Attachment O - Utility and Service Impact Permit.pdf
PDF 661 KB Posted
- Solicitation number
- 36C26222B0009_1
About this file
This document consists of a solicitation and related federal contract opportunity. The solicitation is for construction project 600-17-108 SPS Sterilizers and Equipment Site Prep at the VA Long Beach Healthcare System located in Long Beach, California. The work includes general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures, and other items required for completion. All work must be performed according to the solicitation terms, conditions, specifications, drawings, and applicable local and VA building codes. The related federal contract opportunity is solicitation number 36C26222B0009_1 for the same project. The description notes the requirement is for construction to perform site prep in a functioning hospital environment, with the contractor providing all labor, materials, tools, equipment, transportation, supervision, and training to accomplish the work.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Long Beach Healthcare System Tibor Rubin Medical Center
ES Form 600-138G-1 USIP Revised - 09.17.20
Date:
GC Safety Manager:
Phone:
Start Date: Start Time:
End Date: End Time:
Oxygen Nitrous Oxide Air Vacuum
Feeder Panel (#_____) Riser Circuit (#_____)
Air Handler Exhaust Fan
Water Steam Natural Gas
Hot Water Cold Water Heating Sewer
Device Type: Device Identifier:
Sprinkler Fire Pump Jockey Pump
Smoke Heat Pull AV
Date:
Phone:
Map of impacted areas and control shutoff points included with this form
Narrative to include sequence to make utility safe and then bring back on line; SOP may be attached in lieu of a description.
Section C - Shutdown Process
Section B - Areas Effected by Shutdown
List the rooms effected by the shutdown (Highlight rooms that contain Critical Mission equipment or functions)
Section B - Date and Time of Impact - 21 day notice required (form submission to VA)
Describe the purpose of the utility and/or system impact.
VA COR/PM:
When impacting fire alarm system utilize Worksheet A if shutdown effects only an individual device or system reset to restore to normal. Complete Parts II and III of this form if multiple devices or entire fire zone is effected.
Project #
Plant:
Section A - Requestor Information
Section A - COR/PM Information
Medical Gas:
Electrical:
Section C - Systems (This section may be revised during Part II coordination)
Plumbing:
Fire Alarm:
Section D - Purpose of Shutdown
PART II (Filled out by COR, Supervisor, or PM in coordination with Integrated Project Team - GC, Engineering M&O, Safety, etc)
Work order(s) placed. WO #'s_______________________________________________________
UTILITY AND SERVICE IMPACT PERMIT
Fire Suppression:
Initiating Device:
Other:
Prime Contractor:
Contractor POC:
HVAC:
PART I (Filled out by Contractor or Requestor)
Utility and Service Impact Permit 1 of 2
ES Form 600-138G-1 USIP Revised - 09.17.20
UTILITY AND SERVICE IMPACT PERMIT
Lockout: Simple Complex Form Attached (Complex Only) _____N/A
Electric "Live Work": Yes No Form Attached
Hot Taps:
Hot Work Permit: Yes No Form Attached
Hazard Assessment: Yes No Form Attached
ILSM: Yes No Form Attached
VISN Notification: Yes No Form Attached
ICRA: Yes No Form Attached
Yes No Form Attached
Service POC :__________________________ Title: ________________ Signature:____________________________
Service POC :__________________________ Title: ________________ Signature:____________________________
Service POC :__________________________ Title: ________________ Signature:____________________________
Service POC :__________________________ Title: ________________ Signature:____________________________
Service POC :__________________________ Title: ________________ Signature:____________________________
Service POC :__________________________ Title: ________________ Signature:____________________________
Service POC :__________________________ Title: ________________ Signature:____________________________
Service POC :__________________________ Title: ________________ Signature:____________________________
Service POC :__________________________ Title: ________________ Signature:____________________________
Service POC :__________________________ Title: ________________ Signature:____________________________
Service POC :__________________________ Title: ________________ Signature:____________________________
Service POC :__________________________ Title: ________________ Signature:____________________________
Service POC :__________________________ Title: ________________ Signature:____________________________
COR/Supervisor/PM : Signature: Date:
Shop Requiring Shutdown: __________________. Supervisor approval below:
Print name: Signature: Date:
Shop Requiring Shutdown: __________________. Supervisor approval below:
Print name: Signature: Date:
Shop Requiring Shutdown: __________________. Supervisor approval below:
Print name: Signature: Date:
OSEMS Safety Manager: Signature: Date:
General Foreman: Signature: Date:
Owning Section Chief: Recommendation: Approval Disapproval
Signature: Date:
Chief, Engineering Service: Date:
Excavation & Trenching:
PART II Cont'd (Filled out by COR, Supervisor, or PM in coordination w/ Integrated Project Team - GC, Engineering M&O, Safety, etc)
Affected employees shall be notified both before the onset of and after completion of the outage.
Section D - Special Issues Required (Forms highlighted below need to be posted in the jobsite)
NOT AUTHORIZED
Section A - Approvals
PART III (Routed to Signatures per Section A)
Date: ______________
Date: ______________
Date: ______________
Date: ______________
Date: ______________
Construction Safety Committee Notified - Email: VHALONCSCNotifications@va.gov
General Notification (3 Days Out) - On schedule -Email: VHALONENGINEERINGACTIONITEM@va.gov
Section E - Service representative concurrence (Service POC will print name, job title, sign, and date)
Date: ______________
Date: ______________
Date: ______________
Date: ______________
Date: ______________
Date: ______________
Date: ______________
Date: ______________
Section B - Notification of Employees
Utility and Service Impact Permit 2 of 2
ES Form 600-138G-1 USIP Revised - 09.17.20
General Notes:
2. VA Facilitates all programing.
What type of device Fire Alarm: Device Type: Device Identifier:
Fire Suppression: Sprinkler Fire Pump Jockey Pump
Initiating Device: Smoke Heat Pull/AV
Electronics Contractor
Safety Office Other: .
Has Safety Service been informed? YES NO N/A
Describe the work that is being conducted:
Describe how this work will impact the fire alarm system:
Describe how long the fire alarm system will be affected- Time/date(s):
Additional Comments:
List the areas that will be affected - Building(s), Area(s), Floor(s)+1, etc.:
FIRE ALARM EQUIPMENT STATUS
REPORT OF ACTIONS
Who is putting the fire system into a trouble condition? (Name and Department/Section)
1. Fill out form to ensure an accurate account of the fire system is kept.
3. If fire alarm system is affected for more than 4 hours, ILSM and Fire Watch forms are needed. Final copies must be sent to the VA Electric Shop.
Worksheet A 1 of 1
| Prime Contractor: |
| Contractor POC: |
| Start Date: |
| End Date: |
| Circuit: |
| Panel: |
| Device Identifier: |
| Smoke: |
| undefined: |
| Work orders placed WO s: |
| Text2: |
| Text3: |
| Text4: |
| Text5: |
| Text6: |
| Text7: |
| Text8: |
| Check Box9: Off |
| Check Box10: Off |
| Text11: |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
| Check Box27: Off |
| Check Box28: Off |
| Check Box29: Off |
| Check Box30: Off |
| Check Box31: Off |
| Check Box32: Off |
| Check Box33: Off |
| Check Box34: Off |
| Check Box35: Off |
| Service POC: |
| Service POC_2: |
| Service POC_3: |
| Service POC_4: |
| Service POC_5: |
| Service POC_6: |
| Service POC_7: |
| Service POC_8: |
| Service POC_9: |
| Service POC_10: |
| Service POC_11: |
| Service POC_12: |
| Service POC_13: |
| Title: |
| Title_2: |
| Title_3: |
| Title_4: |
| Title_5: |
| Title_6: |
| Title_7: |
| Title_8: |
| Title_9: |
| Title_10: |
| Title_11: |
| Title_12: |
| Title_13: |
| Shop Requiring Shutdown: |
| Shop Requiring Shutdown_2: |
| Shop Requiring Shutdown_3: |
| name1: |
| name2: |
| name3: |
| name4: |
| name5: |
| name: |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check BoxFA: Off |
| Check BoxFA1: Off |
| Check BoxFA2: Off |
| Check BoxFA3: Off |
| Check BoxFA4: Off |
| Check BoxFA5: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box11: Off |
| Check Box1: Off |
| Text14: |
| Text15: |
| Text16: |
| Text17: |
| Text18: |
| Text19: |
| Text20: |
| Text21: |
| Text22: |
| Text23: |
| Text24: |
| Text25: |
| Text26: |
| Text27: |
| Text28: |
| Text29: |
| Text30: |
| Text31: |
| Text32: |
| Text33: |
| Text34: |
| Check Box46: Off |
| Check Box48: Off |
| Check Box49: Off |
| Text1: |
| Text9: |
| Check Box36: Off |
| Check Box37: Off |
| Check Box38: Off |
| Check Box39: Off |
| Check Box40: Off |
| Check Box41: Off |
| Check Box42: Off |
| Check Box43: Off |
| Check Box44: Off |
| Check Box45: Off |
| Text46: |
| Check Box47: Off |
| Text50: |
| Text51: |
| Text52: |
| Text53: |
| Text54: |
| Text56: |
| Text191: |
| Text201: |
| Text211: |
File details come from the government source that posted it. Updated .