NOTES FOR COMPLETING JL.4
1. Only use the base indirect rates, as applicable and in accordance with disclosed accounting practices, for the base year and each option year. The listed indirect rate categories may be adjusted to reflect the offeror’s accounting system. See additional information in Section L of the solicitation.
2. Attachment JL.4 is provided in Microsoft Word. Complete in Microsoft Word format, as provided. Additionally, offerors shall provide JL.4 in Microsoft Excel format on CDs with formulas intact to show how the multiplier was calculated.
3. Provide the percentage of work expected to be performed by the prime, each joint venture partner, and each cost reimbursable subcontractor under “Proposed Distribution of Work.”
ATTACHMENT JL.4, N62470-22-R-9014
INDIRECT CEILING RATES BUILD-UP, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM
BASE INDIRECT RATES USED TO DERIVE CEILING RATES
BASE YEAR
| Cost Element |
| Fringe |
| Home Overhead |
| Field Overhead |
| G&A |
| Award Fee |
| FCCOM |
| Multiplier |
Direct Labor
Provide in Chart below
Materials
Supplies
Equipment (Contractor –Owned)
Equipment (Contractor –Acquired Property)
0.00%
Rental Equipment
Inventory
Travel
0.00%
Subcontracts
Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)
Other
| FCCOM POOL |
| COST BASIS |
| RATE |
Field
Home
G&A
Owned Equipment
| COST BASIS |
| RATE |
LVE
INDIRECT CEILING RATES BUILD-UP, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM
BASE INDIRECT RATES USED TO DERIVE CEILING RATES
OPTION YEAR 1
| Cost Element |
| Fringe |
| Home Overhead |
| Field Overhead |
| G&A |
| Award Fee |
| FCCOM |
| Multiplier |
Direct Labor
Provide in Chart below
Materials
Supplies
Equipment (Contractor –Owned)
Equipment (Contractor –Acquired Property)
0.00%
Rental Equipment
Inventory
Travel
0.00%
Subcontracts
Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)
Other
| FCCOM POOL |
| COST BASIS |
| RATE |
Field
Home
G&A
Owned Equipment
| COST BASIS |
| RATE |
LVE
INDIRECT CEILING RATES BUILD-UP, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM
OPTION YEAR 2
| Cost Element |
| Fringe |
| Home Overhead |
| Field Overhead |
| G&A |
| Award Fee |
| FCCOM |
| Multiplier |
Direct Labor
Provide in Chart below
Materials
Supplies
Equipment (Contractor –Owned)
Equipment (Contractor –Acquired Property)
0.00%
Rental Equipment
Inventory
Travel
0.00%
Subcontracts
Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)
Other
| FCCOM POOL |
| COST BASIS |
| RATE |
Field
Home
G&A
Owned Equipment
| COST BASIS |
| RATE |
LVE
INDIRECT CEILING RATES BUILD-UP, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM
OPTION YEAR 3
| Cost Element |
| Fringe |
| Home Overhead |
| Field Overhead |
| G&A |
| Award Fee |
| FCCOM |
| Multiplier |
Direct Labor
Provide in Chart below
Materials
Supplies
Equipment (Contractor –Owned)
Equipment (Contractor –Acquired Property)
0.00%
Rental Equipment
Inventory
Travel
0.00%
Subcontracts
Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)
Other
| FCCOM POOL |
| COST BASIS |
| RATE |
Field
Home
G&A
Owned Equipment
| COST BASIS |
| RATE |
LVE
INDIRECT CEILING RATES BUILD-UP, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM
OPTION YEAR 4
| Cost Element |
| Fringe |
| Home Overhead |
| Field Overhead |
| G&A |
| Award Fee |
| FCCOM |
| Multiplier |
Direct Labor
Provide in Chart below
Materials
Supplies
Equipment (Contractor –Owned)
Equipment (Contractor –Acquired Property)
0.00%
Rental Equipment
Inventory
Travel
0.00%
Subcontracts
Cost Reimbursable Subcontractors (Award Fee shall not be applied to award fee of cost reimbursable subcontractor’s costs at any tier)
Other
| FCCOM POOL |
| COST BASIS |
| RATE |
Field
Home
G&A
Owned Equipment
| COST BASIS |
| RATE |
LVE
INDIRECT CEILING RATES BUILD-UP, AWARD FEE APPLICATION AND DISTRIBUTION OF COST-REIMBURSABLE WORK FORM Proposed Distribution of Work Offerors shall include the percentage of work expected to be performed by the prime, each joint venture partner, and each cost reimbursable subcontractor.
Prime
Joint Venture
Company A
_______% (if applicable)
Company B
_______% (if applicable)
Cost Reimbursable Subcontractor
_______% (if applicable)
Cost Reimbursable Subcontractor
_______% (if applicable)
Total