1333ND25QNB190119 AMD 0001 Change Site Visit Date.pdf
PDF 2 MB Posted
- Attached to
- Preventative Maintenance and Emergency Repair of Uninterruptible Power Supply (UPS), Gaithersburg, Maryland
- Solicitation number
- 1333ND25QNB190119
About this file
This document is a federal solicitation amendment for preventative maintenance and emergency repair of uninterruptible power supply (UPS) equipment at the National Institute of Standards and Technology (NIST) in Gaithersburg, Maryland. The amendment (Number 0001) updates the site visit date from July 7, 2025, at 11:00 AM ET to July 10, 2025, at 10:30 AM ET, and adjusts the participant submission deadline from July 3, 2025, to July 8, 2025. The solicitation is being awarded using simplified procedures for commercial items with a small business total set-aside, and requires offerors to demonstrate technical experience with UPS maintenance, provide a detailed technical approach, and submit past performance information. Offerors must have original equipment manufacturer (OEM) trained and certified technicians, capability to provide UPS software services, and experience with multiple UPS equipment branches.
The amendment clarifies that this is a new requirement, with some portions existing previously under separate requirements. Offerors are expected to submit a comprehensive offer including pricing data, technical experience with similar work, a technical approach demonstrating maintenance and repair capabilities, an executable work schedule, key personnel certifications, and past performance questionnaires. The offer must be submitted electronically by July 23, 2025, no later than 1:00 PM ET, with offers evaluated based on price, technical experience, technical approach, and past performance. The solicitation emphasizes the importance of clear, concise offers that demonstrate a thorough understanding of the statement of work and the ability to perform the required UPS maintenance and repair services.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER
IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Attachment Page
PAGE 2 OF 10 1333ND25QNB1901190001
The purpose of this amendment (0001) is to incorporate requests for information (RFI) with government responses, and adjust the site visit date and time:
A. Incorporate the following received RFIs with the government response to the subject solicitation:
[OFFEROR RFI 01] “We would like to know if this is a brand new contract OR if there is (was) an incumbent performing these services. If not brand new, could you please provide the current / previous contract number?”
[GOV RESPONSE 01] This is a new requirement, with portions existing previously under separate requirements.
B. Scheduled site visit is changed FROM: July 7, 2025, at 11:00 AM (ET), TO: July 10, 2025, at 10:30 AM (ET), and participant submission date changed FROM: 4:00 PM ET on July 3, 2025, TO:
4:00 PM ET on July 8, 2025.
REVISE: ADDENDUM TO 52.212-1, INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS, Section 1.7:
1.7 The site visit date for this project is July 7, 2025, at 11:00 AM ET July 10, 2025, at 10:30 AM (ET). Offerors are strongly encouraged to attend to fully inform themselves about the location and conditions under which the work is to be performed.
All participants will meet in the building 101 lobby, also see attached map on last page of addendum.
Please submit the names of the participants by 4:00 PM ET on July 3, 2025 July 8, 2025, to Shawn Borisow at shawn.borisow@nist.gov.
C. The Offer Due Date, Block 8 of the Standard Form (SF) 1449, remains unchanged due to this amendment on July 23, 2025, no later than 1:00PM ET.
D. No other changes occur as a result of this amendment.
Table of Contents
Addendum to 52.212-1
PAGE 3 OF 10 1333ND25QNB1901190001
CLAUSES
Addendum to 52.212-1
PAGE 4 OF 10 1333ND25QNB1901190001
ADDENDUM TO 52.212-1, INSTRUCTIONS TO OFFERORS – COMMERCIAL ITEMS
1. SPECIAL NOTICE TO OFFERORS
The Government intends to evaluate offers and award a contract without discussions. Therefore, the Offeror’s initial offer should contain the Offeror’s best terms from a technical and price standpoint. The Government reserves the right to conduct discussions if the Contracting Officer (CO) later determines them to be necessary. This action is to be executed in accordance with FAR Part 13.5, Simplified Procedures for Certain Commercial Products and Commercial Services, and FAR Part 19.5 Small Business Total Set-Asides, Partial Set-Asides, and Reserves
1.1 Each offer shall clearly demonstrate that the Offeror understands the Statement of Work (SOW) 's general and specific technical requirements.
1.1.1 Failure to explain the Offeror’s ability to meet all requirements may result in the offer not being considered. Clarity and completeness of offers are of the utmost importance.
Therefore, offers must be practical, clear, and concise.
1.1.2 Offers that merely restate the requirement or state that the requirement will be met without providing supporting rationale are not sufficient.
1.2 This requirement is being awarded utilizing the procedures established in FAR Part 13.5.
FAR Part 15 procedures do not govern the evaluation of quotations under this solicitation. An Offeror may be eliminated from consideration without further exchanges if its offer is not among those Offerors considered most advantageous to the Government based on the solicitation criteria.
1.3 Offerors may be asked to clarify certain aspects of their offer to resolve minor or clerical errors and will not constitute discussions.
1.4 Failure to submit any of the information requested by this solicitation may result in an unfavorable offer evaluation.
1.5 Upon receipt, all offers become Government property. In accordance with FAR Subpart 4.8 (Government Contract Files), the Government will retain the original of all unsuccessful offers.
1.6 Please ensure submission contains completed pricing data for all contract line item numbers (CLINs, 0001 through 5002), contained within block 19, continuation pages.
1.6.1 The Offeror agrees to hold the prices in its offer firm for 120 calendar days from the date specified for receipt of offers unless another period is specified in an addendum to the solicitation. Any offer providing less than the specified acceptance period may not be considered acceptable and may not be considered for award.
1.7 The site visit date for this project is July 7, 2025, at 11:00 AM ET July 10, 2025, at 10:30 AM (ET). Offerors are strongly encouraged to attend to fully inform themselves about the location and conditions under which the work is to be performed. All participants will meet in the building 101 lobby, also see attached map on last page of addendum.
National Institute of Standards and Technology (NIST) 100 Bureau Drive, Building 101 Lobby
Gaithersburg, Maryland 20899
All requests must include the following information:
1. Visitor’s full legal name (including middle name).
2. Visitor’s country of citizenship.
PAGE 5 OF 10 1333ND25QNB1901190001
NIST Gaithersburg is a secure federal facility. On the date of the site visit, all Visitors to NIST Gaithersburg may access the site, through the Visitor Center from the main gate (Gate A) at W. Diamond Ave. and Bureau Drive. All visitors must be preregistered and present photo identification and vehicle registration information upon arrival. NIST can only accept a state-issued driver’s license or identification card for access to federal facilities if issued by states that are REAL ID compliant or have an extension.
For more information about visiting the NIST Gaithersburg campus, please visit https://www.nist.gov/visit.
For NIST Visitor, Associate and Contractor Protocols for Mitigating COVID-19 Exposure on NIST Campuses, please visit https://www.nist.gov/visit/nist-visitor-associate-and-contractor-protocols-mitigating-covid-19-exposure-nist-campuses
Please submit the names of the participants by 4:00 PM ET on July 3, 2025 July 8, 2025, to Shawn Borisow at shawn.borisow@nist.gov.
2. INQUIRIES AND QUESTIONS
2.1 The Contracting Officer (CO) is the only approved point(s) of contact for this acquisition. Address any questions or concerns you may have to the CO via e-mail to:
shawn.borisow@nist.gov
2.2 All requests for clarification, inquiries, and questions concerning this solicitation shall be submitted in writing via e-mail to: shawn.borisow@nist.gov by 1:00 PM ET, July 16, 2025.
2.3 All questions and responses to questions shall be provided in writing without identification of the questioner. Questions and responses will be published in an amendment to the solicitation. Even if provided in another form, only the question responses included in the amendment(s) to the solicitation will govern the performance of the contract.
3. SOLICITATION RESPONSE REQUIREMENTS
3.1 The Government will assess offers based on how well the offers meet the factors and requirements outlined in this RFQ using the evaluation criteria and instructions therein.
3.1.1 Any offer that does not meet the stated solicitation requirements may be considered ineligible for award (See paragraph 1).
3.2 OFFER REQUIREMENTS
3.2.1 Offers are expected to conform to solicitation provisions and be prepared in accordance with this section. To aid in evaluation, the offer shall be clearly and concisely written, neatly presented, indexed (cross-indexed as appropriate), and assembled as required by this instruction to offerors. All pages of each part shall be appropriately numbered and identified with the name of the Offeror, the date of the offer, and the solicitation number.
3.2.2 Format. The text shall be single-spaced and able to fit 8½” x 11”, with a minimum one-inch margin all around (should the Government need to print). Each page with content shall count as a single page. Pages shall be numbered consecutively. The text shall be no smaller than 11-point font. Bolding, underlining, and italics may be used to identify topic demarcations or points of emphasis. Graphic presentations, including tables, while not subject to the same font size and spacing requirements, shall have spacing and text that is easily readable.
3.2.3 Restriction of Disclosure/Proprietary Information. If the Offeror wishes to restrict the disclosure or use of its offer, individual subcontractor/vendor proprietary information may be submitted via separate volumes. The information contained in these volumes must be referenced (by volume title, page, and section number as appropriate) within the main offer where the information would have been included if it were not subcontractor/vendor proprietary. The information in these separate volumes is subject to all other requirements of the RFQ, will be included in the page count for the appropriate volume, and must be well-marked to clearly indicate any special handling instructions.
PAGE 6 OF 10 1333ND25QNB1901190001
3.2.4 The Offeror shall submit one (1) electronic version compatible with the Microsoft Office 2016 Software Suite and/or Adobe Acrobat (PDF), by email.
3.2.5 Submission Address. Offers must be submitted via email to Shawn Borisow at shawn.borisow@nist.gov.
FACSIMILE OFFERS ARE NOT AUTHORIZED
3.2.6 Submission Due Dates. Offers must be received prior to the date and time in block 8 of the SF 1449. Offers received after this date and time are considered late and may not be accepted.
4. Factor A – Price Submittal Requirements
4.1 Factor A – Price, shall comply with the instructions in paragraph 3, above, and include the following documents (in the order listed):
4.1.1 The Offeror shall complete and submit the Standard Form 1449, Solicitation/Contract/Order for Commercial Items: Complete Blocks 17a, 17b, 19, 20, 21, 22, 23, 24, 26, 30a, 30b, and 30c only. An official having the authority to contractually bind the Offeror’s company must sign the SF 1449 in accordance with the procedures prescribed in
FAR 4.102.
4.1.2 Acknowledge all solicitation amendments using one of the methods set forth in Block 11 of Standard Form 30, the form on which any amendment will be issued.
4.1.3 Complete all required representations and certifications. PLEASE BE AWARE SOME DEVIATIONS INCLUDED IN THE SOLICTATION MAY NOT BE AVAILABLE ELECTRONICALLY IN SAM.GOV.
Please ensure to complete attached Reps and Certs as part of the submissions of the offer.
4.1.4 Completed Schedule B of the SF 1449, with the labor rates for CLINs X003.
Additionally, complete Attachment C Bid Schedule identified in the solicitation documents and supplied as separate file *xlxs format, and ensure to complete contractor point of contact information on approximately page three (3) of this solicitation.
5. Factor B – Technical Experience
5.1 Technical Experience details shall comply with the instructions in paragraph 3 above and are limited as stated in the factors below.
5.2 Technical Experience shall include the following:
• Submit a minimum of one (1) and up to three (3) recent and relevant projects that demonstrate your organization’s experience performing relevant work that is similar in size, scope, and complexity to this RFQ. For all submitted projects, the description of the project shall clearly describe the scope of work performed and the relevancy to the project requirements of the RFQ. For instances in which the primary firm will be using subcontractors for some portion of the work, this portion of work should include documentation of the subcontractors’ experience in the form of relevant projects as well.
“Recent” is defined as contracts having been completed within the past five (5) years from the closing date of the subject solicitation, or present contracts still ongoing.
A “relevant” project is defined as one that demonstrates experience managing similar, same-scope, or larger-scope projects, as set forth in this RFQ.
Each project submittal must be for a single task order or contract. For multiple awards and indefinite delivery/indefinite quantity type contracts, the IDIQ contract as a whole should not be submitted as a project; rather, the Contractor shall submit the work performed under a specific task order as a project.
The attached RFQ Experience Submittal is MANDATORY and SHALL be used to submit project information. Individual blocks on this form may be expanded; however, the total length for each project data sheet shall not exceed two (2) single-sided pages.
PAGE 7 OF 10 1333ND25QNB1901190001
5.2.1 Ensure to make use of blocks 9,and 10 of the mandatory RFQ Experience Submittal and include the following technical experience:
• Experience relating to similar work in requirement, magnitude, type, and models of electrical equipment.
• Experience performing maintenance and repair of similar or same equipment in type, and/or model.
• Demonstrates the contractor has experience with performing work similar in complexity and magnitude to the work requirement.
6. Factor C – Technical Approach
6.1 Technical Approach: Technical Approach details shall comply with the instructions in paragraph 3 above and are limited as stated in the factors below.
6.2 Exceptions, Deviations, and/or Assumptions. This document shall identify and explain any exceptions or deviations taken to any part of the SOW or conditional assumptions made with respect to the technical requirements of the solicitation. Offerors should note that taking exceptions to the Government's requirements may indicate an unwillingness or inability to perform the contract, and the offer may be evaluated as such.
6.2 Technical Approach Details shall include the following:
6.2.1 Contractors shall submit Technical Approach documentation, which may include a narrative, charts, graphs, tables, and drawings. Technical Approach is defined as the contractor's demonstration of resources and capability to successfully conduct the contract's requirements. The technical approach documentation should clearly and in sufficient detail describe the contractor's resources that will be used to successfully fulfill the technical requirements identified in this RFQ. The documents may include product/ service literature.
6.2.2 If the prime Offeror is proposing a subcontractor or consultant(s) to perform any part of this work, the submittals shall provide documentation of a written agreement identifying the agreement and the proposed work types between the prime offeror and the proposed subcontractor.
6.2.3 The Offeror shall submit technical details sufficient for the Government evaluation team to have a thorough understanding of materials to be used, means and methods of accomplishing the requirements of the SOW, and solutions to addressing the work required.
6.2.4 Minimum technical approach submittal requirements:
• Demonstrates maintenance and repair capability performing preventative maintenance, and repairs on requested equipment in accordance with statement of work.
• Provides executable schedule containing level of detail necessary to properly illustrate work requirement understanding and capability to execute work requirement within period of performances of the solicitation documents. Ensure the schedule contains the following minimum requirements:
o Sequence of events pertinent to this site’s work. Power outages to be minimized to ensure up time of internal customer equipment.
o Ability to accomplish all work scope by the contract end date.
• Demonstrates maintenance and repair capability in accordance with work requirement.
• Offeror shall include key personnel list that demonstrates the proposed project personnel are OEM trained and certified on UPS products specific to the manufacturer for the units outlined in the statement of work.
• Provide documentation or description of training used to prepare staff, and safety training to perform the work requirement and IAW SOW. At a minimum provide training certifications for key personnel list and must be valid at time of award:
o lock-out / tag-out training credentials o Valid service technician OEM training certificates for each Service Technician and
Field Engineer identified in key personnel list. The certificate shall be issued by the UPS manufacturer for products identified in the statement of work.
• Demonstrate the ability to acquire OEM certified service technicians and engineers that are OEM trained and certified on equipment in accordance with SOW.
• Demonstrate the ability to provide UPS software service using proprietary OEM software and firmware in accordance with SOW.
PAGE 8 OF 10 1333ND25QNB1901190001
• Demonstrate the ability to provide support on multiple branches of UPS equipment from different OEMs in accordance with SOW.
7. Factor D – Past Performance
7.1 The past performance evaluation will assess the relative risks associated with an Offeror’s likelihood of success in fulfilling the solicitation’s requirements as indicated by the Offeror’s record of past performance. In this context, “offeror” refers to the prime contractor. Present and past performance shall be evaluated as a measure of the Government’s confidence in the Offeror’s ability to successfully perform based on previous and current contract efforts.
7.2 The Offeror shall submit a completed Past Performance Questionnaire (PPQ) for a minimum of one (1) and up to three (3) relevant projects identified for Factor B – Technical Experience.
7.3 Offerors shall reference the addendum to clause 52.212-2 for further details.
8. Confidential Information
The Freedom of Information Act (FOIA) and its amendments have resulted in an increasing number of requests from outside the Government for copies of Offeror’s qualifications and offers submitted to Federal agencies. If an Offeror's submissions contain information that they believe should be withheld from such requesters under FOIA on the grounds that they contain "trade secrets and commercial or financial information" [5 USC§552(b) (4)], the Offeror should mark its submissions in the following manner "Some parts of this document, as identified on individual pages, are considered by the submitter to be privileged or confidential trade secrets or commercial or financial information not subject to mandatory disclosure under the Freedom of Information Act.”
PAGE 9 OF 10 1333ND25QNB1901190001
liquid Helium
Recovery Facility 321
Robot Test Facility
Gate F
Campus Map
Fluid Mechanics 230
Industrial 231
Emergency S Facility 318 erv1ces
�;;.���;:,��---:::::zero Energy idential Test Facility
Gate B (Exit Only)
PAGE 10 OF 10 1333ND25QNB1901190001
1.2
C:\PERFORM\FORMS\S30.FRP
Forms Management
C:PERFORMFORMSS30.FRP
Acrobat PDFWriter 2.01 for Windows D:19971010095222 D:19990614133004 Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQUISITION NUMBER
5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6)
CODE
STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended.
is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY
CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer) Previous edition unusable
| Descript: |
| Descript1: See Attachment Page. |
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT: |
| IDCode: |
| pdfpage1: 1 |
| Pages: 10 |
| DocNo: 1333ND25QNB1901190001 |
| EffDate: JUN 23, 2025 |
| ReqNo: NB193000-25-00590 |
| ProjNo: |
| IssuedByCode: 000SB |
| IssuedBy: NATIONAL INST OF STDS AND TECHNOLOGY |
100 BUREAU DRIVE STOP 1640
BUILDING 301 ROOM B129
GAITHERSBURG MD 20899-1640
| AdminByCode: 000014 |
| AdminBy: NATIONAL INST OF STDS AND TECHNOLOGY |
325 BROADWAY
BOULDER CO 80305-3328
| ContractorCode: |
| FacCode: |
| SolNo: 1333ND25QNB190119 |
| SolDate: JUN 20, 2025 |
| AwdNo: |
| AwdDate: |
| NoCopies: 1 |
| Amended: Yes |
| OffrExt: Off |
| OffrNoEx: No |
| ApprData: See Schedule |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).: |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| SignName: |
| SignTitl: |
| ContDate: |
| ContrOfficerInfo: |
| CODate: |
| Contractor Info: |
| ContractorPOC: |
| Contractor: |
| ModAmount: |
| 15B. CONTRACTOR/OFFEROR: |
| signature: |
| AwdChg: Off |
| SolChg: Yes |
| Header: |
| Footer1: |