Attachment_B_-__BID_FORM.xlsx
XLSX spreadsheet 18 KB Posted
- Attached to
- Chiller Replacement, Glen Burnie, MVA
- Solicitation number
- BPM047469
- Issued by
- Anne Arundel County, Maryland
About this file
This is a bid form attachment for the Maryland Motor Vehicle Administration (MVA) Solicitation No. V-HQ-25025-C for a chiller replacement project in Glen Burnie. The document outlines the submission requirements for bidders to provide their fully-loaded fixed price for the chiller replacement services. The form requires bidders to include their firm information, authorized representative signature, company address, FEIN, and eMMA number.
The pricing terms specify that bidders must submit a fully-loaded fixed price that includes all direct and indirect costs and profit for the services. The price must encompass all activities required to fulfill the IFB requirements, with no allowance for price adjustments for any direct or indirect expenses incurred. The bid form instructions emphasize that all unit prices and calculations must be clearly entered in dollars and cents, rounded to the nearest cent, and cannot be contingent on any other factors or conditions. Any goods or services proposed at no cost must be clearly marked with $0.00, and if option years are included, pricing must be submitted for each option year.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Bid Form
| ATTACHMENT B - BID FORM |
| STATE OF MARYLAND |
MARYLAND MOTOR VEHICLE ADMINISTRATION SOLICITATION NO: V-HQ-25025-C
Bidders must insert their fully-loaded Fixed Price. The fully-loaded Fixed Price shall consist of all direct and indirect costs and profit for the services.
Payment will be made based upon the successful Bidder’s Fully Loaded Fixed price. The Bidder's Fully Loaded Fixed Price shall take into consideration all activity associated with fulfilling the requirements of this IFB; no price adjustments will be allowed for any direct or indirect expenses incurred by the successful Bidder in performing the services requested in the IFB.
| SERVICES | |
| MVA Chiller Replacement, Glen Burnie. |
TOTAL FULLY LOADED FIXED AMOUNT = $
Bid Form Submitted by (Firm): ______________________________________________________
Submitted by: ______________________________________________________
Signature of Authorized Representative: ______________________________________________________
Title: _______________________________________________________
Company Address: _______________________________________________________
FEIN: _______________________________________________________
eMMA No.: _______________________________________________________
Date:___________________________________________________________
Bid Form-Instructions
B-1 Bid Instructions In order to assist each Bidder in the preparation of its Bid and to comply with the requirements of this solicitation, Bid Instructions and a Bid Form have been prepared. Each Bidder shall submit its Bid on the Bid Form in accordance with the instructions on the Bid Form and as specified herein. Do not alter the Bid Form or the Bid may be determined to be not responsive. The Bid Form is to be signed and dated, where requested, by an individual who is authorized to bind the Bidder to the prices entered on the Bid Form.
The Bid Form is used to calculate the Bidder’s TOTAL BID PRICE. Follow these instructions carefully when completing your Bid Form:
A)All Unit and Extended Prices must be clearly entered in dollars and cents, e.g., $24.15. Make your decimal points clear and distinct.
B)All Unit Prices must be the actual price per unit the State will pay for the specific item or service identified in this IFB and may not be contingent on any other factor or condition in any manner.
C)All calculations shall be rounded to the nearest cent, e.g., .344 shall be .34 and .345 shall be .35.
D)Any goods or services required through this IFB and proposed by the vendor at No Cost to the State must be clearly entered in the Unit Price, if appropriate, and Extended Price with $0.00.
E)Every blank in every Bid Form shall be filled in. Any changes or corrections made to the Bid Form by the Bidder prior to submission shall be initialed and dated.
F)Except as instructed on the Bid Form, nothing shall be entered on or attached to the Bid Form that alters or proposes conditions or contingencies on the prices. Alterations and/or conditions may render the Bid not responsive.
G) It is imperative that the prices included on the Bid Form have been entered correctly and calculated accurately by the Bidder and that the respective total prices agree with the entries on the Bid Form. Any incorrect entries or inaccurate calculations by the Bidder will be treated as provided in COMAR 21.05.02.12, and may cause the Bid to be rejected.
H) If option years are included, Bidders must submit pricing for each option year. Any option to renew will be exercised at the sole discretion of the State and comply with all terms and conditions in force at the time the option is exercised. If exercised, the option period shall be for a period identified in the IFB at the prices entered in the Bid Form.
I)All Bid prices entered below are to be fully loaded prices that include all costs/expenses associated with the provision of services as required by the IFB. The Bid price shall include, but is not limited to, all: labor, profit/overhead, general operating, administrative, and all other expenses and costs necessary to perform the work set forth in the solicitation. No other amounts will be paid to the Contractor. If labor rates are requested, those amounts shall be fully-loaded rates; no overtime amounts will be paid.
J) Unless indicated elsewhere in the IFB, sample amounts used for calculations on the Bid Form are typically estimates for evaluation purposes only. Unless stated otherwise in the IFB, the MVA does not guarantee a minimum or maximum number of units or usage in the performance of the Contract.
K) Failure to adhere to any of these instructions may result in the Bid being determined not responsive.
File details come from the government source that posted it. Updated .