This solicitation is for construction services for a site preparation project at the VA Long Beach Healthcare System located in Long Beach, California. The solicitation seeks a contractor to perform general construction, alterations, mechanical, electrical and utility work to prepare the 7th floor for new sterilization equipment. Key requirements include demolition of existing structures, installation of new walls and doors, relocation of medical equipment and utility systems, and preparation of areas and approaches for new sterilization equipment in accordance with specifications and drawings. The work must be conducted in a functioning hospital environment and coordinated to minimize disruptions to VA operations. The Department of Veterans Affairs Veterans Health Administration VISN 22 is the contracting agency.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N
PARTIAL 7TH FLOOR DEMO PLAN (PART A)
1/4" = 1'-0"
2' 4''0 8'
KEY PLAN 7TH FLOOR
D F L
AREA
OF
WORK
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
ARCHITECT/ENGINEERS/CONSULTANTS:
Office of
Facilities
Management
SITE PREP FOR SPS STERILIZER AND
EQUIPMENT, 7th FLOOR
5901 EAST SEVENTH ST. LONG BEACH, CA 90822
06-08-2021 RK
600-17-108
F I N
A L
S
U B
M I T
T A
L
12-J MAUCHLY
IRVINE, CALIFORNIA 92618
TEL: (949) 450-8420
FAX: (949) 450-8424
A R C H I T E C T U R E + E N G I N E E R I N G C O N S T R U C T I O N M A N A G E M E N T
PARTIAL 7TH FLOOR DEMO PLAN
W717B
STERILIZATION
(E)
(E)
W715C
SUPPLY
DECONTAM
W717
ASSEMBLY
(E) PREP./
W715D
ROOM
(E) MEDIVATOR
W718
STAGING
(E) EQUIP.
W715
DECONTAMINATION
(E) SOILED REC/
W715B
STORAGE
D.I WATER
(E) CART
WASH
KEYNOTES
X
1. RELOCATE (E) FE CABINET & SIGN, SEE (N) PLAN FOR RELOCATION
2. (E) RAMP (PROTECT IN PLACE)
3. (E) SHELF/CART TO BE REMOVED, RETURN TABLE TO VA
4. DEMO (E) WALL
5. CUT OPENING FOR (N) EXIT DOOR
6. (E) UTILITY POLE TO REMAIN, WORK BENCH TO BE FABRICATED AROUND
THE POLE
7. RELOCATE (E) PASS THRU WINDOW, SEE (N) PLAN FOR (N) LOCATION
8. RELOCATE (E) WASHER & UTILITIES, DEMOLISHED (E) CONCRETE CURB,
SEE (N) PLAN FOR (N) LOCATION. FOR CURB & FLOOR SLOPE SEE
STRUCTURAL DRAWINGS FOR FLOOR DRAIN.
9. DEMO (E) DOOR, FRAME AND ASSOCIATED HARDWARE
10. REMOVE (E) TABLE FOR INSTALLATION OF STERILIZER/ EQUIPMENT.
RETURN TABLES TO VA.
11. (E) TABLE TO REMAIN AND PROTECTED
12. RELOCATE (E) REF., SEE (N) PLAN FOR RELOCATION OR RETURN TO VA
13. DEMO (E) CURB
14. INSTALL TEMPORARY WALL WITH DOOR DURING UNOCCUPIED HOURS
(EVENINGS/ WEEKENDS)
15. REMOVE DRYWALL & ADJUST STUDS TO INSTALL STRUCTURAL FRAMING
IN WALL. SEE STRUCTURAL DRAWINGS.
16. REMOVE DRYWALL FOR (N) PIPING CONNECTION. SEE PLUMBING
DRAWINGS
17. REMOVE LAVATORY & CABINET, SEE PLUMBING DWGS
18. PREPARE AREA FOR (N) CURB & CONCRETE PAD, SEE STRUCTURAL &
PLUMBING DWGS
19. GRIND FLOOR/ PREPARE AREA FOR APPROACH @ EQUIPMENT AS
REQUIRED BY MANUFACTURER
20. DURING CONSTRUCTION, THIS AREA WILL BE VACATED
BY VA WITH THE ASSISTANCE BY CONTRACTOR.
21. REMOVE WALL MOUNTED PPE DISPENSER, FOR REINSTALLATION UPON
COMPLETION OF WORK
22. REMOVE WALL MOUNTED ACCESSORIES (EG. HOODS, WALL MOUNTED
DISPENSERS ETC.) FOR REINSTALLATION UPON COMPLETION OF WORK
23. REMOVE CABINETS/ EQUIPMENT FOR REINSTALLATION UPON
COMPLETION OF WORK
24. REMOVE ALL WALL MOUNTED ITEM & PREPARE ROOM FOR (N) WALL
FINISH
25. RELOCATE (E) MOVABLE EXISTING EQUIPMENT WHERE DIRECTED BY VA
26. DEMOLISH (E) SINK, RETURN SINK TO VA AND PREPARE AREA FOR (N)
WORK.
27. RELOCATE (E) BELIMED (ULTRASONIC CLEANER) AS INDICATED IN (N)
LAYOUT. REROUTE/ RECONFIGURE UTILITIES FOR (N) WORK.
28. DEMO (E) EQUIPMENT/ PIPING. SEE MECHANICAL & PLUMBING.
29. (E) CART WASHER TO BE REMOVED BY CONTRACTOR, CONTRACTOR TO
PREPARE AREA FOR (N) CART WASHER
30. TRIM 1/2"-3/4" OF THE (E) CURB PER EQUIPMENT'S MANUFACTURER
RECOMMENDATION, SEE STRUCTURAL
AD-101
W717A
OFFICE
(E)
GENERAL NOTES
1. THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DEMOLITIONS
AT THE FACILITY.
2. REFER TO OTHER DISCIPLINE DRAWINGS FOR EXTENT OF DEMOLITION
FOR RESPECTIVE TRADES. SEE ALL PLANS FOR FULL PROJECT SCOPE.
3. FOR LEGEND SEE SHEET GI-000.
4. COORDINATE THE SEQUENCE OF WORK WITH THE GOVERNMENT:
A. PREPARE SITE & INSTALL TEMPORARY MOBILE SPS ON SITE, SEE
SHEETS AS-101 & AS-102
B. INSTALL TEMPORARY SIGNAGE & BARRICADES FOR SPS'S TRANSPORT
OF CARTS TO MOBILE UNITS
C. INSTALL TEMPORARY WALL (KEYNOTE 14) DURING UNOCCUPIED
HOURS.
D. START CONSTRUCTION ON THE 7TH FLOOR
E. AT CONCLUSION OF CONSTRUCTION, REMOVE TEMP WALL DURING
UNOCCUPIED HOURS. PATCH & REPAIR
F. REMOVE MOBILE UNITS
G. PATCH AND REPAIR SITE.
5. ACCESS, INFECTION CONTROL MEASURES, SHALL BE ACCOMPLISHED
WITH MINIMAL DISRUPTION TO THE VAMC'S OPERATIONS.
6. NEW CONSTRUCTION ADJACENT TO THE EXISTING AREA TO REMAIN,
SHALL MATCH EXISTING FINISH, MATERIAL AND COLOR.
7. COORDINATE WITH EQUIPMENT MFGR TECH REPRESENTATIVE,
RELOCATION OF (E) EQUIPMENT. EQUIPMENT WARRANTIES/
CERTIFICATION SHALL BE MAINTAINED.
8. FOR EXISTING EQUIPMENT (EEQ), SEE SHEET AE-602 TO REMAIN &
PROTECTED. IF REQUIRED, REMOVE & REPLACE AFTER CONCLUSION
OF CONSTRUCTION (INCLUDING UTILITIES).
9. PROTECT ALL EXISTING ITEMS FROM DAMAGE DURING DEMOLITION
AND CONSTRUCTION.
10. DOCUMENT THE CONFIGURATION OF EXISTING FIXED ITEMS INCLUDING
SIGNAGE, ACCESSORIES FOR REINSTALLATION OR REPLACEMENT AT
THE SAME LOCATION OR AS DIRECTED BY GOVERNMENT
REPRESENTATIVE (IN THE SAME GENERAL AREA)
11. REROUTE UTILITIES WHICH ARE TO REMAIN AND ARE IN THE AREA OF
DEMOLITION.
12. PROVIDE FLOOR, WALL AND CEILING PENETRATION FOR NEW/REROUTED
UTILITIES. SEAL ALL PENETRATIONS. FINISH THE AREA AROUND PENETRATION
TO MATCH ADJACENT SURFACES.
13. SEE NOTES ON GI-002 REGARDING MAINTENANCE OF EGRESS
14. EXISTING EQUIPMENT WHICH ARE IN THE WAY OF CONSTRUCTION
WORK, ARE TO BE CLEANED, STERILIZED, WRAPPED AND STORED IN VA
WAREHOUSE B149. AFTER WORK IS COMPLETE, CONTRACTOR TO
BRING ALL EQUIPMENT FROM THE VA WAREHOUSE TO 7TH FLOOR
B126.
15. EXISTING EQUIPMENT BEING DEMOLISHED IS TO BE SALVAGED,
STERILIZED AND RETURNED TO VA WAREHOUSE B149.
16. PROTECT (E) PA SPEAKERS DURING CONSTRUCTION. CLEAN AND
REINSTALL FOR RENOVATED AREAS.
17. EXISTING MEDICAL GAS RISERS TO BE PROTECTED IN PLACE.
18. PROTECT (E) WIRELESS SYSTEM, INCLUDING ANTENNAS DURING
CONSTRUCTION. CLEAN AND REINSTALL FOR RENOVATED AREAS.
19. TEST ALL DEVICES AT CONCLUSION OF WORK. REPLACE ALL DAMAGED
DEVICES, TO PROVIDE FULLY FUNCTIONING SYSTEMS.
D E F
21'-8" 21'-8"
2.3
G H J
21'-8" 10'-0" 21'-8"
(E) E.C.
(E) S.&T.
BREAK
ROOM
F.E.C.
SOILED
CARTLIFT
CLO.
RISER #22
(EXIST'G)
ELEV.
P-3
ELEV.
P-4
ELEV.
S-6
ELEV.
S-6
ELEV.
P-2
ELEV.
P-1
(E) F.E.C.
(E) STAIR
NO. 1
VEST.
(E)
714C
OFFICE
(E)
714D
MEN
(E)
714E
WOMEN
(E)
714B
LOUNGE
(E)
RISER #1
(EXIST'G)
714A
HAC
(E)
C7-1A
CORR.
(E)
STAGING
(E) EQUIP.
VEST.
(E)
716A
LOUNGE
(E)
RISER #6
(EXIST'G)
716C
WOMEN
(E)
716B
MEN
(E)
710A
CHIEF
(E)
RISER #4
(EXIST'G)
CHIEF
(E) ASST.
C7-1
CORR.
(E)
CLERICAL
(E)
LOBBY
(E) PASSENGER
LOBBY
(E) SERV. ELEV.
(E)
MECH.
SHAFT
CONFERENCE
(E)
MATCH LINE
SEE (PART B)/
AD-102
PHOTOS
PHOTO - A
PHOTO - B
PHOTO - C
PHOTO - D
PHOTO - E
LEGEND
(E) WALL
DEMO WALL
N.I.C. AREA FOR ARCHITECTURAL SCOPE
(SEE OTHER DISCIPLINE FOR WORK IN
THIS AREA)
(N) TEMP WALL (SEE GENERAL NOTE 7)
AD101
E
AD101
A
AD101
C
AD101
B
AD101
D
24 TYP.
HARD BARRIER W/
ANTE-ROOM WITH
DOORS
PHASE 2
PHASE 3
HARD BARRIER W/
ANTE-ROOM WITH
DOORS
PHASE 1
N
PARTIAL 7TH FLOOR DEMO PLAN (PART B)
1/4" = 1'-0"
2' 4''0 8'
KEY PLAN 7TH FLOOR
D F L
AREA
OF
WORK
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
ARCHITECT/ENGINEERS/CONSULTANTS:
Office of
Facilities
Management
SITE PREP FOR SPS STERILIZER AND
EQUIPMENT, 7th FLOOR
5901 EAST SEVENTH ST. LONG BEACH, CA 90822
06-08-2021 RK
600-17-108
F I N
A L
S
U B
M I T
T
12-J MAUCHLY
IRVINE, CALIFORNIA 92618
TEL: (949) 450-8420
FAX: (949) 450-8424
A R C H I T E C T U R E + E N G I N E E R I N G C O N S T R U C T I O N M A N A G E M E N T
PARTIAL 7TH FLOOR DEMO PLAN
KEYNOTES
X
1. (E) LOUVER, SEE MECHANICAL DRAWINGS.
2. PREPARE EXHAUST HOOD AT DUCT FOR (N) WORK - SEE
MECHANICAL DWGS.
3. PREPARE AREA TO RECEIVE (N) SLIDING DOOR
4. REMOVE FINISH & WALL MOUNTED ACCESSORIES TO RECEIVE (N)
FINISH & PREPARE AREA FOR NEW VESTIBULE. REINSTALL AT
CONCLUSION OF CONSTRUCTION
5. REMOVE WALL MOUNTED EQUIPMENT/ ACCESSORIES FOR
REINSTALLATION AT CONCLUSION OF CONSTRUCTION
AD-102
LEGEND
(E) WALL
DEMO WALL
GENERAL NOTES
1. SEE AD-101.
D E F
21'-8" 21'-8"
G H J
21'-8" 10'-0" 21'-8"
8.1
W717B
STERILIZATION
(E)
W718
STAGING
(E) EQUIP.
ELEV.
S-6
LOBBY
(E) SERV. ELEV.
EQUIP. STORAGE
(E) SURGERY
(E) STAIR
NO. 3
717E
STAGING
(E) STERILE
718B
HOLDING
(E) CART
C7-2A
CORR.
(E)
C7-2
CORR.
(E)
BREAKOUT
(E) CLN. RECEIVING
& LINEN
(E) TRASH
(E) S.&T.
(E) E.C.
(E)
MECH.
SHAFT
ROOM
(E) MECHANICAL
MATCH LINE
SEE (PART A)/
AD-101
N.I.C. AREA FOR ARCHITECTURAL SCOPE
(SEE OTHER DISCIPLINE FOR WORK IN THIS AREA)
PHOTO 2A
PHOTO 2B
AD102
2A
AD102
2B
HARD BARRIER W/
ANTE-ROOM WITH
DOORS
PHASE 5
HARD BARRIER W/
ANTE-ROOM WITH
DOORS
PHASE 4
HARD BARRIER W/
ANTE-ROOM WITH
DOORS
PHASE 6
PHASE 1
PHASE 9
PHASE 8
PHASE 7
HARD BARRIER W/
ANTE-ROOM WITH
DOORS
HARD BARRIER W/
ANTE-ROOM WITH
DOORS
KEY PLAN 7TH FLOOR
D F L
AREA
OF
WORK
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
ARCHITECT/ENGINEERS/CONSULTANTS:
Office of
Facilities
Management
SITE PREP FOR SPS STERILIZER AND
EQUIPMENT, 7th FLOOR
5901 EAST SEVENTH ST. LONG BEACH, CA 90822
06-08-2021 RK
600-17-108
F I N
A L
S
U B
M I T
T
12-J MAUCHLY
IRVINE, CALIFORNIA 92618
TEL: (949) 450-8420
FAX: (949) 450-8424
A R C H I T E C T U R E + E N G I N E E R I N G C O N S T R U C T I O N M A N A G E M E N T
PARTIAL 7TH FLOOR DEMO RCP
KEYNOTES
X
1. RELOCATE (E) PASS THRU WINDOW, SEE (N) PLAN FOR
RELOCATION
2. INSTALL TEMPORARY WALL DURING UNOCCUPIED HOURS
(WEEKENDS/ EVENING)
3. DEMO (E) CEILING AND PREPARE AREA FOR (N) WORK
4. REMOVE ONLY CEILINGS WHICH CAN BE INSTALLED IN THE (N)
CONFIGURATION OVER ONE WEEKEND, PRIOR TO START OF VA
OPERATIONS, COORDINATE SCHEDULE WITH VA.
5. RELOCATE (E) SMOKE DETECTOR, SEE ELECTRICAL
6. REMOVE CEILING & RAISE CEILING IN THIS AREA APPROXIMATELY
(10'-0" AFF) TO INSTALL GOVERNMENT FURNISHED EQUIPMENT,
SEE GENERAL NOTES
7. REMOVE CEILING IN THIS ROOM & PREPARE FOR (N) CEILING, SEE
GENERAL NOTE 2.
8. REMOVE/ RELOCATE (E) LIGHT FIXTURE PRIOR TO INSTALLATION
OF TEMPORARY WALL.
9. REMOVE (E) STAINLESS STEEL HOOD & PREPARE TO
RECONFIGURE IT FOR (N) LAYOUT
10. DEMO (E) GYPSUM AND ACOUSTIC TILE RECESSED CEILING SOFFIT
AND REINSTALL AFTER THE (N) CART WASHER IS INSTALLED
AD-103
GENERAL NOTES
1. SEE SHEET AD-101.
2. RAISE UTILITIES ABOVE CEILING FOR NEW CEILING HEIGHTS
INCLUDING DUCT WORK, PIPING, CONDUITS ETC.
3. WORK IN CLEAN AREAS (ROOMS W717B, W717E AND W718)
SHALL BE PERFORMED IN SEQUENCES. PERFORM WORK
DURING UNOCCUPIED HOURS. REPLACE CEILING AND
RELATED LIGHTING, FIRE SPRINKLERS, ETC. ONLY THE AREA
WHICH CAN BE RENOVATED DURING ONE EVENING OR
WEEKEND.COORDINATE WORK WITH VA OCCUPANTS.
N
PARTIAL 7TH FLOOR DEMO RCP (PART A)
1/4" = 1'-0"
2' 4''0 8'
W717B
STERILIZATION
(E)
(E)
W715C
SUPPLY
DECONTAM
W717
ASSEMBLY
(E) PREP./
W715D
ROOM
(E) MEDIVATOR
W718
STAGING
(E) EQUIP.
W715
DECONTAMINATION
(E) SOILED REC/
W715B
STORAGE
D.I WATER
(E) CART
WASH
W717A
OFFICE
(E)
D E F
21'-8" 21'-8"
2.3
G H
21'-8" 10'-0"
LEGEND
(D) SUPPLY AIR GRILLE
(D) RETURN AIR GRILLE
(D) LIGHT FIXTURE
(D) ACOUSTIC TILE PATTERN
SD
(E) FIRE PROTECTION SPRINKLER
HEAD
(D) SMOKE DETECTOR
(E) E.C.
(E) S.&T.
BREAK
ROOM
SOILED
CARTLIFT
CLO.
RISER #22
(EXIST'G)
ELEV.
P-3
ELEV.
P-4
ELEV.
S-6
ELEV.
S-6
ELEV.
P-2
ELEV.
P-1
(E) F.E.C.
(E) STAIR
NO. 1
VEST.
(E)
714C
OFFICE
(E)
714D
MEN
(E)
714E
WOMEN
(E)
714B
LOUNGE
(E)
RISER #1
(EXIST'G)
714A
HAC
(E)
C7-1A
CORR.
(E)
STAGING
(E) EQUIP.
VEST.
(E)
716A
LOUNGE
(E)
716C
WOMEN
(E)
716B
MEN
(E)
710A
CHIEF
(E)
RISER #4
(EXIST'G)
CHIEF
(E) ASST.
LOBBY
(E) PASSENGER
LOBBY
(E) SERV. ELEV.
MATCH LINE
SEE (PART B)/
AD-104
N.I.C. AREA FOR ARCHITECTURAL SCOPE
(SEE OTHER DISCIPLINE FOR WORK IN THIS AREA)
(E) SENSOR TRACK DEVICE
PHASE 2
HARD BARRIER W/
ANTE-ROOM
HARD BARRIER W/
ANTE-ROOM
PHASE 1
PHASE 3
KEY PLAN 7TH FLOOR
D F L
AREA
OF
WORK
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
ARCHITECT/ENGINEERS/CONSULTANTS:
Office of
Facilities
Management
SITE PREP FOR SPS STERILIZER AND
EQUIPMENT, 7th FLOOR
5901 EAST SEVENTH ST. LONG BEACH, CA 90822
06-08-2021 RK
600-17-108
F I N
A L
S
U B
M I T
T
12-J MAUCHLY
IRVINE, CALIFORNIA 92618
TEL: (949) 450-8420
FAX: (949) 450-8424
A R C H I T E C T U R E + E N G I N E E R I N G C O N S T R U C T I O N M A N A G E M E N T
PARTIAL 7TH FLOOR DEMO RCP
KEYNOTES
X
1. REMOVE ONLY CEILINGS WHICH CAN BE INSTALLED IN THE (N)
CONFIGURATION OVER ONE WEEKEND, PRIOR TO START OF VA
OPERATIONS, COORDINATE SCHEDULE WITH VA
2. DEMO (E) LIGHTING AND INSTALL (N) LIGHTING - SEE (N) LAYOUT
AD-104
GENERAL NOTES
1. SEE SHEET AD-101.
N
PARTIAL 7TH FLOOR DEMO RCP (PART B)
1/4" = 1'-0"
2' 4''0 8'
D E F
21'-8" 21'-8"
G H J
21'-8" 10'-0" 21'-8"
LEGEND
(D) SUPPLY AIR GRILLE
(D) RETURN AIR GRILLE
(D) LIGHT FIXTURE
(D) ACOUSTIC TILE PATTERN
SD
(E) FIRE PROTECTION SPRINKLER
HEAD
(D) SMOKE DETECTOR
ELEV.
S-6
8.1
W717B
STERILIZATION
(E)
W718
STAGING
(E) EQUIP.
ELEV.
S-6
LOBBY
(E) SERV. ELEV.
EQUIP. STORAGE
(E) SURGERY
(E) STAIR
NO. 3
717E
STAGING
(E) STERILE
718B
HOLDING
(E) CART
C7-2A
CORR.
(E)
C7-2
CORR.
(E)
BREAKOUT
(E) CLN. RECEIVING
& LINEN
(E) TRASH
(E) S.&T.
(E) E.C.
(E)
MECH.
SHAFT
ROOM
(E) MECHANICAL
TYP.
TYP.
MATCH LINE
SEE (PART A)/
AD-103
N.I.C. AREA FOR ARCHITECTURAL SCOPE
(SEE OTHER DISCIPLINE FOR WORK IN THIS AREA)
(E) SENSOR TRACK DEVICE
HARD BARRIER W/
ANTE-ROOM
PHASE 5
HARD BARRIER W/
ANTE-ROOM
PHASE 4
HARD BARRIER W/
ANTE-ROOM
PHASE 6
PHASE 1
PHASE 9
PHASE 8
PHASE 7
HARD BARRIER W/
ANTE-ROOM
HARD BARRIER W/
ANTE-ROOM