This solicitation is for construction services for a site preparation project at the VA Long Beach Healthcare System located in Long Beach, California. The solicitation seeks a contractor to perform general construction, alterations, mechanical, electrical and utility work to prepare the 7th floor for new sterilization equipment. Key requirements include demolition of existing structures, installation of new walls and doors, relocation of medical equipment and utility systems, and preparation of areas and approaches for new sterilization equipment in accordance with specifications and drawings. The work must be conducted in a functioning hospital environment and coordinated to minimize disruptions to VA operations. The Department of Veterans Affairs Veterans Health Administration VISN 22 is the contracting agency.

View the file

Other files

File Type Posted
36C26222B0009_1 0006.pdf PDF
36C26222B0009_1 0005.pdf PDF
36C26222B0009_1 0004 V2.pdf PDF
S05 RFI Question Answer-Amendment 0004.pdf PDF
36C26222B0009_1 0003.pdf PDF
Amendment 3 RFIs_SOW_Specifications.pdf PDF
Barrier-SalesBrochure.pdf PDF
barrier-STARC-Full-Product-Catalog-web.pdf PDF
8-24-2022 RFI Question Answer.pdf PDF
36C26222B0009_1 0002.pdf PDF
36C26222B0009_1 0001.pdf PDF
8-12-2022 Pre-bid conference sign in.pdf PDF
Attachment I - Contractor Laydown Areas.pdf PDF
Attachment R - Excavation Permit.pdf PDF
Attachment D - Drawings - Design Set Combined - June 8 2021.pdf PDF
Attachment M - VA Long Beach ACM Survey Report B126.pdf PDF
Attachment E - IMS SOP 07-013 Cable Installation Labeling and Testing.pdf PDF
Attachment H - Laydown Areas Request Form.docx DOCX document
Attachment L - VALBHS Utility and Service Impact Process.pdf PDF
Attachment C - Specifications - Final.pdf PDF
Attachment P - Safety Lockout Tagout of Equipment Electric Shop.pdf PDF
36C26222B0009_1.pdf PDF
Attachment A - Wage Determination Apr 28 2022.pdf PDF
Attachment O - Utility and Service Impact Permit.pdf PDF
Attachment N - VA Electric Shop Electrical Work Permit.pdf PDF
Attachment K - VALBMC Above The Ceiling and Penetration Permit.pdf PDF
Attachment G - ILSM Checklist Permit.pdf PDF
Attachment J - AHA Activity hazard analysis.pdf PDF
Attachment F - ILSM Map of Construction Areas.pdf PDF
Attachment B - SOW CONSTRUCTION June 8 2021.pdf PDF
Attachment S - Electric Work Permit.pdf PDF
Attachment Q - ILSM and Hot Work Permit.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

PARTIAL 7TH FLOOR DEMO PLAN (PART A)

1/4" = 1'-0"

2' 4''0 8'

KEY PLAN 7TH FLOOR

D F L

AREA

OF

WORK

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

ARCHITECT/ENGINEERS/CONSULTANTS:

Office of

Facilities

Management

SITE PREP FOR SPS STERILIZER AND

EQUIPMENT, 7th FLOOR

5901 EAST SEVENTH ST. LONG BEACH, CA 90822

06-08-2021 RK

600-17-108

F I N

A L

S

U B

M I T

T A

L

12-J MAUCHLY

IRVINE, CALIFORNIA 92618

TEL: (949) 450-8420

FAX: (949) 450-8424

A R C H I T E C T U R E + E N G I N E E R I N G C O N S T R U C T I O N M A N A G E M E N T

PARTIAL 7TH FLOOR DEMO PLAN

W717B

STERILIZATION

(E)

(E)

W715C

SUPPLY

DECONTAM

W717

ASSEMBLY

(E) PREP./

W715D

ROOM

(E) MEDIVATOR

W718

STAGING

(E) EQUIP.

W715

DECONTAMINATION

(E) SOILED REC/

W715B

STORAGE

D.I WATER

(E) CART

WASH

KEYNOTES

X

1. RELOCATE (E) FE CABINET & SIGN, SEE (N) PLAN FOR RELOCATION

2. (E) RAMP (PROTECT IN PLACE)

3. (E) SHELF/CART TO BE REMOVED, RETURN TABLE TO VA

4. DEMO (E) WALL

5. CUT OPENING FOR (N) EXIT DOOR

6. (E) UTILITY POLE TO REMAIN, WORK BENCH TO BE FABRICATED AROUND

THE POLE

7. RELOCATE (E) PASS THRU WINDOW, SEE (N) PLAN FOR (N) LOCATION

8. RELOCATE (E) WASHER & UTILITIES, DEMOLISHED (E) CONCRETE CURB,

SEE (N) PLAN FOR (N) LOCATION. FOR CURB & FLOOR SLOPE SEE

STRUCTURAL DRAWINGS FOR FLOOR DRAIN.

9. DEMO (E) DOOR, FRAME AND ASSOCIATED HARDWARE

10. REMOVE (E) TABLE FOR INSTALLATION OF STERILIZER/ EQUIPMENT.

RETURN TABLES TO VA.

11. (E) TABLE TO REMAIN AND PROTECTED

12. RELOCATE (E) REF., SEE (N) PLAN FOR RELOCATION OR RETURN TO VA

13. DEMO (E) CURB

14. INSTALL TEMPORARY WALL WITH DOOR DURING UNOCCUPIED HOURS

(EVENINGS/ WEEKENDS)

15. REMOVE DRYWALL & ADJUST STUDS TO INSTALL STRUCTURAL FRAMING

IN WALL. SEE STRUCTURAL DRAWINGS.

16. REMOVE DRYWALL FOR (N) PIPING CONNECTION. SEE PLUMBING

DRAWINGS

17. REMOVE LAVATORY & CABINET, SEE PLUMBING DWGS

18. PREPARE AREA FOR (N) CURB & CONCRETE PAD, SEE STRUCTURAL &

PLUMBING DWGS

19. GRIND FLOOR/ PREPARE AREA FOR APPROACH @ EQUIPMENT AS

REQUIRED BY MANUFACTURER

20. DURING CONSTRUCTION, THIS AREA WILL BE VACATED

BY VA WITH THE ASSISTANCE BY CONTRACTOR.

21. REMOVE WALL MOUNTED PPE DISPENSER, FOR REINSTALLATION UPON

COMPLETION OF WORK

22. REMOVE WALL MOUNTED ACCESSORIES (EG. HOODS, WALL MOUNTED

DISPENSERS ETC.) FOR REINSTALLATION UPON COMPLETION OF WORK

23. REMOVE CABINETS/ EQUIPMENT FOR REINSTALLATION UPON

COMPLETION OF WORK

24. REMOVE ALL WALL MOUNTED ITEM & PREPARE ROOM FOR (N) WALL

FINISH

25. RELOCATE (E) MOVABLE EXISTING EQUIPMENT WHERE DIRECTED BY VA

26. DEMOLISH (E) SINK, RETURN SINK TO VA AND PREPARE AREA FOR (N)

WORK.

27. RELOCATE (E) BELIMED (ULTRASONIC CLEANER) AS INDICATED IN (N)

LAYOUT. REROUTE/ RECONFIGURE UTILITIES FOR (N) WORK.

28. DEMO (E) EQUIPMENT/ PIPING. SEE MECHANICAL & PLUMBING.

29. (E) CART WASHER TO BE REMOVED BY CONTRACTOR, CONTRACTOR TO

PREPARE AREA FOR (N) CART WASHER

30. TRIM 1/2"-3/4" OF THE (E) CURB PER EQUIPMENT'S MANUFACTURER

RECOMMENDATION, SEE STRUCTURAL

AD-101

W717A

OFFICE

(E)

GENERAL NOTES

1. THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DEMOLITIONS

AT THE FACILITY.

2. REFER TO OTHER DISCIPLINE DRAWINGS FOR EXTENT OF DEMOLITION

FOR RESPECTIVE TRADES. SEE ALL PLANS FOR FULL PROJECT SCOPE.

3. FOR LEGEND SEE SHEET GI-000.

4. COORDINATE THE SEQUENCE OF WORK WITH THE GOVERNMENT:

A. PREPARE SITE & INSTALL TEMPORARY MOBILE SPS ON SITE, SEE

SHEETS AS-101 & AS-102

B. INSTALL TEMPORARY SIGNAGE & BARRICADES FOR SPS'S TRANSPORT

OF CARTS TO MOBILE UNITS

C. INSTALL TEMPORARY WALL (KEYNOTE 14) DURING UNOCCUPIED

HOURS.

D. START CONSTRUCTION ON THE 7TH FLOOR

E. AT CONCLUSION OF CONSTRUCTION, REMOVE TEMP WALL DURING

UNOCCUPIED HOURS. PATCH & REPAIR

F. REMOVE MOBILE UNITS

G. PATCH AND REPAIR SITE.

5. ACCESS, INFECTION CONTROL MEASURES, SHALL BE ACCOMPLISHED

WITH MINIMAL DISRUPTION TO THE VAMC'S OPERATIONS.

6. NEW CONSTRUCTION ADJACENT TO THE EXISTING AREA TO REMAIN,

SHALL MATCH EXISTING FINISH, MATERIAL AND COLOR.

7. COORDINATE WITH EQUIPMENT MFGR TECH REPRESENTATIVE,

RELOCATION OF (E) EQUIPMENT. EQUIPMENT WARRANTIES/

CERTIFICATION SHALL BE MAINTAINED.

8. FOR EXISTING EQUIPMENT (EEQ), SEE SHEET AE-602 TO REMAIN &

PROTECTED. IF REQUIRED, REMOVE & REPLACE AFTER CONCLUSION

OF CONSTRUCTION (INCLUDING UTILITIES).

9. PROTECT ALL EXISTING ITEMS FROM DAMAGE DURING DEMOLITION

AND CONSTRUCTION.

10. DOCUMENT THE CONFIGURATION OF EXISTING FIXED ITEMS INCLUDING

SIGNAGE, ACCESSORIES FOR REINSTALLATION OR REPLACEMENT AT

THE SAME LOCATION OR AS DIRECTED BY GOVERNMENT

REPRESENTATIVE (IN THE SAME GENERAL AREA)

11. REROUTE UTILITIES WHICH ARE TO REMAIN AND ARE IN THE AREA OF

DEMOLITION.

12. PROVIDE FLOOR, WALL AND CEILING PENETRATION FOR NEW/REROUTED

UTILITIES. SEAL ALL PENETRATIONS. FINISH THE AREA AROUND PENETRATION

TO MATCH ADJACENT SURFACES.

13. SEE NOTES ON GI-002 REGARDING MAINTENANCE OF EGRESS

14. EXISTING EQUIPMENT WHICH ARE IN THE WAY OF CONSTRUCTION

WORK, ARE TO BE CLEANED, STERILIZED, WRAPPED AND STORED IN VA

WAREHOUSE B149. AFTER WORK IS COMPLETE, CONTRACTOR TO

BRING ALL EQUIPMENT FROM THE VA WAREHOUSE TO 7TH FLOOR

B126.

15. EXISTING EQUIPMENT BEING DEMOLISHED IS TO BE SALVAGED,

STERILIZED AND RETURNED TO VA WAREHOUSE B149.

16. PROTECT (E) PA SPEAKERS DURING CONSTRUCTION. CLEAN AND

REINSTALL FOR RENOVATED AREAS.

17. EXISTING MEDICAL GAS RISERS TO BE PROTECTED IN PLACE.

18. PROTECT (E) WIRELESS SYSTEM, INCLUDING ANTENNAS DURING

CONSTRUCTION. CLEAN AND REINSTALL FOR RENOVATED AREAS.

19. TEST ALL DEVICES AT CONCLUSION OF WORK. REPLACE ALL DAMAGED

DEVICES, TO PROVIDE FULLY FUNCTIONING SYSTEMS.

D E F

21'-8" 21'-8"

2.3

G H J

21'-8" 10'-0" 21'-8"

(E) E.C.

(E) S.&T.

BREAK

ROOM

F.E.C.

SOILED

CARTLIFT

CLO.

RISER #22

(EXIST'G)

ELEV.

P-3

ELEV.

P-4

ELEV.

S-6

ELEV.

S-6

ELEV.

P-2

ELEV.

P-1

(E) F.E.C.

(E) STAIR

NO. 1

VEST.

(E)

714C

OFFICE

(E)

714D

MEN

(E)

714E

WOMEN

(E)

714B

LOUNGE

(E)

RISER #1

(EXIST'G)

714A

HAC

(E)

C7-1A

CORR.

(E)

STAGING

(E) EQUIP.

VEST.

(E)

716A

LOUNGE

(E)

RISER #6

(EXIST'G)

716C

WOMEN

(E)

716B

MEN

(E)

710A

CHIEF

(E)

RISER #4

(EXIST'G)

CHIEF

(E) ASST.

C7-1

CORR.

(E)

CLERICAL

(E)

LOBBY

(E) PASSENGER

LOBBY

(E) SERV. ELEV.

(E)

MECH.

SHAFT

CONFERENCE

(E)

MATCH LINE

SEE (PART B)/

AD-102

PHOTOS

PHOTO - A

PHOTO - B

PHOTO - C

PHOTO - D

PHOTO - E

LEGEND

(E) WALL

DEMO WALL

N.I.C. AREA FOR ARCHITECTURAL SCOPE

(SEE OTHER DISCIPLINE FOR WORK IN

THIS AREA)

(N) TEMP WALL (SEE GENERAL NOTE 7)

AD101

E

AD101

A

AD101

C

AD101

B

AD101

D

24 TYP.

HARD BARRIER W/

ANTE-ROOM WITH

DOORS

PHASE 2

PHASE 3

HARD BARRIER W/

ANTE-ROOM WITH

DOORS

PHASE 1

N

PARTIAL 7TH FLOOR DEMO PLAN (PART B)

1/4" = 1'-0"

2' 4''0 8'

KEY PLAN 7TH FLOOR

D F L

AREA

OF

WORK

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

ARCHITECT/ENGINEERS/CONSULTANTS:

Office of

Facilities

Management

SITE PREP FOR SPS STERILIZER AND

EQUIPMENT, 7th FLOOR

5901 EAST SEVENTH ST. LONG BEACH, CA 90822

06-08-2021 RK

600-17-108

F I N

A L

S

U B

M I T

T

12-J MAUCHLY

IRVINE, CALIFORNIA 92618

TEL: (949) 450-8420

FAX: (949) 450-8424

A R C H I T E C T U R E + E N G I N E E R I N G C O N S T R U C T I O N M A N A G E M E N T

PARTIAL 7TH FLOOR DEMO PLAN

KEYNOTES

X

1. (E) LOUVER, SEE MECHANICAL DRAWINGS.

2. PREPARE EXHAUST HOOD AT DUCT FOR (N) WORK - SEE

MECHANICAL DWGS.

3. PREPARE AREA TO RECEIVE (N) SLIDING DOOR

4. REMOVE FINISH & WALL MOUNTED ACCESSORIES TO RECEIVE (N)

FINISH & PREPARE AREA FOR NEW VESTIBULE. REINSTALL AT

CONCLUSION OF CONSTRUCTION

5. REMOVE WALL MOUNTED EQUIPMENT/ ACCESSORIES FOR

REINSTALLATION AT CONCLUSION OF CONSTRUCTION

AD-102

LEGEND

(E) WALL

DEMO WALL

GENERAL NOTES

1. SEE AD-101.

D E F

21'-8" 21'-8"

G H J

21'-8" 10'-0" 21'-8"

8.1

W717B

STERILIZATION

(E)

W718

STAGING

(E) EQUIP.

ELEV.

S-6

LOBBY

(E) SERV. ELEV.

EQUIP. STORAGE

(E) SURGERY

(E) STAIR

NO. 3

717E

STAGING

(E) STERILE

718B

HOLDING

(E) CART

C7-2A

CORR.

(E)

C7-2

CORR.

(E)

BREAKOUT

(E) CLN. RECEIVING

& LINEN

(E) TRASH

(E) S.&T.

(E) E.C.

(E)

MECH.

SHAFT

ROOM

(E) MECHANICAL

MATCH LINE

SEE (PART A)/

AD-101

N.I.C. AREA FOR ARCHITECTURAL SCOPE

(SEE OTHER DISCIPLINE FOR WORK IN THIS AREA)

PHOTO 2A

PHOTO 2B

AD102

2A

AD102

2B

HARD BARRIER W/

ANTE-ROOM WITH

DOORS

PHASE 5

HARD BARRIER W/

ANTE-ROOM WITH

DOORS

PHASE 4

HARD BARRIER W/

ANTE-ROOM WITH

DOORS

PHASE 6

PHASE 1

PHASE 9

PHASE 8

PHASE 7

HARD BARRIER W/

ANTE-ROOM WITH

DOORS

HARD BARRIER W/

ANTE-ROOM WITH

DOORS

KEY PLAN 7TH FLOOR

D F L

AREA

OF

WORK

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

ARCHITECT/ENGINEERS/CONSULTANTS:

Office of

Facilities

Management

SITE PREP FOR SPS STERILIZER AND

EQUIPMENT, 7th FLOOR

5901 EAST SEVENTH ST. LONG BEACH, CA 90822

06-08-2021 RK

600-17-108

F I N

A L

S

U B

M I T

T

12-J MAUCHLY

IRVINE, CALIFORNIA 92618

TEL: (949) 450-8420

FAX: (949) 450-8424

A R C H I T E C T U R E + E N G I N E E R I N G C O N S T R U C T I O N M A N A G E M E N T

PARTIAL 7TH FLOOR DEMO RCP

KEYNOTES

X

1. RELOCATE (E) PASS THRU WINDOW, SEE (N) PLAN FOR

RELOCATION

2. INSTALL TEMPORARY WALL DURING UNOCCUPIED HOURS

(WEEKENDS/ EVENING)

3. DEMO (E) CEILING AND PREPARE AREA FOR (N) WORK

4. REMOVE ONLY CEILINGS WHICH CAN BE INSTALLED IN THE (N)

CONFIGURATION OVER ONE WEEKEND, PRIOR TO START OF VA

OPERATIONS, COORDINATE SCHEDULE WITH VA.

5. RELOCATE (E) SMOKE DETECTOR, SEE ELECTRICAL

6. REMOVE CEILING & RAISE CEILING IN THIS AREA APPROXIMATELY

(10'-0" AFF) TO INSTALL GOVERNMENT FURNISHED EQUIPMENT,

SEE GENERAL NOTES

7. REMOVE CEILING IN THIS ROOM & PREPARE FOR (N) CEILING, SEE

GENERAL NOTE 2.

8. REMOVE/ RELOCATE (E) LIGHT FIXTURE PRIOR TO INSTALLATION

OF TEMPORARY WALL.

9. REMOVE (E) STAINLESS STEEL HOOD & PREPARE TO

RECONFIGURE IT FOR (N) LAYOUT

10. DEMO (E) GYPSUM AND ACOUSTIC TILE RECESSED CEILING SOFFIT

AND REINSTALL AFTER THE (N) CART WASHER IS INSTALLED

AD-103

GENERAL NOTES

1. SEE SHEET AD-101.

2. RAISE UTILITIES ABOVE CEILING FOR NEW CEILING HEIGHTS

INCLUDING DUCT WORK, PIPING, CONDUITS ETC.

3. WORK IN CLEAN AREAS (ROOMS W717B, W717E AND W718)

SHALL BE PERFORMED IN SEQUENCES. PERFORM WORK

DURING UNOCCUPIED HOURS. REPLACE CEILING AND

RELATED LIGHTING, FIRE SPRINKLERS, ETC. ONLY THE AREA

WHICH CAN BE RENOVATED DURING ONE EVENING OR

WEEKEND.COORDINATE WORK WITH VA OCCUPANTS.

N

PARTIAL 7TH FLOOR DEMO RCP (PART A)

1/4" = 1'-0"

2' 4''0 8'

W717B

STERILIZATION

(E)

(E)

W715C

SUPPLY

DECONTAM

W717

ASSEMBLY

(E) PREP./

W715D

ROOM

(E) MEDIVATOR

W718

STAGING

(E) EQUIP.

W715

DECONTAMINATION

(E) SOILED REC/

W715B

STORAGE

D.I WATER

(E) CART

WASH

W717A

OFFICE

(E)

D E F

21'-8" 21'-8"

2.3

G H

21'-8" 10'-0"

LEGEND

(D) SUPPLY AIR GRILLE

(D) RETURN AIR GRILLE

(D) LIGHT FIXTURE

(D) ACOUSTIC TILE PATTERN

SD

(E) FIRE PROTECTION SPRINKLER

HEAD

(D) SMOKE DETECTOR

(E) E.C.

(E) S.&T.

BREAK

ROOM

SOILED

CARTLIFT

CLO.

RISER #22

(EXIST'G)

ELEV.

P-3

ELEV.

P-4

ELEV.

S-6

ELEV.

S-6

ELEV.

P-2

ELEV.

P-1

(E) F.E.C.

(E) STAIR

NO. 1

VEST.

(E)

714C

OFFICE

(E)

714D

MEN

(E)

714E

WOMEN

(E)

714B

LOUNGE

(E)

RISER #1

(EXIST'G)

714A

HAC

(E)

C7-1A

CORR.

(E)

STAGING

(E) EQUIP.

VEST.

(E)

716A

LOUNGE

(E)

716C

WOMEN

(E)

716B

MEN

(E)

710A

CHIEF

(E)

RISER #4

(EXIST'G)

CHIEF

(E) ASST.

LOBBY

(E) PASSENGER

LOBBY

(E) SERV. ELEV.

MATCH LINE

SEE (PART B)/

AD-104

N.I.C. AREA FOR ARCHITECTURAL SCOPE

(SEE OTHER DISCIPLINE FOR WORK IN THIS AREA)

(E) SENSOR TRACK DEVICE

PHASE 2

HARD BARRIER W/

ANTE-ROOM

HARD BARRIER W/

ANTE-ROOM

PHASE 1

PHASE 3

KEY PLAN 7TH FLOOR

D F L

AREA

OF

WORK

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg. of

ARCHITECT/ENGINEERS/CONSULTANTS:

Office of

Facilities

Management

SITE PREP FOR SPS STERILIZER AND

EQUIPMENT, 7th FLOOR

5901 EAST SEVENTH ST. LONG BEACH, CA 90822

06-08-2021 RK

600-17-108

F I N

A L

S

U B

M I T

T

12-J MAUCHLY

IRVINE, CALIFORNIA 92618

TEL: (949) 450-8420

FAX: (949) 450-8424

A R C H I T E C T U R E + E N G I N E E R I N G C O N S T R U C T I O N M A N A G E M E N T

PARTIAL 7TH FLOOR DEMO RCP

KEYNOTES

X

1. REMOVE ONLY CEILINGS WHICH CAN BE INSTALLED IN THE (N)

CONFIGURATION OVER ONE WEEKEND, PRIOR TO START OF VA

OPERATIONS, COORDINATE SCHEDULE WITH VA

2. DEMO (E) LIGHTING AND INSTALL (N) LIGHTING - SEE (N) LAYOUT

AD-104

GENERAL NOTES

1. SEE SHEET AD-101.

N

PARTIAL 7TH FLOOR DEMO RCP (PART B)

1/4" = 1'-0"

2' 4''0 8'

D E F

21'-8" 21'-8"

G H J

21'-8" 10'-0" 21'-8"

LEGEND

(D) SUPPLY AIR GRILLE

(D) RETURN AIR GRILLE

(D) LIGHT FIXTURE

(D) ACOUSTIC TILE PATTERN

SD

(E) FIRE PROTECTION SPRINKLER

HEAD

(D) SMOKE DETECTOR

ELEV.

S-6

8.1

W717B

STERILIZATION

(E)

W718

STAGING

(E) EQUIP.

ELEV.

S-6

LOBBY

(E) SERV. ELEV.

EQUIP. STORAGE

(E) SURGERY

(E) STAIR

NO. 3

717E

STAGING

(E) STERILE

718B

HOLDING

(E) CART

C7-2A

CORR.

(E)

C7-2

CORR.

(E)

BREAKOUT

(E) CLN. RECEIVING

& LINEN

(E) TRASH

(E) S.&T.

(E) E.C.

(E)

MECH.

SHAFT

ROOM

(E) MECHANICAL

TYP.

TYP.

MATCH LINE

SEE (PART A)/

AD-103

N.I.C. AREA FOR ARCHITECTURAL SCOPE

(SEE OTHER DISCIPLINE FOR WORK IN THIS AREA)

(E) SENSOR TRACK DEVICE

HARD BARRIER W/

ANTE-ROOM

PHASE 5

HARD BARRIER W/

ANTE-ROOM

PHASE 4

HARD BARRIER W/

ANTE-ROOM

PHASE 6

PHASE 1

PHASE 9

PHASE 8

PHASE 7

HARD BARRIER W/

ANTE-ROOM

HARD BARRIER W/

ANTE-ROOM

File details come from the government source that posted it. Updated .