Attachment J19 - Self Performed Calculation Sheet (Construction).docx

DOCX document 26 KB Posted

Attached to
PIMC Maintenance & Improvements (M&I) Renovations
Solicitation number
75H701-23-R-00001
Issued by

About this file

This document provides details for a federal construction solicitation seeking maintenance and renovation services at the Phoenix Indian Medical Center. The scope of work includes asbestos abatement, flooring replacement, mechanical HVAC improvements, interior and exterior painting, roof replacement, and fire alarm and sprinkler work. The period of performance is 300 calendar days from notice to proceed. The construction magnitude is estimated between $1,000,000 to $5,000,000. A pre-bid site visit is scheduled and the contract type will be firm fixed price. The solicitation number is 75H701-23-R-00001 and it was issued by the Department of Health and Human Services Indian Health Service for the Phoenix Indian Medical Center located in Phoenix, Arizona.

View the file

Other files

File Type Posted
B04 Pre-Proposal Inquiries (23R00001) (85-87).pdf PDF
B05 75H70123R00001 Amendment A000008.pdf PDF
B05 75H70123R00001 Amendment A000007.pdf PDF
Attachment J17 - WD AZ20230031 2023.01.06.pdf PDF
B05 75H70123R00001 Amendment A000006.pdf PDF
B04 Pre-Proposal Inquiries (23R00001) (1-84).pdf PDF
Attachment J01 R2 - SOW - PIMC MI Renovations (CHANGES IN RED) 2022.12.05.pdf PDF
Attachment J01 R2 - SOW - PIMC MI Renovations FINAL 2022.12.05.pdf PDF
B05 75H70123R00001 Amendment A000005.pdf PDF
Attachment J12 R1 - Micro Lab Renovation Schematics.pdf PDF
Attachment J01 R1 - SOW - PIMC MI Renovations (changes in red) 2022.11.28.docx DOCX document
Attachment J02 R1 - PIMC Campus Map.pdf PDF
B04 Pre-Proposal Inquiries (23R00001) 1-29.pdf PDF
Attachment J04 R1 - Behavioral Health Schematics.pdf PDF
Attachment J03 R1 - 3rd Floor Nurse Station Replacement.pdf PDF
B05 75H70123R00001 Amendment A000004.pdf PDF
Attachment J06 R1 - Main Tower Maintenance Areas.pdf PDF
Attachment J26 - Asbestos Abatement Specification.pdf PDF
Attachment J01 R1 - SOW - PIMC MI Renovations FINAL 2022.11.28.pdf PDF
Attachment J24 - Hospital Exterior Painting.pdf PDF
Attachment J25 - Buildings 5 and 6 Asbestos Survey.pdf PDF
Attachment J10 R1 - Fire Sprinkler Replacement and Testing.pdf PDF
Attachment J05 R1 - Outpatient Floor Plans.pdf PDF
B05 75H70123R00001 Amendment A000003.pdf PDF
B05 75H70123R00001 Amendment A000002.pdf PDF
B04 Pre-Proposal Inquiries (23R00001).pdf PDF
Attachment J19 - Self Performed Calculation Sheet (Amend A00002).pdf PDF
B03 Site Visit Agenda and Sign-in (23R00001).pdf PDF
B05 75H70123R00001 Amendment A000001.pdf PDF
Attachment J17 - WD AZ20220031 Mod 8 2022.10.28.pdf PDF
B01 RFP 75H701-23-R-00001.pdf PDF
Attachment J04 - Behavioral Health Schematics.pdf PDF
Attachment J03 - 3rd Floor Nurse Station Replacement.pdf PDF
Attachment J12 - Micro Lab Renovation Schematics.pdf PDF
Attachment J17 - WD AZ20220031 Mod 7 2022.10.07.pdf PDF
Attachment J06 - Main Tower Maintenance Areas.pdf PDF
Attachment J09 - ED Waiting Room Ventilation.pdf PDF
Attachment J23 - Financial Institution Reference Sheet.docx DOCX document
Attachment J08 - CSR Schematics.pdf PDF
Attachment J21 - Past Performance Questionnaire.docx DOCX document
Attachment J10 - Fire Sprinkler Replacement and Testing.pdf PDF
Attachment J20 - Company Specialized Experience Form.docx DOCX document
Attachment J01 - SOW - PIMC MI Renovations 2022.10.25.pdf PDF
Attachment J15 - ICRA Permit.pdf PDF
Attachment J22 - Key Personnel Resume Form.docx DOCX document
Attachment J14 - Phoenix Solid Waste Access and Enclosure Standard Details.pdf PDF
Attachment J07 - PIMC Asbestos Survey Feb 2003.pdf PDF
Attachment J13 - Trash Enclosure Location.pdf PDF
Attachment J18 - 2022 Exemption Letter for a Qualifying Hospital.pdf PDF
Attachment J11 - PIMC 2021 Fire Alarm Testing Report.pdf PDF
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment J19. Self-Performed Calculation Sheet PH22PH01H6, PIMC M&I Renovations

SELF-PERFORMED CALCULATION SHEET

INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (FAR 52.219-14 (Sep 2021) and/or FAR 52.219-17) Offeror’s are to identify self-performance IAW CFR Title 13: Business Credit and Assistance, Chapter I, PART 125—GOVERNMENT CONTRACTING PROGRAMS § 125.6 Prime contractor performance requirements (limitations on subcontracting). https://www.ecfr.gov/current/title-13/chapter-I/part-125/section-125.6 SELF PERFORMED CALCULATIONS for Construction Firms, it will not pay more than 85% (75% for special trade contractors) of the amount paid by the government to it to firms that are not similarly situated. Any work that a similarly situated subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted. (See Page 3 for clarifications on “similar situated” entities).

OFFEROR’S SELF PERFORMANCE WORKSHEET:

Offeror’s are required to complete this Worksheet for this Task Order.

a) Offeror’s total proposed price (base + option(s))
$___________
b) Subtract profit or fees
$___________
c) Subtract cost of materials
$___________
d) Subtract Offeror’s total estimated cost of contract performance incurred for NON similar situated entities
$___________

e) Offeror’s total estimated cost of contract performance for similar situated entities (a-b-c-d=e)

f) Offeror’s percentage of “similar situated” entities work (e/a x 100% = %)
________%

List of Proposed Prime Contractor and Subcontractors, their work activities and value:

Prime Contractor/Subcontractor
Concern Status

(i.e., SB, 8(a), SDB, SDVOSB, HUBZone, etc.)

Work Activities
$ Value

(Can add additional sheet if necessary)

At completion of this Task Order, the awardee shall complete and submit the following calculations to the Contracting Officer for the actual results achieved.

a) Offeror’s total proposed price (base + option(s))
$___________
b) Subtract profit or fees
$___________
c) Subtract cost of materials
$___________
d) Subtract Offeror’s total estimated cost of contract performance incurred for NON similar situated entities
$___________

e) Offeror’s total estimated cost of contract performance for similar situated entities (a-b-c-d=e)

f) Offeror’s percentage of “similar situated” entities work (e/a x 100% = %)
________%

Signed at submission of Task Order proposal:

Name: ___________________________________ Title: ______________________________________ Signature: _________________________________ Date: ______________________________________

Signed at completion of Task Order:

Name: ___________________________________ Title: ______________________________________ Signature: _________________________________ Date: ______________________________________

Definitions: “Concern Status” means the SBA determined status of the firm, the small business program status as that which qualified the prime contractor for the award, and that is considered small for the NAICS code the prime contractor assigned to the subcontract the subcontractor will perform. These include Small Business, 8(a) participants, Small Disadvantaged Businesses (SDB), HUBZone Small Business concerns, Service-Disabled Veteran-Owned Small Business (SDVOSB) concerns, and Economically Disadvantaged Women-Owned Small Business (EDWOSB) concerns and Women-Owned Small Business (WOSB) concerns eligible under the WOSB Program. If none of these apply, the concern would be a Large Business.

(FAR 52.219-14 Limitations on Subcontracting (SEP 2021)— “Similarly situated entity” means a first-tier subcontractor, including an independent contractor, that has the same small business program status as that which qualified the prime contractor for the award, and that is considered small for the NAICS code the prime contractor assigned to the subcontract the subcontractor will perform. An example of a similarly situated entity is a first-tier subcontractor that is a HUBZone small business concern for a HUBZone setaside or sole source award under the HUBZone Program.]

(13 CFR 125.6) § 125.6 What are the prime contractor's limitations on subcontracting?

(a) General. In order to be awarded a full or partial small business set-aside contract with a value greater than the simplified acquisition threshold (as defined in the FAR at 48 CFR 2.101)” in paragraph (a) introductory text; and an 8(a) contract, an SDVO SBC contract, a HUBZone contract, a WOSB or EDWOSB contract pursuant to part 127 of this chapter, a small business concern must agree that:

(3) In the case of a contract for general construction, it will not pay more than 85% of the amount paid by the government to it to firms that are not similarly situated. Any work that a similarly situated subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

(4) In the case of a contract for special trade contractors, no more than 75% of the amount paid by the government to the prime may be paid to firms that are not similarly situated. Any work that a similarly situated subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

(c) Subcontracts to similarly situated entities. A small business concern prime contractor that receives a contract listed in paragraph (a) of this section and spends contract amounts on a subcontractor that is a similarly situated entity shall not consider those subcontracted amounts as subcontracted for purposes of determining whether the small business concern prime contractor has violated paragraph (a) of this section, to the extent the subcontractor performs the work with its own employees. Any work that the similarly situated subcontractor does not perform with its own employees shall be considered subcontracted SBA will also exclude a subcontract to a similarly situated entity from consideration under the ostensible subcontractor rule (§ 121.103(h)(4)). A prime contractor may no longer count a similarly situated entity towards compliance with the limitations on subcontracting where the subcontractor ceases to qualify as small or under the relevant socioeconomic status.

Example 1 to paragraph (c):

An SDVO SBC sole source contract is awarded in the total amount of $500,000 for hammers. The prime contractor is a manufacturer and subcontracts 51% of the total amount received, less the cost of materials ($100,000) or $204,000, to an SDVO SBC subcontractor that manufactures the hammers in the U.S. The prime contractor does not violate the limitation on subcontracting requirement because the amount subcontracted to a similarly situated entity (less the cost of materials) is excluded from the limitation on subcontracting calculation.

Example 2 to paragraph (c):

A competitive 8(a) BD contract is awarded in the total amount of $10,000,000 for janitorial services. The prime contractor subcontracts $8,000,000 of the janitorial services to another 8(a) BD certified firm. The prime contractor does not violate the limitation on subcontracting for services because the amount subcontracted to a similarly situated entity is excluded from the limitation on subcontracting.

Example 3 to paragraph (c):

A WOSB set-aside contract is awarded in the total amount of $1,000,000 for landscaping services. The prime contractor subcontracts $500,001 to an SDVO SBC subcontractor that is not also a WOSB under the WOSB program. The prime contractor is in violation of the limitation on subcontracting requirement because it has subcontracted more than 50% of the contract amount to an SDVO SBC subcontractor, which is not considered similarly situated to a WOSB prime contractor.