This is an indirect ceiling rates build-up form (Attachment JL.4) for solicitation N62470-24-R-0072, designed to capture offerors' indirect rate structures for the base year and four option years. The form requires offerors to provide base indirect rates for various cost elements including fringe, home overhead, field overhead, G&A, award fee, and FCCOM across different cost categories such as direct labor, materials, equipment, travel, and subcontracts.

The form includes a section for proposed distribution of work where offerors must specify the percentage of work to be performed by the prime contractor, joint venture partners (if applicable), and cost reimbursable subcontractors, totaling 100%. The document must be submitted in both Microsoft Word format as provided and Microsoft Excel format with intact formulas showing multiplier calculations. The form specifically notes that award fees shall not be applied to award fees of cost reimbursable subcontractor's costs at any tier.

View the file

Other files

File Type Posted
N6247024R0072 Amendment 0003.pdf PDF
N62470R0072 Amendment 0002.pdf PDF
Attachment_JL13_Specialized_Technical_Experience R1.docx DOCX document
N62470R0072 Amendment 0001.pdf PDF
Attachment_JL14_Award_Fee_Plan.docx DOCX document
Registration_Instructions_for_the_PIEE_Solicitation_Module.pdf PDF
Attachment_JL13_Specialized_Technical_Experience.docx DOCX document
Attachment_JL7_Proposed_Historical_and_Year_To_Date_Indirect_Rates.docx DOCX document
Attachment_JL15_Past_Performance_Questionnaire.docx DOCX document
Attachment_JL9_Program_Management_Office_Rate.docx DOCX document
Attachment_JL12_Corporate_Experience_Form.docx DOCX document
Attachment_JL3_Identification_of_Uncompensated_Overtime_Ratios.docx DOCX document
PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf PDF
Attachment_JL6_SCA_DBA_Ceiling_Labor_Rates.docx DOCX document
Attachment_JL1_List_of_Directives.docx DOCX document
Attachment_JL2A_Direct_Labor_Rate_Escalation_Submission.xls.xlsx XLSX spreadsheet
Attachment_JL10 SCA Labor.pdf PDF
N6247024R0072.pdf PDF
Attachment_JL.11 DBA Labor.pdf PDF
Attachment_JL5_Indirect_Ceiling_Rate_Forms.docx DOCX document
Attachment_JL2_Direct_Labor_Bid_and_Billing_Rate_Submission.xlsx XLSX spreadsheet
Attachment JL.8 & JL.8A_Cost Model_SA RAC.xlsx XLSX spreadsheet
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTES FOR COMPLETING JL.4

1. Only use the base indirect rates, as applicable and in accordance with disclosed accounting practices, for the base year and each option year. The listed indirect rate categories may be adjusted to reflect the offeror’s accounting system. See additional information in Section L of the solicitation.

2. Attachment JL.4 is provided in Microsoft Word. Complete in Microsoft Word format, as provided. Additionally, offerors shall provide JL.4 in Microsoft Excel format with formulas intact to show how the multiplier was calculated.

3. Provide the percentage of work expected to be performed by the prime, each joint venture partner, and each cost reimbursable subcontractor under “Proposed Distribution of Work.”

ATTACHMENT JL.4, N62470-24-R-0072

INDIRECT CEILING RATES BUILD-UP, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM

BASE INDIRECT RATES USED TO DERIVE CEILING RATES

BASE YEAR

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCOM
Multiplier

Direct Labor

Provide in Chart below

Materials

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

0.00%

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

INDIRECT CEILING RATES BUILD-UP, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM

OPTION YEAR 1

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCOM
Multiplier

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

INDIRECT CEILING RATES BUILD-UP, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM

OPTION YEAR 2

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCOM
Multiplier

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

INDIRECT CEILING RATES BUILD-UP, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM

OPTION YEAR 3

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCOM
Multiplier

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

INDIRECT CEILING RATES BUILD-UP, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM

OPTION YEAR 4

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCOM
Multiplier

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

INDIRECT CEILING RATES BUILD-UP, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM

Proposed Distribution of Work

Offerors shall include the percentage of work expected to be performed by the prime, each joint venture partner, and each cost reimbursable subcontractor.

Prime _______%

Joint Venture

Company A_______% (if applicable)
Company B_______% (if applicable)
Cost Reimbursable Subcontractor_______% (if applicable)
Cost Reimbursable Subcontractor_______% (if applicable)
Total100 %