B05 75H70123R00001 Amendment A000008.pdf
PDF 90 KB Posted
- Solicitation number
- 75H701-23-R-00001
About this file
This solicitation notice is for construction services for maintenance and improvement renovations at the Phoenix Indian Medical Center in Phoenix, Arizona. The services include asbestos abatement, flooring replacement, mechanical HVAC work, painting, roof replacement, fire sprinkler inspection and replacement, and construction of a trash enclosure. The period of performance is 300 calendar days from notice to proceed. The construction value is estimated between $1,000,000 to $5,000,000. A site visit is scheduled and detailed in the solicitation. A single firm fixed price contract will be awarded using lowest price technically acceptable evaluation and procurement as an RFP in accordance with FAR Part 36 procedures. The solicitation number is 75H701-23-R-00001 and responses are due on dates specified within. The agency is the Indian Health Service within the Department of Health and Human Services.
View the file
Other files
Show 40 more
Latest 50 of 53 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
A00008
N/A
KELLY J. BRITTON
Project: PH22PH01H6, PIMC Maintenance & Improvements (M&I) Renovations
Amendment A00008 is issued to correct Block 14 of Amendment A00007 to read "Amendment A00007" and to incorporate Pre-Proposal Inquiries 85-87.
All other terms and conditions of this solicitation remain unchanged.
Division of Eng. Services Seattle 701 Fifth Avenue, Suite 1600 Seattle WA 98104
75H701-23-R-00001
PH22PH01H6
1 2
01/09/2023
10/27/2022
Amendment of Solicitation Amendment A00008 under Solicitation 75H701-23-R-00001 Project PH22PH01H6, PIMC Maintenance & Improvements (M&I) Renovations
INDIAN HEALTH SERVICE
DIVISION OF ENGINEERING
SERVICE
PRE-PROPOSAL INQUIRIES
Solicitation 75H701-23-R-00001
PROJECT:
PIMC Maintenance & Improvements (M&I) Renovations
LOCATION: Phoenix, AZ
PROJECT NO: PH22PH01H6
DOCUMENT
OWNER: Kelly Britton PHONE: 602-364-5081 DOCUMENTS:
DATE: 1/09/2023 DEPARTMENT: IHS/PAO/DFE
Item No.
Reference Drawing, Spec, Page COMMENTS POC IHS Approved Response
Amendment A00008 dated 1/9/2023
1. Painting
In the SOW H.1 and also D.6 it mentions interior painting in the Hospital Tower. Can clarification be given as to what is being painted on the interior? Such as what locations, is it just walls, are ceilings included, door frames, any accent walls.
COR
Reference the Attachment J01 R2 - SOW - PIMC MI Renovations FINAL 2022.12.05 and Attachment J06 R1 - Main Tower Maintenance Areas. Interior room painting is included in rooms with flooring and ceiling work.
2. Painting
Estimated quantities of paint were provided for the Behavioral Health, the Outpatient Buildings and the handrail. Can estimated quantities be provided for the Hospital Tower?
COR This information cannot be calculated this late in the solicitation process.
3. Tile Is there a count for how many showers will be re-tiled? COR Attachment J06 R1 - Main Tower Maintenance Area includes estimates of the total area that requires tiling, including walls.
File details come from the government source that posted it. Updated .