This document is an electric shop electrical work permit template for the VA Long Beach Healthcare System located at 5901 E 7th St, Long Beach, CA. The template outlines safety requirements and approvals for energized electrical work. It requires qualified electricians to have the appropriate personal protective equipment such as flame-retardant clothing, insulating tools, and voltage-rated gloves. The electricians must receive a safety briefing and acknowledge hazards. The work must be approved by an electric shop supervisor and safety officer. Barriers and warning signs are also necessary. The related federal contract opportunity is a solicitation for construction project 600-17-108 to perform site preparation for sterilizers and equipment in building 126, 7th floor. The work includes general construction, alterations, mechanical and electrical work, necessary demolition, and utility system work. All work must follow the solicitation terms and applicable building codes. The opportunity is from the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENERGIZED WORK
Supervisor, Competent Person, or VA Project Engineer (if no contractor):
Printed Name: Sign:
Work start/stop dates: From: To: Time:
EQUIPMENT NAME, LOCATION AND DESCRIPTION: Work order number:
DESCRIPTION OF WORK TO BE PERFORMED:
JUSTIFICATION FOR ENERGIZED WORK:
ELECTRICAL ENERGY SOURCES
PRESENT: Check all that apply:
Maximum Exposure:
Minimum PPE level:
RESULTS OF SHOCK AND FLASH ANALYSIS:
Flash Protection Boundary (2nd degree burn potential):
Approach Boundary (shock protection boundary):
(Note: Employee work on Levels 3 and above is PROHIBITED (work must be contracted) REQUIRED
PERSONAL PROTECTIVE EQUIPMENT:
Non-melting, untreated natural fiber clothing, all layers Shirt (long-sleeve) 8 cal/cm2 Pants (long) 8 cal/cm2 Polycarbonate safety glasses Ear protection EH-rated footwear Insulated tools
Leather gloves Flame-retardant coveralls (Level 1+) 8 cal/cm2
Type 1, Class E hard hat (Levels 1&2) Arc-rated face shield (Levels 1&2) FR flash suit and hood (Level 3+) 40 cal/cm2 Switchboard matting/insulated blankets Other items (specify)
Voltage-rated rubber gloves (Minimum 600V) (Inspect all gloves before each use) BARRIERS (to prevent access to flash protection and limited approach boundaries)
Locked access Barrier tapes, stanchions
Electrical hazard signs Other (describe):
SUPERVISOR’S PRE-JOB BRIEFING BY: Printed Name: Sign:
[ ] Workers are “qualified” (see 29 CFR 1910.399) with a journeyman electrical rating.
[ ] Safety watch is required. This person must be “qualified,” able to disconnect all power sources with proper
PPE and have immediate access to a telephone or radio to summon help in the event of an emergency.
[ ] All jewelry and metal apparel have been removed.
[ ] Confirmed that insulated tools, EH-rated footwear, switchboard matting, FR-clothing and other equipment is available, in good condition, and appropriate for the hazard level to be encountered.
[ ] Verified that barricades and warning signs are installed.
[ ] Outlined safe work practices to be followed (document under Special Instructions, below).
[ ] STOP WORK POINTS: Permit is void if any unexpected energy is found, or equipment has been modified since the permit was issued.
120 Volt 208 Volt
277 Volt 480 Volt
12KV
4160 Volt
VA LONG BEACH ELECTRICAL WORK PERMIT (Revision 1.1)
DE-ENERGIZED SHUTDOWN WORK
Generator
* Refer to "340.1 ESSOP - Electric, Energized Work Permit" when filling out this form.
* Refer to "300.6 ESSOP - Safety, Lockout - Tagout of Equipment" which will be adhered to in addition to your procedures/policies.
[ ] Special instructions and specific job-related hazards:
QUALIFIED PERSONS that understand and agree to the above plan:
Printed name(s): Signature(s) & Date: Printed name(s): Signature(s) & Date:
SAFETY WATCH:
Printed name: Signature & Date: Printed name: Signature & Date:
APPROVALS Print Sign Date Electric Shop Supervisor Mike Mommerency
Project Engineer
Maintenance Supervisor
John Gorman
Safety Officer
Facility Manager Anthony Streletz
Medical Center Deputy Director
Bryan Arnette
Work completed date/time:
List any unexpected hazards or “STOP WORK” issues encountered:
Additional: QUALIFIED PERSONS
1. ___________________
2. _____________________
3.
4. _______________________
* Additional signature blocks at the bottom
QUALIFIED PERSON:
5. __________________
6. __________________
Additional Signature Blocks:
7. __________________
8. __________________
SAFETY WATCH:
1. _________________ 4. ___________________
2. __________________ 5. ___________________
3. __________________ 6. ___________________
Blank Page
| Supervisor Competent Person or VA Project Engineer if no contractor Printed Name Sign: |
| EQUIPMENT NAME LOCATION AND DESCRIPTION Work order number: |
| DESCRIPTION OF WORK TO BE PERFORMED: |
| JUSTIFICATION FOR ENERGIZED WORK: |
| Other items specify: |
| Printed namesRow1_2: |
| Printed namesRow2: |
| Printed namesRow2_2: |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box17: Off |
| Text1: |
| Text2: |
| Text3: |
| Text5: |
| Text7: |
| Text8: |
| Text9: |
| Text10: |
| Printed names: |
| Printed Name: |
| Check Box15: Off |
| Check Box16: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box24: Off |
| Check Box25: Off |
| Text6: |
| Text11: |
| Text12: |
| Text25: |
| Dropdown2: [ ] |
| Printed Name 1: |
| Text4_1: |
| Text22: |
| Text4_6: |
| Text4_7: |
| Check Box26: Off |
| Check Box27: Off |
| Text4-145: |
| Text411: |
| Check Box28: Off |
| Text13: |
| Text14: |
| Text15: |
| Text16: |
| Text17: |
| Text18: |
| Text19: |
| Text20: |
| Text21: |
| Text23: |
File details come from the government source that posted it. Updated .