Attachment R - Excavation Permit.pdf

PDF 686 KB Posted

Attached to
Y1DZ--600-17-108 Site Prep for SPS Sterilizers and Equipment, B126, 7th Floor
Solicitation number
36C26222B0009_1
Issued by

About this file

This document includes an excavation permit and related federal contract solicitation. The excavation permit outlines safety requirements for any excavation work over two feet in depth to be conducted at the VA Long Beach Healthcare System located in Long Beach, California. It requires contractors to identify underground utilities in the area, classify soil types, and implement protective measures. The related federal contract solicitation seeks bids for site preparation work for new sterilizers and equipment in Building 126 at the VA Long Beach Healthcare System. The work includes general construction, alterations, mechanical and electrical work, necessary demolition, and other items to complete the project. All work must be done in accordance with specifications, drawings, and applicable codes. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22 is the contracting agency.

View the file

Other files

File Type Posted
36C26222B0009_1 0006.pdf PDF
36C26222B0009_1 0005.pdf PDF
36C26222B0009_1 0004 V2.pdf PDF
S05 RFI Question Answer-Amendment 0004.pdf PDF
36C26222B0009_1 0003.pdf PDF
Amendment 3 RFIs_SOW_Specifications.pdf PDF
SPS Phasing-DRAFT.pdf PDF
Barrier-SalesBrochure.pdf PDF
barrier-STARC-Full-Product-Catalog-web.pdf PDF
8-24-2022 RFI Question Answer.pdf PDF
36C26222B0009_1 0002.pdf PDF
36C26222B0009_1 0001.pdf PDF
8-12-2022 Pre-bid conference sign in.pdf PDF
Attachment I - Contractor Laydown Areas.pdf PDF
Attachment D - Drawings - Design Set Combined - June 8 2021.pdf PDF
Attachment M - VA Long Beach ACM Survey Report B126.pdf PDF
Attachment E - IMS SOP 07-013 Cable Installation Labeling and Testing.pdf PDF
Attachment H - Laydown Areas Request Form.docx DOCX document
Attachment L - VALBHS Utility and Service Impact Process.pdf PDF
Attachment C - Specifications - Final.pdf PDF
Attachment P - Safety Lockout Tagout of Equipment Electric Shop.pdf PDF
36C26222B0009_1.pdf PDF
Attachment A - Wage Determination Apr 28 2022.pdf PDF
Attachment O - Utility and Service Impact Permit.pdf PDF
Attachment N - VA Electric Shop Electrical Work Permit.pdf PDF
Attachment K - VALBMC Above The Ceiling and Penetration Permit.pdf PDF
Attachment G - ILSM Checklist Permit.pdf PDF
Attachment J - AHA Activity hazard analysis.pdf PDF
Attachment F - ILSM Map of Construction Areas.pdf PDF
Attachment B - SOW CONSTRUCTION June 8 2021.pdf PDF
Attachment S - Electric Work Permit.pdf PDF
Attachment Q - ILSM and Hot Work Permit.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Long Beach Healthcare System ES Form 600-138G-2 EP Revised – N/A

This permit is required per VA Master Specs, Div. 01, Section 01 35 26 Safety Requirements Subtopic 1.18, to be completed prior to digging, drilling or trenching operations and prior to entering excavations and/or trenches. Contractors/VHA employees must obtain written permit from Safety/Engineering personnel for all excavations 2 feet in depth or greater. Permits and daily safety checklist must be present and posted at all excavation worksites. Per Federal Acquisition Regulation (FAR) 32.601, Government expense of correcting defects, reinspection costs and damage costs related to defaults in performance will result in a contractor’s debt and will be due from the contractor under the terms and conditions of the contract. Page 1 of 4

EXCAVATION PERMIT

Section I. Complete by Competent Person prior to digging/drilling and prior to proceeding with entering the excavation

1. Project No.

2. Project title

3. Date:

4. Originated By

5. Phone #

6. Prime Contractor Performing Work

7. Phone #

8. Specific Location:

9. Estimated Dates and Times of Excavation.

Start Date: Start Time: End Date: End Time:

10. Reason for Excavation:

11. Contractors “Competent Person” Print/Sign Below. *

Printed Name: Signature: Date:

*CP must have received 30hr OSHA Construction training as well as formal training in Excavation safety.

12. Excavation Requirements Planning Checklist (check appropriate blocks to determine supplemental approvals)

Yes No

Has review of site drawings been executed and proximity of utilities been determined? (Utility locations must have proper ground markings once they are identified). If so, which qualified utility finding service was used?

As-built survey GPRS Pot Holding Other________________________

Are soil samples required to determine soil contamination?

Has coordination with COR/PM been established?

Is soil or concrete removal to an offsite location necessary?

Has the proposed worksite and workplan been evaluated and deemed eligible per historic preservation standards and guidelines? (State Historic Preservation Office (SHPO), Native American Graves Protection and Repatriation Act (NAGPRA), Etc.)

13. List Facilities, Services, Structures, and Utilities Affected by the Excavation.

14. Map of planned excavation area and any relevant site drawings included.

Approvals

15. Contractor Construction Supervision Signature: Date:

16. Project Engineer/COR Signature: Date:

17. VA Safety Signature: Date:

Note: Return all sections of this permit to Project Engineer and copy to VA Safety Office at completion of job.

This permit is required per VA Master Specs, Div. 01, Section 01 35 26 Safety Requirements Subtopic 1.18, to be completed prior to digging, drilling or trenching operations and prior to entering excavations and/or trenches. Contractors/VHA employees must obtain written permit from Safety/Engineering personnel for all excavations 2 feet in depth or greater. Permits and daily safety checklist must be present and posted at all excavation worksites. Per Federal Acquisition Regulation (FAR) 32.601, Government expense of correcting defects, reinspection costs and damage costs related to defaults in performance will result in a contractor’s debt and will be due from the contractor under the terms and conditions of the contract. Page 2 of 4

EXCAVATION PERMIT

Section II Part A. Completed by the Competent Person prior to personnel entering an excavation greater than 5 feet in depth

Name of Competent Person: Date:

M E

T

N O

T M

E T

N /A

REQUIREMENT

1. Are the estimated locations of utility installations, such as sewer, telephone, fuel, electric, water lines, or any other underground installations that reasonably may be expected to be encountered during excavation work determined prior to opening an excavation? [OSHA 29 CFR 1926.651(b)(1)]

2. Are utility companies contacted within established or customary local response times, advised of the proposed work, and asked to establish the location of utility underground installations up to their own meters prior to the start of actual excavation? [OSHA 29 CFR 1926.651(b)(2)]

3. On VHA property, is the proposed dig site being marked, “as built” drawings reviewed, and visual indicators (manholes, valves, meters, permanent markers, etc.) of the utilities being utilized to establish the location of utility underground installations by in-house VHA personnel or a contracted private locator service? [OSHA 29 CFR 1926.651(b)(2)]

4. On VHA property, are locations of utility underground installations being marked and maintained by use of stakes, paint, flags, or other clearly identifiable materials to show the field location of underground facilities, in accordance with the current color code standard of the American Public Works Association (APWA) Uniform Color Code.? [OSHA 29 CFR 1926.651(b)(2)]

5. If utility companies or the VHA cannot locate underground utility installations or cannot establish the exact location of these installations, are excavation contractors proceeding with caution and using detection equipment or other acceptable means to locate utility installations (careful hand digging, pot-holing and vacuum excavation, hand tools that use air or water under pressure, exploratory bar, or other)? [OSHA 29 CFR 1926.651(b)(2)]

6. When excavation operations approach the estimated location (within 2 feet) of underground installations, are the exact location of the installations determined by safe and acceptable means (careful hand digging, pot-holing and vacuum excavation, hand tools that use air or water under pressure, exploratory bar, or other)? [OSHA 29 CFR 1926.651(b)(3)]

7. While the excavation is open, are underground installations protected, supported or removed (Lockout/Tagout, supports built, etc…) as necessary to safeguard employees? [OSHA 29 CFR 1926.651(b)(4)]

8. Are Activity Hazard Analyses and excavation permits being completed prior to opening excavations? (FAR 52.236-13, Accident Prevention; VA Master Specs, Div. 01, Section 01 35 26 Safety Requirements, Subtopic 1.5 & 1.18)

9. Where workers enter an excavation greater than 5 feet in depth, are soils being classified using a pocket penetrometer in accordance with OSHA classification system (Solid Rock, Type A, Type B, or Type C)? [OSHA Directive CPL 02-00-87; VHA Directive 2011-036, Subpar. 4(l)(7)] Note: If using an excavation protective system of sloping or benching, then the soil classification cannot be Solid Rock or Type A. Thus, the angle of repose cannot be steeper than 1 to 1 (45 degrees) (OSHA 29 CFR 1926.652 & associated Appendix A; VA Master Specs, Div. 01, Section 01 35 26 Safety Requirements, Subtopic 1.18, Par. C)? Soil Type:________________

10. Where workers enter an excavation greater than 5 feet in depth, are protective systems being designed in accordance with 29 CFR 1926, Subpart P, Appendices B to F or designed by Professional Engineer [OSHA 29 CFR 1926.652(a)] Note: excavations in excess of 20 feet in depth must be designed by PE and sloping or benching systems cannot have an angle of repose steeper than 1 to 1 (45 degrees) as provided above.

Competent Person Signature:

This permit is required per VA Master Specs, Div. 01, Section 01 35 26 Safety Requirements Subtopic 1.18, to be completed prior to digging, drilling or trenching operations and prior to entering excavations and/or trenches. Contractors/VHA employees must obtain written permit from Safety/Engineering personnel for all excavations 2 feet in depth or greater. Permits and daily safety checklist must be present and posted at all excavation worksites. Per Federal Acquisition Regulation (FAR) 32.601, Government expense of correcting defects, reinspection costs and damage costs related to defaults in performance will result in a contractor’s debt and will be due from the contractor under the terms and conditions of the contract. Page 3 of 4

EXCAVATION PERMIT

Section II Part B. Completed by the Competent Person prior to personnel entering an excavation greater than 5 feet in depth

EXCAVATION/TRENCH SAFETY CHECKLIST DAILY INSPECTION

Inspection of the excavation/trench, including adjacent areas and protective systems, are conducted daily (at a minimum) by a Competent Person. The Competent Person inspects for evidence of situations that could result in possible cave-ins, indications of protective system failures, indications of a hazardous atmosphere, and other hazardous conditions.

Inspections are conducted after every rainstorm and any other potential hazard-increasing occurrence.

Sloping and benching comply with OSHA 1926.651 and 1926 Subpart P App B.

The following items (as applicable) are verified and the results documented in the Excavation Permit Section II Part C:

The excavation permit is valid, signed, and dated. Excavation began within 60 days of facility/system owner’s signature or by the permit expiration date.

Scan document is valid.

All crew members have received a daily briefing on the work to be accomplished, the excavation/trench’s special requirements, and excavation hazards.

The area surrounding the excavation/trench has been properly protected and barricaded.

Ensure VHA and applicable utility company has been notified 10 days before excavation and every 10 days during excavation (as/if applicable).

Utilities have been located, protected, and marked per APWA Uniform Color Code.

The excavation (if 5 feet [1.5 meters] or deeper) is properly sloped or shored.

Foundations, structures, and appurtenances, for example, are supported or underpinned.

Protective systems being used comply with the manufacturer’s instructions or engineering designs.

Sloping or protective systems have been checked for evidence of failure (such as soil distress, structural member damage, or soil fissures).

A means of egress (such as a stairway, ladder, or ramp) is provided within 25 feet (7.6 meters) of each person in the excavation/trench.

Walkways or bridges with standard handrails are provided where personnel are required to cross the excavation/trench.

Spoil piles have been placed at least 2 feet (0.6 meter) away from the edge of the excavation/trench and safe access provided within 25 feet of the workers.

A determination has been made whether or not to classify the excavation/trench as a confined space.

Note: If the excavation/trench is classified as a confined space, ensure monitoring, as required on the confined space entry permit (VALB Engineering SOP 300.4-Safety, Confined Space Entry), is performed before employees are allowed to enter.

The excavation/trench is safe for employees to enter.

Pre-task planning documents have been updated, as required, to reflect changes in work scope, site conditions, or hazard change. Planning documents have been discussed with, and signed by, affected employees.

Corrective measures have been taken to eliminate existing or predictable hazards.

This permit is required per VA Master Specs, Div. 01, Section 01 35 26 Safety Requirements Subtopic 1.18, to be completed prior to digging, drilling or trenching operations and prior to entering excavations and/or trenches. Contractors/VHA employees must obtain written permit from Safety/Engineering personnel for all excavations 2 feet in depth or greater. Permits and daily safety checklist must be present and posted at all excavation worksites. Per Federal Acquisition Regulation (FAR) 32.601, Government expense of correcting defects, reinspection costs and damage costs related to defaults in performance will result in a contractor’s debt and will be due from the contractor under the terms and conditions of the contract Page 4 of 4.

EXCAVATION PERMIT

Section II Part C. Completed by the Competent Person prior to personnel entering an excavation greater than 5 feet in depth.

EXCAVATION AND TRENCHING DAILY INSPECTION LOG

The applicable items listed on Section II Part B of this Excavation Permit were verified.

Deficiencies observed are noted with the corresponding action that was taken to eliminate the hazard.

Date Time Condition

Comments/Deficiencies Noted Corrective Action Taken Inspected By

(Competent Person) Accept Not Accept

Note: Make copies of this page as needed.

4 Originated By 5 Phone:
6 Prime Contractor Performing Work 7 Phone:
8 Specific Location:
10 Reason for Excavation:
proper ground markings once they are identified If so which qualified utility finding service was used: Off
Asbuilt survey: Off
GPRS: Off
Pot Holding: Off
Other:
13 List Facilities Services Structures and Utilities Affected by the Excavation:
Safety Requirements Subtopic 118 Par C Soil Type:
3 Date:
2 Project title:
1 Project No:
Originated by:
Prime contractor:
Text2:
Text3:
Text4:
Text5:
Text6:
Text8:
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Text17:
Text18:
Text19:
Check Box18: Off
Text20:
Competent Person:
Check Box22: Off
Check Box25: Off
Check Box28: Off
Check Box31: Off
Check Box34: Off
Check Box37: Off
Check Box40: Off
Check Box43: Off
Check Box46: Off
Check Box49: Off

File details come from the government source that posted it. Updated .