Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NOTES FOR COMPLETING JL.5

1. The indirect rate categories may be adjusted to reflect the offeror’s accounting system. See additional information in Sections G10, H8, H24, and L of the solicitation/contract.

2. Attachment JL.5 is provided in Microsoft Word. Complete in Microsoft Word format, as provided. Additionally, offerors shall provide JL.5 in Microsoft Excel format on CDs with formulas intact to show how the multiplier was calculated.

ATTACHMENT JL.5, N62470-22-R-9014

INDIRECT CEILING RATE AND AWARD FEE APPLICATION FORM

BASE YEAR INDIRECT CEILING RATES

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCOM
Multiplier

Direct Labor

Provide in Chart below

Materials

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

0.00%

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

Should actual indirect rates experienced during performance of the contract be lower than those shown above, actual rates will be proposed/charged in lieu of the maximum rates.

See additional information in Sections G10, H8, H24, and L of the solicitation/contract.

Please note that the multiplier rate by itself is not an indirect ceiling rate. Each indirect rate (Fringe, Overhead, and G&A) as well as award fee has its own ceiling rate. The multiplier rate is to be provided by each Offeror so that the Government can understand how the indirect rates and award fee are being applied to the different cost elements as well as to see the total potential markup on each cost element.

INDIRECT CEILING RATE AND AWARD FEE APPLICATION FORM

OPTION YEAR 1

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCOM
Multiplier

Direct Labor

Provide in Chart below

Materials

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

0.00%

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

Should actual indirect rates experienced during performance of the contract be lower than those shown above, actual rates will be proposed/charged in lieu of the maximum rates.

Please note that the multiplier rate by itself is not an indirect ceiling rate. Each indirect rate (Fringe, Overhead, and G&A) as well as award fee has its own ceiling rate. The multiplier rate is to be provided by each Offeror so that the Government can understand how the indirect rates and award fee are being applied to the different cost elements as well as to see the total potential markup on each cost element.

INDIRECT CEILING RATE AND AWARD FEE APPLICATION FORM

OPTION YEAR 2

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCOM
Multiplier

Direct Labor

Provide in Chart below

Materials

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

0.00%

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

Should actual indirect rates experienced during performance of the contract be lower than those shown above, actual rates will be proposed/charged in lieu of the maximum rates.

Please note that the multiplier rate by itself is not an indirect ceiling rate. Each indirect rate (Fringe, Overhead, and G&A) as well as award fee has its own ceiling rate. The multiplier rate is to be provided by each Offeror so that the Government can understand how the indirect rates and award fee are being applied to the different cost elements as well as to see the total potential markup on each cost element.

INDIRECT CEILING RATE AND AWARD FEE APPLICATION FORM

OPTION YEAR 3

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCOM
Multiplier

Direct Labor

Provide in Chart below

Materials

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

0.00%

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

Should actual indirect rates experienced during performance of the contract be lower than those shown above, actual rates will be proposed/charged in lieu of the maximum rates.

Please note that the multiplier rate by itself is not an indirect ceiling rate. Each indirect rate (Fringe, Overhead, and G&A) as well as award fee has its own ceiling rate. The multiplier rate is to be provided by each Offeror so that the Government can understand how the indirect rates and award fee are being applied to the different cost elements as well as to see the total potential markup on each cost element.

INDIRECT CEILING RATE AND AWARD FEE APPLICATION FORM

OPTION YEAR 4

Cost Element
Fringe
Home Overhead
Field Overhead
G&A
Award Fee
FCCOM
Multiplier

Direct Labor

Provide in Chart below

Materials

Supplies

Equipment (Contractor –Owned)

Equipment (Contractor –Acquired Property)

0.00%

Rental Equipment

Inventory

Travel

0.00%

Subcontracts

Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)

Other

FCCOM POOL
COST BASIS
RATE

Field

Home

G&A

Owned Equipment

COST BASIS
RATE

LVE

Should actual indirect rates experienced during performance of the contract be lower than those shown above, actual rates will be proposed/charged in lieu of the maximum rates.

Please note that the multiplier rate by itself is not an indirect ceiling rate. Each indirect rate (Fringe, Overhead, and G&A) as well as award fee has its own ceiling rate. The multiplier rate is to be provided by each Offeror so that the Government can understand how the indirect rates and award fee are being applied to the different cost elements as well as to see the total potential markup on each cost element.