Attachment N - VOL6_1363603dwg7of10.pdf
PDF 2 MB Posted
- Attached to
- P475 Aircraft Maintenance Hangar
- Solicitation number
- N4008526R0148
About this file
These documents are detailed fire suppression and low-level suppression system design drawings for a P-475 Aircraft Maintenance Hangar at MCAS Beaufort, South Carolina, prepared by Jensen Hughes for the Naval Facilities Engineering Systems Command (NAVFAC). The comprehensive set of drawings specifies requirements for wet-pipe sprinkler systems and low-level trench suppression systems, with specific design criteria following NFPA 13, NFPA 409, and UFC standards. Key design specifications include a minimum water density of 0.10-0.20 GPM/SF across different hazard classifications, upright quick-response sprinklers in the hangar bay with a 175°F temperature rating, and a hydraulically designed Viking Grate Nozzle low-level trench system that must provide water at the most remote nozzle within 30 seconds and maintain discharge pressures between 30-35 PSI.
The drawings provide detailed technical schematics for multiple fire protection rooms (FP Rooms 116, 132, and 146), showing riser configurations, control valves, surge tanks, and system interconnections. Specific requirements include providing at least six spare sprinklers, ensuring all pipe penetrations through fire-rated barriers are properly fire-stopped, and implementing seismic protection for both sprinkler and low-level suppression piping. The design also includes precise requirements for signage, with specific color, lettering, and placement instructions for start and stop stations, and mandates for corrosion protection with an Environmental Severity Classification of C4 for building systems and components in designated rooms.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ALL AREAS ARE LIGHT HAZARD UNLESS NOTED OTHERWISE. A MINIMUM DENSITY OF
0.10 GPM/SF WITH A DESIGN AREA OF 1,500 SF MUST BE USED. HOSE ALLOWANCE 250 GPM.
SPRINKLER LAYOUT MUST COMPLY WITH NFPA 13 LIGHT HAZARD SPACING.
SPRINKLERS MUST HAVE A MINIMUM K-FACTOR OF 5.6.
ORDINARY HAZARD. A MINIMUM DENSITY OF 0.20 GPM/SF WITH A DESIGN
AREA OF 2,500 SF MUST BE USED. HOSE ALLOWANCE 250 GPM.
SPRINKLER LAYOUT MUST COMPLY WITH NFPA 13 ORDINARY HAZARD
SPACING. SPRINKLERS MUST HAVE A MINIMUM K-FACTOR OF 8.0.
HANGAR BAY. A MINIMUM DENSITY OF 0.20 GPM/SF WITH A DESIGN AREA OF
5,000 SF MUST BE USED. HOSE ALLOWANCE NOT REQUIRED.
NOTE: NFPA 13 DESIGN AREA REDUCTION FOR QUICK RESPONSE SPRINKLERS IS NOT
PERMITTED.
SPRINKLER HAZARD LEGEND
OH
LOW LEVEL SYSTEM LEGEND
LOW LEVEL SUPPRESSION PIPE
RELEASING SERVICE FIRE ALARM CONTROL UNIT
TEST HEADER
LOW LEVEL SUPPRESSION RISER
MANUAL LOW LEVEL SUPPRESSION SYSTEM DISCHARGE PULL STATION
MANUAL LOW LEVEL SUPPRESSION SYSTEM ABORT
ADDRESSABLE OUTPUT MODULE
ADDRESSABLE INPUT MODULE
RELAY
OPTICAL FLAME DETECTOR
CONTROL MODULE
SURGE SUPPRESSOR
PRESSURE SWITCH
SOLENOID
KEY MAINTENANCE SWITCH
CM
SS
RSFACU
M
R
AIM
AOM
SOL
KS
PS
FIRE SPRINKLER LEGEND
SPRINKLER PIPE
SUPERVISED CONTROL VALVE
WATERFLOW SWITCH
BACKFLOW PREVENTER
WALL MOUNT TEST HEADER
WATERFLOW ALARM BELL
FIRE DEPARTMENT CONNECTION
WET RISER
SYSTEM RISER
PIPE ELBOW UP OR DOWN
PIPE TEE UP OR DOWN
SPRINKLER VALVE TAMPER SWITCH
SPRINKLER WATER FLOW SWITCH
HAZARD CLASSIFICATION
POINT OF CONNECTION TO EXISTING
xx
FO
HGR
15-015-0 15-0
2" 2-1/2" 3" 3-1/2"
15-015-0 15-0
5"4" 6"
15-0
8"
STEEL PIPE SCHEDULE 10
NOMINAL PIPE SIZE
(in.)
1-1/4" 1-1/2"
SPACING BETWEEN HANGERS (STEEL PIPES)
N/AN/AN/A
1"
N/A
N/AN/A N/A N/AN/A N/A N/ASTEEL PIPE SCHEDULE 40 15-015-012-012-0
1" X DROP
1" 90 EL.
1" X ARMOVER
1" X 0'-2" NIPPLE
BRANCH LINE
PENDENT SPRINKLER HEAD
SUSPENDED CEILING
ROOF DECK
1"-12"
UPRIGHT
SPRINKLER
REDUCING TEE
DEFLECTOR TO BE ALIGNED
PARALLEL TO CEILING/ROOF
BRANCH
LINE
STEEL PIPE
FILL OPENING WITH
GROUT OR SEALANT
SEALANT, TYP.
DOUBLE GROUND.
CONNECT TO BUILDING
GROUNDING SYSTEM. TWO
LEADS MUST BE
CONNECTED NOT LESS
THAN 18" NOR MORE THAN
36" APART.
BOUNDARY WALL
GALVANIZED A.T.R.
3/8" ROD UP
TO 4" PIPE
1/2" ROD FOR LARGER
THAN 4" PIPE
STAINLESS HDI DROP
IN ANCHER
GALVANIZED PIPE
CLAMP SIZED FOR
PIPE DIA
Lic. No. 037705
ALISON WAKELINC
O M M O
N W
EAL
THOF
V
IR
G
IN
IA
P R O F
E
SSIONAL EN
G
IN
E E R
ENGINEERS + SURVEYORS
1 2 3 4 5
3 4 5
D
C
B
A
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
P -4
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
V
O
LU
M E
S
IT
E B
A S
E B
ID
A
N D
A D
D
IT
IO
N
A L
O P
T
IO
N S
D C
C O
R E
B E
A U
F O
R T
, S C
N O
R F
O
LK
, V A
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
M C
A S
B E
A U
F O
R T
FP ENGINEER
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
1363603
DRAWFORM REVISION: 25 AUGUST 2020
NOTE:
IF THIS DRAWING IS LESS THAN 34" X 22"
IT IS A REDUCED SIZE DRAWING
D
C
B
A
1 2
KTB / RLH
Approved by J. Scott Roberts, Asset Management Branch Head
& Supervisory Facility Planner, PWD Beaufort, SC via email.
EJA
DSN
DSN
12/15/2022
CUI
CUI
C U
I
M O
D P
5/
M O
D P
A
N D
M O
D P
0/
A ut od es k D oc s:
//2
V
M F
A T
F
M ai nt en an ce
H an ga r/2
F
M ai nt H an ge r - F
P
R V
T
.rv t
/5
/2
4:
:1
P
M
As indicated
H A
N G
A R
F
IR
E
S U
P P
R E
S S
IO
N
N O
T E
S A
N D
L E
G E
N D
FX001Z
ROP AHE APF
12871481
FIRE SPRINKLER GENERAL NOTES:
PROVIDE HANGAR AND SUPPORT AREAS WITH WET-PIPE SPRINKLER SYSTEMS
APPLICABLE CRITERIA:
NFPA 13 INSTALLATION OF SPRINKLER SYSTEMS, 2019.
UFC 3-600-01 FIRE PROTECTION ENGINEERING FOR FACILITIES (CHANGE 5), 24 SEPTEMBER 2020
UFC 4-211-01 AIRCRAFT MAINTENANCE HANGARS (CHANGE 2) 18 MAY 2020
WET PIPE SPRINKLER PIPE MUST BE U.L. LISTED BLACK STEEL, MINIMUM SCHEDULE 40 FOR PIPE DIAMETERS 2-IN AND LESS
AND MINIMUM SCHEDULE 10 FOR PIPE DIAMETER LARGER THAN 2-IN.
WITHIN SUPPORT AREAS, PROVIDE RECESSED QUICK-RESPONSE SPRINKLERS WITH ORDINARY TEMPERATURE RATING.
PROVIDE WHITE SPRINKLERS AND ESCUTCHEON PLATES.
WITHIN HANGAR BAY, PROVIDE UPRIGHT QUICK-RESPONSE SPRINKLERS AT THE ROOF OR CEILING LEVEL WITH A
TEMPERATURE RATING OF 175°F.
WITHIN HANGAR BAY, THE MAJORITY OR ALL OF THE SYSTEM MUST DRAIN BACK TO THE RISER. MINIMIZE OR ELIMINATE
THE REQUIREMENT FOR REMOTE DRAINAGE CONNECTIONS.
LOCATE INSPECTOR'S TEST CONNECTIONS AT THE RISER. TEST STATIONS ARE NOT PERMITTED IN THE HANGAR BAY.
WHERE DRAINAGE PIPING IS REQUIRED IN THE HANGAR BAY, DO NOT ROUTE THE PORTION OF THE DRAINAGE PIPING NORMALLY CONTAINING WATER AND ASSOCIATED DRAINAGE VALVE MORE THAN 5 FT BELOW THE LEVEL OF THE LOWEST SPRINKLER HEAD IN THE HANGAR BAY. ROUTE THE REMAINING NORMALLY EMPTY DRAINAGE PIPING TO THE BUILDING
EXTERIOR.
WITHIN HANGAR BAY, PROVIDE AUTOMATIC AIR VENTS AT HIGH POINTS IN THE SYSTEM TO VENT AT LEAST 95% OF THE VOLUMETRIC CAPACITY OF THE SYSTEM. LIMIT NUMBER OF AUTOMATIC AIR VENTS THROUGH MEANS SUCH AS
CONNECTING BRANCH LINES OR PROVIDING A CROSS MAIN AT THE PEAK.
ALL AREAS ARE LIGHT HAZARD UNLESS OTHERWISE INDICATED ON DESIGN DRAWINGS.
PROVIDE AT LEAST SIX SPARE SPRINKLERS WITH A MINIMUM OF TWO SPARE SPRINKLERS OF EACH TYPE AND TEMPERATURE CLASSIFICATION. PROVIDE SPARE SPRINKLER CABINET, WRENCHES, AND POSTED LIST OF ITEMS WITHIN
THE CABINET. INSTALL IN LOCATION AS DIRECTED BY BUILDING MAINTENANCE PERSONNEL.
SPRINKLER SYSTEM MUST BE HYDRAULICALLY DESIGNED.
ALL PIPE PENETRATIONS THROUGH FIRE RATED BARRIERS MUST BE PROVIDED WITH U.L. LISTED FIRE STOP SYSTEMS.
THIS INCLUDES BUT IS NOT LIMITED TO STAIRS, FLOORS, CEILINGS AND SHAFTS.
UL CLASSIFICATIONS AND MATERIAL PRODUCT DATA SHEETS FOR ALL FIRE STOPPING SYSTEMS MUST BE SUBMITTED AND
APPROVED BEFORE ANY FIRE STOPPING IS INSTALLED.
THESE DRAWINGS DEMONSTRATE THE CONFIGURATION OF MAJOR SYSTEM COMPONENTS. THEY ARE DIAGRAMMATIC IN NATURE AND ARE NOT INTENDED TO SHOW EXACT LOCATIONS. PIPE LENGTHS AND ELEVATIONS INDICATED ON THE DRAWINGS (IF SHOWN) ARE APPROXIMATE. COORDINATE FINAL INSTALLATION WITH ACTUAL FIELD CONDITIONS AND OTHER CONSTRUCTION TRADES. THE CONTRACTOR MUST DESIGN THE SPRINKLER SYSTEM TO PROVIDE COMPLETE
PROTECTION THROUGHOUT IN ACCORDANCE WITH NFPA 13.
PROVIDE SEISMIC PROTECTION IN ACCORDANCE WITH NFPA 13.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
LOW LEVEL SUPPRESSION GENERAL NOTES:
PROVIDE HYDRAULICALLY DESIGNED LOW LEVEL TRENCH SYSTEM, THAT UTLIZES THE VIKING GRATE NOZZLE™
APPLICABLE CRITERIA:
NFPA 409 AIRCRAFT HANGARS, 2016 (WHERE EXPLICITLY REFERENCED BY UFC 4-211-01)
UFC 3-600-01 FIRE PROTECTION ENGINEERING FOR FACILITIES (CHANGE 5) 24 SEPTEMBER 2020
UFC 4-211-01* AIRCRAFT MAINTENANCE HANGARS (CHANGE 1) NOV 2017
* GENERALLY, THE BUILDING IS DESIGNED TO UFC 4-211-01 CHANGE 2, EXCEPT ANYTHING RELATED TO THE LOW LEVEL
SUPPRESSION SYSTEM WHICH IS DESIGNED TO CHANGE 1.
PROVIDE WATER AT THE MOST REMOTE NOZZLE WITHIN 30 SECONDS UPON WATER SYSTEM ACTIVATION SUCH AS FROM THE MANUAL RELEASING SYSTEM. MAINTAIN DISCHARGE PRESSURE FOR ALL NOZZLES BETWEEN 30 PSIG AND 35 PSIG.
CONFIGURE THE SYSTEM TO ONLY RELEASE THE TRENCH NOZZLE SYSTEM ASSOCIATED WITH THE FIRE EVENT.
WATER AND CONCENTRATE SUPPLIES MUST ALLOW FOR SUFFICIENT SIMULTANEOUS OPERATION OF ALL TRENCH NOZZLE SYSTEMS WITHIN THE FIRE AREA THAT ARE WHOLLY OR PARTIALLY WITHIN A 100 FT HORIZONTAL RADIUS OF ANY POINT ON
THE HANGAR BAY FLOOR.
PROVIDE SEISMIC PROTECTION OF LOW LEVEL SUPPRESSION PIPING IN ACCORDANCE WITH NFPA 13.
1.
2.
3.
4.
5.
6.
NOT TO SCALE
A1
HANGER SPACING CHART
NOT TO SCALE
B1
TYPICAL PENDENT SPRINKLER
NOT TO SCALE
B2
TYPICAL UPRIGHT SPRINKLER
NOT TO SCALE
C2
SPRINKLER PIPE GROUNDING
NOT TO SCALE
A3
TRENCH PIPE STAND
M
FO
MFO
MFO
180° 250°
360°
70°
360°
180° 250°
180° 250°
360°
70°
360°
180° 250°
180° 250°
360°
70°
360°
180° 250°
HK
D
HE
HF
HG
HH
HJ
32 4H1 H5 H6 H7 H8 H9H2 H3 H4
FP
AIRFRAMES STOR
114C
VEST
1C05
02 03 04 02
Lic. No. 037705
ALISON WAKELINC
O M M O
N W
EAL
THOF
V
IR
G
IN
IA
P R O F
E
SSIONAL EN
G
IN
E E R
ENGINEERS + SURVEYORS
KEY NOTES 00
SHEET NOTES:
NOTES:
A B C
D
KEYPLAN
E F
0 5'
1/8" = 1'-0" GRAPHIC SCALE
10' 20' 30'
N
PLAN
NORTH
1 2 3 4 5
3 4 5
D
C
B
A
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
P -4
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
V
O
LU
M
E B
A S
E B
ID
A
N D
A D
D
IT
IO
N
A L
O P
T
IO
N S
D C
C O
R E
B E
A U
F O
R T
, S C
N O
R F
O
LK
, V A
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
M C
A S
B E
A U
F O
R T
FP ENGINEER
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
1363603
DRAWFORM REVISION: 25 AUGUST 2020
NOTE:
IF THIS DRAWING IS LESS THAN 34" X 22"
IT IS A REDUCED SIZE DRAWING
D
C
B
A
1 2
KTB / RLH
Approved by J. Scott Roberts, Asset Management Branch Head
& Supervisory Facility Planner, PWD Beaufort, SC via email.
EJA
DSN
DSN
12/15/2022
CUI
CUI
C U
I
M O
D P
5/
M O
D P
A
N D
M O
D P
0/
A ut od es k D oc s:
//2
V
M F
A T
F
M ai nt en an ce
H an ga r/2
F
M ai nt H an ge r - F
P
R V
T
.rv t
/5
/2
4:
:1
P
M
1/8" = 1'-0"
H A
N G
A R
L
O W
L E
V E
L S
U P
P R
E S
S
IO
N P
LA
N
G
R O
U N
D F
LO
O
R
S E
C T
O R
A
FX011ZA
ROP AHE APF
12871482
01 PROVIDE 1-INCH HIGH BLOCK LETTERING SIGN TO INDICATE WHICH
LOW LEVEL SUPPRESSION ZONE IS ACTIVATED BY THIS RELEASING
STATION.
OPTICAL FLAME DETECTOR: PROTECTED ZONE IS LOW LEVEL
SUPPRESSION SYSTEM A
LOW-LEVEL MANUAL STOP STATION
LOW-LEVE MANUAL RELEASE STATION
LOW LEVEL SUPPRESSION SYSTEM A
OPTICAL FLAME DETECTOR: PROTECTED ZONE IS LOW LEVEL
SUPPRESSION SYSTEMS A AND B
RELEASING STATION MUST ACTIVATE LOW LEVEL SUPPRESSION
SYSTEMS A AND B
01 01
REFER TO SHEET FX001 FOR GENERAL NOTES AND SYMBOLS.A.
1/8" = 1'-0" A1
HANGAR - LOW LEVEL SUPPRESSION PLAN - GROUND FLOOR - SECTOR A
PROVIDE EXTERIOR EXPOSURE CORROSION PROTECTION AND CONTROL IN
ACCORDANCE WITH AN ENVIRONMENTAL SEVERITY CLASSIFICATION (ESC)
OF C4 FOR BUILDING SYSTEMS AND COMPONENTS IN THE FOLLOWING
ROOMS: 100 HANGAR, 120 GSE STORAGE, 124 COMPRESS, 135B ELEC, 153
MECH, 153A WATER RM. 154 FP CL, 1S02 STAIR 2, AND 1S03 STAIR 3.
B.
MFO
180° 250°
360°
70°
360°
180° 250°
180° 250°
360°
70°
360°
180° 250°
180° 250°
360°
70°
360°
180° 250°
HK
D
HE
HF
HG
HH
HJ
5 6 8H10 H11 H12 H13 H145.10 976.86.6
FP
132 MAINT CHIEF
134D
VEST
1C07
02 02 03 04 02 02 0306 07
Lic. No. 037705
ALISON WAKELINC
O M M O
N W
EAL
THOF
V
IR
G
IN
IA
P R O F
E
SSIONAL EN
G
IN
E E R
ENGINEERS + SURVEYORS
KEY NOTES 00
SHEET NOTES:
NOTES:
A B C
D
KEYPLAN
E F
0 5'
1/8" = 1'-0" GRAPHIC SCALE
10' 20' 30'
N
PLAN
NORTH
1 2 3 4 5
3 4 5
D
C
B
A
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
P -4
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
V
O
LU
M
E B
A S
E B
ID
A
N D
A D
D
IT
IO
N
A L
O P
T
IO
N S
D C
C O
R E
B E
A U
F O
R T
, S C
N O
R F
O
LK
, V A
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
M C
A S
B E
A U
F O
R T
FP ENGINEER
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
1363603
DRAWFORM REVISION: 25 AUGUST 2020
NOTE:
IF THIS DRAWING IS LESS THAN 34" X 22"
IT IS A REDUCED SIZE DRAWING
D
C
B
A
1 2
KTB / RLH
Approved by J. Scott Roberts, Asset Management Branch Head
& Supervisory Facility Planner, PWD Beaufort, SC via email.
EJA
DSN
DSN
12/15/2022
CUI
CUI
C U
I
M O
D P
5/
M O
D P
A
N D
M O
D P
0/
A ut od es k D oc s:
//2
V
M F
A T
F
M ai nt en an ce
H an ga r/2
F
M ai nt H an ge r - F
P
R V
T
.rv t
/5
/2
4:
:1
P
M
1/8" = 1'-0"
H A
N G
A R
L
O W
L E
V E
L S
U P
P R
E S
S
IO
N P
LA
N
G
R O
U N
D F
LO
O
R
S E
C T
O R
B
FX011ZB
ROP AHE APF
12871483
REFER TO SHEET FX001 FOR GENERAL NOTES AND SYMBOLS.A.
01 PROVIDE 1-INCH HIGH BLOCK LETTERING SIGN TO INDICATE WHICH
LOW LEVEL SUPPRESSION ZONE IS ACTIVATED BY THIS RELEASING
STATION.
OPTICAL FLAME DETECTOR: PROTECTED ZONE IS LOW LEVEL
SUPPRESSION SYSTEM B
LOW-LEVEL MANUAL STOP STATION
LOW-LEVEL MANUAL RELEASE STATION
LOW LEVEL SUPPRESSION SYSTEM B
OPTICAL FLAME DETECTOR: PROTECTED ZONE IS LOW LEVEL
SUPPRESSION SYSTEMS A AND B
OPTICAL FLAME DETECTOR: PROTECTED ZONE IS LOW LEVEL
SUPPRESSION SYSTEMS B AND C
1/8" = 1'-0" A1
HANGAR - LOW LEVEL SUPPRESSION PLAN - GROUND FLOOR - SECTOR B
PROVIDE EXTERIOR EXPOSURE CORROSION PROTECTION AND CONTROL IN
ACCORDANCE WITH AN ENVIRONMENTAL SEVERITY CLASSIFICATION (ESC)
OF C4 FOR BUILDING SYSTEMS AND COMPONENTS IN THE FOLLOWING
ROOMS: 100 HANGAR, 120 GSE STORAGE, 124 COMPRESS, 135B ELEC, 153
M
FO
MFO
180° 250°
360°
70°
360°
180° 250°
180° 250°
360°
70°
360°
180° 250°
180° 250°
360°
70°
360°
180° 250°
HK
D
HE
HF
HG
HH
HJ
10 11 1413H15 H16 H17 H18 H19
H23
H22H21H20
MC SEC STOR
VEST
1C10
02 02
02 01
Lic. No. 037705
ALISON WAKELINC
O M M O
N W
EAL
THOF
V
IR
G
IN
IA
P R O F
E
SSIONAL EN
G
IN
E E R
ENGINEERS + SURVEYORS
KEY NOTES 00
SHEET NOTES:
NOTES:
A B C
D
KEYPLAN
E F
0 5'
1/8" = 1'-0" GRAPHIC SCALE
10' 20' 30'
N
PLAN
NORTH
1 2 3 4 5
3 4 5
D
C
B
A
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
P -4
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
V
O
LU
M
E B
A S
E B
ID
A
N D
A D
D
IT
IO
N
A L
O P
T
IO
N S
D C
C O
R E
B E
A U
F O
R T
, S C
N O
R F
O
LK
, V A
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
M C
A S
B E
A U
F O
R T
FP ENGINEER
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
1363603
DRAWFORM REVISION: 25 AUGUST 2020
NOTE:
IF THIS DRAWING IS LESS THAN 34" X 22"
IT IS A REDUCED SIZE DRAWING
D
C
B
A
1 2
KTB / RLH
Approved by J. Scott Roberts, Asset Management Branch Head
& Supervisory Facility Planner, PWD Beaufort, SC via email.
EJA
DSN
DSN
12/15/2022
CUI
CUI
C U
I
M O
D P
5/
M O
D P
A
N D
M O
D P
0/
A ut od es k D oc s:
//2
V
M F
A T
F
M ai nt en an ce
H an ga r/2
F
M ai nt H an ge r - F
P
R V
T
.rv t
/5
/2
4:
:1
P
M
1/8" = 1'-0"
H A
N G
A R
L
O W
L E
V E
L S
U P
P R
E S
S
IO
N P
LA
N
G
R O
U N
D F
L O
O R
S
E C
T O
R C
FX011ZC
ROP AHE APF
12871484
01 PROVIDE 1-INCH HIGH BLOCK LETTERING SIGN TO INDICATE WHICH
LOW LEVEL SUPPRESSION ZONE IS ACTIVATED BY THIS RELEASING
STATION.
OPTICAL FLAME DETECTOR: PROTECTED ZONE IS LOW LEVEL
SUPPRESSION SYSTEM C
LOW-LEVEL MANUAL STOP STATION
LOW-LEVEL MANUAL RELEASE STATION
FIRE DEPARTMENT CONNECTION LOCATION
LOW LEVEL SUPPRESSION SYSTEM C
OPTICAL FLAME DETECTOR: PROTECTED ZONE IS LOW LEVEL
SUPPRESSION SYSTEMS B AND C
RELEASING STATION MUST ACTIVATE LOW LEVEL SUPPRESSION
SYSTEMS B AND C
01 01
REFER TO SHEET FX001 FOR GENERAL NOTES AND SYMBOLS.A.
1/8" = 1'-0"
HANGAR - LOW LEVEL SUPPRESSION PLAN - GROUND FLOOR - SECTOR C
PROVIDE EXTERIOR EXPOSURE CORROSION PROTECTION AND CONTROL IN
ACCORDANCE WITH AN ENVIRONMENTAL SEVERITY CLASSIFICATION (ESC)
OF C4 FOR BUILDING SYSTEMS AND COMPONENTS IN THE FOLLOWING
ROOMS: 100 HANGAR, 120 GSE STORAGE, 124 COMPRESS, 135B ELEC, 153
B
C
D
HE
32 4 5
H5 H6 H7
H8 H9 H10
A
H4
COMPRESS
SEAT MAINT OFF
118A
SEAT MAINT SHOP
FP
AIRFRAMES SHOP
AIRFRAMES STOR
114C
COND. STOR
114B
AIRFRAMES OFF
114A
POWER LINE SHOP
GSE STORAGE
VEST
1C04
COMM
RECY
JAN
QA
QA OFF
113A
CAREER
TRAINING
STAIR 3
1S03
CORR
1C03
CORR
1C02
VEST
1C05
02 03 04 02
06 06
FX401Z
C1
Lic. No. 037705
ALISON WAKELINC
O M M O
N W
EAL
THOF
V
IR
G
IN
IA
P R O F
E
SSIONAL EN
G
IN
E E R
ENGINEERS + SURVEYORS
KEY NOTES 00
SHEET NOTES:
NOTES:
A B C
D
KEYPLAN
E F
0 5'
1/8" = 1'-0" GRAPHIC SCALE
10' 20' 30'
N
PLAN
NORTH
1 2 3 4 5
3 4 5
D
C
B
A
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
P -4
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
V
O
LU
M
E B
A S
E B
ID
A
N D
A D
D
IT
IO
N
A L
O P
T
IO
N S
D C
C O
R E
B E
A U
F O
R T
, S C
N O
R F
O
LK
, V A
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
M C
A S
B E
A U
F O
R T
FP ENGINEER
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
1363603
DRAWFORM REVISION: 25 AUGUST 2020
NOTE:
IF THIS DRAWING IS LESS THAN 34" X 22"
IT IS A REDUCED SIZE DRAWING
D
C
B
A
1 2
KTB / RLH
Approved by J. Scott Roberts, Asset Management Branch Head
& Supervisory Facility Planner, PWD Beaufort, SC via email.
EJA
DSN
DSN
12/15/2022
CUI
CUI
C U
I
M O
D P
5/
M O
D P
A
N D
M O
D P
0/
A ut od es k D oc s:
//2
V
M F
A T
F
M ai nt en an ce
H an ga r/2
F
M ai nt H an ge r - F
P
R V
T
.rv t
/5
/2
4:
:1
P
M
1/8" = 1'-0"
H A
N G
A R
L
O W
L E
V E
L S
U P
P R
E S
S
IO
N P
LA
N
G
R O
U N
D F
L O
O R
S
E C
T O
R D
FX011ZD
ROP AHE APF
12871485
REFER TO SHEET FX001 FOR GENERAL NOTES AND SYMBOLS.A.
1/8" = 1'-0" A1
HANGAR - LOW LEVEL SUPPRESSION PLAN - GROUND FLOOR - SECTOR D
PROVIDE EXTERIOR EXPOSURE CORROSION PROTECTION AND CONTROL IN
ACCORDANCE WITH AN ENVIRONMENTAL SEVERITY CLASSIFICATION (ESC)
OF C4 FOR BUILDING SYSTEMS AND COMPONENTS IN THE FOLLOWING
ROOMS: 100 HANGAR, 120 GSE STORAGE, 124 COMPRESS, 135B ELEC, 153
B
C
D
HE
6 8
H11 H12 H13 H14
5.10 7.2
A
976.86.6
POWER LINE OFF
110A
POWER LINE STOR
110B
FP
132 MAINT CHIEF
134D
MAINT OFF
134C
MAIN CNTRL OFF
134B
MC SUPPLY
134A
TOOL RM
FLIGHT EQUIP
MAINT CONTROL
JAN
BLDG MAINT STOR
FLIGHT EQUIP STOR
141A
FLIGHT EQUIP OFF
141B
ELEC
135A
DUTY
BUNK
VEST
1C01
ELEV MACH
LOBBY
CORR
1C08
CORR
1C06
VEST
1C07
ELEC
135B
FP CL
02 03 04 02 02 0307
FX402Z
C1
FX404
C3
Lic. No. 037705
ALISON WAKELINC
O M M O
N W
EAL
THOF
V
IR
G
IN
IA
P R O F
E
SSIONAL EN
G
IN
E E R
ENGINEERS + SURVEYORS
KEY NOTES 00
SHEET NOTES:
NOTES:
A B C
D
KEYPLAN
E F
0 5'
1/8" = 1'-0" GRAPHIC SCALE
10' 20' 30'
N
PLAN
NORTH
1 2 3 4 5
3 4 5
D
C
B
A
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
P -4
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
V
O
LU
M
E B
A S
E B
ID
A
N D
A D
D
IT
IO
N
A L
O P
T
IO
N S
D C
C O
R E
B E
A U
F O
R T
, S C
N O
R F
O
LK
, V A
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
M C
A S
B E
A U
F O
R T
FP ENGINEER
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
1363603
DRAWFORM REVISION: 25 AUGUST 2020
NOTE:
IF THIS DRAWING IS LESS THAN 34" X 22"
IT IS A REDUCED SIZE DRAWING
D
C
B
A
1 2
KTB / RLH
Approved by J. Scott Roberts, Asset Management Branch Head
& Supervisory Facility Planner, PWD Beaufort, SC via email.
EJA
DSN
DSN
12/15/2022
CUI
CUI
C U
I
M O
D P
5/
M O
D P
A
N D
M O
D P
0/
A ut od es k D oc s:
//2
V
M F
A T
F
M ai nt en an ce
H an ga r/2
F
M ai nt H an ge r - F
P
R V
T
.rv t
/5
/2
4:
:1
P
M
1/8" = 1'-0"
H A
N G
A R
L
O W
L E
V E
L S
U P
P R
E S
S
IO
N P
LA
N
G
R O
U N
D F
LO
O
R
S E
C T
O R
E
FX011ZE
ROP AHE APF
12871486
01 INCOMING 16" SERVICE LATERAL; REFER TO DRAWING CU105
FOR CONTINUATION.
REFER TO SHEET FX001 FOR GENERAL NOTES AND SYMBOLS.A.
1/8" = 1'-0" A1
HANGAR - LOW LEVEL SUPPRESSION PLAN - GROUND FLOOR - SECTOR E
PROVIDE EXTERIOR EXPOSURE CORROSION PROTECTION AND CONTROL IN
ACCORDANCE WITH AN ENVIRONMENTAL SEVERITY CLASSIFICATION (ESC)
OF C4 FOR BUILDING SYSTEMS AND COMPONENTS IN THE FOLLOWING
ROOMS: 100 HANGAR, 120 GSE STORAGE, 124 COMPRESS, 135B ELEC, 153
MFO
B
C
D
HE
10 11 1413
H15 H16 H17 H18 H19
A
MC SEC STOR
TOOL RM
FP
VAULT
150C
AVIONICS PARTS
150B
AVIONICS OFF
150A
AVIONICS
AVIATION ORD SHOP
AVIATION ORD OFF
152A
MECH
COMM
VEND / BREAK
M TLT
W TLT
W LKRS & SHWR
151A
WATER RM
153A
STAIR 2
1S02
CORR
1C09
VEST
1C11
M LKRS & SHWR
149A
VEST
1C10
02 02
02 0107
08 06
FX403Z
C1
Lic. No. 037705
ALISON WAKELINC
O M M O
N W
EAL
THOF
V
IR
G
IN
IA
P R O F
E
SSIONAL EN
G
IN
E E R
ENGINEERS + SURVEYORS
KEY NOTES 00
SHEET NOTES:
NOTES:
A B C
D
KEYPLAN
E F
0 5'
1/8" = 1'-0" GRAPHIC SCALE
10' 20' 30'
N
PLAN
NORTH
1 2 3 4 5
3 4 5
D
C
B
A
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
P -4
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
V
O
LU
M
E B
A S
E B
ID
A
N D
A D
D
IT
IO
N
A L
O P
T
IO
N S
D C
C O
R E
B E
A U
F O
R T
, S C
N O
R F
O
LK
, V A
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
M C
A S
B E
A U
F O
R T
FP ENGINEER
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
1363603
DRAWFORM REVISION: 25 AUGUST 2020
NOTE:
IF THIS DRAWING IS LESS THAN 34" X 22"
IT IS A REDUCED SIZE DRAWING
D
C
B
A
1 2
KTB / RLH
Approved by J. Scott Roberts, Asset Management Branch Head
& Supervisory Facility Planner, PWD Beaufort, SC via email.
EJA
DSN
DSN
12/15/2022
CUI
CUI
C U
I
M O
D P
5/
M O
D P
A
N D
M O
D P
0/
A ut od es k D oc s:
//2
V
M F
A T
F
M ai nt en an ce
H an ga r/2
F
M ai nt H an ge r - F
P
R V
T
.rv t
/5
/2
4:
:2
P
M
1/8" = 1'-0"
H A
N G
A R
L
O W
L E
V E
L S
U P
P R
E S
S
IO
N P
LA
N
G
R O
U N
D F
LO
O
R
S E
C T
O R
F
FX011ZF
ROP AHE APF
12871487
REFER TO SHEET FX001 FOR GENERAL NOTES AND SYMBOLS.A.
01 FIRE DEPARTMENT CONNECTION LOCATION
1/8" = 1'-0" A1
HANGAR - LOW LEVEL SUPPRESSION PLAN - GROUND FLOOR - SECTOR F
PROVIDE EXTERIOR EXPOSURE CORROSION PROTECTION AND CONTROL IN
ACCORDANCE WITH AN ENVIRONMENTAL SEVERITY CLASSIFICATION (ESC)
OF C4 FOR BUILDING SYSTEMS AND COMPONENTS IN THE FOLLOWING
ROOMS: 100 HANGAR, 120 GSE STORAGE, 124 COMPRESS, 135B ELEC, 153
HE
H7
FP
HANGAR
x3
A1
FX401Z
A1
FX401Z
Level 1 0' - 0"
LS - Level 2 16' - 0"
D HE
Lic. No. 037705
ALISON WAKELINC
O M M O
N W
EAL
THOF
V
IR
G
IN
IA
P R O F
E
SSIONAL EN
G
IN
E E R
ENGINEERS + SURVEYORS
KEY NOTES 00
SHEET NOTES:
NOTES:
1/4" = 1'-0" GRAPHIC SCALE
15'10'5'1'0
1 2 3 4 5
3 4 5
D
C
B
A
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
P -4
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
V
O
LU
M
E B
A S
E B
ID
A
N D
A D
D
IT
IO
N
A L
O P
T
IO
N S
D C
C O
R E
B E
A U
F O
R T
, S C
N O
R F
O
LK
, V A
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
M C
A S
B E
A U
F O
R T
FP ENGINEER
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
1363603
DRAWFORM REVISION: 25 AUGUST 2020
NOTE:
IF THIS DRAWING IS LESS THAN 34" X 22"
IT IS A REDUCED SIZE DRAWING
D
C
B
A
1 2
KTB / RLH
Approved by J. Scott Roberts, Asset Management Branch Head
& Supervisory Facility Planner, PWD Beaufort, SC via email.
EJA
DSN
DSN
12/15/2022
CUI
CUI
C U
I
M O
D P
5/
M O
D P
A
N D
M O
D P
0/
A ut od es k D oc s:
//2
V
M F
A T
F
M ai nt en an ce
H an ga r/2
F
M ai nt H an ge r - F
P
R V
T
.rv t
/5
/2
4:
:2
P
M
1/4" = 1'-0"
H A
N G
A R
L
O W
L E
V E
L S
U P
P R
E S
S
IO
N E
N
LA
R G
E D
P
LA
N
F P
A
FX401Z
ROP AHE APF
12871488
1/4" = 1'-0" C1
HANGAR - LOW LEVEL SUPPRESSION ENLARGED PLAN - FP ROOM 116
1/4" = 1'-0" A1
FP ROOM 116 - LOW LEVEL SUPPRESSION RISER SECTION
01 NOT USED
02 LOW LEVEL SUPPRESSION RISER
SEE SHEET FX501 FOR DETAIL ITEMS
03 PROVIDE SURGE TANK. MINIMUM SIZE 25 GALLON OR LARGER
PER SURGE ANALYSIS.
REFER TO SHEET FX001 FOR GENERAL NOTES AND SYMBOLS.A.
04 SUPERVISED CONTROL VALVE (TYPICAL).
CM
K S
R S
F A
C U
D
HE
65.10 x5
06 10 x7
A1
FX402Z
A1
FX402Z
Level 1 0' - 0"
LS - Level 2 16' - 0"
D HE
Lic. No. 037705
ALISON WAKELINC
O M M O
N W
EAL
THOF
V
IR
G
IN
IA
P R O F
E
SSIONAL EN
G
IN
E E R
ENGINEERS + SURVEYORS
KEY NOTES 00
SHEET NOTES:
NOTES:
1/4" = 1'-0" GRAPHIC SCALE
15'10'5'1'0
1 2 3 4 5
3 4 5
D
C
B
A
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
P -4
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
V
O
LU
M
E B
A S
E B
ID
A
N D
A D
D
IT
IO
N
A L
O P
T
IO
N S
D C
C O
R E
B E
A U
F O
R T
, S C
N O
R F
O
LK
, V A
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
M C
A S
B E
A U
F O
R T
FP ENGINEER
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
1363603
DRAWFORM REVISION: 25 AUGUST 2020
NOTE:
IF THIS DRAWING IS LESS THAN 34" X 22"
IT IS A REDUCED SIZE DRAWING
D
C
B
A
1 2
KTB / RLH
Approved by J. Scott Roberts, Asset Management Branch Head
& Supervisory Facility Planner, PWD Beaufort, SC via email.
EJA
DSN
DSN
12/15/2022
CUI
CUI
C U
I
M O
D P
5/
M O
D P
A
N D
M O
D P
0/
A ut od es k D oc s:
//2
V
M F
A T
F
M ai nt en an ce
H an ga r/2
F
M ai nt H an ge r - F
P
R V
T
.rv t
/5
/2
4:
:2
P
M
1/4" = 1'-0"
H A
N G
A R
L
O W
L E
V E
L S
U P
P R
E S
S
IO
N E
N
LA
R G
E D
P
LA
N
F P
B
FX402Z
ROP AHE APF
12871489
1/4" = 1'-0" C1
HANGAR - LOW LEVEL SUPPRESSION ENLARGED PLAN - FP ROOM 132
1/4" = 1'-0" A1
FP ROOM 132 - LOW LEVEL SUPPRESSION RISER SECTION
01 NOT USED
02 LOW LEVEL SUPPRESSION RISER
SEE SHEET FX501 FOR DETAIL ITEMS
03 PROVIDE SURGE TANK. MINIMUM SIZE 25 GALLON OR LARGER
PER SURGE ANALYSIS.
DO NOT CONNECT THE FIRE ALARM AND LOW LEVEL
SUPPRESSION RELEASING CONTROL PANELS WITH NETWORK
CABLE. COMMUNICATE FUNCTIONALITY BETWEEN PANELS
THROUGH ADDRESSABLE MODULES ONLY.
CHECK VALVE06
STRAINER07
WET-PIPE RISER
SEE SHEET FX501 FOR DETAIL ITEMS
SUPERVISED CONTROL VALVE (TYPICAL)08
WATER SUPPLY TO FP ROOM 116 AND FP ROOM 146.09
REFER TO SHEET FX001 FOR GENERAL NOTES AND SYMBOLS.A.
TO FIRE DEPARTMENT CONNECTION10
SEISMIC SEPARATION ASSEMBLY11
FP
D
HE
02x3
A1
FX403Z
A1
FX403Z
Level 1 0' - 0"
LS - Level 2 16' - 0"
DHE
Lic. No. 037705
ALISON WAKELINC
O M M O
N W
EAL
THOF
V
IR
G
IN
IA
P R O F
E
SSIONAL EN
G
IN
E E R
ENGINEERS + SURVEYORS
KEY NOTES 00
SHEET NOTES:
NOTES:
1'-0" = 1'-0" GRAPHIC SCALE
0 3"2"1" 4"½"
1 2 3 4 5
3 4 5
D
C
B
A
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
P -4
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
V
O
LU
M
E B
A S
E B
ID
A
N D
A D
D
IT
IO
N
A L
O P
T
IO
N S
D C
C O
R E
B E
A U
F O
R T
, S C
N O
R F
O
LK
, V A
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
M C
A S
B E
A U
F O
R T
FP ENGINEER
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
1363603
DRAWFORM REVISION: 25 AUGUST 2020
NOTE:
IF THIS DRAWING IS LESS THAN 34" X 22"
IT IS A REDUCED SIZE DRAWING
D
C
B
A
1 2
KTB / RLH
Approved by J. Scott Roberts, Asset Management Branch Head
& Supervisory Facility Planner, PWD Beaufort, SC via email.
EJA
DSN
DSN
12/15/2022
CUI
CUI
C U
I
M O
D P
5/
M O
D P
A
N D
M O
D P
0/
A ut od es k D oc s:
//2
V
M F
A T
F
M ai nt en an ce
H an ga r/2
F
M ai nt H an ge r - F
P
R V
T
.rv t
/5
/2
4:
:2
P
M
1/4" = 1'-0"
H A
N G
A R
L
O W
L E
V E
L S
U P
P R
E S
S
IO
N E
N
LA
R G
E D
P
LA
N
F P
C
FX403Z
ROP AHE APF
12871490
1/4" = 1'-0" C1
HANGAR - LOW LEVEL SUPPRESSION ENLARGED PLAN - FP ROOM 146
1/4" = 1'-0" A1
FP ROOM 146 - LOW LEVEL SUPPRESION RISER SECTION
01 NOT USED
02 LOW LEVEL SUPPRESSION RISER
SEE SHEET FX501Z FOR DETAIL ITEMS
03 PROVIDE SURGE TANK. MINIMUM 25 GALLON OR LARGER PER
SURGE ANALYSIS.
REFER TO SHEET FX001 FOR GENERAL NOTES AND SYMBOLS.A.
04 SUPERVISED CONTROL VALVE (TYPICAL).
SPRINKLER RISER GENERAL NOTES
1. VANE-TYPE WATER FLOW SWITCH MUST BE MOUNTED A
MINIMUM OF 12-INCHES FROM ANY FITTING AND 24-INCHES
FROM ANY VALVE.
2. ALL DRAINS MUST BE PIPED TO A SANITARY WASTE MAIN
CAPABLE OF ACCEPTING TEST DISCHARGE AT SYSTEM
PRESSURE.
3. COMMON DRAIN HEADERS MUST BE A MINIMUM OF ONE PIPE
SIZE LARGER THAN LARGEST CONNECTED SYSTEM DRAIN LINE.
4. MAINTAIN A SIX-INCH MINIMUM CLEARANCE BETWEEN
COMPONENTS OF ADJACENT RISERS.
5. ALL CONTROL VALVES MUST BE ELECTRICALLY SUPERVISED IN
THEIR NORMAL POSITION UNLESS OTHERWISE NOTED.
6. LOCATE THE INSPECTOR'S TEST CONNECTION AT THE RISER.
TEST STATIONS ARE NOT PERMITTED IN HANGAR BAY.
7. PROVIDE PENETRATIONS OF CONCRETE FLOORS WITH PIPE
SLEEVES. PROVIDE SLEEVES WITH NOMINAL DIAMETER 2 IN.
LARGER THAN PIPES BETWEEN 1 IN. AND 3-1/2 IN. PROVIDE
SLEEVES 4 IN. LARGER THAN PIPES 4 IN. AND LARGER.
RISER TO SYSTEM
VANE-TYPE
WATERFLOW
SWITCH
RISER CHECK VALVE
OS&Y OR BUTTERFLY
VALVE w/ TAMPER
SWITCH
DRAIN PIPEWATER SUPPLY
SYSTEM MAIN
DRAIN
SYSTEM WATER GAUGE
SUPPLY WATER
GAUGE AND VALVE
OS&Y VALVE
w/ TAMPER
SWITCH
FLOW CONTROL
VALVE W/ TRIM
DRAIN PIPE
WATER SUPPLY
CHECK VALVE IN
DRAIN CUP LINE
DRAIN CUP
DRIP CHECK
VALVE
PRESSURE
GAUGE (TYP)
25 GAL. (MIN.)
SURGE TANK
PRESSURE
OPERATED
RELIEF VALVE
(P.O.R.V.)
ALARM SHUT
OFF VALVE
(N.O.)
ALARM TEST
VALVE (N.C.)
FLOW TEST
VALVE (N.C.)
PIPE STAND
RISER TO SYSTEM
1.
2.
3.
4.
5.
6.
IN-BUILDING RISER IS A CONTINUOUS SECTION OF WELDED
STAINLESS STEEL FROM A POINT OUTSIDE THE BUILDING PERIMETER
TO A FLANGED FITTING LOCATED AT LEAST 1 FT. ABOVE FINISHED
FLOOR WITHIN THE BUILDING.
NON-WELDED FITTINGS ARE NOT PERMITTED WITHIN THIS SECTION
OF PIPING (E.G. FLANGES, MECHANICAL COUPLINGS, PUSH-ON).
WELD AND HYDROSTATICALLY TEST THE STAINLESS STEEL PIPE AT
THE FABRICATION SHOP OR MANUFACTURER.
PERFORM THE HYDROSTATIC PRESSURE TEST IN ACCORDANCE
WITH NFPA 24.
WELDING IN THE FIELD IS NOT PERMITTED.
PROVIDE PENETRATIONS OF CONCRETE FLOORS WITH PIPE SLEEVES.
PROVIDE SLEEVES WITH NOMINAL DIAMETER 2 IN. LARGER THAN PIPES
BETWEEN 1 IN. AND 3-1/2 IN. PROVIDE SLEEVES 4 IN. LARGER THAN
PIPES 4 IN. AND LARGER.
GENERAL NOTES
FINSH FLOOR
12" MIN
IN-BUILDING
SERVICE RISER
SEE NOTES 1, 2,
3, 4 & 5
FLANGED END
(GROOVED
OPTIONAL)
TO FIRE PROTECTION
SYSTEMS
INCOMING
SERVICE
STEEL TO
DUCTILE IRON
TRANSITION
FORCE BALANCE
FLEXIBLE
EXPANSION JOINT
Lic. No. 037705
ALISON WAKELINC
O M M O
N W
EAL
THOF
V
IR
G
IN
IA
P R O F
E
SSIONAL EN
G
IN
E E R
ENGINEERS + SURVEYORS
1 2 3 4 5
3 4 5
D
C
B
A
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
P -4
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
V
O
LU
M
E B
A S
E B
ID
A
N D
A D
D
IT
IO
N
A L
O P
T
IO
N S
D C
C O
R E
B E
A U
F O
R T
, S C
N O
R F
O
LK
, V A
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
M C
A S
B E
A U
F O
R T
FP ENGINEER
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
1363603
DRAWFORM REVISION: 25 AUGUST 2020
NOTE:
IF THIS DRAWING IS LESS THAN 34" X 22"
IT IS A REDUCED SIZE DRAWING
D
C
B
A
1 2
KTB / RLH
Approved by J. Scott Roberts, Asset Management Branch Head
& Supervisory Facility Planner, PWD Beaufort, SC via email.
EJA
DSN
DSN
12/15/2022
CUI
CUI
C U
I
M O
D P
5/
M O
D P
A
N D
M O
D P
0/
A ut od es k D oc s:
//2
V
M F
A T
F
M ai nt en an ce
H an ga r/2
F
M ai nt H an ge r - F
P
R V
T
.rv t
/5
/2
4:
:2
P
M
N.T.S
H A
N G
A R
F
IR
E
S U
P P
R E
S S
IO
N
D E
T A
IL
S
FX501Z
ROP AHE APF
12871491
NOT TO SCALE
A1
TYPICAL WET-PIPE SYSTEM RISER
NOT TO SCALE
A3
SINGLE LOW LEVEL SUPPRESSION RISER (SECTION VIEW)
NOT TO SCALE
C1
IN-BUILDING RISER PIPE (SECTION VIEW)
20 INCHES
MINIMUM
I
N C
H E
S M
IN
IM
U M
STOP
FLOOR
SYSTEM
STOP
SIGN TO HAVE WHITE BACKGROUND COLOR
WITH MINIMUM 1/2 INCH WIDE BLUE BORDER
1 INCH HIGH RED
BLOCK LETTERING
BLUE STOP STATION WITH
CLEAR TAMPER COVER
TO STOP FOAM SYSTEM, PRESS
AND CONTINUOUSLY HOLD
"STOP" BUTTON UNTIL RELIEVED
BY EMERGENCY RESPONDERS.
THERE MAY BE UP TO A 30
SECOND DELAY AFTER
PRESSING "STOP" BUTTON
BEFORE THE FOAM STOPS.
CONDUIT DRAIN
3 INCH HIGH BLUE BLOCK
LETTERING
1/2 INCH HIGH BLACK
BLOCK LETTERING
PROVIDE BREATHER
WHERE CONDUIT IS
INSTALLED IN A
HAZARDOUS (CLASSIFIED)
LOCATION
3/4 INCH CONDUIT ROUTED
AROUND SIGN WITH
CONNECTION INTO
BOTTOM OF THE BOX
SPACED NO FURTHER
THAN 12 INCHES FROM
START STATION
CENTRAL FLOOR SYSTEM ONLY
1-INCH HIGH BLACK
LETTERING. MUST
INDICATE IF EAST, WEST
OR CENTRAL SYSTEM IS
STOPPED
20 INCHES
MINIMUM
IN
C H
E S
M
IN
IM
U
M
START
START
FLOOR
SYSTEM
3 INCH HIGH RED BLOCK
LETTERING
YELLOW RELEASING
STATION WITH CLEAR
TAMPER COVER
PROVIDE BREATHER WHERE
CONDUIT IS INSTALLED IN A
HAZARDOUS (CLASSIFIED)
LOCATION
1 INCH HIGH GREEN
BLOCK LETTERING
3/4 INCH CONDUIT ROUTED
AROUND SIGN WITH
CONNECTION INTO BOTTOM
OF THE BOX
SPACED NO FURTHER
THAN 12 INCHES FROM
STOP STATION
CONDUIT DRAIN
CENTRAL FLOOR SYSTEM ONLY
1-INCH HIGH BLACK
LETTERING. MUST
INDICATE IF EAST, WEST
OR CENTRAL SYSTEM IS
ACTIVATED
Lic. No. 037705
ALISON WAKELINC
O M M O
N W
EAL
THOF
V
IR
G
IN
IA
P R O F
E
SSIONAL EN
G
IN
E E R
ENGINEERS + SURVEYORS
1 2 3 4 5
3 4 5
D
C
B
A
SHEET OF
NAVFAC DRAWING NO.
CONSTR. CONTR. NO.
EPROJECT NO.:
SCALE:
D E
P A
R T
M E
N T
O F
T H
E N
A V
Y
P -4
A
IR
C
R A
F T
M A
IN
T
E N
A N
C E
H A
N G
A R
V
O
LU
M
E B
A S
E B
ID
A
N D
A D
D
IT
IO
N
A L
O P
T
IO
N S
D C
C O
R E
B E
A U
F O
R T
, S C
N O
R F
O
LK
, V A
N A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A
V A
L F
A C
IL
IT
IE
S
E N
G
IN
E E
R
IN
G S
Y S
T E
M S
C O
M M
A N
D
M
ID
-A T
LA
N
T
IC
M C
A S
B E
A U
F O
R T
FP ENGINEER
CHIEF ENG/ARCH
BRANCH MANAGER
PM/DM
DES DRW CHK
SATISFACTORY TO DATE
ACTIVITY
FOR COMMANDER NAVFAC
APPROVED
A/E INFO
SEAL
S Y
M D
E S
C R
IP
T
IO
N
D A
T E
A P
P R
1363603
DRAWFORM REVISION: 25 AUGUST 2020
NOTE:
IF THIS DRAWING IS LESS THAN 34" X 22"
IT IS A REDUCED SIZE DRAWING
D
C
B
A
1 2
KTB / RLH
Approved by J. Scott Roberts, Asset Management Branch Head
& Supervisory Facility Planner, PWD Beaufort, SC via email.
EJA
DSN
DSN
12/15/2022
CUI
CUI
C U
I
M O
D P
5/
M O
D P
A
N D
M O
D P
0/
A ut od es k D oc s:
//2
V
M F
A T
F
M ai nt en an ce
H an ga r/2
F
M ai nt H an ge r - F
P
R V
T
.rv t
/5
/2
4:
:2
P
M
N.T.S
H A
N G
A R
F
IR
E
S U
P P
R E
S S
IO
N
D E
T A
IL
FX503Z
ROP AHE APF
12871492
NOT TO SCALE
C1
LOW LEVEL SUPPRESSION STOP SIGNAGE
NOT TO SCALE
A1
LOW LEVEL SUPPRESSION START SIGNAGE
| FIRE SUPPRESSION |
| FX001Z - HANGAR – FIRE SUPPRESSION NOTES AND LEGEND |
| FX011ZA - HANGAR – LOW LEVEL SUPPRESSION PLAN – GROUND FLOOR – SECTOR A |
| FX011ZB - HANGAR – LOW LEVEL SUPPRESSION PLAN – GROUND FLOOR – SECTOR B |
| FX011ZC - HANGAR – LOW LEVEL SUPPRESSION PLAN – GROUND FLOOR – SECTOR C |
| FX011ZD - HANGAR – LOW LEVEL SUPPRESSION PLAN – GROUND FLOOR – SECTOR D |
| FX011ZE - HANGAR – LOW LEVEL SUPPRESSION PLAN – GROUND FLOOR – SECTOR E |
| FX011ZF - HANGAR – LOW LEVEL SUPPRESSION PLAN – GROUND FLOOR – SECTOR F |
| FX401Z - HANGAR – LOW LEVEL SUPPRESSION ENLARGED PLAN – FP A |
| FX402Z - HANGAR – LOW LEVEL SUPPRESSION ENLARGED PLAN – FP B |
| FX403Z - HANGAR – LOW LEVEL SUPPRESSION ENLARGED PLAN – FP C |
| FX501Z - HANGAR – FIRE SUPPRESSION DETAILS |
| FX503Z - HANGAR – FIRE SUPPRESSION DETAIL |
| 2025-11-06T14:03:07-0500 | |
| Alison Wakelin | |
| I, Alison Wakelin, am signing to approve this document. |
| 2025-11-06T14:03:43-0500 | |
| Alison Wakelin | |
| I, Alison Wakelin, am signing to approve this document. |
| 2025-11-06T14:03:08-0500 | |
| Alison Wakelin | |
| I, Alison Wakelin, am signing to approve this document. |
| 2025-11-06T14:03:09-0500 | |
| Alison Wakelin | |
| I, Alison Wakelin, am signing to approve this document. |
| 2025-11-06T14:03:09-0500 | |
| Alison Wakelin | |
| I, Alison Wakelin, am signing to approve this document. |
| 2025-11-06T14:03:10-0500 | |
| Alison Wakelin | |
| I, Alison Wakelin, am signing to approve this document. |
| 2025-11-06T14:03:10-0500 | |
| Alison Wakelin | |
| I, Alison Wakelin, am signing to approve this document. |
| 2025-11-06T14:03:11-0500 | |
| Alison Wakelin | |
| I, Alison Wakelin, am signing to approve this document. |
| 2025-11-06T14:03:11-0500 | |
| Alison Wakelin | |
| I, Alison Wakelin, am signing to approve this document. |
| 2025-11-06T14:03:12-0500 | |
| Alison Wakelin | |
| I, Alison Wakelin, am signing to approve this document. |
| 2025-11-06T14:03:12-0500 | |
| Alison Wakelin | |
| I, Alison Wakelin, am signing to approve this document. |
| 2025-11-06T14:03:13-0500 | |
| Alison Wakelin | |
| I, Alison Wakelin, am signing to approve this document. |
| 2025-11-06T14:03:13-0500 | |
| Alison Wakelin | |
| I, Alison Wakelin, am signing to approve this document. |
| 2025-11-06T14:03:44-0500 | |
| Alison Wakelin | |
| I, Alison Wakelin, am signing to approve this document. |
| 2025-11-06T14:03:45-0500 | |
| Alison Wakelin | |
| I, Alison Wakelin, am signing to approve this document. |
| 2025-11-06T14:03:45-0500 | |
| Alison Wakelin | |
| I, Alison Wakelin, am signing to approve this document. |
| 2025-11-06T14:03:46-0500 | |
| Alison Wakelin | |
| I, Alison Wakelin, am signing to approve this document. |
| 2025-11-06T14:03:46-0500 | |
| Alison Wakelin | |
| I, Alison Wakelin, am signing to approve this document. |
| 2025-11-06T14:03:47-0500 | |
| Alison Wakelin | |
| I, Alison Wakelin, am signing to approve this document. |
| 2025-11-06T14:03:48-0500 | |
| Alison Wakelin | |
| I, Alison Wakelin, am signing to approve this document. |
| 2025-11-06T14:03:48-0500 | |
| Alison Wakelin | |
| I, Alison Wakelin, am signing to approve this document. |
| 2025-11-06T14:03:49-0500 | |
| Alison Wakelin | |
| I, Alison Wakelin, am signing to approve this document. |
| 2025-11-06T14:03:49-0500 | |
| Alison Wakelin | |
| I, Alison Wakelin, am signing to approve this document. |
| 2025-11-06T14:03:50-0500 | |
| Alison Wakelin | |
| I, Alison Wakelin, am signing to approve this document. |
2025-11-22T19:24:20-0500
2025-11-22T19:24:59-0500
2025-11-22T19:24:20-0500
2025-11-22T19:24:21-0500
2025-11-22T19:24:21-0500
2025-11-22T19:24:21-0500
2025-11-22T19:24:22-0500
2025-11-22T19:24:22-0500
2025-11-22T19:24:23-0500
2025-11-22T19:24:23-0500
2025-11-22T19:24:23-0500
2025-11-22T19:24:24-0500
2025-11-22T19:24:24-0500
2025-11-22T19:24:59-0500
2025-11-22T19:25:00-0500
2025-11-22T19:25:00-0500
2025-11-22T19:25:00-0500
2025-11-22T19:25:01-0500
2025-11-22T19:25:01-0500
2025-11-22T19:25:01-0500
2025-11-22T19:25:02-0500
2025-11-22T19:25:02-0500
2025-11-22T19:25:02-0500
2025-11-22T19:25:03-0500
File details come from the government source that posted it. Updated .