ATTACHMENT K RFQ Experience.pdf

PDF 217 KB Posted

Attached to
Preventative Maintenance and Emergency Repair of Uninterruptible Power Supply (UPS), Gaithersburg, Maryland
Solicitation number
1333ND25QNB190119
Issued by

About this file

This document is an RFQ Experience Submittal Form, a standard template designed for contractors to detail their previous project experience when responding to a federal solicitation. The form provides structured fields for contractors to comprehensively document project details including contract type, work performed, contract numbers, award amounts, project dates, type of work, contract structure, and customer information. Key sections require offerors to specify their role (prime/sub/joint venture), project specifics, contract type (firm-fixed price/cost-time and material), and provide a detailed description demonstrating project relevance to the current Request for Quote requirements. The form's footer notes that each project description should not exceed one double-sided page, ensuring concise yet informative submissions.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFQ EXPERIENCE SUBMITTAL FORM

2. Project No. (check one) : #1 #2 #3 #4 #5

2. Experience for: Offeror Joint-Venture Other (Explain)

Firm Name:

Address:

Phone Number:

Point of Contact: Contact Phone Number:

3. Work Performed as: Prime Contractor Sub Contractor Joint Venture Other (Explain)

Percent of project work performed:

If subcontractor, who was prime (Name/Phone #):

4. Contract Number: Delivery/Task Order Number:

Title:

Location:

Award Amount:

Final Price:

5. Award Date (mm/dd/yy): Completion Date (mm/dd/yy):

6. Type of work:

Med/High Electrical Maintenance Other: ______________________________________________________________________

7. Type of Contract/Task Order: (Check ALL that apply)

Firm-Fixed Price Cost/Time and Material Other (explain):

8. Customer/Owner Name:

Point of Contact (POC): POC Phone Number:

FAX Number: POC E-mail address:

9. Provide a detailed description of the project and the relevancy to the project requirements of this RFQ

10. Other Information:

*Individual blocks on this form may be expanded; however, total length for each project data sheet shall not exceed one (1) double-sided page (or two (2) single-sided pages).

File details come from the government source that posted it. Updated .