Attachment_J4_-__Subcontractor_Percentage_Worksheet.pdf

PDF 81 KB Posted

Attached to
GVIC FISH SCREEN REHABILITATION
Solicitation number
140R4024R0024
Issued by

About this file

This is a subcontracting percentage worksheet template from the Department of the Interior for tracking compliance with FAR Clause 52.219-14, Limitations of Subcontracting. The worksheet provides a standardized format for calculating subcontracting labor percentages between prime contractors and subcontractors.

The worksheet breaks down costs into direct labor, fringe benefits, and labor G&A (General and Administrative) costs for both prime contractor and subcontractor. It includes specific calculation instructions for determining the subcontracting labor cost percentage using the formula: subcontractor total labor costs divided by the sum of prime and subcontractor total labor costs. The template includes important notes about demonstrating allowable labor overhead per FAR 31.205-6(m) and guidance on using total subcontracting amounts when detailed breakdowns are not available.

View the file

Other files

File Type Posted
Updated_-_35_22_18_-_Gate_Actuators_Revised_2025_01_14_0003.pdf PDF
Updated_-_01_33_00_-_Submittals_Revised_2025_01_14_0003.pdf PDF
Updated_-_26_05_33_-_Electrical_Conduit_Revised_2025_01_10_0003.pdf PDF
Updated_-_01_11_00_-_Summary_of_Work_Revised_2025_01_13_0003.pdf PDF
Updated_-_31_23_02_-_Compacting_Earth_Materials_Revised_2025_01_14_0003.pdf PDF
Updated_-_Attachment_J5_-__Past_Performance_Questionnaire_0003.pdf PDF
Sol_140R4024R0024_Amd_0003.pdf PDF
Updated_Site_Visit_Questions_2025_01_15_-_GVIC_0003.pdf PDF
Updated_-_00_01_10_-_Table_of_Contents_Revised_2025_01_14_0003.pdf PDF
Site_Visit_Agenda_GVIC_Fish_Screen_0002.pdf PDF
Site_Visit_Questions_and_Answers_-_140R4024R0024_0002.pdf PDF
Sol_140R4024R0024_Amd_0002.pdf PDF
Sign_in_Sheet_for_Site_Visit_0002.pdf PDF
Sol_140R4024R0024_Amd_0001.pdf PDF
Attachment_J7_-_SF25_Performance_Bond.pdf PDF
Attachment_J9_-_Price_Schedule_Sheet.xlsx XLSX spreadsheet
Attachment_J6_-_SF24_Bid_Bond_Form.pdf PDF
Complete_RFP_140R4024R0024_GVIC_Fish_Screen_2.pdf PDF
Attachment_J1_-_Descriptions_and_Specifications.pdf PDF
Attachment_J5_-__Past_Performance_Questionnaire.pdf PDF
Attachment_J3_-_Wage_Requirements_Determination__8_Nov_24.pdf PDF
Attachment_J2c_-_GVIC_Drawing_Package_3_of_3.pdf PDF
Attachment_J2b_-_GVIC_Drawing_Package_2_of_3.pdf PDF
Attachment_J2a_-_GVIC_Drawing_Package_1_of_3.pdf PDF
Sol_140R4024R0024.pdf PDF
Attachment_J8_-_SF25A_Payment_Bond.pdf PDF
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. Department of the Interior

FAR Clause 52.219-14, Limitations of Subcontracting

Subcontracting Percentage Worksheet

PRIME CONTRACTOR: ____ ___ SOURCE: ___ ___

SUBCONTRACTOR: _____ SOURCE: _____ _

PRIME CONTRACTOR SUBCONTRACTOR

DIRECT LABOR $ $

FRINGE BENEFITS* $ $

SUBTOTAL (A) $ (B) $

LABOR G&A** @ % $ $

TOTAL LABOR COSTS (C) $ (D) $

To calculate the subcontracting percentage, first add DIRECT LABOR and FRINGE BENEFITS and enter the figures for the prime contractor in space (A) and for the subcontractor (if available)*** in space (B).

Next, calculate the LABOR G&A by multiplying the G&A rate by the SUBTOTAL figure in space (A).

Attachment 4 - Subcontractor Worksheet

Calculate the subcontractor's LABOR G&A by multiplying the subcontractor's G&A rate by the subcontractor's SUBTOTAL figure in (B).

Add the LABOR G&A to the SUBTOTAL and record that figure in the spaces for TOTAL LABOR COSTS at (C) and (D) respectively.

Next, using the formula below, calculate the subcontracting labor percentage.

(D)

(C) + (D)

SUBCONTRACTING LABOR COST PERCENTAGE = _______ %

* The firm must demonstrate that their labor overhead is allowable in accordance with FAR 31 .205-6(m). Failure to do so will cause the entire overhead to be eliminated from the calculations.

** G&A denotes General and Administrative Costs

*** You need to compare as like figures as possible. Therefore, if you have a breakdown of the subcontractor's costs use it in the formulation above. If you do not have a breakdown you need to use the TOTAL SUBCONTRACTING AMOUNT for item (D) even though you must still breakdown the contractor's costs.

File details come from the government source that posted it. Updated .