORK AS MAY BE NECESSARY FOR PROPER INSTALLATION OF WORK. CONSULT, CONFER AND OTHERWISE COORDINATE WITH ANY AND ALL OTHER CONTRACTORS AND CONCERNED PARTIES REGARDING PROPER LOCATION, SIZE, PLACEMENT, ALIGNMENT AND ORIENTATION OF SAME. IN CASE OF ANY FAILURE TO LEAVE OR CUT SUCH OPENINGS OR OTHERWISE LEAVE SUCH ACCOMMODATIONS IN PROPER PLACE, CUT THEM AFTERWARDS AT OWN EXPENSE. NO EXCESSIVE CUTTING WILL BE PERMITTED NOR ANY STRUCTURAL MEMBERS TO BE CUT WITHOUT THE CONSENT OF THE ARCHITECT.
12. ALL EQUIPMENT TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. ALL LABOR, EQUIPMENT
AND MATERIAL TO BE GUARANTEED AS PER PROJECT SPECIFICATIONS.
13. COMPLY WITH ALL OWNER SAFETY TRAINING REQUIREMENTS AND SITE PROCEDURES, AND COORDINATE THE FOREGOING
WITH OWNER'S DESIGNATED REPRESENTATIVES.
14. PERFORM ALL WORK WITHOUT INTERFERING WITH OWNER'S NORMAL OPERATIONS.
15. PROJECT DOCUMENTS ARE INTENDED TO BE COMPLEMENTARY. ITEMS INDICATED IN ONE PLACE OR ANOTHER AMONG THE
DOCUMENTS ARE INTENDED AS THOUGH SHOWN IN ALL PLACES.
16. COORDINATE ALL NEW WORK WITH ALL EXISTING CONDITIONS. EXISTING ELEMENTS AFFECTING THE WORK REQUIRE SUCH
COORDINATION WHETHER OR NOT THEY ARE INDICATED IN THE DOCUMENTS.
17. DO NOT SCALE DRAWINGS FOR CONSTRUCTION PURPOSES.
18. ALL WORK IS GUARANTEED FOR A PERIOD OF ONE YEAR FROM DATE OF SUBSTANTIAL COMPLETION.
1 2 3 4 5 6
A
B
C
D
E
PROJECT NUMBER:
DESIGNED: MODELED: CHECKED:
DATE:
DRAWING TITLE:
DRAWING NO.:
1 2 3 4 5 6
Gannett Fleming, Inc.
10200 Grand Central Ave.
Suite 310 Owings Mills • MD • 21117 t 410 • 907 • 2710
L o c a l F ile www.gannettfleming.com
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED
PROFESSIONAL ARCHITECT OR
ENGINEER UNDER THE LAWS OF
THE STATE OF MARYLAND,
LICENSE NO.
EXPIRATION DATE:
/1
/2
:1
:5
P
M
A u to d e s k D o c s /0
-M D
O T
M
V A
V
M
U L
/0
-1
A
C e n tr a l_
R
.r v t
G002
GENERAL NOTES,
SYMBOLS, LEGENDS &
ABBREVIATIONS
08/11/23
JEFMDMD
067196
G L E
N B
U R
N
IE
B U
IL
D
IN
G
A C
H
IL
L E
R R
E N
O V
A T
IO
N
M A
R Y
L A
N D
D E
P A
R T
M E
N T
O F
T R
A N
S P
O R
T A
T
IO
N M
O T
O R
V E
H
IC
L E
A D
M
IN
IS
T
A R
T
IO
N
R
IT
C H
IE
H
IG
H
W A
Y N
E G
L E
N B
U R
N
IE
M
D
BID/PERMIT SUBMISSION
GENERAL
SHEET 2 OF 15
C e n tr a l F ile B
IM
A c e n tr a l_
R .r v t
P ro je c t N u m b e r:
GENERAL DEMOLITION NOTES GENERAL NOTES
REVISIONS
NO. DATE DESCRIPTION
19412
04-11-2024
S
TA
T E
O F MARYLAN
D
A
R C H I T ECT
JA
M E S E . FICKES
N o . 1 9412
SCVTO
B
O N
Æ V
I K V B T A T U S T V Æ
C O
R O
N A
S T
I
NOS
1 6 3 2
NEW WORK LINEWEIGHT
EXISTING WORK LINEWEIGHT
FUTURE WORK LINEWEIGHT
DEMOLITION WORK LINEWEIGHT
POINT OF CONNECTION
TERMINATION POINT OF DEMOLITION
SHEET NOTE REFERENCE
REVISION REFERENCE
M301
INDICATES PLAN/DETAIL NUMBER
PLAN/DETAIL TITLE
SCALE (AS REQUIRED)
INDICATES PLAN/DETAIL NUMBER
INDICATES DRAWING ON WHICH
DRAWING SECTION APPEARS
VAV/AIR VALVE TAG
8"
VAV-1
DESIGNATION
DUCT INLET/PIPE SIZE
CFM/GPM
EQUIPMENT TAGE-1
VIEW TITLE
SCALE:
NORTH ARROW
DIFFUSER, REGISTER, OR GRILLE
DESIGNATION AND AIRFLOW TAG(S)150
8"
CD-1
TYPE
CFM
CD-1
CD-1-150
NECK
POINT OF FUTURE CONNECTION
AREA OF DEMOLITION
SYMBOL DESCRIPTION
PIPING TURNING DOWN
PIPE BRANCH TOP TAKEOFF
CAP
PIPE RISER UP/DOWN
PIPING TURNING UP
PIPE BRANCH BOTTOM TAKEOFF
TEE DOWN
FLOW DIRECTION
R/D
PIPE SLOPE RISE/DROP
CONCENTRIC REDUCER/INCREASER
ECCENTRIC REDUCER/INCREASER (FOB)
UNION
, PIPE CONTINUATION
PIPE ANCHOR
PIPE GUIDE
FLEXIBLE PIPE CONNECTOR
STEAM TRAP
EXPANSION LOOP (WxH)
DIFFERENTIAL PRESSURE TRANSDUCER
TEMPERATURE SENSOR
PRESSURE SENSOR
FLOW SWITCH
FLOW METER
PUMP
H W
EXPANSION JOINT
EJ
VALVE IN VERTICAL PIPE
BLIND FLANGE
VENTURI FLOW METER
T
P
DP
FS
FM
DESCRIPTION
STRAINER WITH DRAIN VALVE AND CAP
GEN. SHUTOFF VALVE (BALL, GATE, BUTTERFLY)
GATE VALVE
CHECK VALVE
BALL VALVE
BUTTERFLY VALVE
GAS COCK
STRAINER
PRESSURE REDUCING VALVE
CALIBRATED BALANCING VALVE
CONTROL VALVE, TWO-WAY (ELECTRIC)
CONTROL VALVE, THREE-WAY (ELECTRIC)
THREE-WAY MANUAL VALVE
SOLENOID VALVE
RELIEF/SAFETY VALVE
SYMBOL
s
GLOBE VALVE
OUTSIDE STEM & YOKE VALVE
PRESSURE GAUGE WITH COCK
THERMOMETER
PRESSURE/TEMPERATURE TEST PORT
AQUASTAT
NORMALLY CLOSED PORT (NC)
CONTROL VALVE, TWO-WAY (PNEUMATIC)
CONTROL VALVE, THREE-WAY (PNEUMATIC)
AUTOMATIC AIR VENT (EXTEND TO DRAIN)
MANUAL AIR VENT
AAV
MAV
FUSOMATIC GATE VALVE
F
SYMBOL
DOUBLE LINE DESCRIPTION
DUCTWORK, SIZE AS INDICATED
DUCTWORK, WITH SOUNDLINING
VANED ELBOW
SUPPLY DUCT TURNING UP AND DOWN
RETURN DUCT TURNING UP AND DOWN
EXHAUST/RELIEF DUCT TURNING UP AND DOWN
DUCT RISE/DROP IN AIRFLOW DIRECTION
DUCT TRANSITION, SQUARE TO SQUARE
DUCT TRANSITION, SQUARE TO ROUND
DUCT CAPPED
45 DEGREE TAP
CONICAL TAP
SPUN-IN RUNOUT FITTING W/ FLEX. & VD
FLEXIBLE DUCT
MANUAL VOLUME DAMPER
FIRE DAMPER
SMOKE DAMPER
COMBINATION FIRE/SMOKE DAMPER
BACKDRAFT DAMPER
MOTORIZED DAMPER
RETURN, EXHAUST GRILLE OR REGISTER
SUPPLY AIR DIFFUSER, 4-WAY BLOW
UNDERCUT DOOR
DOOR LOUVER
THERMOSTAT, MASTER THERMOSTAT
TEMPERATURE SENSOR
SUPPLY AIR DIFFUSER, 3-WAY BLOW
SUPPLY AIR DIFFUSER, 2-WAY BLOW
SUPPLY AIR DIFFUSER, 1-WAY BLOW
FLEXIBLE CONNECTION
HUMIDISTAT
HUMIDITY SENSOR
DUCT SMOKE DETECTOR
CARBON MONOXIDE SENSOR
STATIC PRESSURE SENSOR
UC
DL
12x12
DUCT ACCESS DOORAD
AD
AIR FLOW MEASURING STATION
DUCT CONTINUATION
SUPPLY AIR FLOW DIRECTION
OUTSIDE AIR FLOW DIRECTION
RETURN/EXHAUST AIR FLOW DIRECTION
OA
FREEZESTAT
MANUAL TIMER SWITCH
SWITCH OR TOGGLE SWITCH
HAND/OFF/AUTO SWITCH
UN-VANED ELBOW
VANED TEE
UN-VANED TEE
BAROMETRIC DAMPER
LINEAR SLOT DIFFUSER
GAS CONCENTRATION MONITOR
RADIUS ELBOW
HOA
TM
S
AFMS
SP
CO
D
HS
FZ
H
TS
TT
SF
R/D
20x12
20x12
F
BD
MD
BDD
S
SAFETY SWITCH/PUSH BUTTONPB
1. NOT ALL ABBREVIATIONS, LINE TYPES, OR SYMBOLS MAY APPEAR ON THESE
CONTRACT DOCUMENTS.
2. DRAWINGS SHALL BE CONSIDERED DIAGRAMMATIC AND ARE INTENDED TO
INDICATE CAPACITY, SIZE, APPROXIMATE LOCATION AND GENERAL ARRANGEMENT.
WHILE THE DRAWINGS ARE GENERALLY TO SCALE AND ARE AS ACCURATE AS THE
SCALE WILL PERMIT, DIMENSIONS SHALL BE CONFIRMED IN THE FIELD.
3. THE CONTRACTOR SHALL COMPLY WITH THE LAWS, ORDINANCES, RULES AND
REGULATIONS OF LOCAL AND STATE GOVERNMENTAL AUTHORITIES; OF THE
NATIONAL FIRE PROTECTION ASSOCIATION AS INTERPRETED BY THE ENFORCING
AUTHORITY HAVING JURISDICTION; AND OF PUBLIC UTILITIES HAVING CONNECTION
WITH ANY OF THE SYSTEMS HEREIN SPECIFIED.
4. INSTALL EQUIPMENT IN A SERVICEABLE MANNER WITHOUT DISRUPTION TO
ADJACENT SERVICES OR DAMAGING INSULATION. THIS INCLUDES, BUT IS NOT
LIMITED TO: PROVIDE VALVE OPERATOR EXTENSIONS TO EXTEND THRU THE
INSULATION AND HANDLES TO SWING TOWARD THE OPERATOR FOR ISOLATION.
5. PROVIDE ALL NEW AND REUSED WALL PENETRATIONS WITH A SLEEVE/CONDUIT
FOR SERVICES PENETRATING IT. THIS INCLUDES, BUT IS NOT LIMITED
TO: DUCTWORK, PIPING, POWER, AND CONTROL WIRING.
6. THE CONTRACTOR SHALL SECURE AND PAY FOR ALL PERMITS AND INSPECTIONS
REQUIRED BY ANY OF THE FOREGOING AUTHORITIES, AND PAY FOR ALL OTHER
COSTS IN CONNECTION WITH THE WORK. CERTIFICATES SHALL BE IN DUPLICATE
AND SHALL BE DELIVERED TO THE OWNER.
7. THE SITE, LOCATION, AND ROUTING OF SYSTEMS INDICATED TO HAVE NEW
CONNECTIONS MADE TO THEM ARE SHOWN AS ACCURATELY AS FIELD CONDITIONS
PERMIT. CONTRACTOR SHALL VISIT THE SITE AND THOROUGHLY EXAMINE THE
CONTRACT DRAWINGS. ALL EXISTING CONDITIONS SHALL BE EXAMINED AND THEIR
EXACT LOCATIONS VERIFIED. THE CONTRACTOR SHALL REPORT TO THE ENGINEER
ANY CONDITIONS WHICH MIGHT MAKE INSTALLATION OF REQUIRED EQUIPMENT A
PROBLEM. NO CONSIDERATION OR ALLOWANCE WILL BE GRANTED FOR FAILURE
TO INVESTIGATE CONDITIONS OR MISUNDERSTANDINGS OF THE CONTRACTUAL
REQUIREMENTS.
8. THE CONTRACTOR SHALL INSTALL AND CONNECT EQUIPMENT AND MATERIALS IN
ACCORDANCE WITH THE BEST ENGINEERING PRACTICE AND, UNLESS OTHERWISE
SHOWN OR SPECIFIED, FOLLOW THE MANUFACTURER'S PRINTED INSTALLATION
REQUIREMENTS AND RECOMMENDATIONS, AND FURNISH AND INSTALL REQUIRED
AUXILIARY ITEMS TO PROVIDE A COMPLETE INSTALLATION.
9. THE CONTRACTOR SHALL REPAIR WALLS, CEILING, FLOORS, ETC., THAT ARE
REQUIRED TO BE PENETRATED, OR OTHERWISE DISTURBED. THE REPAIRS SHALL
BE WITH MATERIALS AND FINISHES TO MATCH EXISTING. FIRE WALL PENETRATIONS
SHALL BE SEALED WITH SUITABLE MATERIALS TO PRESERVE FIRE WALL INTEGRITY.
10. THE CONTRACTOR SHALL REMOVE EQUIPMENT NOT INDICATED TO BE REUSED TO
A DESIGNATED LOCATION AT THE PROJECT SITE. AFTER THE EQUIPMENT HAS BEEN
ASSEMBLED FOR THE OWNER'S INSPECTION AND POSSIBLE RETENTION, ALL
EQUIPMENT NOT TO BE RETAINED BY THE OWNER SHALL BE REMOVED FROM THE
SITE BY THE CONTRACTOR.
11. COORDINATE WITH OTHER TRADES TO AVOID INTERFERENCE AMONG
MECHANICAL, ELECTRICAL, ARCHITECTURAL AND STRUCTURAL, PLUMBING, ETC.
PROVIDE NECESSARY OFFSETS IN PIPING, DUCTWORK AND FITTINGS ETC.,
REQUIRED TO PROPERLY INSTALL WORK WITHOUT INTERFERENCES.
12. BUILDING SYSTEMS SHALL REMAIN IN SERVICE UNLESS INDICATED OTHERWISE.
OUTAGES OR INTERRUPTIONS SHALL BE KEPT TO A MINIMUM DURATION. NOTIFY
THE OWNER 48 HOURS IN ADVANCE OF ANY OUTAGE OR INTERRUPTION. IF
TEMPORARY CONNECTIONS ARE NECESSARY TO ASSURE THIS CONTINUITY OF
SERVICES, THEY SHALL BE FURNISHED BY THE CONTRACTOR WITHOUT ADDITIONAL
CHARGE TO THE OWNER AND SHALL BE REMOVED WHEN NO LONGER NEEDED.
13. THE CONTRACTOR SHALL ARRANGE AND EXECUTE HIS WORK SUCH THAT ANY
CONNECTIONS, BOTH TEMPORARY OR PERMANENT, TO, OR REARRANGEMENT OF,
PRESENT EQUIPMENT, PIPING, ETC., SHALL BE MADE IN SUCH A MANNER AS TO
ASSURE FULL RESUMPTION OF SERVICE AT THE TIME DESIGNATED BY THE OWNER.
14. THE CONTRACTOR SHALL LOCATE EQUIPMENT WHICH MUST BE SERVICED,
OPERATED OR MAINTAINED IN FULLY ACCESSIBLE POSITIONS. FURNISH ACCESS
DOORS AS REQUIRED FOR BETTER ACCESSIBILITY. MINOR DEVIATIONS FROM
DRAWINGS MAY BE MADE TO ALLOW FOR ACCESSIBILITY, BUT CHANGES OF
MAGNITUDE WHICH INVOLVE EXTRA COSTS SHALL NOT BE MADE WITHOUT
WRITTEN APPROVAL.
15. ALL DIMENSIONS FOR EXISTING PIPING AND DUCTWORK SHALL BE VERIFIED IN THE
FIELD BY THE CONTRACTOR PRIOR TO CONSTRUCTION, WHERE NEW WORK
CONNECTIONS ARE INDICATED. NEW DUCT DIMENSIONS SHOWN ARE INSIDE CLEAR
DIMENSIONS.
16. OPENINGS REMAINING IN EXISTING PIPING/DUCTWORK AS A RESULT OF
DEMOLITION SHALL BE SEALED WITH AN AIRTIGHT/WATERTIGHT SHEET METAL CAP.
WHERE EXISTING SYSTEMS ARE INSULATED, WORK SHALL INCLUDE REPAIR AND
REPLACEMENT OF INSULATION EITHER DAMAGED OR REMOVED AS A RESULT OF
DEMOLITION.
17. PIPING SCOPE REQUIREMENTS: HORIZONTAL DRAINAGE PIPING SHALL BE
INSTALLED IN UNIFORM ALIGNMENT AT UNIFORM SLOPES. THE MINIMUM SLOPE OF
HORIZONTAL DRAINAGE PIPE SHALL BE IN ACCORDANCE WITH THE FOLLOWING:
SIZE (INCHES) MINIMUM SLOPE (INCHES PER FOOT)
2-1/2 OR LESS 1/4
3 TO 6 1/8
8 OR LARGER 1/16
1. EXISTING HANGERS SHALL BE MODIFIED TO FACILITATE NEW
ABOVE CEILING WORK.
2. EQUIPMENT NOT BEING REUSED SHALL BE REMOVED IN ITS
ENTIRETY AS REQUIRED TO FACILITATE NEW WORK.
2/20/2023
LINES & REFERENCE SYMBOLS
PIPING
MECH VALVESDUCTWORK
1 2 3 4 5 6
A
B
C
D
E
PROJECT NUMBER:
DESIGNED: MODELED: CHECKED:
DATE:
DRAWING TITLE:
DRAWING NO.:
1 2 3 4 5 6
Gannett Fleming, Inc.
10200 Grand Central Ave.
Suite 310 Owings Mills • MD • 21117 t 410 • 907 • 2710
L o c a l F ile www.gannettfleming.com
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED
PROFESSIONAL ARCHITECT OR
ENGINEER UNDER THE LAWS OF
THE STATE OF MARYLAND,
LICENSE NO.
EXPIRATION DATE:
/1
/2
:3
:2
A
M
A u to d e s k D o c s /0
-M D
O T
M
V A
V
M
U L /0
.1
M
V A
-G B
-C h ill e r_ M
E P
R
.r v t
M001
LEGEND, GENERAL
NOTES, &
ABBREVIATIONS
08/11/23
PWHJMJJMJ
067196.12
G L E
N B
U R
N
IE
B U
IL
D
IN
G
'A
C H
IL
L E
R R
E N
O V
A T
IO
N
M A
R Y
L A
N D
D E
P A
R T
M E
N T
O F
T R
A N
S P
O R
T A
T
IO
N M
O T
O R
V E
H
IC
L E
A D
M
IN
IS
T
A R
T
IO
N
R
IT
C H
IE
H
IG
H
W A
Y N
E G
L E
N B
U R
N
IE
M
D
BID/PERMIT SUBMISSION
MECHANICAL
SHEET 3 OF 15
C e n tr a l F ile B
IM
M c e n tr a l_
R .r v t
P ro je c t N u m b e r:
.1
27702
06/14/2024
GENERAL NOTES
GENERAL DEMOLITION NOTES
ABBREVIATIONS
HWS HOT WATER SUPPLY
HX HEAT EXCHANGER
HZ HERTZ (CYCLES PER SECOND)
ID INSIDE DIAMETER
IN WG INCHES OF WATER GAUGE
IN, “ INCH, INCHES
INFO INFORMATION
INT INTERIOR
INV EL INVERT ELEVATION
ISOL ISOLATION
kAIC KILO AMPERE INTERRUPTING CAPACITY
KW KILOWATTS
L LENGTH, LONG
LAV LAVATORY
LBS POUNDS
LDR LEADER
LP LIQUID PROPANE
LPCR LOW PRESSURE CONDENSATE RETURN
LPS LOW PRESSURE STEAM
LRA LOAD RATED AMPS
LWT LEAVING WATER TEMPERATURE
M METER
MAV MANUAL AIR VENT
MAX MAXIMUM
MBH THOUSAND BRITISH THERMAL UNITS
PER HOUR
MCA MINIMUM CIRCUIT AMPACITY
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT PROTECTION
MPS MEDIUM PRESSURE STEAM
MTD MOUNTED
MUW MAKE UP WATER
N NITROGEN
N/A NOT APPLICABLE
NC NORMALLY CLOSED, NOISE CRITERIA
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NG NATURAL GAS
NIC NOT IN CONTRACT
NO NORMALLY OPENED
No NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OA OUTSIDE AIR
OC ON CENTER
OS&Y OUTSIDE STEM AND YOKE VALVE
P PUMP
PC PUMPED CONDENSATE
PD PRESSURE DROP
PG PRESSURE GAUGE
PLBG PLUMBING
PNEU PNEUMATIC
POS POSITION
PRESS PRESSURE
PRV PRESSURE REDUCING VALVE
PS PRESSURE SWITCH
PSC PUMPED STEAM CONDENSATE RETURN
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH GAUGE
PVC POLYVINYL CHLORIDE
(RL) RELOCATED POSITION
R RISE
RA RETURN AIR
RD ROOF DRAIN, REFRIGERANT
DISCHARGE
REF REFRIGERANT
REQ'D REQUIRED
RF RETURN FAN
RL REFRIGERANT LIQUID
RLA RATED LOAD AMPS
RM ROOM
RPM REVOLUTIONS PER MINUTE
RPZ REDUCED PRESSURE BFP
RS REFRIGERANT SUCTION
RTU ROOFTOP UNIT
S SWITCH
S/S START/STOP
SA SUPPLY AIR
SAN SANITARY
SC STEAM CONDENSATE RETURN
SCCR SHORT CIRCUIT CURRENT RATING
SF SUPPLY FAN, SQUARE FEET
SK SINK
SP STATIC PRESSURE
SPEC SPECIFICATION
SPR SPRINKLER
SQ SQUARE
SQ FT SQUARE FOOT, SQUARE FEET
SS STAINLESS STEEL
STD STANDARD
STL STEEL
STM STEAM
TEMP TEMPERATURE, TEMPORARY
TP TEST PORT, TRAP PRIMER
TW TEPID WATER
TYP TYPICAL
UL UNDERWRITERS LABORATORIES
UON UNLESS OTHERWISE NOTED
UV UNIT VENTILATOR
V VOLTS, VENT
VD VOLUME DAMPER
VEL VELOCITY
VERT VERTICAL
VFD VARIABLE FREQUENCY DRIVE
VIB VIBRATION
VSD VARIABLE SPEED DRIVE
VTR VENT THROUGH ROOF
W WIDTH, WIDE
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WG WATER GAUGE
WMS WIRE MESH SCREEN
WPD WATER PRESSURE DROP
WT WEIGHT
ZN ZONE
AAV AUTOMATIC AIR VENT
ABV ABOVE
AD AREA DRAIN, ACCESS DOOR, AIR
DRYER
ADA AMERICANS WITH DISABILITIES ACT
ADJ ADJUST, ADJUSTABLE
AF ANTI-FREEZE
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ALUM ALUMINUM
AP ACCESS PANEL
APPROX APPROXIMATELY
ARCH ARCHITECTURAL
AS AIR SEPARATOR
AST ABOVEGROUND STORAGE TANK
ATV ATMOSPHERIC VENT
AVG AVERAGE
BA BREATHABLE AIR
BAS BUILDING AUTOMATION SYSTEM
BFP BACKFLOW PREVENTER
BLDG BUILDING
BLW BELOW
BMS BUILDING MANAGEMENT SYSTEM
BOD BASIS OF DESIGN
BOT BOTTOM
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNITS PER HOUR
C COMMON
CA COMPRESSED AIR
CD CONDENSATE DRAIN
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CL CENTER LINE
CLNG CEILING
CNG COMPRESSED NATURAL GAS
CO CLEANOUT, CARBON MONOXIDE
CO2 CARBON DIOXIDE
COL COLUMN
CONC CONCRETE
COND CONDENSATE
CONN CONNECTION
CONT CONTINUATION
CONT'D CONTINUED
CPVC CHLORINATED POLYVINYL CHLORIDE
CUH CABINET UNT HEATER
CV CLEANING VACUUM, CHECK VALVE
CW COLD WATER
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
Cx COMMISSIONING
CxA COMMISSIONING AUTHORITY
(D) DEMOLISH, REMOVE
D DRAIN, DEPTH
DB DECIBELS
DCW DOMESTIC COLD WATER
DDC DIRECT DIGITAL CONTROL
DEG, ° DEGREES
DEH DEHUMIDIFIER
DEPT DEPARTMENT
DESG DESIGNATION
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DI DEIONIZED WATER
DIA, Ø DIAMETER
DIFF DIFFERENTIAL, DIFFERENCE
DISC DISCONNECT
DN DOWN
DWG DRAWING
(E) EXISTING TO REMAIN
(ER) EXISTING RELOCATED
EA EACH
EA EXHAUST AIR
EDB ENTERING DRY BULB
EF EXHAUST FAN
EFF EFFICIENCY
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRIC, ELECTRICAL
ELEV ELEVATOR
EQ EQUAL
ET EXPANSION TANK
EWB ENTERING WET BULB
EXT EXTERIOR
(F) FUTURE
FCO FLOOR CLEANOUT
FD FLOOR DRAIN, FIRE DAMPER
FDC FIRE DEPARTMENT CONNECTION
FF FINISHED FLOOR
FG FUEL GAS
FLA FULL LOAD AMPS
FLEX FLEXIBLE
FLR FLOOR
FM FLOW METER
FO FUEL OIL
FOF FUEL OIL FILL
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FPM FEET PER MINUTE
FPS FEET PER SECOND
FS FLOW SWITCH
FT HD FEET OF HEAD
FT, ‘ FOOT, FEET
FZ FREEZE, FREEZSTAT
°F DEGREES FAHRENHEIT
G GAS
GA GAUGE
GAL GALLON, GALLONS
GALV GALVANIZED
GEN GENERATOR
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GUH NATURAL GAS UNIT HEATER
H HEIGHT
H2O WATER
HHWR HEATING HOT WATER RETURN
HHWS HEATING HOT WATER SUPPLY
HORIZ HORIZONTAL
HP HORSEPOWER
HPS HIGH PRESSURE STEAM
HTG HEATING
HUH HYDRONIC UNIT HEATER
HWR HOT WATER RETURN
REVISIONS
NO. DATE DESCRIPTION
SHEET DEMOLITION NOTES
1. REMOVE AND DISPOSE OF CHILLER, STARTER, WIRING, CONDUIT,
JUNCTION AND PULL BOXES, DISCONNECT, SENSORS, AND
CONTROLS. REMOVAL SHALL INCLUDE REFRIGERANT
EVACUATION BY A CERTIFIED COMPANY. RECOVERED
REFRIGERANT SHALL BE DISPOSED PER LOCAL AND STATE
REGULATIONS.
2. DISCONNECT EXISTING REFRIGERANT VENT/RELIEF PIPING AND
DEMOLISH TO POINT SHOWN, AND CAP AND SEAL PIPING.
3. DISCONNECT AND REMOVE EXISTING REFRIGERANT MONITORING
PANEL.
4. EXISTING CHILLER, CH-3, IS EXISTING TO REMAIN.
5. PROVIDE PRE-DEMOLITION WATER FLOW AND HEAD PRESSURE
MEASUREMENT OF HYDRONIC CHILLED WATER PUMPS. SEND
REPORT TO ENGINEER.
6. PROVIDE PRE-DEMOLITION WATER FLOW AND HEAD PRESSURE
MEASUREMENT OF HYDRONIC CONDENSER WATER PUMPS. SEND
REPORT TO ENGINEER.
7. REMOVE EXISTING PNEUMATIC CONTROL VALVES FROM CHILLED
WATER PIPING AND CONDENSER WATER PIPING. FIELD VERIFY
PNEUMATIC PIPE ROUTING SERVING PNEUMATIC CONTROL
VALVES AND PERMANENTLY CAP ASSOCIATED PNEUMATIC LINES
BACK TO MAIN.
8. DURING REMOVAL OF CHILLERS, THE WEIGHT OF THE CHILLERS
SHALL NOT BE PUT ON THE ROOF. CONTRACTOR SHALL SUBMIT A
CRANE LIFT SAFETY PLAN.
9. REMOVE SECTION OF PIPE FOR INSTALLATION OF AIR
SEPARATOR.
K
K
L
L
M
M
N
N
O
O
(E)CT-1
(E)CH-3
(E)CWP-2
(E)CWP-1
(E)CHWP-4(E)CHWP-2(E)CHWP-1(E)CHWP-3(E)CHWP-5
(E)4" Ø CHWR
(E)6" Ø CHWR
(E)6" Ø CHWR
(E)4" Ø CHWR
(E)6" Ø CHWR
(E)6" Ø CHWR
(E)6" Ø CHWR
(E)6" Ø CHWR
(E)8" Ø CWR
(E)8" Ø CWR
(E)8" Ø CWS
(E)8" Ø CWS
(E)8" Ø CWR
(E)8" Ø CWS
(E)8" Ø CWS
(E)6" Ø CHWS
(E)8" Ø CHWS
(E)6" Ø CHWS
(E)8" Ø CHWR
(E)6" Ø CHWS
(E)4" Ø CHWR
(E)6" Ø CHWR
(E)6" Ø CHWR
(E)6" Ø CHWR
(E)6" Ø CHWR
(E)6" Ø CHWS
(D)ET-1
(D)CSF
(E)8" Ø CHWS
(E)2" Ø DCW
(E)2" Ø DCW
(E)1 1/2" Ø DCW
(E)8" Ø CHWR
(E)1 1/2" Ø DCW
TO (E)ET
(E)6" Ø CHWS
(E)6" Ø CHWR
DN TO (E)AHU-3
CHW COIL
(E)4" Ø CHWS
(E)4" Ø CHWR
(E)6" Ø CHWR
(E)8" Ø CWR
(E)8" Ø CWS
(E)2" Ø DCW
DN TO (E)CH-2
(E)MCC
(E)7'-0"x7'-0"RELIEF AIR LOUVER W/MOD(E)14'-0"x10'-0" INTAKE
AIR LOUVER SERVING
(E)AHU-3
(E)2" REFRIG. VENT(E)2" REFRIG.
VENT
(E)EMERGENCY
EXHAUST FAN
(D)CH-2
(E)18"x12" OA DUCT
(D)CH-1
A P
P R
O X
. 4
'-0 " T
O E
D G
E O
F R
O O
F
MD101
(E)EYE
WASH
(E)6" Ø CHWR
(E)6" Ø CHWR (D)6"⌀
(E)6" Ø CHWS
(E)6" Ø CHWR
(E)6" Ø CHWR
(E)4" Ø CHWR
(E)4" Ø CHWR
(E)4" Ø CHWS
(E)4" Ø CHWS
(D
-1
/2
(D)4"⌀, (ABANDONED)
(D)4"⌀
(D)6"⌀
(D)4"⌀
(D)6"⌀
(D)6"⌀
1. SEE SHEET M001 FOR GENERAL NOTES, LEGENDS AND
ABBREVIATIONS.
GENERAL NOTES
M
(D)BACKFLOW
PREVENTOR (D)PRESSURE
REDUCING VALVE
(D)CHEMICAL
SHOT FEEDER
(D)EXPANSION TANK
(D)1-1/2" ⌀ TO CHILLED
WATER LOOP
(E)3/4" ⌀ TO CHILLED
WATER LOOP
(E)1 1/2" Ø DCW
(E)1 1/2" Ø DCW
(E)1 1/2" Ø DCW
(E)2" Ø CHWR (E)1 1/2" Ø DCW
2/20/2023
1 2 3 4 5 6
A
B
C
D
E
PROJECT NUMBER:
DESIGNED: MODELED: CHECKED:
DATE:
DRAWING TITLE:
DRAWING NO.:
1 2 3 4 5 6
Gannett Fleming, Inc.
10200 Grand Central Ave.
Suite 310 Owings Mills • MD • 21117 t 410 • 907 • 2710
L o c a l F ile www.gannettfleming.com
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED
PROFESSIONAL ARCHITECT OR
ENGINEER UNDER THE LAWS OF
THE STATE OF MARYLAND,
LICENSE NO.
EXPIRATION DATE:
/1
/2
:3
:4
A
M
A u to d e s k D o c s /0
-M D
O T
M
V A
V
M
U L /0
.1
M
V A
-G B
-C h ill e r_ M
E P
R
.r v t
MD101
DEMOLITION FLOOR
PLANS
08/11/23
PWHJMJJMJ
067196.12
G L E
N B
U R
N
IE
B U
IL
D
IN
G
'A
C H
IL
L E
R R
E N
O V
A T
IO
N
M A
R Y
L A
N D
D E
P A
R T
M E
N T
O F
T R
A N
S P
O R
T A
T
IO
N M
O T
O R
V E
H
IC
L E
A D
M
IN
IS
T
A R
T
IO
N
R
IT
C H
IE
H
IG
H
W A
Y N
E G
L E
N B
U R
N
IE
M
D
BID/PERMIT SUBMISSION
MECHANICAL
SHEET 4 OF 15
C e n tr a l F ile B
IM
M c e n tr a l_
R .r v t
P ro je c t N u m b e r:
.1
27702
06/14/2024
SCALE: 1/4" = 1'-0"
CHILLER PENTHOUSE PIPING FLOOR PLAN - DEMOLITION
SCALE: 1/4" = 1'-0"
CHILLED WATER MAKEUP WATER PIPING SECTION
(E)8" CWS
(E)8" CWS
(E )6
C
W S
(E )6
C
W S
(E)CT-1
(E)8" CHWS
(E)8" CHWR
(E )6
"C W
R
MEZZANINE
MEZZANINE
EXTERIOR
(E) 8" CWR
(E)6"CWS/R TO
(E)CH-3
CONDENSER WATER FLOW DIAGRAM
CHILLED WATER FLOW DIAGRAM
(E)1-1/2" DCW
(E)1-1/2" MAKE-
UP WATER
(E)DRAIN AND
OVERFLOW TO
(E)ROOF DRAIN
(TYP.)
(E) 8" CWR BYPASS
(E) 8" CWR
(E) 8" CWR
(E) 6"
(E) 6"
(E)8" CWR
(E )6
"C W
R
(E)8" CWS
EXISTING CONCRETE PAD, TYP.
(D) BYPASS CONTROL VALVE
(E)
CHWP-5 (E)
CHWP-3
(E)
CHWP-1
(E)
CHWP-2
(E)
CHWP-4
(E)4" CHWR TO (E)AHU-4, BASEMENT
(E)6" CHWR TO (E)AHU-2, MEZZANINE
(E)6" CHWR
TO (E)AHU-1,
MEZZANINE
(E)6" CHWR TO (E)AHU-3, MEZZANINE
(STANDBY)
(E)6" CHWS
TO AHU-1
(E)6" CHWS
TO (E)AHU-3,
MEZZANINE
(E)4" CHWS TO AHU-4,
BASEMENT
(E)6" CHWS
TO (E)AH-3
(E )6
C
W S
(E )6
"C W
R
(D)6" CWS/R TO
(D)CH-1
(E)6" CHWR
(E)6" CHWR
(E)6" CHWR
(E)4" CHWR
(E)8" CHWR
(E)6" CHWR
(E)6" CHWS/R (E)6" CHWS/R (E)6" CHWS/R (E)6" CHWS/R (E)6" CHWS/R
(E)INCOMING
DOMESTIC COLD
WATER SUPPLY
(E)1-1/2" DCW TO
CHILLED WATER LOOP
CHILLED WATER MAKEUP CONNECTION DIAGRAM
(D)BACKFLOW
PREVENTOR
(D)PRESSURE
REDUCING VALVE
(E)8" CHWS
(E)4" CHWS
(E)6" CHWR
(E)2" CHWR
(D) EXPANSION
TANK
REMOVE EXISTING
PNEUMATIC VALVE
(D)
CH-2
(D )C
W S
(D )C
W R
(E)
CH-3
(E )C
W S
(E )C
W R
REMOVE EXISTING
PNEUMATIC CONTROL VALVE
REMOVE EXISTING PNEUMATIC
CONTROL VALVE
(D)6"CWS/R TO
(E)CH-2
(D)
CH-1
(E )C
W S
(E )C
W R
EXISTING CONCRETE PAD
TO REMAIN, TYP.
MEZZANINE
(D)1-1/4" AIR
GAP & DRAIN
(E)3/4" TO
EXPANSION TANK
(E)BYPASS
2/20/2023
1 2 3 4 5 6
A
B
C
D
E
PROJECT NUMBER:
DESIGNED: MODELED: CHECKED:
DATE:
DRAWING TITLE:
DRAWING NO.:
1 2 3 4 5 6
Gannett Fleming, Inc.
10200 Grand Central Ave.
Suite 310 Owings Mills • MD • 21117 t 410 • 907 • 2710
L o c a l F ile www.gannettfleming.com
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED
PROFESSIONAL ARCHITECT OR
ENGINEER UNDER THE LAWS OF
THE STATE OF MARYLAND,
LICENSE NO.
EXPIRATION DATE:
/1
/2
:3
:4
A
M
A u to d e s k D o c s /0
-M D
O T
M
V A
V
M
U L /0
.1
M
V A
-G B
-C h ill e r_ M
E P
R
.r v t
MD301
PIPING RISER DIAGRAM -
DEMOLITION
08/11/23
PWHAPTAPT
067196.12
G L E
N B
U R
N
IE
B U
IL
D
IN
G
'A
C H
IL
L E
R R
E N
O V
A T
IO
N
M A
R Y
L A
N D
D E
P A
R T
M E
N T
O F
T R
A N
S P
O R
T A
T
IO
N M
O T
O R
V E
H
IC
L E
A D
M
IN
IS
T
A R
T
IO
N
R
IT
C H
IE
H
IG
H
W A
Y N
E G
L E
N B
U R
N
IE
M
D
BID/PERMIT SUBMISSION
MECHANICAL
SHEET 5 OF 15
C e n tr a l F ile B
IM
M c e n tr a l_
R .r v t
P ro je c t N u m b e r:
.1
27702
06/14/2024
SCALE: NTS
CHILLED WATER AND CONDENSER WATER PIPING SCHEMATIC- DEMOLITION
SHEET KEYNOTES
1. PROVIDE NEW CHILLER, CORRESPONDING VIBRATION
ISOLATION, ANCHOR, AND SUPPORT. REFER TO MECHANICAL
DETAILS. CONNECT NEW CHILLER INTO EXISTING BUILDING
AUTOMATIC SYSTEM.
2. PROVIDE REFRIGERANT VENT/RELIEF PIPING FROM CHILLER (AS
PER CHILLER MANUFACTURER) AND ASHRAE STANDARD 15.
CONNECT NEW REFRIGERANT RELIEF PIPING FROM CHILLER TO
EXISTING REFRIGERANT RELIEF MAIN.
3. PROVIDE NEW EXPANSION TANK ON NEW 3'-6" L x1'-6" W x4" H
CONCRETE EQUIPMENT PAD. REFER TO MECHANICAL DETAILS.
4. PROVIDE NEW AIR SEPARATOR AND RECONNECT TO EXISTING
PIPING. EXTEND 1-1/2" COLD WATER MAKE-UP TO AIR
SEPARATOR. REFER TO MECHANICAL DETAILS.
5. PROVIDE NEW REFRIGERANT SENSOR AT EACH NEW CHILLER
AND AT EXISTING CHILLER. PROVIDE NEW REFRIGERANT
MONITORING SYSTEM.
6. PROVIDE NEW REFRIGERANT MONITORING CONTROL PANEL
AND SYSTEM. BASIS OF DESIGN: HALOGUARD IR. CONNECT TO
EXISTING EMERGENCY EXHAUST FAN CONTROLS AND NEW
REFRIGERANT MONITOR SENSORS TO NEW MONITORING
CONTROL PANEL.
7. PROVIDE CHEMICAL BYPASS FEEDER AND ASSOCIATED PIPING
AND VALVES. EXTEND 3/4" PIPING AND CONNECT TO EXISTING
PIPING. REFER TO MECHANICAL PIPING.
8. PROVIDE NEW CHILLED WATER PIPING FROM POINT SHOWN.
PROVIDE SHUTOFF VALVE(S) IN VERTICAL CHWS/R PIPING.
PROVIDE NEW PRESSURE GAUGES AND THERMOSTATS. REFER
TO MECHANICAL DETAILS. PROVIDE INSULATION FOR CHILLED
WATER SUPPLY AND RETURN PIPING AND VALVES.
9. PROVIDE NEW CONDENSER WATER PIPING FROM POINT
SHOWN. PROVIDE SHUTOFF VALVE(S) IN VERTICAL CHWS/R
PIPING. PROVIDE NEW PRESSURE GAUGES AND THERMOSTATS.
REFER TO MECHANICAL DETAILS.
10. MAINTAIN MINIMUM 3'-6" CLEARANCE IN FRONT OF EXISTING
MCC FOR CHILLER, CH-1 EQUIPMENT AND PIPING.
11. DURING INSTALLATION OF CHILLERS, THE WEIGHT OF THE
CHILLERS CANNOT BE SET ON THE ROOF (AREA OUTSIDE THE
MECHANICAL ROOM). SUBMIT CRANE LIFT SAFETY PLAN.
12. PROVIDE NEW ISOLATION VALVE WITH ELECTRIC ACTUATION AT
EXISTING CHILLER, (E)CH-2. CONNECTION TO EXISTING
CONTROL SYSTEM.
13. NEW 6'-0" x 4'-0" X 1/2" STEEL PLATE CRIBBING SHALL BE
INSTALLED CENTERED UNDER SUPPORT FEET OF NEW CHILLER
TO BE INSTALLED.
K L M N O
(E)CT-1
(E)CH-3
(E)CWP-2
(E)CWP-1
(E)CHWP-4(E)CHWP-2(E)CHWP-1(E)CHWP-3(E)CHWP-5
(E)4" Ø CHWR
(E)6" Ø CHWR
(E)6" Ø CHWR
(E)4" Ø CHWR
(E)6" Ø CHWR(E
)6
Ø
C H
W R
(E )6
Ø
C H
W R
(E )6
Ø
C H
W R
(E)8" Ø CWR
(E)8" Ø CWR
(E)8" Ø CWS
(E)8" Ø CWS
(E)8" Ø CWR
(E)8" Ø CWS
(E)8" Ø CWS
(E)6" Ø CHWS
(E)6" Ø CHWR
(E)8" Ø CHWS
(E)6" Ø CHWS
(E)8" Ø CHWR
(E)6" Ø CHWS
(E)4" Ø CHWR
(E)6" Ø CHWR
(E)6" Ø CHWR
(E)6" Ø CHWR
(E)6" Ø CHWR
(E)6" Ø CHWS
(E)1 1/2" Ø DCW
(E)8" Ø CHWS
(E)2" Ø DCW
(E)2" Ø DCW
(E)1 1/2" Ø DCW
(E)8" Ø CHWR
(E)1 1/2" Ø DCW
TO (E)ET
(E)6" Ø CHWS
(E)6" Ø CHWR
(E)6" CHWS/R
DN TO(E)CH-2
(E)4" Ø CHWR
(E)6" Ø CHWR
(E)6" Ø CHWR
(E)8" Ø CWR
(E)8" Ø CWS
(E)2" Ø DCW
CSF-1
1CH-2
CH-1
ET-CHW
(E)7'-0"x7'-0" RELIEF
AIR LOUVER W/ MOD
(E)MCC
DN TO (E)AHU-3
CHW COIL
CSF-2
AS-1
AS-3
AS-4 AS-2
(E)2" REFRIG. RELIEF VENT(E)2" REFRIG.
RELIEF VENT
(E)EMERGENCY
EXHAUST FAN
M101
4" Ø
6" Ø
6" Ø
M101
(E)18"x12 OA DUCT
(E)6" Ø CHWS
(E)4" Ø CHWS
(E)EYE WASH
(E)2" Ø CHWR
(E)2" REFRIG.
RELIEF VENT
/2
Ø
1 1/2" Ø DCW
V-CH-3CH
V-CH-3C
V-CH-2CH
V-CH-2C
V-CH-1CH V-CH-1C
(E) BACKFLOW PREVENTOR,
COOLING TOWER MAKE-UP WATER
M101
/2
Ø
(E)4" Ø CHWS
1 1/2" Ø DCW
6" Ø
4" Ø
1. SEE SHEET M001 FOR GENERAL NOTES, LEGENDS AND
ABBREVIATIONS.
GENERAL NOTES
K L
(E)6" Ø CHWR
(E)6" Ø CHWS (E)6" Ø CWR
(E)6" Ø CWS
HIGH-PERFORMANCE
BUTTERFLY VALVE
(E)EMERGENCY
EXHAUST
FAN
V-CH-3CH
V-CH-3C
2"⌀ REFRIGERANT VENT
M
N
6" Ø CHWS
6" Ø CHWR
(E)6" Ø CWS
(E)6" Ø CWR
(E)8" Ø CWS
(E)8" Ø CWR
(E)8" Ø CHWR
(E)6" Ø CHWS
V-CH-1CH
V-CH-1C
2"⌀ REFRIGERANT VENT
M
EXISTING FLOOR
DRAIN
BFP-1
PRV-1ET-CHW
CSF-1
1 1/2" Ø
TO AIR SEPARATORS
(E)EYE WASH
1 1/2" Ø
FROM EXPANSION TANK
(E)1 1/2" Ø DCW (E)1 1/2" Ø DCW
1 1/2" Ø
BACKFLOW
PREVENTOR DRAIN
(E)3/4" TO CHILLED
WATER LOOP
(E)1-1/2" CAPPED
(E)1 1/2" Ø DCW
2/20/2023
4' 8'0'
SCALE: 1/4" = 1'-0"
1 2 3 4 5 6
A
B
C
D
E
PROJECT NUMBER:
DESIGNED: MODELED: CHECKED:
DATE:
DRAWING TITLE:
DRAWING NO.:
1 2 3 4 5 6
Gannett Fleming, Inc.
10200 Grand Central Ave.
Suite 310 Owings Mills • MD • 21117 t 410 • 907 • 2710
L o c a l F ile www.gannettfleming.com
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED
PROFESSIONAL ARCHITECT OR
ENGINEER UNDER THE LAWS OF
THE STATE OF MARYLAND,
LICENSE NO.
EXPIRATION DATE:
/1
/2
:3
:3
A
M
A u to d e s k D o c s /0
-M D
O T
M
V A
V
M
U L /0
.1
M
V A
-G B
-C h ill e r_ M
E P
R
.r v t
M101
NEW WORK FLOOR PLAN
08/11/23
PWHJMJJMJ
067196.12
G L E
N B
U R
N
IE
B U
IL
D
IN
G
'A
C H
IL
L E
R R
E N
O V
A T
IO
N
M A
R Y
L A
N D
D E
P A
R T
M E
N T
O F
T R
A N
S P
O R
T A
T
IO
N M
O T
O R
V E
H
IC
L E
A D
M
IN
IS
T
A R
T
IO
N
R
IT
C H
IE
H
IG
H
W A
Y N
E G
L E
N B
U R
N
IE
M
D
BID/PERMIT SUBMISSION
MECHANICAL
SHEET 6 OF 15
C e n tr a l F ile B
IM
M c e n tr a l_
R .r v t
P ro je c t N u m b e r:
.1
27702
06/14/2024
SCALE: 1/4" = 1'-0"
CHILLER PENTHOUSE PIPING FLOOR PLAN - NEW WORK
SCALE: 1/4" = 1'-0"
CH-3 PIPING SECTION
SCALE: 1/4" = 1'-0"
CH-1 PIPING SECTION
GENERAL STRUCTURAL NOTE NEW CHILLER SUPPORTS:
NEW CHILLERS SHALL HAVE VIBRATION DAMPENING MECHANISMS
WITHIN THE MACHINERY TO PREVENT VIBRATIONS FROM EXTENDING
INTO THE BUILDING STRUCTURE.
SCALE: 1/4" = 1'-0"
CHILLED WATER MAKEUP SECTION
(E)8" CWS
(E )6
C
W S
C W
S
EXISTING COOLING TOWER
(E)8" CHWS
(E)8" CHWR
(E )6
"C W
R
MEZZANINE
MEZZANINE
EXTERIOR
(E) 8" CWR
(E)6"CWS/R TO
(E)CH-3
6" CWS/R TO
CONDENSER WATER FLOW DIAGRAM
CHILLED WATER FLOW DIAGRAM
(E)1-1/2" DCW
(E)1-1/2" MAKE-UP
WATER
(E)DRAIN AND
OVERFLOW TO
(E)ROOF DRAIN
(TYP.)
NOT ALL VALVES ARE SHOWN. REFER TO
"M501 - MECHANICAL DETAILS" AND SPECIFICATIONS.
(E) 8" CWR BYPASS
(E) 8" CWR
(E) 8" CWR
(E) 6"
(E) 6"
(E)8" CWR
"C
W R
(E)8" CWS
EXISTING CONCRETE
PAD, TYP.
(D) BYPASS CONTROL VALVE
(E)
CHWP-5 (E)
CHWP-3
(E)
CHWP-1
(E)
CHWP-2
(E)
CHWP-4
(E)4" CHWR TO (E)AHU-4, IN BASEMENT
(E)6" CHWR TO (E)AHU-2, MEZZANINE
(E)6" CHWR TO (E)AHU-1,
MEZZANINE
(E)6" CHWR TO (E)AHU-3, MEZZANINE
(STANDBY)
(E)6" CHWS
TO AHU-1
(E)6" CHWS
TO (E)AHU-3,
MEZZANINE
(E)4" CHWS
TO (E)AHU-4,
BASEMENT
(E)6" CHWS
TO (E)AH-3
C W
S
"C
W R
6" CWS/R TO
AS-4
ET-1
CSF-2
AS-2
AS-3
(E)4" CHWR
(E)6" CHWR
(E)6" CHWR
(E)6" CHWR
4"
6"
6"
6"
(E)6" CHWR
417 GPM 417 GPM 389 GPM 417 GPM417 GPM
(E)2" CHWR
NEW ISOLATION VALVE WITH
ELECTRIC ACTUATION, CONNECT TO
EXISTING CONTROL SYSTEM, TYP.
CH-2
C W
S
C W
R
250 TONS
CONDENSER WATER: 753 GPM
CHILLED WATER: 599 GPM
6"
EXISTING
CH-3
(E )C
W S(E
)C W
R
250 TONS
(E)6"CHWS
6"
CH-1
C W
S
C W
R
EXISTING
CONCRETE PAD,
TYP.
250 TONS
(STANDBY)
6"
(E)6"CHWR
3/4"
(E)6"CHWRV-CH-2CH
V-CH-3CH
V-CH-1CH
V-CH-2C
V-CH-3C
V-CH-1C
(E)INCOMING
DOMESTIC COLD
WATER SUPPLY
(E)1-1/2" DCW TO
CHILLED WATER LOOP
CHILLED WATER MAKEUP CONNECTION DIAGRAM
BFP-1
PRV-1
1-1/4" AIR GAP & DRAIN TO
NEAREST EXISTING FLOOR DRAIN
(E)3/4" TO
EXPANSION TANK
(E)BYPASS
CH-2 CH-1
AS-1
CONDENSER WATER: 753 GPM
CHILLED WATER: 599 GPM
CONDENSER WATER: 753 GPM
CHILLED WATER: 599 GPM
SEE "CHILLER PIPING"
DETAIL
SEE "CHILLER PIPING"
DETAIL
2/20/2023
1 2 3 4 5 6
A
B
C
D
E
PROJECT NUMBER:
DESIGNED: MODELED: CHECKED:
DATE:
DRAWING TITLE:
DRAWING NO.:
1 2 3 4 5 6
Gannett Fleming, Inc.
10200 Grand Central Ave.
Suite 310 Owings Mills • MD • 21117 t 410 • 907 • 2710
L o c a l F ile www.gannettfleming.com
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED
PROFESSIONAL ARCHITECT OR
ENGINEER UNDER THE LAWS OF
THE STATE OF MARYLAND,
LICENSE NO.
EXPIRATION DATE:
/1
/2
:3
:3
A
M
A u to d e s k D o c s /0
-M D
O T
M
V A
V
M
U L /0
.1
M
V A
-G B
-C h ill e r_ M
E P
R
.r v t
M301
PIPING RISER DIAGRAM
08/11/23
PWHAPTAPT
067196.12
G L E
N B
U R
N
IE
B U
IL
D
IN
G
'A
C H
IL
L E
R R
E N
O V
A T
IO
N
M A
R Y
L A
N D
D E
P A
R T
M E
N T
O F
T R
A N
S P
O R
T A
T
IO
N M
O T
O R
V E
H
IC
L E
A D
M
IN
IS
T
A R
T
IO
N
R
IT
C H
IE
H
IG
H
W A
Y N
E G
L E
N B
U R
N
IE
M
D
BID/PERMIT SUBMISSION
MECHANICAL
SHEET 7 OF 15
C e n tr a l F ile B
IM
M c e n tr a l_
R .r v t
P ro je c t N u m b e r:
.1
27702
06/14/2024
SCALE: NTS
CHILLED WATER & CONDENSER WATER PIPING SCHEMATIC- NEW WORK
F
TEMPERATURE GAUGE (TYP)
PRESSURE GAUGE (TYP)
DRAIN VALVE
(TYP)
EXISTING HOUSEKEEPING PAD.
MODIFY TO ACCOMMODATE NEW CHILLER.
NEOPRENE WAFFLE VIBRATION ISOLATION PADS.
PER RECOMMENDATION OF CHILLER
MANUFACTURER (TYP)
SEE NOTE 9
CHILLER
VICTAULIC
COUPLING
(TYP)
EVAPORATOR
CONDENSER
SEE NOTE 9
FLOW SWITCH (TYP)
FROM CONDENSER WATER PUMP,
SEE NOTE 10
TO COOLING TOWER,
SEE NOTE 10
TO SYSTEM,
SEE NOTE 10
FROM CHILLED WATER PUMP,
SEE NOTE 10
HIGH PERFORMANCE
BUTTERFLY VALVE
(TYP)
2" REFRIGERANT
VENT PIPING, SEE
NOTE 11
FLOOR
C W
S
C W
R
NOTES:
1. THIS DETAIL IS A GENERAL SCHEMATIC TO SHOW THE CHILLER PIPING, VALVES, GAUGES, ETC. REFER TO FLOOR PLANS FOR ACTUAL
CONNECTIONS, ORIENTATION, AND LAYOUT.
2. REPLACE CHILLED WATER AND CONDENSER WATER SUPPLY AND RETURN PIPE, VALVES, & FITTINGS AS SHOWN ON THE FLOOR PLAN.
GROOVED PIPE AND VICTAULIC COUPLINGS SHALL BE USED.
3. CONNECT CHILLER REFRIGERANT RELIEF VALVES TO NEW REFRIGERANT PURGE PIPE. PROVIDE A PIPING FLEXIBLE CONNECTION CLOSE TO
THE CHILLER. PROVIDE A TEE IN THE DISCHARGE PIPING NEAR THE CHILLER WITH A DRAIN VALVE, NIPPLE AND CAP IN THE BOTTOM OF THE
TEE.
4. ALL PIPING SHALL BE CONFIGURED TO MINIMIZE INTERFERENCE WITH THE SERVICE AND MAINTENANCE OF THE CHILLER.
5. PROVIDE AND INSTALL TEMPERATURE AND PRESSURE GAUGES WITH SNUBBERS.
6. FURNISH AND INSTALL FLOW SWITCHES AS INDICATED ON PLANS UNLESS PROVIDED ON THE CHILLER BY THE MANUFACTURER.
7. FURNISH AND INSTALL SENSORS FOR ALL DATA POINTS NOT INCLUDED BY THE CHILLER MANUFACTURER.
8. UTILIZE SUFFICIENT VICTAULIC PIPE COUPLINGS TO ALLOW REMOVAL OF PIPE AND ACCESSORIES TO PERMIT EVAPORATOR AND CONDENSER
TUBE REMOVAL. ALL OTHER PIPE SHALL BE WELDED.
9. MAINTAIN APPROPRIATE CLEARANCES PER MANUFACTURER'S RECOMMENDATION ON PIPING TO ACCOMMODATE ALL VALVES, FLEX
CONNECTIONS, AND PIPE FITTINGS. PERFORM ADDITIONAL PIPE CUTTING IF REQUIRED.
10. REFER TO SPECIFIC CHILLER PLANT DRAWINGS FOR EXACT PIPE SIZES.
11. SIZE AND INSTALL REFRIGERANT VENT PIPING AT CHILLER PER MANUFACTURER'S REQUIREMENTS.
FLEXIBLE CONNECTION
(TYP)
STRAINER
NOTE 11NOTE 11
2"
NOTE 11
F
C H
W S
C H
W R
(E)2"
STRAINER
CONTROL VALVE
CONTROL VALVE
C F
SFUNNEL FILL
WITH CAP
CHEMICAL TANK
WITH HIGH-
TEMP FILTER
BALANCING
COCK
PUMP
SUCTION
0-200
PSIG
1/2" TEST SAMPLE
OUTLET WITH CAPUNION
TYP.
C F
R
PUMP
DISCHARGE
/4
/4
DRAIN VALVE
WITH CAP
SUPPORT LEGSCONCRETE PAD
NOTES:
1. SEE SCHEDULE/SPECIFICATIONS FOR
CAPACITY AND ACCESSORIES
2. REFER TO FLOOR PLANS FOR LOCATION
BALL VALVE
CHECK VALVE
GAUGE WITH COCK
PROVIDE BASE PLATES AND
ANCHOR TO CONCRETE PAD
PRESSURE
GAUGE
E X
P A
N S
IO
N
T A
N K
PRESSURIZED
EXPANSION TANK
(BLADDER TYPE)
PRE-CHARGING
AIR CONNECTION
LOCK VALVE OPEN AND
REMOVE HANDLE
TO CHWR, SEE FLOOR
PLANS FOR SIZING
UNION
DRAIN VALVE
WITH 3/4" NPT HOSE
CONNECTION
CONCRETE EQUIPMENT PAD,
SEE FLOOR PLANS FOR SIZING,
SEE "EQUIPMENT CONCRETE PAD DETAIL" ON S001
AIR VENT
SHIELD LENGTH
4" OR
SMALLER
8"-24"
5"-6"
PIPE DIA.
12"
24"
18"
PIPE SHIELD DIMENSIONS
GALVANIZED PROTECTION
SHIELD-18 GA.,LENGTH PER
TABLE WHEN PIPING IS
INSULATED
NYLON INSERT
LOCKNUTS (TYPICAL)
GALVANIZED STEEL ALL THREADED ROD
PIPE
PIPE INSULATION
RIGID INSULATION
INSERT, EXTEND 2"
BEYOND SHIELD
NYLON INSERT
LOCKNUTS (TYPICAL)
AIR SEPARATOR
AUTOMATIC AIR VENT
1-1/2" MAKE-UP WATER
GATE VALVE
HIGH PERFORMANCE
BUTTERFLY VALVE, TYP
CHILLED WATER
RETURN
CHWR TO EXPANSION TANK, SEE
FLOOR PLANS FOR SIZING
LOCKING NUT
(TYP)
STAND (TYP)
BOLT PIPE ROLLER
TO CHANNEL (TYP)
SUPPORT NUT
(TYP)
6" STEEL CHANNEL
MAX SPACING 2'-0" OC
INSULATION
(NOT VAPOR BARRIER)
UNINSULATED PIPE
PIPE
VIBRATION ISOLATOR, TYPICAL
(WHERE APPLICABLE REFER TO
SPECIFICATIONS)
HANGER ROD
(TYP)
PIPE SADDLE, MIN
12" LENGTH
ROLLER (TYP)
WELD
PIPE SHIELD TO
PREVENT PIPE WEAR,
STRAPPED TO PIPE
1-1/2" MAKE-UP WATER
CONNECTION TO
HVAC EQUIPMENT
BACKFLOW PREVENTER INSTALLED 12" TO
60" ABOVE FINISHED FLOOR. (WATTS909LF)
CONNECT NEW CW CONNECTION TO
EXISTING CW PIPING
WATER REGULATING VALVE
(WATTS MODEL LF2235) SET
FOR 35 PSI
ROUTE TO NEAREST FLOOR
DRAIN, END 2" ABOVE FOR AIR
GAP
PROVIDE FUNNEL DRAIN
FITTING
2/20/2023
1 2 3 4 5 6
A
B
C
D
E
PROJECT NUMBER:
DESIGNED: MODELED: CHECKED:
DATE:
DRAWING TITLE:
DRAWING NO.:
1 2 3 4 5 6
Gannett Fleming, Inc.
10200 Grand Central Ave.
Suite 310 Owings Mills • MD • 21117 t 410 • 907 • 2710
L o c a l F ile www.gannettfleming.com
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED
PROFESSIONAL ARCHITECT OR
ENGINEER UNDER THE LAWS OF
THE STATE OF MARYLAND,
LICENSE NO.
EXPIRATION DATE:
/1
/2
:3
:3
A
M
A u to d e s k D o c s /0
-M D
O T
M
V A
V
M
U L /0
.1
M
V A
-G B
-C h ill e r_ M
E P
R
.r v t
M501
DETAILS
08/11/23
PWHAPTJMJ
067196.12
G L E
N B
U R
N
IE
B U
IL
D
IN
G
'A
C H
IL
L E
R R
E N
O V
A T
IO
N
M A
R Y
L A
N D
D E
P A
R T
M E
N T
O F
T R
A N
S P
O R
T A
T
IO
N M
O T
O R
V E
H
IC
L E
A D
M
IN
IS
T
A R
T
IO
N
R
IT
C H
IE
H
IG
H
W A
Y N
E G
L E
N B
U R
N
IE
M
D
BID/PERMIT SUBMISSION
MECHANICAL
SHEET 8 OF 15
C e n tr a l F ile B
IM
M c e n tr a l_
R .r v t
P ro je c t N u m b e r:
.1
27702
06/14/2024
SCALE: NTS
CHILLER PIPING
SCALE: NTS
BY-PASS CHEMICAL SHOT FEEDER
SCALE: NTS
VERTICAL EXPANSION TANK PIPING
SCALE: NTS
CLEVIS PIPE HANGER
SCALE: NTS
AIR SEPARATOR
SCALE: NTS
LARGER DIAMETER PIPING ROLLER HANGER
SCALE: NTS
MAKE-UP WATER CONNECTION
CONTROL VALVE SCHEDULE
MARK CHILLER SERVED PIPE SERVED SIZE (IN.) MODULATION POWER
V-CH-1CH CH-1 CHILLED WATER 6" OPEN / CLOSE NOTE 1
CONDENSER WATERV-CH-1C
V-CH-2CH
V-CH-2C
V-CH-3CH
V-CH-3C
CH-1
CH-2
CH-2
CH-3
CH-3
CHILLED WATER
CONDENSER WATER
CHILLED WATER
CONDENSER WATER
6"
6"
6"
6"
6"
OPEN / CLOSE
OPEN / CLOSE
OPEN / CLOSE
OPEN / CLOSE
OPEN / CLOSE
NOTE 1
NOTE 1
NOTE 1
NOTE 1
NOTE 1
1. FURNISH 120V OR 24 VDC POWER TO CONTROL THE ACTUATOR. CONTROL VENDOR TO SELECT POWER AND
PROVIDE WIRING AND CONDUIT TO POWER AND CONTROL THE VALVE.
2/20/2023
1 2 3 4 5 6
A
B
C
D
E
PROJECT NUMBER:
DESIGNED: MODELED: CHECKED:
DATE:
DRAWING TITLE:
DRAWING NO.:
1 2 3 4 5 6
Gannett Fleming, Inc.
10200 Grand Central Ave.
Suite 310 Owings Mills • MD • 21117 t 410 • 907 • 2710
L o c a l F ile www.gannettfleming.com
PROFESSIONAL CERTIFICATION.
I HEREBY CERTIFY THAT THESE
DOCUMENTS WERE PREPARED
OR APPROVED BY ME, AND
THAT I AM A DULY LICENSED
PROFESSIONAL ARCHITECT OR
ENGINEER UNDER THE LAWS OF
THE STATE OF MARYLAND,
LICENSE NO.
EXPIRATION DATE:
/1
/2
:3
:3
A
M
A u to d e s k D o c s /0
-M D
O T
M
V A
V
M
U L /0
.1
M
V A
-G B
-C h ill e r_ M
E P
R
.r v t
M601
SCHEDULES
08/11/23
PWHAPTJMJ
067196.12
G L E
N B
U R
N
IE
B U
IL
D
IN
G
'A
C H
IL
L E
R R
E N
O V
A T
IO
N
M A
R Y
L A
N D
D E
P A
R T
M E
N T
O F
T R
A N
S P
O R
T A
T
IO
N M
O T
O R
V E
H
IC
L E
A D
M
IN
IS
T
A R
T
IO
N
R
IT
C H
IE
H
IG
H
W A
Y N
E G
L E
N B
U R
N
IE
M
D
BID/PERMIT SUBMISSION
MECHANICAL
SHEET 9 OF 15
C e n tr a l F ile B
IM
M c e n tr a l_
R .r v t
P ro je c t N u m b e r:
.1
27702
06/14/2024
WATER COOLED CHILLER SCHEDULE
MARK
CAPACITY
(TONS)
REFRIGERANT
TYPE
FLUID
TYPE
EVAPORATOR CONDENSER COMPRESSORS/CIRCUITS ELECTRICAL DATA
NPLV
(KW/TON)
SPL RATING
OPERATING
WEIGHT
(LBS)
BASIS OF DESIGN
REMARKS
EWT
(°F)
LWT
(°F)
FLOW
RATE
(GPM)
WPD
(FT WG)
FOULING
FACTOR EWT (°F)
LWT
(°F)
FLOW
RATE
(GPM)
WPD
(FT WG)
FOULING
FACTOR QTY TYPE
KW
(EA) V Ø FLA MCA MOCP
SPL
(dB)
SPL
DISTANCE MANUFACTURER MODEL
(E)CH-3 250 R-123 WATER 54 44 600.0 0.0 85 95 0.0 CENTRIFUGAL 0 460 3 0.0 0.0 0.0 0 0 0 EXISTING TO REMAIN
CH-1 250 R-134A WATER 54 44 599.0 17.2 0.00010 85 95 753.4 14.6 0.000250 1 SCREW 141 460 3 213.0 253.0 450.0 0.3707 84 3'-0" 15366 CARRIER 23RVA4A4NPJR350
CH-2 250 R-134A WATER 54 44 599.0 17.2 0.00010 85 95 753.4 14.6 0.000250 1 SCREW 141 460 3 213.0 253.0 450.0 0.3707 84 3'-0" 15366 CARRIER 23RVA4A4NPJR350
EXISTING COOLING TOWER SCHEDULE (REFERENCE ONLY)
MARK
TOTAL
COOLING
CAPACITY
(TONS) FAN QTY
FAN
HP
EWT
(°F)
LWT
(°F)
FLOW
RATE
(GPM)
WPD
(FT WG)
AMBIENT
TEMP WB
(°F)
ELECTRICAL DATA
APPROX.
OPERATING
WEIGHT (LBS)
BASIS OF DESIGN
REMARKSV Ø FLA MCA MOCP SCCR MANUFACTURER MODEL
(E)CT-1 625 2 0 95 85 °F 1500 0.0 95 460 3 0.0 0.0 0.0 0 kA - - EXISTING TO REMAIN
EXPANSION TANK SCHEDULE
MARK
TOTAL VOLUME
(GAL)
ACCEPTANCE
VOLUME (GAL)
FILL
PRESSURE
(PSI)
DIAMETER
(IN)
HEIGHT
(IN) LOCATION
APPROX. MAX.
OPERATING WEIGHT
(LBS)
BASIS OF DESIGN
REMARKSMANUFACTURER MODEL
ET-CHW 34 19 12 20" 38 PENTHOUSE 200 TACO CBX130-125
EXISTING PUMP SCHEDULE (REFERENCE ONLY)
MARK TYPE SERVICE
FLOW
(GPM)
HEAD
(FT WG)
FLUID
TEMP (°F) FLUID TYPE
MOTOR
HP RPM
ELECTRICAL
DATA
OPERATING
WEIGHT
(LBS)
BASIS OF DESIGN
REMARKSV Ø MANUFACTURER MODEL
(E)CHWP-1 CENTRIFUGAL (E)AHU-1 417 45 54 CHILLED WATER 7.5 1750 460 3 - - - 1
(E)CHWP-2 CENTRIFUGAL (E)AHU-2 389 45 54 CHILLED WATER 7.5 1750 460 3 - - - 1
(E)CHWP-3 CENTRIFUGAL (E)AHU-3 417 45 54 CHILLED WATER 7.5 1750 460 3 - - - 1
(E)CHWP-4 CENTRIFUGAL (E)AHU-5 417 45 54 CHILLED WATER 7.5 1750 460 3 - - - 1
(E)CHWP-5 CENTRIFUGAL STANDBY 417 45 54 CHILLED WATER 7.5 1750 460 3 - - - 1
(E)CWP-1 CENTRIFUGAL (E)CT-1 1500 50 95 CONDENSING WATER 30 1770 460 3 - - - 1
(E)CWP-2 CENTRIFUGAL (E)CT-1 1500 50 95 CONDENSING WATER 30 1770 460 3 - - - 1
AIR SEPARATOR SCHEDULE
MARK
MAX
FLOW
(GPM)
CONNECTION
SIZE (IN) STRAINER
MAX WPD
(FT/H20)
OPERATING
WEIGHT (LBS)
BASIS OF DESIGN
REMARKSMANUFACTURER MODEL
AS-1 700 6" STAINLESS STEEL MESH (1/4" x 3/4") 0.8 580 BELL AND GOSSETT R-6F 1
AS-2 700 6" STAINLESS STEEL MESH (1/4" x 3/4") 0.8 580 BELL AND GOSSETT R-6F 1
AS-3 700 6" STAINLESS STEEL MESH (1/4" x 3/4") 0.8 580 BELL AND GOSSETT R-6F 1
AS-4 300 4" STAINLESS STEEL MESH (1/4" x 3/4") 0.8 280 BELL AND GOSSETT R-4F 1
CHEMICAL SHOT FEEDER SCHEDULE
MARK
TANK
VOL.
(GAL)
MAX
PRESSURE
(PSI)
MAX TEMP.
(F)
APPROX.
OPERATING
WEIGHT (LBS)
BASIS OF DESIGN
REMARKSMANUFACTURER MODEL
CSF-1 10.0 300 200 120 NEPTUNE DBF-10HP
CSF-2 10.0 300 200 120 NEPTUNE DBF-10HP
PLUMBING BACKFLOW PREVENTER SCHEDULE
MARK SERVICE
FLOW
(GPM)
SIZE
(IN)
VELOCITY
(FPS)
MAX PD
(PSI) TYPE
APPROX.
OPERATING
WEIGHT (LBS)
BASIS OF DESIGN
REMARKSMANUFACTURER MODEL
BFP-1 CHILLED WATER LOOP 30 1 1/4" 6 15.00 REDUCED PRESSURE ZONE ASSEMBLY 16 WATTS LF909 1, 2
1. REDUCED PRESSURE ZONE ASSEMBLY INCLUDES TWO (2) INLINE INDEPENDENT CHECK VALVES WITH AN INTERMEDIATE RELIEF VALVE AND SHALL COMPLY WITH NSF 61 AND ASSE 1013.
2. PROVIDE MANUFACTURER'S AIR GAP DEVICE.
1. PROVIDE MANUFACTURER'S AUTOMATIC AIR VENT ACCESSORY.
PRESSURE REDUCING VALVE SCHEDULE
MARK SERVICE
FLOW
(GPM)
SIZE
(IN)
VELOCITY
(FPS)
MAX PD
(PSI) TYPE
APPROX.
OPERATING
WEIGHT (LBS)
BASIS OF DESIGN
REMARKS
MANUFACTU
RER MODEL
PRV-1 CHILLED WATER LOOP 30 1 1/2" 3 5.00 PRESSURE REDUCING VALVE 14 WATTS LF2235
1. EXISTING TO REMAIN, BALANCE TO INDICATED FLOW RATE.
EXISTING
CH-3
CH-2
CH-1
CONTROL
PANEL
CONTROL
PANEL
CONTROL
PANEL
V-CH-3CH
V-CH-1CH
CHWS
CHWR
CHWS
CHWS
CHWR
CHWR
CWS
CWS
CWS
CWR
CWR
CWR
(E)CHWP-5
(E)CHWP-3
(E)CHWP-1
(E)CHWP-2
(E)CHWP-4
CHWR
CHWR
CHWR
CHWR
V-CH-1C
V-CH-3C
CHWS
(E)CWP-2
(E)CWP-1
(E)COOLING
TOWER
FSFM T
T
FSFM
T
T
FM T
T
V-CH-2CH
V-CH-2C
FS
FS
FS
FS
MOTOR VEHICLE ADMINISTRATION EMCS SEQUENCES OF OPERATION
FOR THE HEADQUARTERS BUILDING – CHILLER REPLACEMENT
1. The MVA Headquarters building in Glen Burnie MD has an existing building automation system (BAS). The existing BAS is Schneider Electric Eco-Struxture 2.0 Installed in 2019. This project is to replace two of three existing water cooled chillers. Existing pumping systems to remain as is. The existing control systems will be modified as required to provide new control functions. Control functions not affected by these upgrades do not need to be modified.
2. New controls will be the latest version of Schneider Electric Eco-Struxture compatible with the existing system. Contact for current control contractor is:
John Beahm, Sales Operation Manager, Control Sources LLC. Cell: 410.365.6009
Fax: 410.574.6300 Email: jbeahm@controlsources.biz
1. Chilled Water Plant Operating Modes
a. The EMCS shall enable the chilled water plant when the outside air dry-bulb temperature is above 48°F (ADJ) for 30 minutes
(ADJ), and there is a request for cooling.
b. A request for cooling shall be initiated in each AHU when the CHW Valve is 100% open (ADJ) for ten minutes (ADJ), and the discharge air is 2°F (ADJ) above set point for ten minutes (ADJ).
c. A request for cooling shall be cleared when the CHW Valve is 0% open (ADJ) for ten (ADJ) minutes or when the AHU is de-energized.
d. The EMCS shall disable the chilled water plant when the outside air dry-bulb temperature is below 45°F (ADJ) for 60 minutes
(ADJ), or there are no requests for cooling for 60 minutes (ADJ).
e. The OWS shall include provisions to override automatic operation and manually enable or disable chilled water plant operating modes based on a single graphic command.
2. Chiller Lead / Lag Designation Modes
a. The EMCS shall use lead / lag chiller designations to equalize runtime during staging. Chillers shall not be started and stopped for the sole purpose of maintaining equalized runtime.
b. If a chiller failure is detected, that chiller will be removed from the staging sequence until the failure is manually reset at the OWS.
c. The facility operator shall have the provisions to make one or more chillers unavailable to staging sequence for purposes of performing routine maintenance.
d. The OWS graphics shall clearly indicate the calculated staging sequence, as well as any chillers that are either unavailable or need to be reset.
3. Chilled Water Supply Temperature Set Point Modes
a. Chilled water temperature set point shall be reset as follows:
Outdoor Air Temperature Dry-Bulb Chilled Water Set Point
50°F (ADJ) 49°F (ADJ)
85°F (ADJ) 44°F (ADJ)
b. All chillers shall operate at the same chilled water temperature set point, and all chilled water temperatures listed are leaving or supply water temperatures.
4. Chiller Control Modes
a. The EMCS shall enable and disable chillers as required by the chiller staging sequence.
b. The EMCS shall be connected to each respective chiller interface and monitor all chiller operating parameters which are currently connected to the DDC systems in the Headquarters Building. All points will be displayed on the OWS graphics.
c. All factory-furnished interlocks, time delays, and load controls included with the chiller control panel to maintain the integrity of the chiller shall remain intact.
d. The EMCS shall monitor and confirm chiller status through the local chiller controller.
e. If a chiller failure is detected, the EMCS shall initiate an alarm at the OWS,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .