This is a cost model spreadsheet template (Attachment JL.8 & JL.8A) for an Environmental Remedial Action Contract that spans a base year plus four option years. The template requires offerors to provide labor rates across 45 labor categories including key personnel, scientists, engineers, radiation safety officers, and equipment operators, with predetermined hours allocated across home office (145,250 hours), field (47,500 hours), and Davis-Bacon Act labor (112,500 hours) categories.

The cost model includes fixed amounts for Other Direct Costs ($8,640,000), Travel ($4,320,000), and Fixed Price Subcontracts ($8,640,000) per year that offerors cannot modify. The template requires indirect cost calculations including fringe benefits, overhead, and G&A rates, with a Program Management Office (PMO) fee capped at 3% and maximum award fee of 10%. Offerors must submit the completed template in Excel format with intact formulas showing all calculations, and cannot modify the labor categories or predetermined hours. The summary sheet (JL.8A) requires a breakdown of costs between prime contractor/joint venture members and cost reimbursable contractors, including applicable mark-ups and fees.

View the file

Other files

File Type Posted
N6247024R0072 Amendment 0003.pdf PDF
N62470R0072 Amendment 0002.pdf PDF
Attachment_JL13_Specialized_Technical_Experience R1.docx DOCX document
N62470R0072 Amendment 0001.pdf PDF
Attachment_JL14_Award_Fee_Plan.docx DOCX document
Registration_Instructions_for_the_PIEE_Solicitation_Module.pdf PDF
Attachment_JL13_Specialized_Technical_Experience.docx DOCX document
Attachment_JL7_Proposed_Historical_and_Year_To_Date_Indirect_Rates.docx DOCX document
Attachment_JL15_Past_Performance_Questionnaire.docx DOCX document
Attachment_JL9_Program_Management_Office_Rate.docx DOCX document
Attachment_JL12_Corporate_Experience_Form.docx DOCX document
Attachment_JL3_Identification_of_Uncompensated_Overtime_Ratios.docx DOCX document
PIEE_Solicitation_Module_Vendor_Access_Instructions.pdf PDF
Attachment_JL6_SCA_DBA_Ceiling_Labor_Rates.docx DOCX document
Attachment_JL1_List_of_Directives.docx DOCX document
Attachment_JL2A_Direct_Labor_Rate_Escalation_Submission.xls.xlsx XLSX spreadsheet
Attachment_JL10 SCA Labor.pdf PDF
N6247024R0072.pdf PDF
Attachment_JL.11 DBA Labor.pdf PDF
Attachment_JL5_Indirect_Ceiling_Rate_Forms.docx DOCX document
Attachment_JL2_Direct_Labor_Bid_and_Billing_Rate_Submission.xlsx XLSX spreadsheet
Attachment_JL4_Indirect_Ceiling_Rates_Build_Up_Form.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

Attachment JL.8, Cost Model Base Year
N62470-24-R-0072
BASE YEAR
Direct Labor Cost
Labor HoursLabor Cost
Labor CategoryRateHomeFieldDBASCAHomeFieldDBASCA
( $/hr )( hr)( hr)( hr)( hr)( $ )( $ )( $ )( $ )
Key Personnel -- Program Managerx1,000$
Key Personnel -- Senior Project Engineer or Managerx1,000$
Key Personnel -- Quality Control Program Managerx1,000$
Key Personnel -- Safety and Health Managerx3,750$
Key Personnel -- Contract Administration Managerx1,000$
Key Personnel -- Senior Project Scientistx3,750$
Project Task Order Managerx10,000$
Project QC Managerx10,000$
Certified Industrial Hygienistx1,000$
Site Safety and Health Officerx10,000$
Project Contract Administratorx5,000$
Secretaryx5,000$
Senior Procurement Specialistx3,750$
Procurement Specialistx10,000$
Senior Scientistx10,000$
Scientist IIx3,750$
Staff Scientist/Scientist Ix11,250$
Senior Engineerx6,250$
Engineer IIx3,750$
Staff Engineer/Engineer Ix6,250$
Engineering Technicianx10,000$
Field Engineerx10,000$
Senior Drafterx3,750$
Drafterx5,000$
Program Geophysicistx1,000$
Project Geophysicistx1,000$
Geographic Information Systems Managerx3,750$
Geographic Information Systems Specialistx5,000$
Database Administratorx3,750$
Data Management Specalistx10,000$
Estimatorx1,000$
Project Control /Schedulerx1,000$
Project Accountant/Financialx1,000$
Project Accounting/Control Managerx1,000$
Project Superintendent/Construction Site Managerx12,500$
Transportation and Disposal Coordinatorx5,000$
Environmental Compliance Specialistx5,000$
Licensing Radiation Safety Officerx500$
Site Radiation Safety Officerx1,000$
Health Physics Field Supervisorx1,000$
Senior Radiation Control Technicianx1,500$
Junior Radiation Control Technicianx1,500$
DBA Power Equipment Operator (Excavator )x22,500$
DBA Power Equipment Operator (Loader)x22,500$
DBA Power Equipment Operator (Bulldozer)x22,500$
DBA Laborer (Common or General)x22,500$
DBA Truck Driverx22,500$
Total (Home)$$$$
Total (Field)
Total (Craft SCA/DBA)
Total Hours (Home, Field, DBA, and SCA)145,25047,500112,500- 0
BASE YEAR
Indirect Costs
RateLaborCost
( % )( hr )( $ )
Direct Labor CostHome145,250$
Field47,500$
DBA112,500$
SCA- 0$
FringeHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
OverheadHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
Low Value EquipmentHome%x$$
Field%x$$
DBA%x$$
SCA%x$$

Other Direct Costs $8,640,000

Travel $4,320,000

Fixed Price Subcontracts $8,640,000

G&AHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
ODC's%x$$
Travel%x$$
Subs%x$$
Facilities Capital Cost of Money (FCCOM)Homex$$
Fieldx$$
G&Ax$$
Dir. Equip.x$$

PMO (not to exceed 3% of total costs) % x $ $

Maximum Award Fee (not to exceed 10%) % x $ $

TOTAL COST $

Notes:

1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.8 FORM.
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Fixed Price Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge, low value equipment).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. Do not include hazard pay for the SCA labor categories.
8. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format with formulas intact on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
9. SEE ADDITIONAL INSRUCTIONS IN SECTION L

Option Yr 1

Attachment JL.8, Cost Model Base Year
N62470-24-R-0072
OPTION YEAR 1
Direct Labor Cost
Labor HoursLabor Cost
Labor CategoryRateHomeFieldDBASCAHomeFieldDBASCA
( $/hr )( hr)( hr)( hr)( hr)( $ )( $ )( $ )( $ )
Key Personnel -- Program Managerx1,000$
Key Personnel -- Senior Project Engineer or Managerx1,000$
Key Personnel -- Quality Control Program Managerx1,000$
Key Personnel -- Safety and Health Managerx3,750$
Key Personnel -- Contract Administration Managerx1,000$
Key Personnel -- Senior Project Scientistx3,750$
Project Task Order Managerx10,000$
Project QC Managerx10,000$
Certified Industrial Hygienistx1,000$
Site Safety and Health Officerx10,000$
Project Contract Administratorx5,000$
Secretaryx5,000$
Senior Procurement Specialistx3,750$
Procurement Specialistx10,000$
Senior Scientistx10,000$
Scientist IIx3,750$
Staff Scientist/Scientist Ix11,250$
Senior Engineerx6,250$
Engineer IIx3,750$
Staff Engineer/Engineer Ix6,250$
Engineering Technicianx10,000$
Field Engineerx10,000$
Senior Drafterx3,750$
Drafterx5,000$
Program Geophysicistx1,000$
Project Geophysicistx1,000$
Geographic Information Systems Managerx3,750$
Geographic Information Systems Specialistx5,000$
Database Administratorx3,750$
Data Management Specalistx10,000$
Estimatorx1,000$
Project Control /Schedulerx1,000$
Project Accountant/Financialx1,000$
Project Accounting/Control Managerx1,000$
Project Superintendent/Construction Site Managerx12,500$
Transportation and Disposal Coordinatorx5,000$
Environmental Compliance Specialistx5,000$
Licensing Radiation Safety Officerx500$
Site Radiation Safety Officerx1,000$
Health Physics Field Supervisorx1,000$
Senior Radiation Control Technicianx1,500$
Junior Radiation Control Technicianx1,500$
DBA Power Equipment Operator (Excavator )x22,500$
DBA Power Equipment Operator (Loader)x22,500$
DBA Power Equipment Operator (Bulldozer)x22,500$
DBA Laborer (Common or General)x22,500$
DBA Truck Driverx22,500$
Total (Home)$$$$
Total (Field)
Total (Craft SCA/DBA)
Total Hours (Home, Field, DBA, and SCA)145,25047,500112,500- 0
OPTION YEAR 1
Indirect Costs
RateLaborCost
( % )( hr )( $ )
Direct Labor CostHome145,250$
Field47,500$
DBA112,500$
SCA- 0$
FringeHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
OverheadHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
Low Value EquipmentHome%x$$
Field%x$$
DBA%x$$
SCA%x$$

Other Direct Costs $8,640,000

Travel $4,320,000

Fixed Price Subcontracts $8,640,000

G&AHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
ODC's%x$$
Travel%x$$
Subs%x$$
Facilities Capital Cost of Money (FCCOM)Homex$$
Fieldx$$
G&Ax$$
Dir. Equip.x$$

PMO (not to exceed 3% of total costs) % x $ $

Maximum Award Fee (not to exceed 10%) % x $ $

TOTAL COST $

Notes:

1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.8 FORM.
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Fixed Price Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge, low value equipment).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. Do not include hazard pay for the SCA labor categories.
8. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format with formulas intact on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
9. SEE ADDITIONAL INSRUCTIONS IN SECTION L

Option Yr 2

Attachment JL.8, Cost Model Base Year
N62470-24-R-0072
OPTION YEAR 2
Direct Labor Cost
Labor HoursLabor Cost
Labor CategoryRateHomeFieldDBASCAHomeFieldDBASCA
( $/hr )( hr)( hr)( hr)( hr)( $ )( $ )( $ )( $ )
Key Personnel -- Program Managerx1,000$
Key Personnel -- Senior Project Engineer or Managerx1,000$
Key Personnel -- Quality Control Program Managerx1,000$
Key Personnel -- Safety and Health Managerx3,750$
Key Personnel -- Contract Administration Managerx1,000$
Key Personnel -- Senior Project Scientistx3,750$
Project Task Order Managerx10,000$
Project QC Managerx10,000$
Certified Industrial Hygienistx1,000$
Site Safety and Health Officerx10,000$
Project Contract Administratorx5,000$
Secretaryx5,000$
Senior Procurement Specialistx3,750$
Procurement Specialistx10,000$
Senior Scientistx10,000$
Scientist IIx3,750$
Staff Scientist/Scientist Ix11,250$
Senior Engineerx6,250$
Engineer IIx3,750$
Staff Engineer/Engineer Ix6,250$
Engineering Technicianx10,000$
Field Engineerx10,000$
Senior Drafterx3,750$
Drafterx5,000$
Program Geophysicistx1,000$
Project Geophysicistx1,000$
Geographic Information Systems Managerx3,750$
Geographic Information Systems Specialistx5,000$
Database Administratorx3,750$
Data Management Specalistx10,000$
Estimatorx1,000$
Project Control /Schedulerx1,000$
Project Accountant/Financialx1,000$
Project Accounting/Control Managerx1,000$
Project Superintendent/Construction Site Managerx12,500$
Transportation and Disposal Coordinatorx5,000$
Environmental Compliance Specialistx5,000$
Licensing Radiation Safety Officerx500$
Site Radiation Safety Officerx1,000$
Health Physics Field Supervisorx1,000$
Senior Radiation Control Technicianx1,500$
Junior Radiation Control Technicianx1,500$
DBA Power Equipment Operator (Excavator )x22,500$
DBA Power Equipment Operator (Loader)x22,500$
DBA Power Equipment Operator (Bulldozer)x22,500$
DBA Laborer (Common or General)x22,500$
DBA Truck Driverx22,500$
Total (Home)$$$$
Total (Field)
Total (Craft SCA/DBA)
Total Hours (Home, Field, DBA, and SCA)145,25047,500112,500- 0
OPTION YEAR 2
Indirect Costs
RateLaborCost
( % )( hr )( $ )
Direct Labor CostHome145,250$
Field47,500$
DBA112,500$
SCA- 0$
FringeHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
OverheadHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
Low Value EquipmentHome%x$$
Field%x$$
DBA%x$$
SCA%x$$

Other Direct Costs $8,640,000

Travel $4,320,000

Fixed Price Subcontracts $8,640,000

G&AHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
ODC's%x$$
Travel%x$$
Subs%x$$
Facilities Capital Cost of Money (FCCOM)Homex$$
Fieldx$$
G&Ax$$
Dir. Equip.x$$

PMO (not to exceed 3% of total costs) % x $ $

Maximum Award Fee (not to exceed 10%) % x $ $

TOTAL COST $

Notes:

1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.8 FORM.
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Fixed Price Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge, low value equipment).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. Do not include hazard pay for the SCA labor categories.
8. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format with formulas intact on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
9. SEE ADDITIONAL INSRUCTIONS IN SECTION L

Option Yr 3

Attachment JL.8, Cost Model Base Year
N62470-24-R-0072
OPTION YEAR 3
Direct Labor Cost
Labor HoursLabor Cost
Labor CategoryRateHomeFieldDBASCAHomeFieldDBASCA
( $/hr )( hr)( hr)( hr)( hr)( $ )( $ )( $ )( $ )
Key Personnel -- Program Managerx1,000$
Key Personnel -- Senior Project Engineer or Managerx1,000$
Key Personnel -- Quality Control Program Managerx1,000$
Key Personnel -- Safety and Health Managerx3,750$
Key Personnel -- Contract Administration Managerx1,000$
Key Personnel -- Senior Project Scientistx3,750$
Project Task Order Managerx10,000$
Project QC Managerx10,000$
Certified Industrial Hygienistx1,000$
Site Safety and Health Officerx10,000$
Project Contract Administratorx5,000$
Secretaryx5,000$
Senior Procurement Specialistx3,750$
Procurement Specialistx10,000$
Senior Scientistx10,000$
Scientist IIx3,750$
Staff Scientist/Scientist Ix11,250$
Senior Engineerx6,250$
Engineer IIx3,750$
Staff Engineer/Engineer Ix6,250$
Engineering Technicianx10,000$
Field Engineerx10,000$
Senior Drafterx3,750$
Drafterx5,000$
Program Geophysicistx1,000$
Project Geophysicistx1,000$
Geographic Information Systems Managerx3,750$
Geographic Information Systems Specialistx5,000$
Database Administratorx3,750$
Data Management Specalistx10,000$
Estimatorx1,000$
Project Control /Schedulerx1,000$
Project Accountant/Financialx1,000$
Project Accounting/Control Managerx1,000$
Project Superintendent/Construction Site Managerx12,500$
Transportation and Disposal Coordinatorx5,000$
Environmental Compliance Specialistx5,000$
Licensing Radiation Safety Officerx500$
Site Radiation Safety Officerx1,000$
Health Physics Field Supervisorx1,000$
Senior Radiation Control Technicianx1,500$
Junior Radiation Control Technicianx1,500$
DBA Power Equipment Operator (Excavator )x22,500$
DBA Power Equipment Operator (Loader)x22,500$
DBA Power Equipment Operator (Bulldozer)x22,500$
DBA Laborer (Common or General)x22,500$
DBA Truck Driverx22,500$
Total (Home)$$$$
Total (Field)
Total (Craft SCA/DBA)
Total Hours (Home, Field, DBA, and SCA)145,25047,500112,500- 0
OPTION YEAR 3
Indirect Costs
RateLaborCost
( % )( hr )( $ )
Direct Labor CostHome145,250$
Field47,500$
DBA112,500$
SCA- 0$
FringeHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
OverheadHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
Low Value EquipmentHome%x$$
Field%x$$
DBA%x$$
SCA%x$$

Other Direct Costs $8,640,000

Travel $4,320,000

Fixed Price Subcontracts $8,640,000

G&AHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
ODC's%x$$
Travel%x$$
Subs%x$$
Facilities Capital Cost of Money (FCCOM)Homex$$
Fieldx$$
G&Ax$$
Dir. Equip.x$$

PMO (not to exceed 3% of total costs) % x $ $

Maximum Award Fee (not to exceed 10%) % x $ $

TOTAL COST $

Notes:

1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.8 FORM.
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Fixed Price Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge, low value equipment).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. Do not include hazard pay for the SCA labor categories.
8. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format with formulas intact on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
9. SEE ADDITIONAL INSRUCTIONS IN SECTION L

Option Yr 4

Attachment JL.8, Cost Model Base Year
N62470-24-R-0072
OPTION YEAR 4
Direct Labor Cost
Labor HoursLabor Cost
Labor CategoryRateHomeFieldDBASCAHomeFieldDBASCA
( $/hr )( hr)( hr)( hr)( hr)( $ )( $ )( $ )( $ )
Key Personnel -- Program Managerx1,000$
Key Personnel -- Senior Project Engineer or Managerx1,000$
Key Personnel -- Quality Control Program Managerx1,000$
Key Personnel -- Safety and Health Managerx3,750$
Key Personnel -- Contract Administration Managerx1,000$
Key Personnel -- Senior Project Scientistx3,750$
Project Task Order Managerx10,000$
Project QC Managerx10,000$
Certified Industrial Hygienistx1,000$
Site Safety and Health Officerx10,000$
Project Contract Administratorx5,000$
Secretaryx5,000$
Senior Procurement Specialistx3,750$
Procurement Specialistx10,000$
Senior Scientistx10,000$
Scientist IIx3,750$
Staff Scientist/Scientist Ix11,250$
Senior Engineerx6,250$
Engineer IIx3,750$
Staff Engineer/Engineer Ix6,250$
Engineering Technicianx10,000$
Field Engineerx10,000$
Senior Drafterx3,750$
Drafterx5,000$
Program Geophysicistx1,000$
Project Geophysicistx1,000$
Geographic Information Systems Managerx3,750$
Geographic Information Systems Specialistx5,000$
Database Administratorx3,750$
Data Management Specalistx10,000$
Estimatorx1,000$
Project Control /Schedulerx1,000$
Project Accountant/Financialx1,000$
Project Accounting/Control Managerx1,000$
Project Superintendent/Construction Site Managerx12,500$
Transportation and Disposal Coordinatorx5,000$
Environmental Compliance Specialistx5,000$
Licensing Radiation Safety Officerx500$
Site Radiation Safety Officerx1,000$
Health Physics Field Supervisorx1,000$
Senior Radiation Control Technicianx1,500$
Junior Radiation Control Technicianx1,500$
DBA Power Equipment Operator (Excavator )x22,500$
DBA Power Equipment Operator (Loader)x22,500$
DBA Power Equipment Operator (Bulldozer)x22,500$
DBA Laborer (Common or General)x22,500$
DBA Truck Driverx22,500$
Total (Home)$$$$
Total (Field)
Total (Craft SCA/DBA)
Total Hours (Home, Field, DBA, and SCA)145,25047,500112,500- 0
OPTION YEAR 4
Indirect Costs
RateLaborCost
( % )( hr )( $ )
Direct Labor CostHome145,250$
Field47,500$
DBA112,500$
SCA- 0$
FringeHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
OverheadHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
Low Value EquipmentHome%x$$
Field%x$$
DBA%x$$
SCA%x$$

Other Direct Costs $8,640,000

Travel $4,320,000

Fixed Price Subcontracts $8,640,000

G&AHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
ODC's%x$$
Travel%x$$
Subs%x$$
Facilities Capital Cost of Money (FCCOM)Homex$$
Fieldx$$
G&Ax$$
Dir. Equip.x$$

PMO (not to exceed 3% of total costs) % x $ $

Maximum Award Fee (not to exceed 10%) % x $ $

TOTAL COST $

Notes:

1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.8 FORM.
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Fixed Price Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge, low value equipment).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. Do not include hazard pay for the SCA labor categories.
8. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format with formulas intact on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
9. SEE ADDITIONAL INSRUCTIONS IN SECTION L

Sum Cost Model

COST MODEL SUMMARY SHEET JL.8A
N62470-24-R-0072
THIS FORM TO BE SUBMITTED BY PRIME CONTRACTOR/JV ENTITY ONLY
Base YearTotal Cost Model Value for Base Year% of work (JL.4)Total Value of Base Year based on % of Work
Prime / JV member$0.00$0.00
Prime/JV member$0.00$0.00
Cost Reimbursable Contractor$0.00$0.00
Cost Reimbursable Contractor$0.00$0.00
100%$0.00
Cost Sub Total% Mark-upCost Sub Mark-up
Prime/JV indirect ceiling rate mark-up on Cost Reimbursable Subcontractors, i.e. G&A, as provided on JL.5$0.00$0.00
Total JV fees/mark-ups, i.e. G&A, as provided on JL.8$0.00$0.00
TOTAL VALUE OF COST MODEL FOR BASE YEAR$0.00
Option Year 1Total Cost Model Value for First Option Year% of workTotal Value of First Option Year based on % of Work
Prime / JV member$0.00$0.00
Prime/JV member$0.00$0.00
Cost Reimbursable Contractor$0.00$0.00
Cost Reimbursable Contractor$0.00$0.00
100%$0.00
Cost Sub Total% Mark-upCost Sub Mark-up
Prime/JV indirect ceiling rate mark-up on Cost Reimbursable Subcontractors, i.e. G&A, as provided on JL.5$0.00$0.00
Total JV fees/mark-ups, i.e. G&A, as provided on JL.8$0.00$0.00
TOTAL VALUE OF COST MODEL FOR OPTION YEAR 1$0.00
Option Year 2Total Cost Model Value for Second Option Year% of workTotal Value of Second Option Year based on % of Work
Prime / JV member$0.00$0.00
Prime/JV member$0.00$0.00
Cost Reimbursable Contractor$0.00$0.00
Cost Reimbursable Contractor$0.00$0.00
100%$0.00
Cost Sub Total% Mark-upCost Sub Mark-up
Prime/JV indirect ceiling rate mark-up on Cost Reimbursable Subcontractors, i.e. G&A, as provided on JL.5$0.00$0.00
Total JV fees/mark-ups, i.e. G&A, as provided on JL.8$0.00$0.00
TOTAL VALUE OF COST MODEL FOR OPTION YEAR 2$0.00
Option Year 3Total Cost Model Value for Third Option Year% of workTotal Value of Third Option Year based on % of Work
Prime / JV member$0.00$0.00
Prime/JV member$0.00$0.00
Cost Reimbursable Contractor$0.00$0.00
Cost Reimbursable Contractor$0.00$0.00
100%$0.00
Cost Sub Total% Mark-upCost Sub Mark-up
Prime/JV indirect ceiling rate mark-up on Cost Reimbursable Subcontractors, i.e. G&A, as provided on JL.5$0.00$0.00
Total JV fees/mark-ups, i.e. G&A, as provided on JL.8$0.00$0.00
TOTAL VALUE OF COST MODEL FOR OPTION YEAR 3$0.00
Option Year 4Total Cost Model Value for Fourth Option Year% of workTotal Value of Fourth Option Year based on % of Work
Prime / JV member$0.00$0.00
Prime/JV member$0.00$0.00
Cost Reimbursable Contractor$0.00$0.00
Cost Reimbursable Contractor$0.00$0.00
100%$0.00
Cost Sub Total% Mark-upCost Sub Mark-up
Prime/JV indirect ceiling rate mark-up on Cost Reimbursable Subcontractors, i.e. G&A, as provided on JL.5$0.00$0.00
Total JV fees/mark-ups, i.e. G&A, as provided on JL.8$0.00$0.00
TOTAL VALUE OF COST MODEL FOR OPTION YEAR 4$0.00

TOTAL VALUE OF COST MODEL FOR BASE AND OPTION YEARS 1 - 4 $0.00

In addittion to hard copy, offerors shall submit this form in Microsoft Excel format on CD.
SEE ADDITIONAL INSTRUCTIONS IN SECTION L.
SAMPLE
Total Cost Model Value for Base Year% of work (JL.4)Total Value of Base Year based on % of Work
Prime / JV member$490,000.0030%$147,000.00
Prime/JV member$505,000.0025%$126,250.00
Cost Reimbursable Contractor$479,000.0020%$95,800.00
Cost Reimbursable Contractor$515,000.0025%$128,750.00
100%$497,800.00
Cost Sub Total% Mark-upCost Sub Mark-up
Prime/JV indirect ceiling rate mark-up on Cost Reimbursable Subcontractors, i.e. G&A, as provided on JL.5$224,550.007.5%$16,841.25
Total JV fees/mark-ups, i.e. G&A, as provided on JL.8$41,171.00$41,171.00
TOTAL VALUE OF COST MODEL FOR BASE YEAR$555,812.25