Attachment K - VALBMC Above The Ceiling and Penetration Permit.pdf

PDF 209 KB Posted

Attached to
Y1DZ--600-17-108 Site Prep for SPS Sterilizers and Equipment, B126, 7th Floor
Solicitation number
36C26222B0009_1
Issued by

About this file

This document contains a solicitation for construction services and an above ceiling and penetration permit for the VA Long Beach Healthcare System. The solicitation seeks construction services for site preparation for sterilizers and equipment in Building 126, 7th floor at the VA Long Beach Healthcare System located in Long Beach, California. The scope of work includes general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures, and other items required for completion. All work must be performed according to the solicitation terms, conditions, specifications, drawings, and applicable local and VA building codes. The permit application requires information on the type and location of penetrations and acknowledges responsibility for following OSHA, consensus standards, and VA requirements. Approvals are required from the project engineer, section chief or shop supervisor, and life safety officer.

View the file

Other files

File Type Posted
36C26222B0009_1 0006.pdf PDF
36C26222B0009_1 0005.pdf PDF
36C26222B0009_1 0004 V2.pdf PDF
S05 RFI Question Answer-Amendment 0004.pdf PDF
36C26222B0009_1 0003.pdf PDF
Amendment 3 RFIs_SOW_Specifications.pdf PDF
SPS Phasing-DRAFT.pdf PDF
Barrier-SalesBrochure.pdf PDF
barrier-STARC-Full-Product-Catalog-web.pdf PDF
8-24-2022 RFI Question Answer.pdf PDF
36C26222B0009_1 0002.pdf PDF
36C26222B0009_1 0001.pdf PDF
8-12-2022 Pre-bid conference sign in.pdf PDF
Attachment I - Contractor Laydown Areas.pdf PDF
Attachment R - Excavation Permit.pdf PDF
Attachment D - Drawings - Design Set Combined - June 8 2021.pdf PDF
Attachment M - VA Long Beach ACM Survey Report B126.pdf PDF
Attachment E - IMS SOP 07-013 Cable Installation Labeling and Testing.pdf PDF
Attachment H - Laydown Areas Request Form.docx DOCX document
Attachment L - VALBHS Utility and Service Impact Process.pdf PDF
Attachment C - Specifications - Final.pdf PDF
Attachment P - Safety Lockout Tagout of Equipment Electric Shop.pdf PDF
36C26222B0009_1.pdf PDF
Attachment A - Wage Determination Apr 28 2022.pdf PDF
Attachment O - Utility and Service Impact Permit.pdf PDF
Attachment N - VA Electric Shop Electrical Work Permit.pdf PDF
Attachment G - ILSM Checklist Permit.pdf PDF
Attachment J - AHA Activity hazard analysis.pdf PDF
Attachment F - ILSM Map of Construction Areas.pdf PDF
Attachment B - SOW CONSTRUCTION June 8 2021.pdf PDF
Attachment S - Electric Work Permit.pdf PDF
Attachment Q - ILSM and Hot Work Permit.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA Long Beach Healthcare System (VALBHS)

Above the Ceiling & Penetration Permit This permit requests must be submitted through the Fire & Life Safety PM, or Safety designee; 48 working hours in advance, before the start of any work. For emergency permit requests, call (562)826-8000 or ext. 3153.

Contact: VALBMC FLS PM Page 1 of 2 Form – FLS 5 (562)676-2236 or Ext. 3153 Rev: Sept. 2019 By: MB

Penetration - Life Safety Deficiency / ILSM Considerations

Horizontal or vertical penetrations, in: 1.) existing structure 2.) New construction

Smoke Barriers: YES NO Fire Barriers: YES NO

Will fire sprinklers, fire alarm system/devices be affected?................. YES NO

Will work have PACM (potentially asbestos containing material) exposure? …. YES NO

Other: ___________________________________________________________________________________

Acknowledgments/Approvals (print, sign, date):

General Contractor: ______________________________________________________ Date: __________________

*Acknowledges and is responsible for compliance with OSHA, IBR CONCENSUS STANDARDS and VHA requirement, for all work processes performed at VALBMC; and has read and understood reverse page information this permit.

1. Approved/Disapproved: _______________________________________________ Date: __________________

(Project Engineer: RE/COR)

2. Approved/Disapproved: _______________________________________________ Date: __________________

(Section Chief/Shop Supervisor)

3. Concur/Non-concur: __________________________________________________ Date: __________________

3.a Permit Expiration Date: _______________________________________________________________________

(Life Safety Officer)

Final, completion of work Inspection: ____________________________________________ Date: __________________

(COR)

Requestor: Date of Request: Date of Request:

COR/Requester’s HCG/Shop: Phone#:

Est. start of work – Date: Time: Est. Compl. of work -Date: Time:

Affected Working Area Building(s) #: HCG/Service/Clinic:

Floor(s): Room(s)#: Other:

Immediate Area Affected:

Scope/Description of work to Be performed:

Actual Start, Date/Time of work: / Actual Compl., Date/Time of work: /

Responsible Party for Sealing Penetrations Supervisor’s Name: Company:

Supervisors’ Phone#: 24-HR Emergency Phone#:

Type of penetration sealant or fire stop:

(submit/attach: SDS and/or applicable fire stop manufacture specification)

Type of penetration sealant or fire stop:

(submit/attach: SDS and/or applicable fire stop manufacture specification)

UL/ASTM Approved for use? Yes No (ex: ASTM E814, UL1479, etc.)

VA Long Beach Healthcare System (VALBHS)

Above the Ceiling & Penetration Permit This permit requests must be submitted through the Fire & Life Safety PM, or Safety designee; 48 working hours in advance, before the start of any work. For emergency permit requests, call (562)826-8000 or ext. 3153.

Contact: VALBMC FLS PM Page 2 of 2 Form – FLS 5 (562)676-2236 or Ext. 3153 Rev: Sept. 2019 By: MB

The VALBMC expectation is full cooperation in complying with our efforts to maintain our fire/smoke barriers, throughout our facility; and providing a safe environment for: our patients, staff, students, and visitors.

A. General contractors, vendors and VA staff performing short/long term work, that requires aspects of permit, at the VA Long Beach Healthcare System shall:

1) Obtain fully approved Above-Ceiling-Work/Fire/Wall Penetration Permit; prior to the commencement of any work.

2) Requests must be submitted 48 working hours prior to the start of any work. Permits are valid for 24 hours. On a case-by-case basis, the maximum length of any permit is 1 working week.

3) Must specifically include all work areas affected and thorough scope of work, for operation.

4) Ensure a copy of valid permits, are conspicuously posted at work location; and readily available for inspection/verification, upon request.

5) Permit must be accompanied by a completed and signed Infection Control Risk Assessment (ICRA) Form.

6) Upon completion of work and after COR’s final inspection. Permit is to be returned to the Safety Service’s

Fire and Life Safety PM to be filed: 1.). Permit, 2. JSA 3. SDS/MFG. Specifications.).

B. Permits shall be used to: 1.) Control, maintain and assure permanent record of any penetrations and/or drywall openings made in fire/smoke barriers. 2.) Ensure general safety precautions are addressed. Such as, but not limited to:

1) Secure the Area - placement of barricades or cones around work areas to prevent inadvertent access or exposure to all potential hazards associated with the scope of work to employees, patients, and visitors.

2) Not leave work area unattended - If work areas are left unattended for breaks or lunch, etc., ladders are stored safely, ceiling tiles are replaced, no wires, etc. are left in public access areas.

3) Securing the work tools and equipment so as not to create any hazard or be used as weapons.

C. General contractor scope of work shall include job specific Job Safety Analysis (JSA), to mitigate and address identified risk (ex: PACM, ILSM, Fall Protection, Electrical Safety, etc.). Attach JSA to permit request for VALBMC Fire & Life Safety Program Managers review.

D. General contractors, vendors are responsible for their employees, its agents or subcontractors; to be properly trained and knowledgeable on: 1.) The application of fire stopping materials. 2.) Scope of work. 3.) Applicable general safety, local policy & federal standards; and related environmental responsibility.

E. Within 24 hours or less, any penetrations made in a fire rated wall, ceiling, or floor; must be sealed.

Penetration seal work must be performed IAW applicable: manufacture specification, NFPA, consensus standard, and VA policy. The competed work must be visually inspected by the VA COR representative to verify integrity.

Under no circumstances will penetrations remain unsealed or open.

F. Please direct your questions to: Corresponding Engineering Contracting Officer Representative (COR), Project Engineer/designated representative, Unit Supervisor in charge of this project or the VA Life Safety Program Manger.

Requestor Date of Request:
Date of Request:
Phone:
Buildings:
Floors:
Rooms:
Other:
Immediate Area Affected:
ScopeDescription of work to Be performed:
Other_2:
Supervisors Name:
Company:
Supervisors Phone:
24HR Emergency Phone:
3a Permit Expiration Date:
Date_5:
Vertical: Off
Horizontal: Off
Existing: Off
New: Off
CORRequesters HCGShop:
HCG/Service/Clinic:
UL/ASTM Approved for use?:
Type of penetration sealant or fire stop:
YES4: Off
YES3: Off
YES2: Off
YES1: Off
YES5: Off
NO5: Off
NO_2: Off
NO_1: Off
NO_4: Off
NO_3: Off
Date_Approved:
Date_GC:
Date_Approved2:
Date_Concur:
Time_EST START:
Date_EST START:
Date_EST COMPLETE:
Time_EST COMPLETE:
Date_ACTUAL START:
Time_ACTUAL START:
Date_ACTUAL COMPLETE:
Time_ACTUAL COMPLETE: