This is an indirect rate ceiling and award fee application form template (Attachment JL.5) for solicitation N62470-24-R-0072. The template provides standardized forms for contractors to submit their indirect rates and multipliers across the base year and four option years, covering categories including fringe benefits, home overhead, field overhead, G&A, award fee, and FCCOM. The form requires contractors to detail how these rates apply to various cost elements such as direct labor, materials, equipment, travel, and subcontracts.

The template specifies that actual indirect rates experienced during contract performance that are lower than the proposed ceiling rates must be charged instead of the maximum rates. Contractors must submit the completed form in both Microsoft Word and Excel formats, with Excel formulas intact to demonstrate multiplier calculations. The form emphasizes that individual indirect rates and award fees each have their own ceiling rates, and the multiplier rate is used to show the government how indirect rates and award fees are applied across cost elements and the total potential markup.

View the file

Other files

File Type Posted
N6247024R0072 Amendment 0003.pdf PDF
N62470R0072 Amendment 0002.pdf PDF
Attachment_JL13_Specialized_Technical_Experience R1.docx DOCX document
N62470R0072 Amendment 0001.pdf PDF
Attachment_JL14_Award_Fee_Plan.docx DOCX document
Registration_Instructions_for_the_PIEE_Solicitation_Module.pdf PDF
Attachment_JL13_Specialized_Technical_Experience.docx DOCX document
Attachment_JL7_Proposed_Historical_and_Year_To_Date_Indirect_Rates.docx DOCX document
Attachment_JL15_Past_Performance_Questionnaire.docx DOCX document
Attachment_JL9_Program_Management_Office_Rate.docx DOCX document
Attachment_JL12_Corporate_Experience_Form.docx DOCX document
Attachment_JL3_Identification_of_Uncompensated_Overtime_Ratios.docx DOCX document
PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf PDF
Attachment_JL6_SCA_DBA_Ceiling_Labor_Rates.docx DOCX document
Attachment_JL1_List_of_Directives.docx DOCX document
Attachment_JL2A_Direct_Labor_Rate_Escalation_Submission.xls.xlsx XLSX spreadsheet
Attachment_JL10 SCA Labor.pdf PDF
N6247024R0072.pdf PDF
Attachment_JL.11 DBA Labor.pdf PDF
Attachment_JL2_Direct_Labor_Bid_and_Billing_Rate_Submission.xlsx XLSX spreadsheet
Attachment_JL4_Indirect_Ceiling_Rates_Build_Up_Form.docx DOCX document
Attachment JL.8 & JL.8A_Cost Model_SA RAC.xlsx XLSX spreadsheet
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTES FOR COMPLETING JL.5

1. The indirect rate categories may be adjusted to reflect the offeror’s accounting system. See additional information in Sections G10, H8, H24, and L of the solicitation/contract.

2. Attachment JL.5 is provided in Microsoft Word. Complete in Microsoft Word format, as provided. Additionally, offerors shall provide JL.5 in Microsoft Excel format with formulas intact to show how the multiplier was calculated.

ATTACHMENT JL.5, N62470-24-R-0072

INDIRECT CEILING RATE AND AWARD FEE APPLICATION FORM

BASE YEAR INDIRECT CEILING RATES

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCOM
Multiplier

Direct Labor

Provide in Chart below

Materials

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

0.00%

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

Should actual indirect rates experienced during performance of the contract be lower than those shown above, actual rates will be proposed/charged in lieu of the maximum rates.

See additional information in Sections G10, H8, H24, and L of the solicitation/contract.

Please note that the multiplier rate by itself is not an indirect ceiling rate. Each indirect rate (Fringe, Overhead, and G&A) as well as award fee has its own ceiling rate. The multiplier rate is to be provided by each Offeror so that the Government can understand how the indirect rates and award fee are being applied to the different cost elements as well as to see the total potential markup on each cost element.

OPTION YEAR 1

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCOM
Multiplier

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

Should actual indirect rates experienced during performance of the contract be lower than those shown above, actual rates will be proposed/charged in lieu of the maximum rates.

Please note that the multiplier rate by itself is not an indirect ceiling rate. Each indirect rate (Fringe, Overhead, and G&A) as well as award fee has its own ceiling rate. The multiplier rate is to be provided by each Offeror so that the Government can understand how the indirect rates and award fee are being applied to the different cost elements as well as to see the total potential markup on each cost element.

OPTION YEAR 2

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCOM
Multiplier

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

Should actual indirect rates experienced during performance of the contract be lower than those shown above, actual rates will be proposed/charged in lieu of the maximum rates.

Please note that the multiplier rate by itself is not an indirect ceiling rate. Each indirect rate (Fringe, Overhead, and G&A) as well as award fee has its own ceiling rate. The multiplier rate is to be provided by each Offeror so that the Government can understand how the indirect rates and award fee are being applied to the different cost elements as well as to see the total potential markup on each cost element.

OPTION YEAR 3

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCOM
Multiplier

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

Should actual indirect rates experienced during performance of the contract be lower than those shown above, actual rates will be proposed/charged in lieu of the maximum rates.

Please note that the multiplier rate by itself is not an indirect ceiling rate. Each indirect rate (Fringe, Overhead, and G&A) as well as award fee has its own ceiling rate. The multiplier rate is to be provided by each Offeror so that the Government can understand how the indirect rates and award fee are being applied to the different cost elements as well as to see the total potential markup on each cost element.

OPTION YEAR 4

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCOM
Multiplier

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

Should actual indirect rates experienced during performance of the contract be lower than those shown above, actual rates will be proposed/charged in lieu of the maximum rates.

Please note that the multiplier rate by itself is not an indirect ceiling rate. Each indirect rate (Fringe, Overhead, and G&A) as well as award fee has its own ceiling rate. The multiplier rate is to be provided by each Offeror so that the Government can understand how the indirect rates and award fee are being applied to the different cost elements as well as to see the total potential markup on each cost element.