Attachment JL.8 & JL.8A_Cost Model_MAC RAC II.xlsx

XLSX spreadsheet 79 KB Posted

Attached to
Environmental Remediation Services Federal contract opportunity
Solicitation number
N6247022R9014
Issued by
Department of the Navy Naval Facilities Engineering Command

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Base Year

Attachment JL.8, Cost Model Base Year
N62470-22-R-9014
BASE YEAR
Direct Labor Cost
Labor HoursLabor Cost
Labor CategoryRateHomeFieldDBASCAHomeFieldDBASCA
( $/hr )( hr)( hr)( hr)( hr)( $ )( $ )( $ )( $ )
Key Personnel -- Program Managerx1,000$
Key Personnel -- Senior Project Engineer or Managerx1,000$
Key Personnel -- Quality Control Program Managerx1,000$
Key Personnel -- Safety and Health Managerx3,750$
Key Personnel -- Contract Administration Managerx1,000$
Key Personnel -- Senior Project Scientistx3,750$
Project Task Order Managerx10,000$
Project QC Managerx10,000$
Certified Industrial Hygienistx1,000$
Site Safety and Health Officerx10,000$
Project Contract Administratorx5,000$
Secretaryx5,000$
Senior Procurement Specialistx3,750$
Procurement Specialistx10,000$
Senior Scientistx10,000$
Scientist IIx3,750$
Staff Scientist/Scientist Ix11,250$
Senior Engineerx6,250$
Engineer IIx3,750$
Staff Engineer/Engineer Ix6,250$
Engineering Technicianx10,000$
Field Engineerx10,000$
Senior Drafterx3,750$
Drafterx5,000$
Program Geophysicistx1,000$
Project Geophysicistx1,000$
Geographic Information Systems Managerx3,750$
Geographic Information Systems Specialistx5,000$
Database Administratorx3,750$
Data Management Specalistx10,000$
Estimatorx1,000$
Project Control /Schedulerx1,000$
Project Accountant/Financialx1,000$
Project Accounting/Control Managerx1,000$
Project Superintendent/Construction Site Managerx12,500$
Transportation and Disposal Coordinatorx5,000$
Environmental Compliance Specialistx5,000$
Senior UXO Supervisorx3,000$
UXO Quality Control Specialistx5,000$
UXO Safety Officerx5,000$
Licensing Radiation Safety Officerx500$
Site Radiation Safety Officerx1,000$
Health Physics Field Supervisorx1,000$
Senior Radiation Control Technicianx1,500$
Junior Radiation Control Technicianx1,500$
SCA 30495 - Unexploded (UXO) Sweep Personnelx10,000$
SCA 30491 - Unexploded Ordnance (UXO) Technician Ix10,000$
SCA 30492 - Unexploded Ordnance (UXO) Technician IIx10,000$
SCA 30493 - Unexploded Ordnance (UXO) Technician IIIx10,000$
DBA Power Equipment Operator (Excavator )x22,500$
DBA Power Equipment Operator (Loader)x22,500$
DBA Power Equipment Operator (Bulldozer)x22,500$
DBA Laborer (Common or General)x22,500$
DBA Truck Driverx22,500$
Total (Home)$$$$
Total (Field)
Total (Craft SCA/DBA)
Total Hours (Home, Field, DBA, and SCA)145,25060,500112,50040,000
BASE YEAR
Indirect Costs
RateLaborCost
( % )( hr )( $ )
Direct Labor CostHome145,250$
Field60,500$
DBA112,500$
SCA40,000$
FringeHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
OverheadHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
Low Value EquipmentHome%x$$
Field%x$$
DBA%x$$
SCA%x$$

Other Direct Costs $8,640,000

Travel $4,320,000

Fixed Price Subcontracts $8,640,000

G&AHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
ODC's%x$$
Travel%x$$
Subs%x$$
Facilities Capital Cost of Money (FCCOM)Homex$$
Fieldx$$
G&Ax$$
Dir. Equip.x$$

PMO (not to exceed 3% of total costs) % x $ $

Maximum Award Fee (not to exceed 10%) % x $ $

TOTAL COST $

Notes:

1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.8 FORM.
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Fixed Price Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge, low value equipment).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. Do not include hazard pay for the SCA labor categories.
8. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format with formulas intact on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
9. SEE ADDITIONAL INSRUCTIONS IN SECTION L

Option Yr 1

Attachment JL.8, Cost Model Base Year
N62470-22-R-9014
OPTION YEAR 1
Direct Labor Cost
Labor HoursLabor Cost
Labor CategoryRateHomeFieldDBASCAHomeFieldDBASCA
( $/hr )( hr)( hr)( hr)( hr)( $ )( $ )( $ )( $ )
Key Personnel -- Program Managerx1,000$
Key Personnel -- Senior Project Engineer or Managerx1,000$
Key Personnel -- Quality Control Program Managerx1,000$
Key Personnel -- Safety and Health Managerx3,750$
Key Personnel -- Contract Administration Managerx1,000$
Key Personnel -- Senior Project Scientistx3,750$
Project Task Order Managerx10,000$
Project QC Managerx10,000$
Certified Industrial Hygienistx1,000$
Site Safety and Health Officerx10,000$
Project Contract Administratorx5,000$
Secretaryx5,000$
Senior Procurement Specialistx3,750$
Procurement Specialistx10,000$
Senior Scientistx10,000$
Scientist IIx3,750$
Staff Scientist/Scientist Ix11,250$
Senior Engineerx6,250$
Engineer IIx3,750$
Staff Engineer/Engineer Ix6,250$
Engineering Technicianx10,000$
Field Engineerx10,000$
Senior Drafterx3,750$
Drafterx5,000$
Program Geophysicistx1,000$
Project Geophysicistx1,000$
Geographic Information Systems Managerx3,750$
Geographic Information Systems Specialistx5,000$
Database Administratorx3,750$
Data Management Specalistx10,000$
Estimatorx1,000$
Project Control /Schedulerx1,000$
Project Accountant/Financialx1,000$
Project Accounting/Control Managerx1,000$
Project Superintendent/Construction Site Managerx12,500$
Transportation and Disposal Coordinatorx5,000$
Environmental Compliance Specialistx5,000$
Senior UXO Supervisorx3,000$
UXO Quality Control Specialistx5,000$
UXO Safety Officerx5,000$
Licensing Radiation Safety Officerx500$
Site Radiation Safety Officerx1,000$
Health Physics Field Supervisorx1,000$
Senior Radiation Control Technicianx1,500$
Junior Radiation Control Technicianx1,500$
SCA 30495 - Unexploded (UXO) Sweep Personnelx10,000$
SCA 30491 - Unexploded Ordnance (UXO) Technician Ix10,000$
SCA 30492 - Unexploded Ordnance (UXO) Technician IIx10,000$
SCA 30493 - Unexploded Ordnance (UXO) Technician IIIx10,000$
DBA Power Equipment Operator (Excavator )x22,500$
DBA Power Equipment Operator (Loader)x22,500$
DBA Power Equipment Operator (Bulldozer)x22,500$
DBA Laborer (Common or General)x22,500$
DBA Truck Driverx22,500$
Total (Home)$$$$
Total (Field)
Total (Craft SCA/DBA)
Total Hours (Home, Field, DBA, and SCA)145,25060,500112,50040,000
OPTION YEAR 1
Indirect Costs
RateLaborCost
( % )( hr )( $ )
Direct Labor CostHome145,250$
Field60,500$
DBA112,500$
SCA40,000$
FringeHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
OverheadHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
Low Value EquipmentHome%x$$
Field%x$$
DBA%x$$
SCA%x$$

Other Direct Costs $8,640,000

Travel $4,320,000

Fixed Price Subcontracts $8,640,000

G&AHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
ODC's%x$$
Travel%x$$
Subs%x$$
Facilities Capital Cost of Money (FCCOM)Homex$$
Fieldx$$
G&Ax$$
Dir. Equip.x$$

PMO (not to exceed 3% of total costs) % x $ $

Maximum Award Fee (not to exceed 10%) % x $ $

TOTAL COST $

Notes:

1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.8 FORM.
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Fixed Price Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge, low value equipment).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. Do not include hazard pay for the SCA labor categories.
8. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format with formulas intact on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
9. SEE ADDITIONAL INSRUCTIONS IN SECTION L

Option Yr 2

Attachment JL.8, Cost Model Base Year
N62470-22-R-9014
OPTION YEAR 2
Direct Labor Cost
Labor HoursLabor Cost
Labor CategoryRateHomeFieldDBASCAHomeFieldDBASCA
( $/hr )( hr)( hr)( hr)( hr)( $ )( $ )( $ )( $ )
Key Personnel -- Program Managerx1,000$
Key Personnel -- Senior Project Engineer or Managerx1,000$
Key Personnel -- Quality Control Program Managerx1,000$
Key Personnel -- Safety and Health Managerx3,750$
Key Personnel -- Contract Administration Managerx1,000$
Key Personnel -- Senior Project Scientistx3,750$
Project Task Order Managerx10,000$
Project QC Managerx10,000$
Certified Industrial Hygienistx1,000$
Site Safety and Health Officerx10,000$
Project Contract Administratorx5,000$
Secretaryx5,000$
Senior Procurement Specialistx3,750$
Procurement Specialistx10,000$
Senior Scientistx10,000$
Scientist IIx3,750$
Staff Scientist/Scientist Ix11,250$
Senior Engineerx6,250$
Engineer IIx3,750$
Staff Engineer/Engineer Ix6,250$
Engineering Technicianx10,000$
Field Engineerx10,000$
Senior Drafterx3,750$
Drafterx5,000$
Program Geophysicistx1,000$
Project Geophysicistx1,000$
Geographic Information Systems Managerx3,750$
Geographic Information Systems Specialistx5,000$
Database Administratorx3,750$
Data Management Specalistx10,000$
Estimatorx1,000$
Project Control /Schedulerx1,000$
Project Accountant/Financialx1,000$
Project Accounting/Control Managerx1,000$
Project Superintendent/Construction Site Managerx12,500$
Transportation and Disposal Coordinatorx5,000$
Environmental Compliance Specialistx5,000$
Senior UXO Supervisorx3,000$
UXO Quality Control Specialistx5,000$
UXO Safety Officerx5,000$
Licensing Radiation Safety Officerx500$
Site Radiation Safety Officerx1,000$
Health Physics Field Supervisorx1,000$
Senior Radiation Control Technicianx1,500$
Junior Radiation Control Technicianx1,500$
SCA 30495 - Unexploded (UXO) Sweep Personnelx10,000$
SCA 30491 - Unexploded Ordnance (UXO) Technician Ix10,000$
SCA 30492 - Unexploded Ordnance (UXO) Technician IIx10,000$
SCA 30493 - Unexploded Ordnance (UXO) Technician IIIx10,000$
DBA Power Equipment Operator (Excavator )x22,500$
DBA Power Equipment Operator (Loader)x22,500$
DBA Power Equipment Operator (Bulldozer)x22,500$
DBA Laborer (Common or General)x22,500$
DBA Truck Driverx22,500$
Total (Home)$$$$
Total (Field)
Total (Craft SCA/DBA)
Total Hours (Home, Field, DBA, and SCA)145,25060,500112,50040,000
OPTION YEAR 2
Indirect Costs
RateLaborCost
( % )( hr )( $ )
Direct Labor CostHome145,250$
Field60,500$
DBA112,500$
SCA40,000$
FringeHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
OverheadHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
Low Value EquipmentHome%x$$
Field%x$$
DBA%x$$
SCA%x$$

Other Direct Costs $8,640,000

Travel $4,320,000

Fixed Price Subcontracts $8,640,000

G&AHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
ODC's%x$$
Travel%x$$
Subs%x$$
Facilities Capital Cost of Money (FCCOM)Homex$$
Fieldx$$
G&Ax$$
Dir. Equip.x$$

PMO (not to exceed 3% of total costs) % x $ $

Maximum Award Fee (not to exceed 10%) % x $ $

TOTAL COST $

Notes:

1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.8 FORM.
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Fixed Price Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge, low value equipment).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. Do not include hazard pay for the SCA labor categories.
8. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format with formulas intact on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
9. SEE ADDITIONAL INSRUCTIONS IN SECTION L

Option Yr 3

Attachment JL.8, Cost Model Base Year
N62470-22-R-9014
OPTION YEAR 3
Direct Labor Cost
Labor HoursLabor Cost
Labor CategoryRateHomeFieldDBASCAHomeFieldDBASCA
( $/hr )( hr)( hr)( hr)( hr)( $ )( $ )( $ )( $ )
Key Personnel -- Program Managerx1,000$
Key Personnel -- Senior Project Engineer or Managerx1,000$
Key Personnel -- Quality Control Program Managerx1,000$
Key Personnel -- Safety and Health Managerx3,750$
Key Personnel -- Contract Administration Managerx1,000$
Key Personnel -- Senior Project Scientistx3,750$
Project Task Order Managerx10,000$
Project QC Managerx10,000$
Certified Industrial Hygienistx1,000$
Site Safety and Health Officerx10,000$
Project Contract Administratorx5,000$
Secretaryx5,000$
Senior Procurement Specialistx3,750$
Procurement Specialistx10,000$
Senior Scientistx10,000$
Scientist IIx3,750$
Staff Scientist/Scientist Ix11,250$
Senior Engineerx6,250$
Engineer IIx3,750$
Staff Engineer/Engineer Ix6,250$
Engineering Technicianx10,000$
Field Engineerx10,000$
Senior Drafterx3,750$
Drafterx5,000$
Program Geophysicistx1,000$
Project Geophysicistx1,000$
Geographic Information Systems Managerx3,750$
Geographic Information Systems Specialistx5,000$
Database Administratorx3,750$
Data Management Specalistx10,000$
Estimatorx1,000$
Project Control /Schedulerx1,000$
Project Accountant/Financialx1,000$
Project Accounting/Control Managerx1,000$
Project Superintendent/Construction Site Managerx12,500$
Transportation and Disposal Coordinatorx5,000$
Environmental Compliance Specialistx5,000$
Senior UXO Supervisorx3,000$
UXO Quality Control Specialistx5,000$
UXO Safety Officerx5,000$
Licensing Radiation Safety Officerx500$
Site Radiation Safety Officerx1,000$
Health Physics Field Supervisorx1,000$
Senior Radiation Control Technicianx1,500$
Junior Radiation Control Technicianx1,500$
SCA 30495 - Unexploded (UXO) Sweep Personnelx10,000$
SCA 30491 - Unexploded Ordnance (UXO) Technician Ix10,000$
SCA 30492 - Unexploded Ordnance (UXO) Technician IIx10,000$
SCA 30493 - Unexploded Ordnance (UXO) Technician IIIx10,000$
DBA Power Equipment Operator (Excavator )x22,500$
DBA Power Equipment Operator (Loader)x22,500$
DBA Power Equipment Operator (Bulldozer)x22,500$
DBA Laborer (Common or General)x22,500$
DBA Truck Driverx22,500$
Total (Home)$$$$
Total (Field)
Total (Craft SCA/DBA)
Total Hours (Home, Field, DBA, and SCA)145,25060,500112,50040,000
OPTION YEAR 3
Indirect Costs
RateLaborCost
( % )( hr )( $ )
Direct Labor CostHome145,250$
Field60,500$
DBA112,500$
SCA40,000$
FringeHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
OverheadHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
Low Value EquipmentHome%x$$
Field%x$$
DBA%x$$
SCA%x$$

Other Direct Costs $8,640,000

Travel $4,320,000

Fixed Price Subcontracts $8,640,000

G&AHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
ODC's%x$$
Travel%x$$
Subs%x$$
Facilities Capital Cost of Money (FCCOM)Homex$$
Fieldx$$
G&Ax$$
Dir. Equip.x$$

PMO (not to exceed 3% of total costs) % x $ $

Maximum Award Fee (not to exceed 10%) % x $ $

TOTAL COST $

Notes:

1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.8 FORM.
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Fixed Price Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge, low value equipment).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. Do not include hazard pay for the SCA labor categories.
8. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format with formulas intact on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
9. SEE ADDITIONAL INSRUCTIONS IN SECTION L

Option Yr 4

Attachment JL.8, Cost Model Base Year
N62470-22-R-9014
OPTION YEAR 4
Direct Labor Cost
Labor HoursLabor Cost
Labor CategoryRateHomeFieldDBASCAHomeFieldDBASCA
( $/hr )( hr)( hr)( hr)( hr)( $ )( $ )( $ )( $ )
Key Personnel -- Program Managerx1,000$
Key Personnel -- Senior Project Engineer or Managerx1,000$
Key Personnel -- Quality Control Program Managerx1,000$
Key Personnel -- Safety and Health Managerx3,750$
Key Personnel -- Contract Administration Managerx1,000$
Key Personnel -- Senior Project Scientistx3,750$
Project Task Order Managerx10,000$
Project QC Managerx10,000$
Certified Industrial Hygienistx1,000$
Site Safety and Health Officerx10,000$
Project Contract Administratorx5,000$
Secretaryx5,000$
Senior Procurement Specialistx3,750$
Procurement Specialistx10,000$
Senior Scientistx10,000$
Scientist IIx3,750$
Staff Scientist/Scientist Ix11,250$
Senior Engineerx6,250$
Engineer IIx3,750$
Staff Engineer/Engineer Ix6,250$
Engineering Technicianx10,000$
Field Engineerx10,000$
Senior Drafterx3,750$
Drafterx5,000$
Program Geophysicistx1,000$
Project Geophysicistx1,000$
Geographic Information Systems Managerx3,750$
Geographic Information Systems Specialistx5,000$
Database Administratorx3,750$
Data Management Specalistx10,000$
Estimatorx1,000$
Project Control /Schedulerx1,000$
Project Accountant/Financialx1,000$
Project Accounting/Control Managerx1,000$
Project Superintendent/Construction Site Managerx12,500$
Transportation and Disposal Coordinatorx5,000$
Environmental Compliance Specialistx5,000$
Senior UXO Supervisorx3,000$
UXO Quality Control Specialistx5,000$
UXO Safety Officerx5,000$
Licensing Radiation Safety Officerx500$
Site Radiation Safety Officerx1,000$
Health Physics Field Supervisorx1,000$
Senior Radiation Control Technicianx1,500$
Junior Radiation Control Technicianx1,500$
SCA 30495 - Unexploded (UXO) Sweep Personnelx10,000$
SCA 30491 - Unexploded Ordnance (UXO) Technician Ix10,000$
SCA 30492 - Unexploded Ordnance (UXO) Technician IIx10,000$
SCA 30493 - Unexploded Ordnance (UXO) Technician IIIx10,000$
DBA Power Equipment Operator (Excavator )x22,500$
DBA Power Equipment Operator (Loader)x22,500$
DBA Power Equipment Operator (Bulldozer)x22,500$
DBA Laborer (Common or General)x22,500$
DBA Truck Driverx22,500$
Total (Home)$$$$
Total (Field)
Total (Craft SCA/DBA)
Total Hours (Home, Field, DBA, and SCA)145,25060,500112,50040,000
OPTION YEAR 4
Indirect Costs
RateLaborCost
( % )( hr )( $ )
Direct Labor CostHome145,250$
Field60,500$
DBA112,500$
SCA40,000$
FringeHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
OverheadHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
Low Value EquipmentHome%x$$
Field%x$$
DBA%x$$
SCA%x$$

Other Direct Costs $8,640,000

Travel $4,320,000

Fixed Price Subcontracts $8,640,000

G&AHome%x$$
Field%x$$
DBA%x$$
SCA%x$$
ODC's%x$$
Travel%x$$
Subs%x$$
Facilities Capital Cost of Money (FCCOM)Homex$$
Fieldx$$
G&Ax$$
Dir. Equip.x$$

PMO (not to exceed 3% of total costs) % x $ $

Maximum Award Fee (not to exceed 10%) % x $ $

TOTAL COST $

Notes:

1. RATES MUST BE PROVIDED FOR ALL LABOR CATEGORIES LISTED IN THIS JL.8 FORM.
2. The offeror shall not add or delete labor categories, make structural changes, or change the hours on this form.
3. Offeror shall not change the costs associated with Travel, Other Direct Costs, or Fixed Price Subcontractors on this form.
4. If applicable, offeror should add direct costs applied to the labor base (e.g. Health and Safety charge, low value equipment).
5. Offeror should add or delete additional indirect costs in accordance with established accounting system (must use appropriate base and explain).
6. The direct cost amounts presented above are for informational purposes only and not necessarily representative of actual costs to be incurred on this contract.
7. Do not include hazard pay for the SCA labor categories.
8. This form does not include formulas. In addition to the hard copies, offerors shall submit this form in Microsoft Excel format with formulas intact on a CD to show all calculations (i.e. labor extensions, indirect rate application to labor, etc.) used to arrive at the total cost.
9. SEE ADDITIONAL INSRUCTIONS IN SECTION L

Sum Cost Model

COST MODEL SUMMARY SHEET JL.8A
N62470-22-R-9014
THIS FORM TO BE SUBMITTED BY PRIME CONTRACTOR/JV ENTITY ONLY
Base YearTotal Cost Model Value for Base Year% of work (JL.4)Total Value of Base Year based on % of Work
Prime / JV member$0.00$0.00
Prime/JV member$0.00$0.00
Cost Reimbursable Contractor$0.00$0.00
Cost Reimbursable Contractor$0.00$0.00
100%$0.00
Cost Sub Total% Mark-upCost Sub Mark-up
Prime/JV indirect ceiling rate mark-up on Cost Reimbursable Subcontractors, i.e. G&A, as provided on JL.5$0.00$0.00
Total JV fees/mark-ups, i.e. G&A, as provided on JL.8$0.00$0.00
TOTAL VALUE OF COST MODEL FOR BASE YEAR$0.00
Option Year 1Total Cost Model Value for First Option Year% of workTotal Value of First Option Year based on % of Work
Prime / JV member$0.00$0.00
Prime/JV member$0.00$0.00
Cost Reimbursable Contractor$0.00$0.00
Cost Reimbursable Contractor$0.00$0.00
100%$0.00
Cost Sub Total% Mark-upCost Sub Mark-up
Prime/JV indirect ceiling rate mark-up on Cost Reimbursable Subcontractors, i.e. G&A, as provided on JL.5$0.00$0.00
Total JV fees/mark-ups, i.e. G&A, as provided on JL.8$0.00$0.00
TOTAL VALUE OF COST MODEL FOR OPTION YEAR 1$0.00
Option Year 2Total Cost Model Value for Second Option Year% of workTotal Value of Second Option Year based on % of Work
Prime / JV member$0.00$0.00
Prime/JV member$0.00$0.00
Cost Reimbursable Contractor$0.00$0.00
Cost Reimbursable Contractor$0.00$0.00
100%$0.00
Cost Sub Total% Mark-upCost Sub Mark-up
Prime/JV indirect ceiling rate mark-up on Cost Reimbursable Subcontractors, i.e. G&A, as provided on JL.5$0.00$0.00
Total JV fees/mark-ups, i.e. G&A, as provided on JL.8$0.00$0.00
TOTAL VALUE OF COST MODEL FOR OPTION YEAR 2$0.00
Option Year 3Total Cost Model Value for Third Option Year% of workTotal Value of Third Option Year based on % of Work
Prime / JV member$0.00$0.00
Prime/JV member$0.00$0.00
Cost Reimbursable Contractor$0.00$0.00
Cost Reimbursable Contractor$0.00$0.00
100%$0.00
Cost Sub Total% Mark-upCost Sub Mark-up
Prime/JV indirect ceiling rate mark-up on Cost Reimbursable Subcontractors, i.e. G&A, as provided on JL.5$0.00$0.00
Total JV fees/mark-ups, i.e. G&A, as provided on JL.8$0.00$0.00
TOTAL VALUE OF COST MODEL FOR OPTION YEAR 3$0.00
Option Year 4Total Cost Model Value for Fourth Option Year% of workTotal Value of Fourth Option Year based on % of Work
Prime / JV member$0.00$0.00
Prime/JV member$0.00$0.00
Cost Reimbursable Contractor$0.00$0.00
Cost Reimbursable Contractor$0.00$0.00
100%$0.00
Cost Sub Total% Mark-upCost Sub Mark-up
Prime/JV indirect ceiling rate mark-up on Cost Reimbursable Subcontractors, i.e. G&A, as provided on JL.5$0.00$0.00
Total JV fees/mark-ups, i.e. G&A, as provided on JL.8$0.00$0.00
TOTAL VALUE OF COST MODEL FOR OPTION YEAR 4$0.00

TOTAL VALUE OF COST MODEL FOR BASE AND OPTION YEARS 1 - 4 $0.00

In addittion to hard copy, offerors shall submit this form in Microsoft Excel format on CD.
SEE ADDITIONAL INSTRUCTIONS IN SECTION L.
SAMPLE
Total Cost Model Value for Base Year% of work (JL.4)Total Value of Base Year based on % of Work
Prime / JV member$490,000.0030%$147,000.00
Prime/JV member$505,000.0025%$126,250.00
Cost Reimbursable Contractor$479,000.0020%$95,800.00
Cost Reimbursable Contractor$515,000.0025%$128,750.00
100%$497,800.00
Cost Sub Total% Mark-upCost Sub Mark-up
Prime/JV indirect ceiling rate mark-up on Cost Reimbursable Subcontractors, i.e. G&A, as provided on JL.5$224,550.007.5%$16,841.25
Total JV fees/mark-ups, i.e. G&A, as provided on JL.8$41,171.00$41,171.00
TOTAL VALUE OF COST MODEL FOR BASE YEAR$555,812.25