Attachment J21 - Past Performance Questionnaire.docx

DOCX document 26 KB Posted

Attached to
PIMC Maintenance & Improvements (M&I) Renovations
Solicitation number
75H701-23-R-00001
Issued by

About this file

This solicitation notice is for construction services at the Phoenix Indian Medical Center in Phoenix, Arizona. The services include abatement of asbestos, replacement of flooring, tiles, ceiling tiles, countertops, furniture and HVAC improvements. Additional work comprises interior and exterior painting, roof replacement, construction of a trash enclosure, fire sprinkler inspection and replacement, and fire alarm panel replacement. The period of performance is 300 calendar days from notice to proceed. The construction magnitude is estimated between $1,000,000 to $5,000,000. A site visit is scheduled as detailed in the solicitation. A firm fixed price contract will be awarded following a request for proposal and lowest price technically acceptable evaluation. The response deadline is TBD in the solicitation. The Department of Health and Human Services Indian Health Service is the contracting agency.

View the file

Other files

File Type Posted
B04 Pre-Proposal Inquiries (23R00001) (85-87).pdf PDF
B05 75H70123R00001 Amendment A000008.pdf PDF
B05 75H70123R00001 Amendment A000007.pdf PDF
Attachment J17 - WD AZ20230031 2023.01.06.pdf PDF
B05 75H70123R00001 Amendment A000006.pdf PDF
B04 Pre-Proposal Inquiries (23R00001) (1-84).pdf PDF
Attachment J01 R2 - SOW - PIMC MI Renovations (CHANGES IN RED) 2022.12.05.pdf PDF
Attachment J01 R2 - SOW - PIMC MI Renovations FINAL 2022.12.05.pdf PDF
B05 75H70123R00001 Amendment A000005.pdf PDF
Attachment J12 R1 - Micro Lab Renovation Schematics.pdf PDF
Attachment J01 R1 - SOW - PIMC MI Renovations (changes in red) 2022.11.28.docx DOCX document
Attachment J02 R1 - PIMC Campus Map.pdf PDF
B04 Pre-Proposal Inquiries (23R00001) 1-29.pdf PDF
Attachment J04 R1 - Behavioral Health Schematics.pdf PDF
Attachment J03 R1 - 3rd Floor Nurse Station Replacement.pdf PDF
B05 75H70123R00001 Amendment A000004.pdf PDF
Attachment J06 R1 - Main Tower Maintenance Areas.pdf PDF
Attachment J26 - Asbestos Abatement Specification.pdf PDF
Attachment J01 R1 - SOW - PIMC MI Renovations FINAL 2022.11.28.pdf PDF
Attachment J24 - Hospital Exterior Painting.pdf PDF
Attachment J25 - Buildings 5 and 6 Asbestos Survey.pdf PDF
Attachment J10 R1 - Fire Sprinkler Replacement and Testing.pdf PDF
Attachment J05 R1 - Outpatient Floor Plans.pdf PDF
B05 75H70123R00001 Amendment A000003.pdf PDF
B05 75H70123R00001 Amendment A000002.pdf PDF
B04 Pre-Proposal Inquiries (23R00001).pdf PDF
Attachment J19 - Self Performed Calculation Sheet (Amend A00002).pdf PDF
B03 Site Visit Agenda and Sign-in (23R00001).pdf PDF
B05 75H70123R00001 Amendment A000001.pdf PDF
Attachment J17 - WD AZ20220031 Mod 8 2022.10.28.pdf PDF
B01 RFP 75H701-23-R-00001.pdf PDF
Attachment J04 - Behavioral Health Schematics.pdf PDF
Attachment J03 - 3rd Floor Nurse Station Replacement.pdf PDF
Attachment J19 - Self Performed Calculation Sheet (Construction).docx DOCX document
Attachment J12 - Micro Lab Renovation Schematics.pdf PDF
Attachment J17 - WD AZ20220031 Mod 7 2022.10.07.pdf PDF
Attachment J06 - Main Tower Maintenance Areas.pdf PDF
Attachment J09 - ED Waiting Room Ventilation.pdf PDF
Attachment J23 - Financial Institution Reference Sheet.docx DOCX document
Attachment J08 - CSR Schematics.pdf PDF
Attachment J10 - Fire Sprinkler Replacement and Testing.pdf PDF
Attachment J20 - Company Specialized Experience Form.docx DOCX document
Attachment J01 - SOW - PIMC MI Renovations 2022.10.25.pdf PDF
Attachment J15 - ICRA Permit.pdf PDF
Attachment J22 - Key Personnel Resume Form.docx DOCX document
Attachment J14 - Phoenix Solid Waste Access and Enclosure Standard Details.pdf PDF
Attachment J07 - PIMC Asbestos Survey Feb 2003.pdf PDF
Attachment J13 - Trash Enclosure Location.pdf PDF
Attachment J18 - 2022 Exemption Letter for a Qualifying Hospital.pdf PDF
Attachment J11 - PIMC 2021 Fire Alarm Testing Report.pdf PDF
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J21. Past Performance Questionnaire (PPQ) Form PPQ-0 Solicitation 75H701-23-R-00001

Volume I – Factor 2 – Past Performance

FOR OFFICIAL USE ONLY, SOURCE SELECTION INFORMATION (FAR 3.104)

Response to Solicitation 75H701-23-R-00001 (Cover page not required in submission)

COMPANY EXPERIENCE FORM (PAST PERFORMANCE)

PAST PERFORMANCE QUESTIONNAIRE (Form PPQ-0)

CONTRACT INFORMATION (Contractor to complete Blocks 1-4)

1. Contractor Information
Firm Name:CAGE Code:
Address:UEI:

Phone Number:

Email Address:

Point of Contact: Contact Phone Number:

2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other (Explain) Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: |_| Firm Fixed Price |_| Cost Reimbursement |_| Other (Please specify):

Contract Title:

Contract Location:

Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

4. Project Description:
Complexity of Work|_| High|_| Med|_| Routine

How is this project relevant to project of submission? (Please provide details such as similar equipment, requirements, conditions, etc.)

CLIENT INFORMATION (Client to complete Blocks 5-8)

5. Client Information Name:

Title:

Phone Number:

Email Address:

6. Describe the client’s role in the project:

7. Date Questionnaire was completed (mm/dd/yy):

8. Client’s Signature:

NOTE: IHS DES REQUESTS THAT THE CLIENT COMPLETES THIS QUESTIONNAIRE AND SUBMITS DIRECTLY BACK TO THE OFFEROR. THE OFFEROR WILL SUBMIT THE COMPLETED QUESTIONNAIRE TO IHS WITH THEIR PROPOSAL, AND MAY DUPLICATE THIS QUESTIONNAIRE FOR FUTURE SUBMISSION ON IHS SOLICITATIONS. CLIENTS ARE HIGHLY ENCOURAGED TO SUBMIT QUESTIONNAIRES DIRECTLY TO THE OFFEROR. HOWEVER, QUESTIONNAIRES MAY BE SUBMITTED DIRECTLY TO IHS. PLEASE CONTACT THE OFFEROR FOR IHS POC INFORMATION. THE GOVERNMENT RESERVES THE RIGHT TO VERIFY ANY AND ALL INFORMATION ON THIS FORM.

ADJECTIVE RATINGS AND DEFINITIONS TO BE USED TO BEST REFLECT

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE

RATING
DEFINITION
NOTE
(E) Exceptional
Performance meets contractual requirements and exceeds many to the Government/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.
An Exceptional rating is appropriate when the Contractor successfully performed multiple significant events that were of benefit to the Government/ Owner. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.
(VG) Very Good
Performance meets contractual requirements and exceeds some to the Government’s/Owner’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
A Very Good rating is appropriate when the Contractor successfully performed a significant event that was a benefit to the Government/Owner. There should have been no significant weaknesses identified.
(S) Satisfactory
Performance meets minimum contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
A Satisfactory rating is appropriate when there were only minor problems, or major problems that the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.
(M) Marginal
Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor's proposed actions appear only marginally effective or were not fully implemented.
A Marginal is appropriate when a significant event occurred that the contractor had trouble overcoming which impacted the Government/Owner.
(U) Unsatisfactory
Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains serious problem(s) for which the contractor's corrective actions appear or were ineffective.
An Unsatisfactory rating is appropriate when multiple significant events occurred that the contractor had trouble overcoming and which impacted the Government/Owner. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating.
(N) Not Applicable
No information or did not apply to your contract
Rating will be neither positive nor negative.

TO BE COMPLETED BY CLIENT

PLEASE CIRCLE THE ADJECTIVE RATING WHICH BEST REFLECTS

YOUR EVALUATION OF THE CONTRACTOR’S PERFORMANCE.

1. QUALITY:

a) Quality of technical data/report preparation efforts
EVGSMUN
b) Ability to meet quality standards specified for technical performance
EVGSMUN
c) Timeliness/effectiveness of contract problem resolution without extensive customer guidance
EVGSMUN
d) Adequacy/effectiveness of quality control program and adherence to contract quality assurance requirements (without adverse effect on performance)
EVGSMUN

2. SCHEDULE/TIMELINESS OF PERFORMANCE:

a) Compliance with contract delivery/completion schedules including any significant intermediate milestones. (If liquidated damages were assessed or the schedule was not met, please address below)
EVGSMUN
b) Rate the contractor’s use of available resources to accomplish tasks identified in the contract
EVGSMUN

3. CUSTOMER SATISFACTION:

a) To what extent were the end users satisfied with the project?
EVGSMUN
b) Contractor was reasonable and cooperative in dealing with your staff (including the ability to successfully resolve disagreements/disputes; responsiveness to administrative reports, businesslike and communication)
EVGSMUN
c) To what extent was the contractor cooperative, businesslike, and concerned with the interests of the customer?
EVGSMUN
d) Overall customer satisfaction
EVGSMUN

4. MANAGEMENT/ PERSONNEL/LABOR

a) Effectiveness of on-site management, including management of subcontractors, suppliers, materials, and/or labor force?
EVGSMUN
b) Ability to hire, apply, and retain a qualified workforce to this effort
EVGSMUN
c) Government Property Control
EVGSMUN
d) Knowledge/expertise demonstrated by contractor personnel
EVGSMUN
e) Utilization of Small Business concerns
EVGSMUN
f) Ability to simultaneously manage multiple projects with multiple disciplines
EVGSMUN
g) Ability to assimilate and incorporate changes in requirements and/or priority, including planning, execution and response to Government changes
EVGSMUN
h) Effectiveness of overall management (including ability to effectively lead, manage and control the program)
EVGSMUN

5. COST/FINANCIAL MANAGEMENT

a) Ability to meet the terms and conditions within the contractually agreed price(s)?
EVGSMUN
b) Contractor proposed innovative alternative methods/processes that reduced cost, improved maintainability or other factors that benefited the client
EVGSMUN
c) If this is/was a Government cost type contract, please rate the Contractor’s timeliness and accuracy in submitting monthly invoices with appropriate back-up documentation, monthly status reports/budget variance reports, compliance with established budgets and avoidance of significant and/or unexplained variances (under runs or overruns)
EVGSMUN
d) Is the Contractor’s accounting system adequate for management and tracking of costs? If no, please explain in Remarks section.
YesNo
e) If this is/was a Government contract, has/was this contract been partially or completely terminated for default or convenience or are there any pending terminations? Indicate if show cause or cure notices were issued, or any default action in comment section below.
YesNo
f) Have there been any indications that the contractor has had any financial problems? If yes, please explain below.
YesNo

6. SAFETY/SECURITY

a) To what extent was the contractor able to maintain an environment of safety, adhere to its approved safety plan, and respond to safety issues? (Includes: following the users rules, regulations, and requirements regarding housekeeping, safety, correction of noted deficiencies, etc.)
EVGSMUN
b) Contractor complied with all security requirements for the project and personnel security requirements.
EVGSMUN

7. GENERAL

a) Ability to successfully respond to emergency and/or surge situations (including notifying COR, PM or Contracting Officer in a timely manner regarding urgent contractual issues).
EVGSMUN
b) Compliance with contractual terms/provisions (explain if specific issues)
EVGSMUN
c) Would you hire or work with this firm again? (If no, please explain below)
YesNo
d) In summary, provide an overall rating for the work performed by this contractor.
EVGSMUN

Please provide responses to the questions above (if applicable) and/or additional remarks. Furthermore, please provide a brief narrative addressing specific strengths, weaknesses, deficiencies, or other comments which may assist our office in evaluating performance risk (please attach additional pages if necessary):