Attachment_J2a_-_GVIC_Drawing_Package_1_of_3.pdf
PDF 26 MB Posted
- Attached to
- GVIC FISH SCREEN REHABILITATION
- Solicitation number
- 140R4024R0024
About this file
This file is a drawing package (1 of 3) containing technical engineering drawings related to the GVIC Fish Screen Rehabilitation project in Mesa County, Colorado. The drawings appear to be technical schematics and engineering plans for fish screening infrastructure improvements at the Grand Valley Irrigation Canal (GVIC) facility near Palisade, Colorado. Without access to view the actual drawings, specific engineering details cannot be provided.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ColoradoUtah
New MexicoArizona
Wyoming
Salt Lake City
Denver
Grand Junction
Grand Junction
Palisade
Clifton
GVIC SiteB rentw ood D r
Hwy 6
B re nt w oo d
D r
C ol or ad o R iv er
Palisade, CO
North site access gate
South site access gate
D
C
B
D
C
B
A
A
SA
FE
TY
AL
W
AY
S
TH
IN
K
BU
R
EA
U O
F R
EC
LA
M
A
TI
O N
U .S
D
EP
AR
TM
EN
T O
F
TH
E
IN
TE
R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
£T A£
£AA£
U
PP
ER
C
O
LO
R A D
O R
IV
ER
E N
D A N
G
ER
ED
F
IS
H
R
EC
O V
ER
Y
PR
O G
R A M
G R A N
D V
A
LL
EY
I
R R
IG
A
TI
O N
C O
M
PA
N Y
G V
IC
F
IS
H S
C R
EE
N F
A C
IL
IT
Y
G V
IC
F
IS
H S
C R
EE
N R
EH
A
BI
LI
TA
TI
O
N
Joshua Dunham, P.E.
Mark Wernke, P.E.
GRAND JUNCTION, CO 2024-05-30
Location Map
1745-417-111
Tom Hook
Tom Hook
Matt Bryner
ADMIN APPROVAL - Technical Services Division Manger
1 Regional Map
2 Grand Valley Map
NOTES:
1. All site access from Hwy 6 via Brentwood Drive.
2. See specification section 52 00 00 - Drawings for complete drawing list.
3 Site Map
Table 52 00 00A - List of Drawings Sheet No. Title Drawing No.
1 Location Map 1745-417-111 2 Site Plan 1745-417-112 3 Numbering Diagram 1745-417-113 4 Demolition Overview 1745-417-114 5 Bypass Channel Demolition 1745-417-115 6 Fish Return Demolition 1745-417-116 7 Structure Overview 1745-417-117
8 Bypass Channel Plan and Access Road Section 1745-417-118
9 Bypass Channel Sections and Concrete Joints 1745-417-119
10 Fish Return Foundation and Surface Features 1745-417-120
11 Fish Return Walls 1745-417-121 12 Fish Return Sections 1745-417-122 13 Pier Extensions 1745-417-123 14 Bypass Gates 1745-417-124
15 Guardrails and Safety Cable with Floats 1745-417-125
16 Grating and Supports 1745-417-126 17 Screen Component Assemblies 1745-417-127 18 Wash Water Supply System 1745-417-128
19 Wash Water Plumbing Components 1745-417-129
20 Wash Water Pipe Support Components 1745-417-130
21 Conduit and Panel Support Components 1745-417-131
22 Wash Water Pipe Termination 1745-417-132
23 Electrical Communication and Routing Sheet 1 of 3 1745-417-133
24 Electrical Communication and Routing Sheet 2 of 3 1745-417-134
25 Electrical Communication and Routing Sheet 3 of 3 1745-417-135
26 Electrical Schematic - Power Distribution 1745-417-136
27 PLC Screen Electrical Schematic 1745-417-137 28 Trough Pump Assembly 1745-417-138 29 Pump Platform Support Angles 1745-417-139 30 Trough Pump Platform 1745-417-140 31 Grating Support Weldment 1745-417-141
32 Debris Conveyor and Trough Installation 1745-417-142
33 Debris Conveyor Attachments 1745-417-143 Standard Drawings
34 Typical Grounding Details Sheet 1 of 2 40-D-4334
35 Typical Grounding details Sheet 2 of 2 40-D-4335
36 General Notes for Concrete Outlines and Reinforcement 40-D-60003
37 Minimum Requirements for Detailing Reinforcement 40-D-6004
Information Only Drawings
38-64 Original Construction Drawings 1745-100-1 to 1745-100-27
Outside Agency Drawings
Redgroup Screen and Conveyor Control System
1745-OA-003 to
1745-OA-036
HydroLox Traveling Screens 1745-OA-070 to
1745-OA-076
HydroLox Debris Trough and Conveyor 1745-OA-077 to
1745-OA-081
R
EV
N O
S
TA
-1
1-
TO
M
H O
O K
U pd at ed d ra w in gs t o m ee t sc re en s up pl ie r re qu ir em en ts
Sheet #001
B rentw oo d D rive
Access from US Hwy 6
River trail pedestrian bridge to remain open to public during construction.
GVIC canal O&M road for GVIC and GVIC's contractor use only.
Do Not Disturb
South site access with existing gate
Gauging Station Do Not Disturb
Check Structure
Fish return structure
4686' - 9 3/4"GVA-23A1-500
Do Not Disturb
Fish return vent Do Not Disturb
Fis h S cre en
Stru ctu re
GVA-23A1-501
Transformer
Backup Generator, Main Distribution Panel, and Air Compressor.
See note 6.
Equipment building reserved for GVIC operations.
Do Not Disturb
Dam Tender residence Do not block access
Contractor shall maintain a 14 ft access road through worksite from Canal O&M Road to GVIC Bridge.
Contractor shall maintain a 14 ft access road through worksite from Brentwood Drive to river access and equipment building.
GVIC Bridge Passenger vehicles only.
Flood Gates Do Not Disturb
River Gates Do Not Disturb
Riverfront Trail
Potential Staging Area Approx 0.33 acres
Contractor may install temporary canal crossing for equipment across canal.
Approx location shown. Do not disturb canal within 50 ft of gauge weir.
If disturbed, return canal to preproject condition after project completion.
North site access with existing gate
H-15 Rated bridge with trash rack
Area reserved for GVIC and GVIC's contractor use only.
Do Not Disturb
Gauge weir Do Not Disturb
N 1474402.54 E 2191042.86
Property pin.
Survey and reset after completing site work
Approx location of existing leach field. GVIC to identify location with temporary construction fencing prior to contractor onsite mobilization. Contractor shall ensure leach field is not damaged during project.
GVIC Field Do Not Disturb
Potential Staging Area Approx 0.66 acres
Potential Staging Area Approx 0.90 acres
Stockpiled material may be used for temp canal crossing and other project backfill as needed.
Excess excavated material may be stockpiled here at end of project.
Area reserved for GVIC and GVIC's contractor use only.
Do Not Disturb
GVA-23A1-510
LS 12085
Washer in conc/pvc pipe @ Surf.
Do Not Disturb.
Do not disturb existing trees.
Groundwater typically surfaces in this area.
Approx path of buried electrical service line to transformer.
Approx location of unwatering sump.
See note 5.
D
C
B
D
C
B
A
A
S A
FE
T Y
A
LW
A
YS
T H
IN
K
B U
R E A U
O F
R E C
LA
M A T
IO
N
U .S
D
E
PA
R T M
E N
T O
F T H
E I
N T E R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
£TA £
£AA £
U
PP
E R C
O
LO
R A D
O R
IV
E R E
N D
A N
G E R E D
F
IS
H R
E C O
V E R Y P
R O
G R A M
G R A N
D V
A
LL
E Y
IR
R
IG
A
TI
O N
C O
M
PA
N Y
G V
IC
F
IS
H S
C R E E N
F A C
IL
IT
Y
G V
IC
F
IS
H S
C R E E N
R E H
A B
IL
IT
A T
IO
N
Joshua Dunham, P.E.
Mark Wernke, P.E.
GRAND JUNCTION, CO 2024-05-30
Site Plan
1745-417-112
Tom Hook
Tom Hook
Matt Bryner
ADMIN APPROVAL - Technical Services Division Manger
Scale: 1" = 40'-0"1 Site Access and Use Map
Project / Drawing Infromation
1. HORIZONTAL DATUM:
Colorado Central Zone, State Plane Coordinate System
(0502 CO C NAD 83 (2011))
2. VERTICAL DATUM:
North American Vertical Datum of 1988
(NAV88), GEOID 18
3. UNIT OF MEASUREMENT:
U.S. Survey Foot.
(One U.S. Survey Foot = 12/39.37 Meter)
4. PROJECT CONTROL:
All primary control monumentation are 3" brass caps set in concrete slabs stamped with the point number.
0' 1/2" 1" 2" 4"
0' 20' 40' 80' 160'
INCH INCREMENTS SHOWN ARE AT FULL SCALE ON THE SHEET.
IF AT ANY OTHER LENGTH, SCALE DRAWING PROPORTIONALLY.
1" = 40'
NOTES:
1. Site access from Hwy 6 via Brentwood Drive.
2. Contractor shall provide an area and maintain vehicle access for a Government trailer. See specification section 01 14 10 Use of Site.
3. If disturbed, return staging areas to preproject condition after project completion. See specification section 01 14 10 - Use of Site.
4. The site will be provided to the contractor in an unwatered condition with the river gates fully closed.
However, some leakage (~1 cfs) should be expected.
See specification section 31 03 33.
5. Existing sump pit between river gates and trash rack available for contractor use. Sump may require maintenance prior to contractor use.
6. Put Air Compressor on dunnage and haul off site. See specification section 02 41 07. Leave Backup Generator and Main Distribution Panel in place.
Control Points Point Name Description Northing Easting Elevation
GVA-23A1-500 Brass Cap in Concrete 1474243.111 2190960.455 4686.805 GVA-23A1-501 Brass Cap in Concrete 1474433.461 2191273.981 4686.661
R E V N
O
S T A
-1
1-
T O
M H
O O
K U p d at e d dr a w in g s to m ee t sc re en s u p p lie r re q u ir em en ts
Sheet #002
Bay
Screen
Screen
Screen
Screen
Screen
Screen
Screen
Screen
Screen
Screen
Screen
Screen
Screen
Screen
Screen
Screen
Screen
Bypass
Bypass
Bypass
Bypass
Bay
Bay
Bay
Bay
Bay
Bay
Bay
Bay
Bay
Bay
Bay
Bay
Bay
Bay
Bay
Bay
Bay
Bay
Bay
Bay
Bay
Check 1
Check 2
Check 3
Check 4
Check 5
Check 6
Check 7
Pi e r
Pi e r
Pi e r
Pi e r
Pi e r
Pi e r
Pi e r
Pi e r
Pi e r
Pi e r
Pi er
Pi er
Pi er
Pi er
Pi er
Pi er
Pi er
Pi er
Pi er
Pi er
Pi er
Pi er
Pi er
Pi er
Bay
D
C
B
D
C
B
A
A
S A
FE
T Y
A
LW
A
YS
T H
IN
K
B U
R E A U
O F
R E C
LA
M A T
IO
N
U .S
D
E
PA
R T M
E N
T O
F T H
E I
N T E R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
£TA £
£AA £
U
PP
E R C
O
LO
R A D
O R
IV
E R E
N D
A N
G E R E D
F
IS
H R
E C O
V E R Y P
R O
G R A M
G R A N
D V
A
LL
E Y
IR
R
IG
A
TI
O N
C O
M
PA
N Y
G V
IC
F
IS
H S
C R E E N
F A C
IL
IT
Y
G V
IC
F
IS
H S
C R E E N
R E H
A B
IL
IT
A T
IO
N
Joshua Dunham, P.E.
Mark Wernke, P.E.
GRAND JUNCTION, CO 2024-05-30
Numbering Diagram
1745-417-113
Tom Hook
Tom Hook
Matt Bryner
ADMIN APPROVAL - Technical Services Division Manger
Scale: 1/16" = 1'-0"1 Numbering Diagram for Completed Facility
NOTES
1. All references to check gates, bays, piers, screens, and bypass gates in the project drawings and specifications are located as shown on this drawing.
2. All contractor provided documentation shall use the same numbering system as shown on this drawing.
0' 1/2" 1" 2" 4"
0' 8' 16' 32' 64'
INCH INCREMENTS SHOWN ARE AT FULL SCALE ON THE SHEET.
IF AT ANY OTHER LENGTH, SCALE DRAWING PROPORTIONALLY.
1" = 16'
R E V N
O
S T A
-1
1-
T O
M H
O O
K U p d at e d dr a w in g s to m ee t sc re en s u p p lie r re q u ir em en ts
Sheet #003
Existing topography.
Channel bottom and bank covered with riprap.
See site photos.
Remove and dispose approx. 40 linear feet of grouted riprap upstream of transition.
~40'-0"
Existing topography.
Channel bottom and bank covered with riprap.
See Dwg. 1745-417-117 for bank regrading.
Approximately 55 linear feet of bank to be excavated for bypass channel.
See Dwg. 1745-417-117 for bank regrading.
Remove and dispose existing bollard and culvert under driveway.
Brick paver slope protection.
Do not disturb.
Fish return pipe vent and project control point.
Do not disturb
Walkway not shown for clarity
Bank may be disturbed as needed for access into canal.
Return to existing grade and replace riprap upon completion.
Locate utilities prior to excavation. Electrical and data cables to guage station may be encountered.
Do Not Disturb.
Remove and dispose S7x18.9 festoon trolly beam for entire length of structure.
Approx 260 feet.
Remove and dispose all (26) 3 ft W6x9 vertical beams.
Bolted connection
Relocate upstream S8x18.4 screen hoist trolley beam to the upstream edge of top W6x25 Beam for use as traveling screen hoist trolley.
Approx 275 feet.
Bolted connection See Info Dwg. 1745-100-15
Remove and dispose existing L2x2x1/8 bracing where present in 8 bays.
Remove and dispose S8x18.4 cleaner trolley beam.
Approx 260 feet.
Cut and dispose (7) 1.5 ft W6x9 trolley support cantilevered beams flush with column face on piers 0, and 18-23.
Welded connection
Remove and dispose (21) screen panels from all bays except 17 and
20. See Info Dwg. 1745-100-12 for screen panel detail.
Remove and stockpile (5) baffle panels from bays 0, 18, 19, 21, 22. See Info
Dwg. 1745-100-11 for baffle detail.
Downstream S8x18.4 baffle hoist trolley beam to remain in place.
Screen panel not shown for clarity
Remove and dispose all existing cleaning system components not shown including:
2" Air line Air Burst Festoon System Brush Cleaner See Info drawings for cleaning system detail.
9"
Cut and dispose (17) trolley support cantilevered beams 9" from column face on piers 1-17.
W6x25 Column
Baffle Slot
Screen Slot
Cleaner Trolley Beam.
Remove and dispose.
Guardrail Bolted Connection
Scale: 1/16" = 1'-0"3 Demolition Plan
D
C
B
D
C
B
A
A
S A
FE
T Y
A
LW
A
YS
T H
IN
K
B U
R E A U
O F
R E C
LA
M A T
IO
N
U .S
D
E
PA
R T M
E N
T O
F T H
E I
N T E R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
£TA £
£AA £
U
PP
E R C
O
LO
R A D
O R
IV
E R E
N D
A N
G E R E D
F
IS
H R
E C O
V E R Y P
R O
G R A M
G R A N
D V
A
LL
E Y
IR
R
IG
A
TI
O N
C O
M
PA
N Y
G V
IC
F
IS
H S
C R E E N
F A C
IL
IT
Y
G V
IC
F
IS
H S
C R E E N
R E H
A B
IL
IT
A T
IO
N
Joshua Dunham, P.E.
Mark Wernke, P.E.
GRAND JUNCTION, CO 2024-05-30
Demolition Overview
1745-417-114
Tom Hook
Tom Hook
Matt Bryner
ADMIN APPROVAL - Technical Services Division Manger
1 Steel Structure Demolition
0' 1/2" 1" 2" 4"
0' 8' 16' 32' 64'
INCH INCREMENTS SHOWN ARE AT FULL SCALE ON THE SHEET.
IF AT ANY OTHER LENGTH, SCALE DRAWING PROPORTIONALLY.
1" = 16'
Scale: 3/8" = 1'-0"2 Trolley Support Cantilevered Beam
NOTES
1. See specification section 02 41 07 - Modification or Removal of
Existing Features and 03 81 10 - Concrete Removal.
2. See Dwg. 1745-417-115 for bypass channel demolition detail and
Dwg. 1745-417-116 for fish return demolition detail.
3. Scales shown on views are for drawings printed at full scale.
4. Appropriate worker protection shall be used when modifying galvanized components.
5. Coat all cut faces with liquid galvanizing paint.
6. Stockpile removed baffle panels on site as directed by COR.
7. Components shall remain as part of the facility, unless their removal is specified in the drawings or specs. Any components temporarily removed for convenience of the contractor shall be restored after project completion.
R E V N
O
S T A
-1
1-
T O
M H
O O
K U p d at e d dr a w in g s to m ee t sc re en s u p p lie r re q u ir em en ts
Sheet #004
4680'
4685'
Remove and dispose all existing concrete within crosshatch area including 6" slab, 12" wall, 10" cutoff wall, and 12" transition slab. Approx 23 cy total.
See Info Dwg. 1745-100-7.
Remove and dispose existing electrical and control panels.
See Info Dwg. 1745-100-24 and site photos.
Saw cut existing slab.
Remove and dispose 2.5 ft W6x25 column and 1.5 ft W6x9 support cantilevered beam. See
Info Dwg. 1745-100-9.
Remove and dispose cleaner brush motor stand and associated components including pulleys and cables across structure. See Info Dwg. 1745-100-22.
Remove and dispose irrigation box. Cut pipes below grade and abandon in place.
23'-6" 12'-0"
Remove and dispose abondonded buried utitlities as needed for excavation and installation of new utilities. See photos and Info Dwg. 1745-100-25 for existing conduit layout.
10"
1'-0"
10"
1 x MK-6 Guardrail Remove and dispose.
See Info Dwg. 1745-100-17.
1 x 24' MK-7 Guardrail Remove and dispose.
See Info Dwg. 1745-100-17.
1 x 2' MK-7 Guardrail Remove and dispose.
See Info Dwg. 1745-100-17.
Walkway grating not shown.
6'-0"6'-0"
El. 4676.88 D/S Invert
El. 4686.66 Top of Wall
Saw cut along foundation slab.
Transition, wall, and slab to be removed.
6"
1'-0"Compacted backfill
Guardrail not shown.
3' -0
4'-0"
10" cutoff wall
D
C
B
D
C
B
A
A
S A
FE
T Y
A
LW
A
YS
T H
IN
K
B U
R E A U
O F
R E C
LA
M A T
IO
N
U .S
D
E
PA
R T M
E N
T O
F T H
E I
N T E R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
£TA £
£AA £
U
PP
E R C
O
LO
R A D
O R
IV
E R E
N D
A N
G E R E D
F
IS
H R
E C O
V E R Y P
R O
G R A M
G R A N
D V
A
LL
E Y
IR
R
IG
A
TI
O N
C O
M
PA
N Y
G V
IC
F
IS
H S
C R E E N
F A C
IL
IT
Y
G V
IC
F
IS
H S
C R E E N
R E H
A B
IL
IT
A T
IO
N
Joshua Dunham, P.E.
Mark Wernke, P.E.
GRAND JUNCTION, CO 2024-05-30
Bypass Channel Demolition
1745-417-115
Tom Hook
Tom Hook
Matt Bryner
ADMIN APPROVAL - Technical Services Division Manger
Scale: 1/4" = 1'-0"2 Bypass Transition Demolition
1 Existing Electrical/Control Panels Photo
Scale: 3/8" = 1'-0"3 Existing Upstream Transition Section
NOTES
1. See specification section 02 41 07 - Modification or Removal of
Existing Features and 03 81 10 - Concrete Removal.
2. See Dwg. 1745-417-115 for bypass channel demolition detail and
Dwg. 1745-417-116 for fish return demolition detail.
3. Scales shown on views are for drawings printed at full scale.
4. Appropriate worker protection shall be used when modifying galvanized components.
5. Coat all cut faces with liquid galvanizing paint.
6. Stockpile removed baffle panels on site as directed by COR.
7. Components shall remain as part of the facility, unless their removal is specified in the drawings or specs. Any components temporarily removed for convenience of the contractor shall be restored after project completion.
R E V N
O
S T A
-1
1-
T O
M H
O O
K U p d at e d dr a w in g s to m ee t sc re en s u p p lie r re q u ir em en ts
Sheet #005
4680'
4685' Remove and dispose 6" concrete slab.
Approx 4 cy.
Remove slab at joint with wall.
Remove and dispose 2'x5' slide gate.
18'-5 3/4"
1'-0"
See Dwg. 1745-417-126 for grating modifications
Remove and dispose existing transition structure and foundation slab as shown. Original structure was modified in previous project.
See photo for detail. Approx 80 cy.
Saw cut 24-inch foundation slab.12'-0"
Saw cut, remove, and dispose inclined wall, channel wall, and
12-inch slab as shown.
Approx 5 cy.
See Info Dwg. 1745-100-6
/4
/8
Saw cut, remove, and dispose slab and wall as necessary for installation of new utilities.
Remove and reinstall water level sensor enclosure on new wall as shown on Dwg. 1745-417-121.
6"
Fish return pipe slide gate to remain in place.
24'-0"
Saw cut inclinded wall flush with vertical wall.
5 x 4' - 4" Removable Guardrail.
Remove and stockpile for use on new structure.
3 x MK-6 Guardrails Remove and dispose.
Saw cut vertical channel wall.
D
C
B
D
C
B
A
A
S A
FE
T Y
A
LW
A
YS
T H
IN
K
B U
R E A U
O F
R E C
LA
M A T
IO
N
U .S
D
E
PA
R T M
E N
T O
F T H
E I
N T E R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
£TA £
£AA £
U
PP
E R C
O
LO
R A D
O R
IV
E R E
N D
A N
G E R E D
F
IS
H R
E C O
V E R Y P
R O
G R A M
G R A N
D V
A
LL
E Y
IR
R
IG
A
TI
O N
C O
M
PA
N Y
G V
IC
F
IS
H S
C R E E N
F A C
IL
IT
Y
G V
IC
F
IS
H S
C R E E N
R E H
A B
IL
IT
A T
IO
N
Joshua Dunham, P.E.
Mark Wernke, P.E.
GRAND JUNCTION, CO 2024-05-30
Fish Return Demolition
1745-417-116
Tom Hook
Tom Hook
Matt Bryner
ADMIN APPROVAL - Technical Services Division Manger
Scale: 3/16" = 1'-0"3 Fish Return Demolition Plan
1 3D Fish Return Before Demolition 2 3D Fish Return After Demolition
4 Fish Return Transition Modification Photo
NOTES
1. See specification section 02 41 07 - Modification or Removal of
Existing Features and 03 81 10 - Concrete Removal.
2. See Dwg. 1745-417-115 for bypass channel demolition detail and
Dwg. 1745-417-116 for fish return demolition detail.
3. Scales shown on views are for drawings printed at full scale.
4. Appropriate worker protection shall be used when modifying galvanized components.
5. Coat all cut faces with liquid galvanizing paint.
6. Stockpile removed baffle panels on site as directed by COR.
7. Components shall remain as part of the facility, unless their removal is specified in the drawings or specs. Any components temporarily removed for convenience of the contractor shall be restored after project completion.
8. Fish return transition has been modified and differs from that shown on Information Drawings. Modification is shown in Detail 4.
R E V N
O
S T A
-1
1-
T O
M H
O O
K U p d at e d dr a w in g s to m ee t sc re en s u p p lie r re q u ir em en ts
Sheet #006
(4) Bi-fold overshot gates
Flow
Flow
Install electric actuators on check 3, 4, and 5 slide gates.
See Info Dwg. 1745-100-5
Traveling screens and walkway not shown for clarity
Remove existing riprap and grade slope until it intersects existing slope (approx 80 ft). Maintain toe parallel to screen structure and match existing side slope at intersection. Estimated 340 CY to be removed. Reinstall riprap on side slope and invert..
.8
Grout voids in riprap on side slope and invert for
20 ft downstream of new transition. See note 2.
Grout voids in riprap on side slope and invert for 20 ft upstream of new transition. See note 2.
Regrade as needed for access.
Return to existing condition.
Remove existing riprap and grade slope until it intersects existing slope (approx 90 ft). Match existing side slope at intersection. Estimated 185 CY to be removed. Reinstall riprap on side slope and invert.
Pier Extensions See Dwg. 1745-417-123.
Modify fish return transition
Create concrete bypass channel. Estimated 350 CY to be removed from existing bank.
H-15 rated bridge with 6" trash rack.
Approx extents of road surfacing. Slope as directed by COR for vehicle access.
Approx extents of road surfacing.
Modified fish return
Pier extensions
Regraded bank
Regraded bank
Bypass channel
Graveled access to trashrack
Check structure
Fish return vent and project control point
Temporary canal crossing approx.
location downstream of check structure.
Bi-fold overshot gates
Existing trashrack and bridge
Metalwork and screen system not shown
Scale: 1/16" = 1'-0"2 Structure Overview
D
C
B
D
C
B
A
A
S A
FE
T Y
A
LW
A
YS
T H
IN
K
B U
R E A U
O F
R E C
LA
M A T
IO
N
U .S
D
E
PA
R T M
E N
T O
F T H
E I
N T E R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
£TA £
£AA £
U
PP
E R C
O
LO
R A D
O R
IV
E R E
N D
A N
G E R E D
F
IS
H R
E C O
V E R Y P
R O
G R A M
G R A N
D V
A
LL
E Y
IR
R
IG
A
TI
O N
C O
M
PA
N Y
G V
IC
F
IS
H S
C R E E N
F A C
IL
IT
Y
G V
IC
F
IS
H S
C R E E N
R E H
A B
IL
IT
A T
IO
N
Joshua Dunham, P.E.
Mark Wernke, P.E.
GRAND JUNCTION, CO 2024-05-30
Structure Overview
1745-417-117
Tom Hook
Tom Hook
Matt Bryner
ADMIN APPROVAL - Technical Services Division Manger
NOTES:
1. Topo lines are on 1-foot increments.
2. Fill voids in riprap in a manner to ensure a minimum of 4" of rock remains protruding into the flow of the canal.
3. See specification sections 32 15 10 - Road Surfacing and 31 23 11 - Earthwork for Structures.
0' 1/2" 1" 2" 4"
0' 8' 16' 32' 64'
INCH INCREMENTS SHOWN ARE AT FULL SCALE ON THE SHEET.
IF AT ANY OTHER LENGTH, SCALE DRAWING PROPORTIONALLY.
1" = 16'
1 Structure Isometric
R E V N
O
S T A
-1
1-
T O
M H
O O
K U p d at e d dr a w in g s to m ee t sc re en s u p p lie r re q u ir em en ts
Sheet #007
New 6" concrete slab
6'-0"
Cutoff wall
Concrete dog leg transition
.5
H :1
V
Road surfacing as directed by COR. See Dwg. 1745-417-117 for approx extents. 3'-0" 3'-0"
6" Bollard
6" Drain center line
Catch Basin Grade drainage ditch along road to catch basin. Establish berm as necessary.
1'-0" typ
Match elevation of existing wall
Match elevation of existing surface slab
20'-0"
20'-0"
15'-1"
Cr.J
Cr.J
Cr.J
Cr.J
EJ EJ
24'-3" 19'-2" 19'-2" 14'-5 1/2"
Cr.J
Cr.J1
/4
25'-0"
/2
Guardrail not shown
1'-0"
12" Concrete wall Reinforcement not shown
6'-0"
Match elevation of existing slab
New underground utilities.
See Dwg. 1745-417-133.
Concrete step for electrical enclosure. Match top of wall elevation.
6"L x 12"W x 4"D Blockout in top of wall to allow surface drainage to canal.
11'-2"
TJ
TJ
TJ
1'-2"
El. 4686.66 Top of Wall
12" Catch Basin See spec 33 41 10
6"
Surround with 6" concrete slab.
Slope slab 2% towards basin.
6" HDPE Pipe See spec 33 41 10.
Maintain 1' min cover. 2 x #4 bars throughout
El. 4689.66 Catch Basin
1'-0"
6" Bollard See spec 33 41 10
Road surfacing 4" min thickness
Guardrail (typ).
m in
0' 1/2" 1" 2" 4"
0' 1' 2' 4' 8'
INCH INCREMENTS SHOWN ARE AT FULL SCALE ON THE SHEET.
IF AT ANY OTHER LENGTH, SCALE DRAWING PROPORTIONALLY.
1/2" = 1'
Traffic rated grate
1'-0"
4"
Approx ground surface
D
C
B
D
C
B
A
A
S A
FE
T Y
A
LW
A
YS
T H
IN
K
B U
R E A U
O F
R E C
LA
M A T
IO
N
U .S
D
E
PA
R T M
E N
T O
F T H
E I
N T E R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
£TA £
£AA £
U
PP
E R C
O
LO
R A D
O R
IV
E R E
N D
A N
G E R E D
F
IS
H R
E C O
V E R Y P
R O
G R A M
G R A N
D V
A
LL
E Y
IR
R
IG
A
TI
O N
C O
M
PA
N Y
G V
IC
F
IS
H S
C R E E N
F A C
IL
IT
Y
G V
IC
F
IS
H S
C R E E N
R E H
A B
IL
IT
A T
IO
N
Joshua Dunham, P.E.
Mark Wernke, P.E.
GRAND JUNCTION, CO 2024-05-30
Bypass Channel Plan and Access Road Section
1745-417-118
Tom Hook
Tom Hook
Matt Bryner
ADMIN APPROVAL - Technical Services Division Manger
117 Scale: 3/16" = 1'-0" 2 Bypass Channel Callout
118 Scale: 1/2" = 1'-0" 1 Screen Access Road and Catch Basin Section
0' 1/2" 1" 2" 4"
0' 2.66' 5.33' 10.66' 21.33'
INCH INCREMENTS SHOWN ARE AT FULL SCALE ON THE SHEET.
IF AT ANY OTHER LENGTH, SCALE DRAWING PROPORTIONALLY.
3/16" = 1'
NOTES:
1. Clean and roughen existing concrete prior to new placements per specification section 03 30 00, article 3.01.
2. Minimum depth of tooled joint shall be 1/4 of the depth of concrete.
3. For joint type definitions see specification section 03 30 00, article 3.04.
4. See Dwg. 1745-417-119 for details of typical Expansion Joint (EJ) and Contraction
Joint (Cr.J).
5. See specification sections 32 15 10 - Road Surfacing and 31 23 11 - Earthwork for
Structures.
6. See Dwg. 40-D-60003 and 40-D-60004 for standard concrete details.
R E V N
O
S T A
-1
1-
T O
M H
O O
K U p d at e d dr a w in g s to m ee t sc re en s u p p lie r re q u ir em en ts
Sheet #008
El. 4676.88 D/S Invert
El. 4686.66 Top of Wall
CJ
3"
1.5H:1V
#5 @ 1' - 0" E.W. E.F.
#5 @ 1' - 0" E.W. I.F.
#6 @ 1' - 0" vert O.F.
#5 @ 1' - 0" horz O.F.
Guardrail not shown
Cutoff wall
3' -0
1'-1"
EJ
21'-10"
Existing concrete foundation
El. 4676.88 D/S Invert
El. 4686.66 Top of Wall
CJ
Cr.J Reinforcement not shown
Cr.J
Cutoff wall #5 @ 1' - 0" E.W. E.F.
Grouted riprap not shown
Guardrail not shown
1'-0" min.
Discontinue alt #6 bars on O.F.
@ approx 10' - 6" from Cr.J.
Break line to vertical
7'-4"
6" Chamfer
10'-6"
3"
El. 4676.88 D/S Invert
El. 4686.66 Top of Wall
Compacted backfill See spec 31 23 02 for compaction requirements.
1'-0"
Match top of wall elevation to top of existing wall.
*VARIES*
Road surfacing
Slope or shore as required for safety.
8" min compacted class 6 gravel under all new concrete.
Overexcavate unsuitable material as directed by COR. Import class 2 and compact as needed for overexcavation. Moisten disturbed soil and compact with vibratory plate prior to placement of class 2 material.
Approx. W.S.
El. 4682.68
1'-0" min. typ for all excavations.
1'-0" min
#5 @ 1' - 0" E.W. I.F.
Add'l alt. #6 @ 0' - 6" vert. O.F.
End @ 4' - 0" from top of slab.
Existing concrete foundation
EJ
Guardrail not shown
#6 @ 1' - 0" verts O.F.
#5 @ 1' - 0" horz O.F.
Tie into bottom mat of slab reinforcement.
Match wall reinforcement within 4 ft of wall face.
#5 @ 1' - 0" E.W. T.F.
#5 @ 1' - 0" Long. B.F.
#6 @ 1' - 0" Trans. B.F.
Slope as directed by COR.
4"
Extend alt. #6 bars in bottom face 4' - 0" beyond wall face.
Beyond 4 ft from wall face.
#5 @ 1' - 0" E.W. E.F.
Coat joint with curing compound prior to adjacent placement to prevent bond.
2' x 1/2" Greased smooth dowel centered on joint @ 1' - 0" O.C.
t
3/4" Chamfers on walls, 1/4" tooled edge on slabs, exposed face only.
t/
Embed per epoxy manufacturers instructions for joint with existing concrete.
2' x 1/2" Greased smooth dowel @ 1' - 0" O.C.
t
3/4" Chamfers on walls, 1/4" tooled edge on slabs, exposed face only.
1/2" Sponge rubber t/
Embed per epoxy manufacturers instructions.
Concrete wall
1/2" Sponge rubber against wall or existing slab 6" Concrete Slab
#4 @ 1' - 0" E.W.
8" min Compacted class 6 material
4" min Road surface
Varies
Compacted backfill or native undisturbed material dependent on location
1/4" Tooled edge
D
C
B
D
C
B
A
A
S A
FE
T Y
A
LW
A
YS
T H
IN
K
B U
R E A U
O F
R E C
LA
M A T
IO
N
U .S
D
E
PA
R T M
E N
T O
F T H
E I
N T E R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
£TA £
£AA £
U
PP
E R C
O
LO
R A D
O R
IV
E R E
N D
A N
G E R E D
F
IS
H R
E C O
V E R Y P
R O
G R A M
G R A N
D V
A
LL
E Y
IR
R
IG
A
TI
O N
C O
M
PA
N Y
G V
IC
F
IS
H S
C R E E N
F A C
IL
IT
Y
G V
IC
F
IS
H S
C R E E N
R E H
A B
IL
IT
A T
IO
N
Joshua Dunham, P.E.
Mark Wernke, P.E.
GRAND JUNCTION, CO 2024-05-30
Bypass Channel Sections and Concrete Joints
1745-417-119
Tom Hook
Tom Hook
Matt Bryner
ADMIN APPROVAL - Technical Services Division Manger
118 Scale: 3/8" = 1'-0" 5 Bypass Channel Transition Section 1
118 Scale: 3/8" = 1'-0" 6 Bypass Channel Transition Section 2
118 Scale: 3/8" = 1'-0" 4 Bypass Channel Typ Vertical Section
Scale: 1" = 1'-0"2 Typical Contraction Joint (Cr.J)
Scale: 1" = 1'-0"1 Typical Expansion Joint (EJ)
Scale: 1" = 1'-0"3 6-Inch Slab Section (Typ)
NOTES:
1. Clean and roughen existing concrete prior to new placements per specification section 03 30 00, article 3.01.
2. Minimum depth of tooled joint shall be 1/4 of the depth of concrete.
3. For joint type definitions see specification section 03 30 00, article 3.04.
4. See specification sections 32 15 10 - Road Surfacing and 31 23 11 -
Earthwork for Structures.
5. See Dwg. 40-D-60003 and 40-D-60004 for standard concrete details.
R E V N
O
S T A
-1
1-
T O
M H
O O
K U p d at e d dr a w in g s to m ee t sc re en s u p p lie r re q u ir em en ts
Sheet #009
EJ
Cr.JCr.J
EJ
Existing 24" slab
Concrete dog leg transition
Cutoff wall
90°
Existing walkway grating not shown
.5
H :1
V
1' -0
Existing fish return Do Not Disturb
Existing 12" slab
1'-5"
1'-0"
11'-1 1/2" 16'-2 1/2"
1'-0"
28'-9 1/2"
Cr.J
11'-1 1/2"25'-10 1/2"
Blockout in slab for dual leaf gate.
Size per manufactuerers requirements.
Align with blockouts in walls.
See Dwg. 40-D-60004 for typ recess detail.
Existing concrete pier
Edge of existing concrete step
Bay 0 Bay 1
Flow
26'-3 1/2"
1' -4
Match elevavation of existing foundation
Walls not shown. See Dwg.
1745-417-121 for wall locations.
1'-0"
Breakline
Match elevation of existing foundation.
Match elev. of existing wall.
New 6" Concrete Slab
El. 4686.33
6" Slab where existing slab was removed for utility installation.
Bay 0
Flow
Existing fish return concrete wall
Match elev. of existing slab.
See Dwg. 1745-417-135 for underground utilities.
New 6" Concrete Slab
Bay 1
Walkway grating not shown.
5'-9 1/2" 1'-10"
18'-10"
1'-0"
TJ
TJ
/2
Slope for drainage to wall blockout
6"
1'-0"
15'-0"
Fr o m f a ce o f ex is ti n g p ie r
/2
20'-0"
9'-10 1/2"
19'-2 1/2"
El. 4686.00 El. 4686.33
El. 4686.33
D
C
B
D
C
B
A
A
S A
FE
T Y
A
LW
A
YS
T H
IN
K
B U
R E A U
O F
R E C
LA
M A T
IO
N
U .S
D
E
PA
R T M
E N
T O
F T H
E I
N T E R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
£TA £
£AA £
U
PP
E R C
O
LO
R A D
O R
IV
E R E
N D
A N
G E R E D
F
IS
H R
E C O
V E R Y P
R O
G R A M
G R A N
D V
A
LL
E Y
IR
R
IG
A
TI
O N
C O
M
PA
N Y
G V
IC
F
IS
H S
C R E E N
F A C
IL
IT
Y
G V
IC
F
IS
H S
C R E E N
R E H
A B
IL
IT
A T
IO
N
Joshua Dunham, P.E.
Mark Wernke, P.E.
GRAND JUNCTION, CO 2024-05-30
Fish Return Foundation and Surface Features
1745-417-120
Tom Hook
Tom Hook
Matt Bryner
ADMIN APPROVAL - Technical Services Division Manager
117 Scale: 3/8" = 1'-0" 1 Fish Return Foundations
117 Scale: 1/4" = 1'-0" 2 Fish Return Surface Features
NOTES:
1. Clean and roughen existing concrete prior to new placements per specification section 03 30 00, article 3.01.
2. Minimum depth of tooled joint shall be 1/4 of the depth of concrete.
3. For joint type definitions see specification section 03 30 00, article 3.04.
4. See Dwg. 1745-417-119 for details of typical Expansion Joint (EJ) and
Contraction Joint (Cr.J).
5. See specification sections 32 15 10 - Road Surfacing and 31 23 11 - Earthwork for Structures.
6. See Dwg. 40-D-60003 and 40-D-60004 for standard concrete details.
R E V N
O
S T A
-1
1-
T O
M H
O O
K U p d at e d dr a w in g s to m ee t sc re en s u p p lie r re q u ir em en ts
Sheet #010
18" Pier extension
Match height of existing wall. Approx
El. 4686.33.
Guardrail not shown
Existing 24" slab
Cr.J
Relocated water sensor enclosure. Match existing elevation.
Concrete dog leg transition
Existing walkway metalwork not shown
Screen wash pump platform not shown
2' -0
4"
10"
26'-7"
1'-0" typ.
1'-0"
New 1' 1" slab See Dwg. 1745-417-120
Blockouts for dual leaf gate.
Size per manufacturers requirements.
See Dwg. 40-D-60004 for typical recess detail.
CJ
CJ between pier extension and bay 0 transition.
Bay 0 Bay 1
10'-0"
See section view for reinforcement detail.
/2
4'-3 1/8" 10'-9"
10 1/2"
Provide blockouts as necessary for conduit. See
Dwg. 1745-417-122 and 1745-417-135.
Edge of existing foundation
Edge of new foundation.
See Dwg. 1745-417-120
Dual leaf gate not shown.
See spec 35 22 17.
EJ
12"L x 12"W x 8"D Blockout in top of wall2'-0"
Bay 0 Sediment Step El. varies 4678.88 to 4679.21
Bay 0 Transition El. 4681.76
/2
See Dwg. 1745-417-120 and 1745-417-122
1'-1 1/2"
5'-6"5"
El. 4683.83El. 4683.33
El. 4686.33
El. 4686.66
Surface slabs not shown.
See Dwg. 1745-417-120
.2
30"L x 6"W x 12"D Blockout in top of wall
2'-6"
10'-9"
18" Peir Extension
See Dwg. 1745-417-126 for grating support embed.
Provide blockout for conduit to sensor 18" below top of wall. See Dwg. 1745-417-135.
Slope trough transition channel toward fish return with constant slope. See Dwg. 1745-417-142 Detail G for channalizing grout.
D
C
B
D
C
B
A
A
S A
FE
T Y
A
LW
A
YS
T H
IN
K
B U
R E A U
O F
R E C
LA
M A T
IO
N
U .S
D
E
PA
R T M
E N
T O
F T H
E I
N T E R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
£TA £
£AA £
U
PP
E R C
O
LO
R A D
O R
IV
E R E
N D
A N
G E R E D
F
IS
H R
E C O
V E R Y P
R O
G R A M
G R A N
D V
A
LL
E Y
IR
R
IG
A
TI
O N
C O
M
PA
N Y
G V
IC
F
IS
H S
C R E E N
F A C
IL
IT
Y
G V
IC
F
IS
H S
C R E E N
R E H
A B
IL
IT
A T
IO
N
Joshua Dunham, P.E.
Mark Wernke, P.E.
GRAND JUNCTION, CO 2024-05-30
Fish Return Walls
1745-417-121
Tom Hook
Tom Hook
Matt Bryner
ADMIN APPROVAL - Technical Services Division Manger
117 Scale: 3/8" = 1'-0" 1 Fish Return Walls
2 Fish Return Concrete Isometric
NOTES:
1. Clean and roughen existing concrete prior to new placements per specification section 03 30 00, article 3.01.
2. Minimum depth of tooled joint shall be 1/4 of the depth of concrete.
3. For joint type definitions see specification section 03 30 00, article 3.04.
4. See Dwg. 1745-417-119 for details of typical Expansion Joint (EJ) and
Contraction Joint (Cr.J).
5. See specification sections 32 15 10 - Road Surfacing and 31 23 11 - Earthwork for Structures.
6. See Dwg. 40-D-60003 and 40-D-60004 for standard concrete details.
7. See Dwg. 1745-417-126 for grating and concrete embed.
R E V N
O
S T A
-1
1-
T O
M H
O O
K U p d at e d dr a w in g s to m ee t sc re en s u p p lie r re q u ir em en ts
Sheet #011
El. 4675.88 U/S Invert
El. 4686.33 Walkway
Existing concrete foundationCr.J
Match height of existing wall
#5 @ 1' - 0" E.W. I.F.
#6 @ 1' - 0" vert O.F.
#5 @ 1' - 0" horz O.F.
Add'l alt. #6 @ 0' - 6" vert O.F.
End @ 5' - 0" from top of slab.
4" min
Compacted backfill See spec 31 23 02 for compaction requirements.
8" min compacted class 6 gravel under all new concrete placements
6" Slab
Slope or shore as required for safety.
Extend alt. #6 bars in bottom face 5' - 0" beyond wall face.
Overexcavate unsuitable material as directed by COR. Import class 2 and compact as needed for overexcavation. Moisten disturbed soil and compact with vibratory plate prior to placement of class 2 material.
#5 @ 1' - 0" E.W. T.F.
#5 @ 1' - 0" Long. B.F.
#6 @ 1' - 0" Trans. B.F.
Walkway not shown
#5 @ 1' - 0" E.W. E.F.
1'-0"
#4 @ 0' - 6" E.W. Exposed Faces #4 @ 1' - 0" E.W. Adjacent Existing Concrete
5"
Optional CJ
#4 @ 1' - 0" E.W.
required if Optianl CJ is used.
El. 4681.76
Embed reinforcement in existing slab and wall per epoxy manufacturers instructions.
El. 4675.88 U/S Invert
El. 4686.33 Walkway
Wall reinforcement not shown
Slab reinforcement not shown
6" Slab Reinforcement not shown
Varies
2'-0"
Compacted backfill not shown
#4 @ 1' - 0" E.W.
Against existing concrete
Embed reinforcement in existing slab and wall per epoxy manufacturers instructions where applicable.
Tie into slab reinforcement where applicable.
Provide blockouts as needed for conduits.
See Dwg. 1745-417-135.
#4 bars @ 2' - 0" E.W. embeded in existing concrete.
2'-0" normal
Tie bar only required in sections greater than
1'-6" wide
#4 @ 0' - 6" E.W.
All exposed faces
See Dwg. 1745-417-126 for grating and grating support embed.
See Dwg. 1745-417-142 for channelizing grout.
Varies 2'-6" to 3'-0"
El. 4675.88 U/S Invert
El. 4686.66 Top of Wall
CJ
#5 @ 1' - 0" E.W. I.F.
#6 @ 1' - 0" vert O.F.
#5 @ 1' - 0" horz O.F.
3"
3' -0
1'-1"
#5 @ 1' - 0" E.W. E.F.
1.5H:1V
Cutoff wall.
Reinforcement not shown.
Drill and epoxy reinforcement into existing foundation.
Continue reinforcement into new foundation slab.
El. 4675.88 U/S Invert
El. 4686.66 Top of Wall
Existing foundation not shown for clarity.
3"
Grouted riprap not shown
Break line to vertical
Reinforcement not shown
CJ
Cr.J
Cutoff wall #5 @ 1' - 0" E.W. E.F.
CJ
Guardrail not shown
14'-0"
Discontinue alt #6 bars on O.F.
@ approx 14' - 0" from Cr.J.
Water level sensor enclosure relocated from existing structure
Cr.J 6" Chamfer3
1'-0" min
D
C
B
D
C
B
A
A
S A
FE
T Y
A
LW
A
YS
T H
IN
K
B U
R E A U
O F
R E C
LA
M A T
IO
N
U .S
D
E
PA
R T M
E N
T O
F T H
E I
N T E R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
£TA £
£AA £
U
PP
E R C
O
LO
R A D
O R
IV
E R E
N D
A N
G E R E D
F
IS
H R
E C O
V E R Y P
R O
G R A M
G R A N
D V
A
LL
E Y
IR
R
IG
A
TI
O N
C O
M
PA
N Y
G V
IC
F
IS
H S
C R E E N
F A C
IL
IT
Y
G V
IC
F
IS
H S
C R E E N
R E H
A B
IL
IT
A T
IO
N
Joshua Dunham, P.E.
Mark Wernke, P.E.
GRAND JUNCTION, CO 2024-05-30
Fish Return Sections
1745-417-122
Tom Hook
Tom Hook
Matt Bryner
ADMIN APPROVAL - Technical Services Division Manger
121 Scale: 1/2" = 1'-0" 1 Bay 0 Transition and Fish Return Wall Typ Section
121 Scale: 1/2" = 1'-0" 2 Fish Return Channel Section
121 Scale: 1/2" = 1'-0" 3 Fish Return Transition Section 1
121 Scale: 1/2" = 1'-0" 4 Fish Return Transition Section 2
NOTES:
1. Clean and roughen existing concrete prior to new placements per specification section 03 30 00, article 3.01.
2. Minimum depth of tooled joint shall be 1/4 of the depth of concrete.
3. For joint type definitions see specification section 03 30 00, article 3.04.
4. See Dwg. 1745-417-119 for details of typical Expansion Joint (EJ) and Contraction Joint (Cr.J).
5. See specification sections 32 15 10 - Road Surfacing and 31 23 11 - Earthwork for Structures.
6. See Dwg. 40-D-60003 and 40-D-60004 for standard concrete details.
R E V N
O
S T A
-1
1-
T O
M H
O O
K U p d at e d dr a w in g s to m ee t sc re en s u p p lie r re q u ir em en ts
Sheet #012
El. 4676.88 D/S Invert
El. 4686.66 Top of Wall
Approx. Normal W.S.
El. 4682.88
Existing concrete pier
#4 Tie bars @ 1' - 0" along slope and top of pier
Existing screen channel
Existing baffle channel
Drill and epoxy reinforcement into existing slab or extend reinforcement into new slab.
1'-0"
#6 @ 1' - 0" E.W. E.F.
4" PVC pipe through pier for lower spray bar. End pipe flush with face of pier.
No blockout at peir 1.
4'-2 1/2"
30°
5" 8"
8'-7"
4'-9 1/2"
3"
1'-6"
2"2"
18" Pier Extension symetrical about centerline
1/2" Sponge rubber between pier extension and existing pier and concrete step
11'-0" Typ.
T y p
18" 15"
Edge of existing concrete slab
18" Pier Extension Typ. Pier 1-16
15" Pier Extension Pier 17
12" Pier Extension Typ. Pier 18, 20, 21, 23
Bi-fold overshot gate not shown
Bay 15 Bay 16 Bay 17 Bay 18
Traveling screens not shown
12"
El. 4676.88 D/S Invert
El. 4686.66 Top of Wall
Approx. Normal W.S.
El. 4682.88
Existing concrete pier
#4 Tie bars @ 1' - 0" along slope and top of pier
Existing screen channel
Existing baffle channel
Drill and epoxy reinforcement into existing slab.
1'-0"
#6 @ 1' - 0" E.W. E.F.
4'-2 1/2"
8'-7"
5"
30°
3"
2"
1'-3"
Existing Screen Panel may be temporarily removed during construction as needed.
15" Pier Extension not symetrical
1/2" Sponge rubber between pier extension and existing pier and concrete step
2"
El. 4676.88 D/S Invert
El. 4686.66 Top of Wall
#5 @ 1' - 0" E.W. E.F.
12" Pier Extension Exact dimensions subject to change to meet bi-fold overshot gate manufacturers requirements.
Existing screen channel
1'-0"5"
30°
8'-7"
Approx. Normal W.S.
El. 4682.88
Existing concrete pier
Existing baffle channel 4'-2 1/2"
1'-0"4'-0" Drill and epoxy reinforcement into existing slab.
Drill and epoxy reinforcement into existing slab. 2 x #5 E.F.
2 #4 stirrups 1'-0"
1/2" Sponge rubber between pier extension and existing pier and concrete step
2"
Bi-fold overshot gate not shown2"
D
C
B
D
C
B
A
A
S A
FE
T Y
A
LW
A
YS
T H
IN
K
B U
R E A U
O F
R E C
LA
M A T
IO
N
U .S
D
E
PA
R T M
E N
T O
F T H
E I
N T E R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
£TA £
£AA £
U
PP
E R C
O
LO
R A D
O R
IV
E R E
N D
A N
G E R E D
F
IS
H R
E C O
V E R Y P
R O
G R A M
G R A N
D V
A
LL
E Y
IR
R
IG
A
TI
O N
C O
M
PA
N Y
G V
IC
F
IS
H S
C R E E N
F A C
IL
IT
Y
G V
IC
F
IS
H S
C R E E N
R E H
A B
IL
IT
A T
IO
N
Joshua Dunham, P.E.
Mark Wernke, P.E.
GRAND JUNCTION, CO 2024-05-30
Pier Extensions
1745-417-123
Tom Hook
Tom Hook
Matt Bryner
ADMIN APPROVAL - Technical Services Division Manger
123 Scale: 3/8" = 1'-0" 2 18" Pier Extension Section Typ.
123 Scale: 1 1/2" = 1'-0" 3 18" Pier Extension Connection Detail Typ.
117 Scale: 1/4" = 1'-0" 1 Pier Extensions
123 Scale: 3/8" = 1'-0" 4 15" Pier Extension Section
123 Scale: 1 1/2" = 1'-0" 5 15" Pier Extension Connection Detail
123 Scale: 3/8" = 1'-0" 6 12" Pier Extension Section Typ.
123 Scale: 1 1/2" = 1'-0" 7 12" Pier Extension Connection Detail Typ.
NOTES:
1. See Dwg. 1745-417-119 for details of typical Expansion Joint (EJ) and Contraction Joint (Cr.J). See specification section 03 30 00 3.04 for Construction (CJ) and Control (Ct.J) Joints.
2. See specification sections 32 15 10 - Road Surfacing and 31 23 11 - Earthwork for Structures.
3. See Dwg. 40-D-60003 and 40-D-60004 for standard concrete details.
4. Clean and roughen existing concrete before placement in accordance with Specification Section 03 30 00 Cast-in-Place Concrete.
5. Embed dowels to the greater of 5 inches or manufacturers recommended depth.
6. See numbering diagram sheet for bay and pier numbers.
R E V N
O
S T A
-1
1-
T O
M H
O O
K U p d at e d dr a w in g s to m ee t sc re en s u p p lie r re q u ir em en ts
Sheet #013
Leave existing screen and baffle panels in place in unused bays.
Bi-fold overshot gate
Gate Equipment Box.
Gates mirrored to avoid interference.
Side seal panels provided by gate manufacturer.
Flow
Bi-fold overshot gate electrical/control boxes not shown. Existing walkway grating not shown.
Adjacent side plates braced together for lateral strength.
Designed by gate manufacturer.
12" Pier extension typ
Bay 18 Bay 22
Government furnished Sediment Spray Bars in front of each gate.
To connection with Wash Water Pipeline. See Dwg. 1745-417-129.
Approx layout of plumbing to sediment spray bars.
Trough pump not shown
El. 4676.88 D/S Invert
El. 4686.66 Top of Wall
Stainless steel side plate
Gate leaf
Gap under side plate to prevent sediment accumulation
Actuator enclosure
Bi-fold Gate frame
Existing baffle channel Baffle pannel removed from gate bays
Approx W.S.
El. 4682.88
Gate sill beam flush with concrete step
12" Pier Extension See Dwg. 1745-417-123 for detail
Bi-fold gate electrical/control panel on down stream side of walkway not shown. See Dwg.
1745-417-133.
Government furnished Sediment Spray Bar, see Dwg. 1745-417-129. Secure to concrete with clamps and anchors. Flow
D
C
B
D
C
B
A
A
S A
FE
T Y
A
LW
A
YS
T H
IN
K
B U
R E A U
O F
R E C
LA
M A T
IO
N
U .S
D
E
PA
R T M
E N
T O
F T H
E I
N T E R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
£TA £
£AA £
U
PP
E R C
O
LO
R A D
O R
IV
E R E
N D
A N
G E R E D
F
IS
H R
E C O
V E R Y P
R O
G R A M
G R A N
D V
A
LL
E Y
IR
R
IG
A
TI
O N
C O
M
PA
N Y
G V
IC
F
IS
H S
C R E E N
F A C
IL
IT
Y
G V
IC
F
IS
H S
C R E E N
R E H
A B
IL
IT
A T
IO
N
Joshua Dunham, P.E.
Mark Wernke, P.E.
GRAND JUNCTION, CO 2024-05-30
Bypass Gates
1745-417-124
Tom Hook
Tom Hook
Matt Bryner
ADMIN APPROVAL - Technical Services Division Manager
117 Scale: 3/8" = 1'-0" 3 Bypass Gates
124 Scale: 3/8" = 1'-0" 1 Bypass Gate Section 2 Bypass Gates
0' 1/2" 1" 2" 4"
0' 1' 2" 2' 4" 4' 8" 9' 4"
INCH INCREMENTS SHOWN ARE AT FULL SCALE ON THE SHEET.
IF AT ANY OTHER LENGTH, SCALE DRAWING PROPORTIONALLY.
3/8" = 1'
NOTES
1. Bi-fold gates shown in drawings are approximations to communicate design intent only. Actual dimensions and geometry to be determined by gate manufacturer.
2. See Specification Section 35 22 20 for Bi-fold overshot gate requirements.
3. See Dwg. 1745-417-129 for plumbing and 1745-417-133 and 1745-417-135 for electrical details.
4. Final bi-fold gate characteristics and mounting detail to be approved by COR prior to procuring gates in RSN 35 22 20-1.
5. All submerged metal components shall be stainless steel.
R E V N
O
S T A
-1
1-
T O
M H
O O
K U p d at e d dr a w in g s to m ee t sc re en s u p p lie r re q u ir em en ts
Sheet #014
4'-4" Removeable Guardrail (1)
2'-4" Removeable Guardrail (1)
4'-4" Removeable Guardrail (17) DP1 and Master SCADA Panel enclosure serves as guardrail in this section.
See Dwg. 1745-417-133.
Guardrail posts with chains (2).
Locate posts to avoid interference with bi-fold gate operator.
4'-4" Removeable Guardrail (1)
Existing guardrail not shown
Chains between post and removeable guardrail
4'-4" Removeable Guardrail (7)
Bay 1 Bay 2
Install chains between 36" wall and dual leaf gate as directed by COR.
Install chains between 36" wall and guardrail as directed by COR.
Bay 3
3'-6" typ
0'-11" (1 New)8 1/2" 8 1/2"
1'-8" 1 1/2" Diameter steel pipe
Top of concrete wall
Guardrail Socket
2'-11" (21 New) typ 1'-3 1/2"
3" Min to edge of concrete or Cr.J
6"
6"
3/8"
2" sch. 40 steel pipe
1/4" Fillet weld around pipe
1/2" Dia. hole for drain
6"x6"x3/8" steel plate
6"
6"
1" typ
1" typ
(4) 9/16" Dia. holes, mount w/ 1/2" dia. x 6 1/2" long epoxy anchor bolts.
6"x6"x3/8" steel plate
3'-6"
Guardrail Socket
1'-8" 1 1/2" Diameter steel pipe
Top of concrete wall
5'-0" typ
1/2" Galvanized epoxy anchor eye bolt installed in concrete structure 6" above water line.
7/16" Wire rope thimble 3 - 7/16" Galvanized wire rope clips
Strip length of nylon cover as required for connection.
Protect end of cable from raveling.
1/2" Galvanized wire rope clips, typical on each end of float. Exclude for "Safety cable without floats".
For float description, see specifications paragraphs. Exclude for "Safety cable without floats".
15/32" Nylon covered wire rope, tensile strength 14,000 lbs. min
Flow
Safety cable with floats
Safety cable without floats. Install anchors and tension as needed to maintain cable ~6 inches above normal water surface.
~53'
Mount to existing concrete pier.
Mount to existing concrete wall.
Mount to new concrete transition.
Mount to center of front face of 18" pier extension.
Pier 2 Pier 5
~19'
D
C
B
D
C
B
A
A
S A
FE
T Y
A
LW
A
YS
T H
IN
K
B U
R E A U
O F
R E C
LA
M A T
IO
N
U .S
D
E
PA
R T M
E N
T O
F T H
E I
N T E R
IO
R
DESIGNED
CHECKED
DRAWN
TECH. APPR.
APPROVED
£TA £
£AA £
U
PP
E R C
O
LO
R A D
O R
IV
E R E
N D
A N
G E R E D
F
IS
H R
E C O
V E R Y P
R O
G R A M
G R A N
D V
A
LL
E Y
IR
R
IG
A
TI
O N
C O
M
PA
N Y
G V
IC
F
IS
H S
C R E E N
F A C
IL
IT
Y
G V
IC
F
IS
H S
C R E E N
R E H
A B
IL
IT
A T
IO
N
Joshua Dunham, P.E.
Mark Wernke, P.E.
GRAND JUNCTION, CO 2024-05-30
Guardrails and Safety Cable with Floats
1745-417-125
Tom Hook
Tom Hook
Matt Bryner
ADMIN APPROVAL - Technical Services Division Manager
Scale: 3/16" = 1'-0"7 Bypass Channel Guardrails Scale: 3/16" = 1'-0"6 Fish Return Guardrails
Scale: 1" = 1'-0"1 Removable Guardrail
Scale: 1 1/2" = 1'-0"2 Guardrail Socket (46 New)
NOTES:
1. Reuse 5 existing 4'-4" Removeable Guardrail sections from fish return transition.
2. Ground all guardrail as shown on standard Dwg. 40-D-4334 and 40-D-4335.
3. Weld dimensions are minimum, weld in accordance with AWS D1.1
4. Finish hot dipped galvanized in accordance with specifications.
5. 1/4" Galvanized chain with maximum sag of 2-inches. Provide "S" hook and heavy duty swivel snap at one end. Weld single chain link to opposite end post or return.
Install 3/8" eye bolt for connection with concrete.
6. See specification section 35 69 20 - Safety Cable with Floats.
Scale: 1" = 1'-0"3 Chain Post
5 Safety Cable with Floats
Scale: 1/16" = 1'-0"4 Safety Cable Locations
R E V N
O
S T A
-1
1-
T O
M H
O O
K U p d at e d dr a w in g s to m ee t sc re en s u p p lie r re q u ir em en ts
Sheet #015
PLAN VIEW OF FISH RETURN GRATING
SECTION A-A
SCALE 1/18
SECTION B-B
SCALE 1/18
GRATING SUPPORT ANGLE 24 1/2 INCH
SCALE 3/16 QTY 4
SECTION C-C
ANGLED GRATING TRAFFIC RATED
SCALE 1/8
PLAN VIEW OF FISH RETURN WITHOUT GRATING
SECTION D-D
SCALE 1 /18
GRATING SUPPORT ANGLE SOUTH
SCALE 3/16 QTY 1
WALL EMBEDMENT
SCALE 1/8
SECTION C-C
SCALE 1 /18
GRATING SUPPORT ANGLE 89 INCH
SCALE 3/16
GRATING SUPPORT ANGLE 34 INCH
SCALE 3/16
GRATING SUPPORT WELDMENT ANGLE 16 INCH
SCALE 3/16
WALL EMBEDMENT DETAIL E
SCALE 1/6
A A
B B
C C
D D
A A
B
B
C
C
D
D
C
C E
AL
W
AY
S
TH
IN
K S
AF
ET
Y U.
S.
D
EP
AR
TM
EN
T
OF
T
HE
IN
TE
RI
OR
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N
UP
PE
R
CO
LO
RA
DO
R
IV
ER
E
ND
AN
GE
RE
D
FI
SH
R
EC
OV
ER
Y
PR
OG
RA
M
GR
AN
D
VA
LL
EY
IR
RI
GA
TI
ON
C
OM
PA
NY
GV
IC
F
IS
H
SC
RE
EN
F
AC
IL
IT
Y
GV
IC
F
IS
H
SC
RE
EN
R
EH
AB
IL
IT
AT
IO
N
Matt Bryner
DESIGNED
Matt Bryner
DRAWN
Thomas Hook
CHECKED
Joshua Dunham, P.E.
TECH. APPR.
Mark Wernke, P.E.
APPROVED
GRAND JUNCTION, CO 13NOV2024
THIRD ANGLE PROJECTION
1745-417-126
TOLERANCES (UNLESS NOTED OTHERWISE)
FRACTIONS 1/16
X.X.06
X.XX .02
X.XXX.01
GRATING AND
SUPPORTS
Notes
1. All material steel A36 or A572 any grade
2. Weld in accordance with AWS D1.4.
3. Weld sizes are minimum.
4. Install Neilson Studs per manufactures recomendations
5. Remove all weld spatter and brake sharp edges.
6. Galvanize in accordance with specifications.
7. All dimensions are inches
Existing 3'-10" grating to be relocated to this location.
Dual Leaf Gate not shown
Angled Grating
Existing traffic rated grating and support angle
2' length Serrated Steel Bar Grating McMaster Carr part no 6867T71 (2) 1' lengths Serrated Steel
Bar Grating McMaster Carr part no 6867T62
2" 2"
1/4"
2'- 1/2"
1" 5/8"
2" x 2" x 1/4" angle
1/8
Existing traffic rated grating to remain
New light weight gratings
6"
1'-11 1/16"
3'-6 7/8"Approximately
Match properties of existing traffic rated grating verify (3/8" x 4" bars, 1.25" spacing).
Galvanize after fabrication.
3 1/2"( ) Ensure grating is flush with surface
Grating Support Weldment See drawing 1745-417-141
Grating Support Weldment
Attach to walls with Ø5/8" epoxy anchor bolts
6"
6"
Attach to concrete wall with Ø1/2" epoxy anchors typ
Drill thru steel cap and attach with Ø1/2" bolt
Grating Support Angles 24 1/2"
Grating Support Angle South
9"6"
Same as above with differing hole location
2'-9 1/8"
5"
7"
1'-5 1/8"
1"
140°
4"
8" typ
1/2"
3"
3"
Surfaces level
Neilson stud Ø1/2 min length 4"
Grating Support Angle 89 inch
Grating Support Weldment Angle 16 inch
Wall Embedment
Wall Embedment Grating Support Angle 89 inch
7'-5"
2 1/2"
1"
1'-0" typ 2" x 2" x 1/4" angle
2"
5/8"8x
2'-9 3/4"
1"
3 3/8" 5/8" 9" typ
2"
2" x 2" x 1/4" angle
Grating Support Angle 34 inch
Grating Support Weldment Angle 16 inch
Attach to walls with Ø1/2" epoxy anchors
Attach to walls with Ø5/8" epoxy anchor bolts
3" x 3" x 3/8" angle
1'-4"
3/4"
1'-0"1 1/2"
Grating Support Angle 34 inch
Existing concrete
New concrete
Wall Embedment
Grating Support Angle 34 inch
Grating Support Weldment see drawing 1745-417-141
1/2"
Concrete wall
Existing gratings to be removed, stockpiled during construction then replaced
Existing 3'-10" grating to be relocated
Remove existing 2" x 2" grating support angle where 3'-10" grating was.
9" 9"
Sheet #016
PLAN VIEW OF SCREENS
(Hoist system not shown)
SECTION A-A
DETAIL B
SCALE 1 / 15
SCREEN NO FLIGHTS SCREENS 5-16
SUPPLIED TO CONTRACTOR
(DOWNSTREAM VIEW)
SCREEN WITH FLIGHTS SCREENS 1-4
SUPPLIED TO CONTRACTOR
(DOWN STREAM VIEW)
SECTION C-C
DOWNSTREAM SCREEN SUPPORT ANGLE QTY 16
MIRRORED PART FOR UPSTREAM QTY 16
TOE ANGLE QTY 16
VIEW D-D
(Screen not shown)
DETAIL E
A A
B B
C C
D D
AL
W
AY
S
TH
IN
K S
AF
ET
Y U.
S.
D
EP
AR
TM
EN
T
OF
T
HE
IN
TE
RI
OR
BU
RE
AU
O
F
RE
CL
AM
AT
IO
N
UP
PE
R
CO
LO
RA
DO
R
IV
ER
E
ND
AN
GE
RE
D
FI
SH
R
EC
OV
ER
Y
PR
OG
RA
M
GR
AN
D
VA
LL
EY
IR
RI
GA
TI
ON
C
OM
PA
NY
GV
IC
F
IS
H
SC
RE
EN
F
AC
IL
IT
Y
GV
IC
F
IS
H
SC
RE
EN
R
EH
AB
IL
IT
AT
IO
N
Matt Bryner
DESIGNED
Matt Bryner
DRAWN
Thomas Hook
CHECKED
Joshua Dunham, P.E.
TECH. APPR.
Mark Wernke, P.E.
APPROVED
GRAND JUNCTION, CO 28MAY2024
1745-417-127
SCREEN COMPONENT
ASSEMBLY
A
A
B
C
C D D
E
2" schedule 80 PVC line to toe wash spray bars
Screen support angle downstream Upstream angle on opposite side of bay
Toe wash spray bar
Toe wash spray bar
1'-1" Face of concrete to top surface of angle
Existing pier
New pier extension see drawing 1745-417-123
Screen support angles, flat side up
6"1'-0"9x TYP
5/8" TYP
10'-0"
3" x 3" x 3/8" angle 304 series Stainless steel
10'-11 3/4"
1" TYP4" TYP
5/8" TYP
6"
2" X 2" X 3/8" Angle 304 series Stainless Steel
Upstream screen support angle
Downstream screen support angle
Toe angle
1/2" Stainless steel epoxy anchors minimum embedment 4" Typical
Toe angle
1/4"
1 3/8" TYP
SCREEN 1
SCREEN 4
Two lift rails for screens provided by screen manufacture. Attaches to top of screen as shown in manufacture's rigging drawings 1745-OA-074 & 075 approximate weight of screens also provided on drawings. Existing hoist not rated for lifting assemblies and cannot be used for screen placement.
SCREEN 5
Notes
1. Screens and Screen control panels are furnished Government Furnished Equipment. Contractor is responsible for all installation plumbing and electrical/control connections between control panels and screen and wash water system.
2. All hardware that is immersed in water shall be stainless steel.
3. Representative of screen manufacture must be on site for installation. Contractor shall notify COR 14 days before install, see specification…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .