Attachment J01a Specifications - Parker Duplex.pdf

PDF 7 MB Posted

Attached to
Parker Duplex Quarters in Parker, Arizona
Solicitation number
75H701-25-R-00002
Issued by

About this file

This document is a solicitation notice for an upcoming construction project, Solicitation 75H701-25-R-00002 Parker Duplex Quarters (Parker, AZ), prepared by the Indian Health Service (IHS). The project involves the construction of two new duplex units, with each unit designed as a two-bedroom, two-bath residence, to replace four existing housing units at the Parker Indian Health Center. The construction site is on IHS leased land that is currently an empty lot with utilities and street access.

The project has an anticipated construction value between $1,000,000 and $5,000,000, and the period of performance is 150 calendar days from the issuance of the Notice to Proceed. The procurement will be a single Firm Fixed Price (FFP) contract set aside for Indian Small Business Economic Enterprise (ISBEE) firms under NAICS code 236116. A site visit is scheduled for December 10, 2024, and the solicitation will be released as a Request for Proposal (RFP) with Lowest Price Technically Acceptable (LPTA) evaluation criteria.

View the file

Other files

File Type Posted
B01 RFP 75H70125R00002 Parker Duplex Qtrs (CONFORMED Thru A000010).pdf PDF
B04 Pre-Proposal Inquiries 1-43 (25R00002).pdf PDF
B05 Amendment A00010 (75H70125R00002 Parker Duplex Qtrs).pdf PDF
Attachment J04 2025 Exemption Letter for a Qualifying Hospital.pdf PDF
Attachment J02 WD AZ20250004 Residential 2025.01.03.pdf PDF
B05 Amendment A00009 (75H70125R00002 Parker Duplex Qtrs).pdf PDF
B01 RFP 75H701-25-R-00002 Parker Duplex Quarters (CONFORMED).pdf PDF
B05 Amendment A00008 (75H70125R00002 Parker Duplex Qtrs).pdf PDF
B05 Amendment A00007 (75H70125R00002 Parker Duplex Qtrs).pdf PDF
B04 Pre-Proposal Inquiries 1-38 (25R00002).pdf PDF
B05 Amendment A00005 (75H70125R00002 Parker Duplex Qtrs) Corrected.pdf PDF
B05 Amendment A00006 (75H70125R00002 Parker Duplex Qtrs).pdf PDF
B05 Amendment A00005 (75H70125R00002 Parker Duplex Qtrs).pdf PDF
B05 Amendment A00004 (75H70125R00002 Parker Duplex Qtrs).pdf PDF
B05 Amendment A00003 (75H70125R00002 Parker Duplex Qtrs).pdf PDF
B05 Amendment A00002 (75H70125R00002 Parker Duplex Qtrs).pdf PDF
B05 Amendment A00001 (75H70125R00002 Parker Duplex Qtrs).pdf PDF
Attachment J01d Location Maps.pdf PDF
Attachment J06 PPQ.pdf PDF
Attachment J04 2024 Exemption Letter for a Qualifying Hospital.pdf PDF
Attachment J04a FORMS_TPT_5000HC_11228.pdf PDF
Attachment J03 Self Performed Calculation Sheet.pdf PDF
Attachment J07 IHS IEE Representation Form.pdf PDF
Attachment J01c CRIT Permit Requirements and Forms.pdf PDF
Attachment J05 Company Specialized Experience Form Construction.pdf PDF
Attachment J02 WD AZ20240004 Residential 2024.01.05.pdf PDF
Attachment J01b Drawings - Parker Duplex.pdf PDF
B01 RFP 75H701-25-R-00002 Parker Duplex Quarters.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RE

GI

ST

ERED ARCHITECT

A

R I Z O N A , U . S

A

D a te S ig n ed . . .

CE

R T

IFICATE NO.23533

ROBIN A.

SHAMBACH

EXPIRES 06/30/2025

ARCHITECTS

261 North Court Avenue

Tucson, Arizona 85701

520.795.2705 Fax 520.795.6171

www.bwsarchs.com

BURNS WALD-HOPKINS SHAMBACH ARCHITECTS

CONSULTANTS

BWS Project Number:

CONSTRUCTION DOCUMENTS

JUNE 24, 2024

1818.900

PARKER INDIAN HEALTH CENTER

DUPLEX DESIGN

CIVIL

EEC

555 E River Road, Suite 301

Tucson, AZ 85704 Phone: (520) 321-4625

LANDSCAPE

McGann & Associates 6814 N. Oracle Rd. #210

Tucson, AZ 85704 Phone: 520.297.9540

MECHANICAL

Zona Technical Engineering 6422 E Speedway Blvd, Suite 130

Tucson, AZ 85710 Phone: (520) 200-2612

ELECTRICAL

M3 Engineering 2051 W Sunset Rd

Tucson, AZ 85704 Phone: (520) 293-1488

Parker, AZ

IHS PROJECT NO.PH21CRO3Q3

6/2 4/2

Indian Health Services IHS PH21CR03Q3 Parker Duplex Quarters BWS 1818.900

CONSTRUCTION DOCUMENTS

CONSTRUCTION DOCUMENTS - CONTENTS PG. 1

PROJECT MANUAL

Indian Health Services Parker Duplex Quarters

CONSTRUCTION DOCUMENTS

June 24, 2024

TECHNICAL SPECIFICATIONS

Division 1 – General Requirements 011100 Summary 013100 Project Meetings 013300 Submittals 013526 Safety Requirements 014000 Quality Requirements 014200 References 015000 Temporary Facilities 016000 Product Requirements 017400 Warranties 017700 Project Closeout 017823 Operation and Maintenance Data 017839 Project Record Documents

Division 2 – Existing Conditions – Not Used

Division 3 - Concrete 033000 Cast-In-Place Concrete

Division 4 – Masonry – Not Used

Division 5 - Metals 051200 Structural Steel 055000 Metal Fabrications

Division 6 – Wood, Plastics, and Composites 061000 Rough Carpentry 061753 Metal Plate Connected Wood Trusses 061850 Structural Glue-Laminated Timber

CONSTRUCTION DOCUMENTS - CONTENTS PG. 2

Division 7 - Thermal and Moisture Protection 072100 Insulation 072410 Exterior Insulation and Finish System – EIFS 072700 Air Barriers 074113 Preformed Metal Roofing 074600 Fiber Cement Siding 078400 Firestopping 079200 Joint Sealers

Division 8 - Doors and Windows 081113 Steel (Hollow Metal) Doors and Frames 081433 Interior Stile and Rail Wood Doors – Single Swing, Bi-Fold, and Sliding 081444 Fiberglass Entry Doors 081673 Fiberglass Sliding Doors 083113 Access Doors and Frames 085413 Fiberglass Picture and Casement Windows 086200 Tubular Skylights 087100 Finish (Door) Hardware and Hardware Schedule 088300 Frameless Mirrors

Division 9 – Finishes 092900 Gypsum Drywall Systems 093000 Tile 099000 Painting

Division 10 – Specialties 102800 Toilet Accessories 104400 Portable Fire Extinguishers

Division 11 – Equipment - Not Used

Division 12 – Furnishings 122416 Pleated Shades - Cellular 123530 Residential Casework 123640 Stone Countertops

Division 13 - Special Construction – Not Used

Division 14 – Conveyances – Not Used

Division 21- Fire Protection 211100 Fire Protection

Division 22 – Plumbing 224000 Plumbing

CONSTRUCTION DOCUMENTS - CONTENTS PG. 3

Division 23 – Heating, Ventilating and Air Conditioning 230500 Basic Mechanical Materials and Methods 230593 Testing, Adjusting, Balancing (TAB) 230700 Mechanical Insulation 232000 Building Services Piping 233000 Air Distribution 237000 Heating, Ventilating, and Air Conditioning Equipment - HVAC

Division 26 – Electrical – See Drawings

Division 28 – Fire Protection – See Drawings

Division 31 – Earthwork 312000 Earthwork

Geotechnical Evaluation Report 313116 Termite Control

Division 32 – Exterior Improvements 321313 Portland Cement Concrete Paving 323119 Chain-Link Fences and Gates 328000 Irrigation System 329000 Landscape Work

END OF CONTENTS

CONSTRUCTION DOCUMENTS

SUMMARY 011100 - 1

SECTION 011100 - SUMMARY

PART 1 – GENERAL

1.1 SUMMARY

A. A summary of the specifications as part of the Contract Documents

1.2 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Division 1 Specification Sections, apply to this Section.

1.3 WORK COVERED BY CONTRACT DOCUMENTS

A. Project Identification: The project consists of residential quarters for staff working at Parker Indian Health Center. The project will add 4 new units – 2 duplex quarters – each unit will have 2 bedrooms and 2 bathrooms. Exterior colors and details to match existing buildings.

1. Project Location: Parker, Arizona

2. Owner: Indian Health Service

B. Architect Identification: The Contract Documents, dated June 24, 2024 were prepared for the Project by Burns Wald-Hopkins Shambach Architects (BWS) and their consultants.

1.4 USE OF PREMISES

A. Contractor shall coordinate with service unit and will have an area near work site to use as a staging area.

1.5 SPECIFICATION FORMATS AND CONVENTIONS

A. Specification Format

The Specifications are organized into Divisions and Sections using the 49-division format and CSI/CSC's "MasterFormat" numbering system.

1. Section Identification: The Specifications use section numbers and titles to help cross-referencing in the Contract Documents. Sections in the Project Manual are in numeric sequence; however, the sequence is incomplete. Consult the table of contents at the beginning of the Project Manual to determine numbers and names of sections in the Contract Documents.

B. Specification Content

The Specifications use certain conventions for the style of language and the intended meaning of certain terms, words, and phrases when used in particular situations. These conventions are as follows:

CONSTRUCTION DOCUMENTS

SUMMARY 011100 - 2

1. Abbreviated Language: Language used in the Specifications and other Contract Documents may be abbreviated. Words and meanings shall be interpreted as appropriate. Words implied, but not stated, shall be inferred as the sense requires. Singular words shall be interpreted as plural, and plural words shall be interpreted as singular where applicable as the context of the Contract Documents indicates.

2. Imperative mood and streamlined language are generally used in the Specifications. Requirements expressed in the imperative mood are to be performed by Contractor. Occasionally, the indicative or subjunctive mood may be used in the Section Text for clarity to describe responsibilities that must be fulfilled indirectly by Contractor or by others when so noted.

a. The words "shall," "shall be," or "shall comply with," depending on the context, are implied where a colon (:) is used within a sentence or phrase.

1.6 DOCUMENT MANAGEMENT

A, Section 013300 – Submittals: Submittals describe the requirement that the General Contractor procures use of Submittal Exchange or ProCore for the duration of the construction portion of the project. This shall be a cloud-based project management system that allows residence and management of all project documents, including drawings and specifications, submittals, RFI’s, ASI’s, COR’s/Proposal Requests, etc.

The GC shall administer the program during the construction period and provide general document management for the entire project construction team.

1.7 LAYING OUT OF THE WORK

A. Prior to commencing work, the Contractor shall carefully compare and check all drawings, each with the other, that in any way affect the locations or elevation of the work to be executed by him, and should any discrepancy be found, he shall immediately report the same to the Architect for verifications and adjustments. Any duplication of work made necessary by failure or neglect on the Contractor's part to comply with this provision shall be done at his sole expense.

B. The drawings accompanying these specifications indicate generally the design and arrangement of all apparatus, fixtures, accessories, etc., necessary to complete the work required. The exact location or arrangement of equipment is subject to minor changes necessitated by field conditions and shall be made as required without additional cost to the Owner.

C. If there is a discrepancy between documents, the most stringent requirements shall be assumed to apply to the work. Contractor shall not scale drawings if dimensions are not shown but ask for clarification from the architect.

D. Surveys, Benchmarks, Lines and Levels: Working from data established by his property survey, Contractor shall establish and maintain benchmarks and other dependable markers and set lines and levels for the work on site as needed to properly locate each element of entire project. Contractor shall calculate and measure required dimensions as shown (within recognized tolerances). Contractor shall not scale drawings to determine dimensions. Contractor shall advise tradesmen performing the work of marked lines and levels provided for their use in layout of work.

CONSTRUCTION DOCUMENTS

SUMMARY 011100 - 3

E. Existing Conditions

1. The existing utilities and other conditions shown or referred to on the drawings or in the specifications were located from existing reference drawings. While it may be reasonable to assume that the locations are reasonably accurate, the Contractor shall utilize blue staking services or other information as available for to verify all existing utilities. Contractor should use extreme caution in trenching, cutting asphalt, etc.

a. Reference also the Geotechnical Investigation Report. These are included after Section 312000 – Earthwork.

2. If the Contractor should encounter utilities or conditions not shown on available reference materials, immediately notify the Architect who will direct Contractor in removal, repair, and/or rerouting of utilities and resolution of unexpected conditions.

3. Utility Shutdowns: Contractor shall coordinate closely with Owner’s

Representative for all utility shutdowns and changeovers. Contractor shall conduct a planning meeting with all affected parties, coordinated with the Owner’s Representative, a minimum of 2 weeks prior to any required shutdown.

PART 2 – PRODUCTS (Not Used)

PART 3 – EXECUTION (Not Used)

END OF SECTION 011100

CONSTRUCTION DOCUMENTS

PROJECT MEETINGS 013100 - 1

SECTION 013100 - PROJECT MEETINGS

PART 1 – GENERAL

1.1 SUMMARY

A. This section specifies administrative and procedural requirements for project meetings including but not limited to:

1. Pre-construction conference

2. Pre-Installation Conferences as noted in individual spec sections

3. Coordination meetings

4. Progress meetings

1.2 RELATED DOCUMENTS

A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-01 Specification Sections, apply to this section.

1.3 PRECONSTRUCTION CONFERENCE:

A. To be held after execution of the Agreement and prior to commencement of construction activities.

B. Attendees: The COR, CO, OWNER, Architect, and their consultants, the Contractor and his/her superintendent, major subcontractors, manufacturers, suppliers and other concerned parties shall each be represented at the conference by persons familiar with and authorized to conclude matters relating to the work.

C. Deliverable: Fully developed and vetted critical path construction schedule.

D. Agenda: Discuss items of significance that could affect progress including such topics as:

1. Critical work sequencing

2. Designation of responsible personnel

3. Procedures for processing change orders

4. Procedures for processing applications for payment

5. Distribution of contract documents

6. Process for submittals of shop drawings, product data and samples

7. Preparation of record documents

8. Office, work, access, and storage areas.

9. Equipment deliveries and priorities

CONSTRUCTION DOCUMENTS

PROJECT MEETINGS 013100 - 2

10. Housekeeping

11. Working hours

E. The CO will chair the conference, record significant discussions, and electronically distribute copies of minutes of the conference promptly to everyone concerned.

1.4 COORDINATION MEETINGS:

A. Conduct coordination meetings with subcontractors as required to expedite job progress.

Project coordination meetings are in addition to specific meetings held for other purposes, such as regular progress meetings and special pre-installation meetings.

B. Request representation at each meeting by every party currently involved in coordination or planning for the construction activities involved.

C. The General Contractor will chair the meetings, record significant discussions of each meeting, and electronically distribute copies of minutes of each meeting promptly to everyone concerned.

1.5 PROGRESS MEETINGS:

A. The Contractor shall schedule and administer monthly construction progress meetings throughout the contract performance period. Additional meetings may be held as required. The location of progress meetings will normally be on site; however, other locations may be approved by CO.

1. The Contractor shall make arrangements for meetings, prepare agenda, and distribute notice of meetings to participants three (3) business days in advance of each progress meeting. Meeting agenda shall cover topics pertinent to continued progress and successful completion of the contract.

2. The CO, or if not attending, the appointed COR will preside over progress meetings. The Contractor shall record meeting minutes and distribute copies within five (5) calendar days after each meeting to participants, entities affected by meeting decisions, and the CO.

3. Attendance: Contractor, project superintendent, and subcontractors and suppliers as appropriate to agenda; the CO, COR, and other Government representatives may attend as appropriate.

4. Suggested topics include:

a. Review previous meeting minutes

b. Review schedule and progress. Contractor shall be prepared to:

i. Discuss the work and any causes of work delay(s);

ii. Present a plan to bring the work back into conformance with the schedule; or, if necessary:

iii. Propose a revised work schedule.

c. Review field observations, problems, and decisions

CONSTRUCTION DOCUMENTS

PROJECT MEETINGS 013100 - 3

d. Status of submittals / RFIs

e. Off-site fabrication and delivery schedules, if applicable

f. Quality control

g. Progress payments

B. Agenda: Review, correct and approve minutes of the previous progress meeting. Include topics for discussion as appropriate to the current status of the project.

C. Contractor's Construction Schedule: Review progress since the last meeting. Determine where each activity is in relation to the Contractor's construction schedule, whether on time or behind schedule. Determine how construction behind schedule will be expedited;

secure commitments from parties involved to do so. Discuss whether schedule revisions are required to ensure that current and subsequent activities will be completed within the Contract Time. Review other items of significance that could affect progress.

D. Documentation Status: Review status of critical submittals, requests for information, proposal requests/change proposals, change orders, and similar items.

E. The Contractor will chair the meetings, record significant discussions and, soon after each meeting, electronically distribute copies of minutes of each meeting to each party present and to other members of the construction team.

PART 2 – PRODUCTS (Not Used)

PART 3 – EXECUTION (Not Used)

END OF SECTION 013100

SUBMITTALS 013300 - 1

SECTION 013300 - SUBMITTALS

PART 1 – GENERAL

1.1 SUMMARY

A. Work related submittals including shop drawings, product data, samples and non-administrative miscellaneous submittals related directly to the work.

1.2 RELATED DOCUMENTS

Drawings and general provisions of Contract, including General and Supplementary Conditions and other Division-1 Specification sections, apply to work of this section.

A. Coordination Drawings: The contractor shall work with appropriate subcontractors to provide coordination drawings for all work above ceilings. Drawings shall fully address mechanical, electrical, data, fire sprinklers, fire alarm, and other systems as appropriate.

1.3 RELATED SECTIONS

A. Section 011100 – Summary: Summary for general discussion of cloud-based project management during construction, which shall be provided and administered by the General Contractor. Particular requirements for its use are included in this Submittals section.

1.4 DESCRIPTION OF REQUIREMENTS:

A. General: The Contractor shall provide and utilize a construction management software product designed specifically for transmitting information between construction project team members and overall management of documentation during the construction process (e.g., submittals, requests for information (RFIs), daily reports, progress photos, meeting minutes, etc.). The software shall use a cloud storage infrastructure that is Federal Risk and Authorization Management Program (FedRAMP) authorized, such as Amazon Web Service or Google Cloud. Examples of construction management software that use FedRAMP authorized cloud services include ProCore and Submittal Exchange. See Solicitation H Clause for further details.

B. The types of submittal requirements specified in this section include shop drawings, product data, samples and miscellaneous work-related submittals. Individual submittal requirements are specified in applicable sections for each unit of work. Refer to other Division-1 sections and other contract documents for requirements of administrative submittals.

C. Definitions: Work-related submittals of this section are categorized for convenience as follows:

1. Shop drawings include specially-prepared technical data for the project, including drawings, diagrams, performance curves, data sheets, schedules, templates, patterns, reports, calculations, instructions, measurements and similar information not in standard printed form for general application to more than one project.

SUBMITTALS 013300 - 2

2. Product data include standard printed information on materials, products and systems; not specially-prepared for this project, other than the designation of selections from among available choices printed therein. Include manufacturer's standard printed recommendations for application and use, compliance with standards, applications for labels and seals, maintenance information, and special coordination requirements for installation.

3. Samples include both fabricated and unfabricated physical examples of materials, products and units of work; both as complete units and as smaller portions of units of work; either for limited visual inspection or, (where indicated), for more detailed testing and analysis.

1. Approved physical samples shall be delivered to the job site and be maintained in the job site office.

4. Miscellaneous submittals related directly to the work, (non-administrative), include warranties, coordination drawings, maintenance agreements, workmanship bonds, survey data and reports, physical work records, quality testing and certifying reports, copies of industry standards, record drawings, field measurement data, operating and maintenance materials, overrun stock, and similar information, devices and materials applicable to the work and not processed as shop drawings, product data or samples.

1.5 INTENT

A. The review of shop drawings is intended to be a preview of what the Contractor intends to provide and functions as an effort to foresee unacceptable materials or methods and to avoid the possibility of their rejection at the project site. Review of submittals will be only for conformance with the design concept of the project and compliance with the information given in the Contract Documents. Review of shop drawings does not preclude Contractor from meeting all requirements of the Contract Documents and providing the work as documented therein.

B. The Contractor is responsible for dimensions to be confirmed at the site; for information that pertains solely to fabrication processes or to the means, methods, techniques, sequences, and procedures of construction; for actual quantities of items to be furnished;

and for coordination of the work of all trades. The Architect's approval of a specific item does not indicate approval of an assembly of which the item is a component.

1.6 GENERAL SUBMITTAL REQUIREMENTS:

A. Coordination and Sequencing: Coordinate preparation and processing of submittals with performance of the work so that work will not be delayed by submittals. Coordinate and sequence different submittals for same work, and for interfacing units of work, so that one unit of work will not be delayed for coordination with another. The Contractor shall provide a list of all required submittals, along with a sequence that the submittals will be provided, for review by the Architect.

B. No fabrication of work shall be done, or any parts thereof shipped to site prior to approval of required submittals for such work.

SUBMITTALS 013300 - 3

C. Submittals will not be reviewed which do not bear Contractor's signature and statement that Contractor has reviewed submittal and the contents of the submittals are in full conformity with the contract documents, except as noted. Contractor will be held responsible for any delay in the progress of the work which may be due to his failure to observe these requirements, and the time for the completion of his contract will not be e extended on account of his failure to submit information promptly.

D. Review Times: The schedule of shop drawings shall include 14 calendar days for review of each submittal by the Architect, although the Architect will attempt to review submittals as quickly as possible. For complex submittals allow for a ten-calendar day resubmittal review time by the Architect, if required. Revise submittal schedule and resubmit when progress deviates from previous schedule by 7 calendar days.

1.7 PREPARATION OF SUBMITTALS

A. Show Contractor's executed review and approval marking and provide space for Architect's "Action" marking. Package each submittal appropriately for transmittal and handling. Submittals which are received from sources other than through Contractor's office will be returned "without action".

1. Installer's Copy: Do not proceed with ordering or installation of materials, products or systems until final copy of applicable submittal is in possession of Installer.

1.8 ADDITIONAL DISTRIBUTION AND COORDINATION OF SUBMITTALS BY CONTRACTOR

A. Provide additional distribution of submittals (not included in foregoing copy submittal requirements) to subcontractors, suppliers, fabricators, installers, governing authorities and others as necessary for proper coordination of the work. Include such additional copies in transmittal to Architect where required to receive "Action" marking before final distribution. Show such distributions on transmittal forms.

1.9 SPECIFIC-CATEGORY SUBMITTAL REQUIREMENTS

A. The intent of electronic submittals is to expedite the construction process by reducing paperwork, improving information flow, and decreasing turnaround time.

B. The electronic submittal process is not intended for color samples, color charts, or physical material samples.

1.10 PROCEDURES

A. Submittal Preparation: Contractor may use any or all of the following options:

1. Subcontractors and Suppliers provide electronic (PDF) submittals to Contractor via the project management website.

2. Subcontractors and Suppliers provide paper submittals to General Contractor who electronically scans and converts to PDF format.

3. Subcontractors and Suppliers provide paper submittals to Scanning Service which electronically scans and converts to PDF format.

SUBMITTALS 013300 - 4

B. Contractor shall review and apply electronic stamp certifying that the submittal complies with the requirements of the Contract Documents including verification of manufacturer / product, dimensions, and coordination of information with other parts of the work.

C. Contractor shall transmit each submittal to Architect, and any other designated construction team members using the project management system.

D. Architect / Engineer review comments will be made available on the management website for downloading. Contractor will receive email notice of completed review.

E. Distribution of reviewed submittals to subcontractors and suppliers is the responsibility of the Contractor.

1.11 COSTS

A. General Contractor shall include the full cost of the project management system subscription in their bid proposal. This cost shall be included in the Contract Amount.

The GC shall directly verify such costs with the service provider prior to bid.

1.12 INTERNET SERVICE AND EQUIPMENT REQUIREMENTS

A. Email address and Internet access at Contractor’s main office.

B. Adobe Acrobat (www.adobe.com), Bluebeam PDF Revu (www.bluebeam.com), or other similar PDF review software for applying electronic stamps and comments.

1.13 MATERIAL SAFETY DATA SHEETS (MSDS)

A. Comply with OSHA Globally Harmonized Criteria.

1.14 EQUIPMENT SUBMITTALS

A. Submit all submittals for equipment in a given system, such as an air handling system, at one time.

1. Piping, conduit, equipment, etc. submittals shall be accompanied with support/suspension information intended to be used for installation.

1.15 SAMPLES

A. Provide units identical with final condition of proposed materials or products for the work.

Include "range" samples (not less than 3 units) where unavoidable variations are to be expected and describe or identify variations between units of each set. Provide full set of optional samples where Architect's selection is required. Prepare samples to match Architect's sample where so indicated. Include information with each sample to show generic description, source or product name and manufacturer, limitations, and compliance with standards. Samples are submitted for review and confirmation of color, pattern, texture, and "kind" by Architect. Architect will not "test" samples (except as otherwise indicated) for compliance with other requirements, which are therefore the exclusive responsibility of the Contractor.

SUBMITTALS 013300 - 5

1.16 INSPECTION AND TEST REPORTS

A. Classify each as either "shop drawing" or "product data", depending upon whether report is uniquely prepared for project or a standard publication of workmanship control testing at point of production, and process accordingly.

1.17 MATERIALS AND TOOLS

A. Refer to individual work sections for required quantities of spare parts, extra and overrun stock, maintenance tools and devices, keys, and similar physical units to be submitted.

1.18 ACTION ON SUBMITTALS

A. Architect's Action: Where action and return is required, Architect will review each submittal and return with comments within a reasonable period of time. Where submittal must be held for coordination, Contractor will be so advised without delay.

B. Review comments may be interpreted as follows:

1. "Approved" or "Reviewed": Work may proceed, provided it complies with Contract Documents.

2. "Approved As Noted", “Correct as Noted”, or “Reviewed with Comments”: Work may proceed, provided it complies with notations and corrections on submittal and with Contract Documents. This may include some portions of submittals to be resubmitted or additional information to be provided.

3. Revise and Resubmit", "Not Approved", "Rejected", or “Submit Specified Item”:

Do not proceed with the work. Revise submittal in accordance with notations and corrections and resubmit without delay.

PART 2 – PRODUCTS – NOT USED

PART 3 – EXECUTION – NOT USED

END OF SECTION 013300

Indian Health Service IHS PH21CR03Q3

SAFETY REQUIREMENTS 013526 -1

SECTION 013526 - SAFETY REQUIREMENTS

TABLE OF CONTENTS

1.1 APPLICABLE PUBLICATIONS:

1.2 DEFINITIONS:

1.3 REGULATORY REQUIREMENTS:

1.4 ACCIDENT PREVENTION PLAN (APP):

1.5 ACTIVITY HAZARD ANALYSES (AHAs):

1.6 PRECONSTRUCTION CONFERENCE:

1.7 “SITE SAFETY AND HEALTH OFFICER” (SSHO) and “COMPETENT PERSON” (CP):... 10

1.8 TRAINING:

1.9 INSPECTIONS:

1.10 ACCIDENTS, OSHA 300 LOGS, AND MAN-HOURS:

1.11 PERSONAL PROTECTIVE EQUIPMENT (PPE):

1.14 FIRE SAFETY

1.15 ELECTRICAL

1.16 FALL PROTECTION

1.17 SCAFFOLDS AND OTHER WORK PLATFORMS

1.18 EXCAVATION AND TRENCHES

1.19 CRANES

1.20 CONTROL OF HAZARDOUS ENERGY (LOCKOUT/TAGOUT)

1.21 CONFINED SPACE ENTRY

1.22 WELDING AND CUTTING

1.23 LADDERS

1.24 FLOOR & WALL OPENINGS

SAFETY REQUIREMENTS 013526 -2

SECTION 013526 - SAFETY REQUIREMENTS

PART 1 - GENERAL

1.1 APPLICABLE PUBLICATIONS:

A. Latest publications listed below form part of this Article to extent referenced. Publications are referenced in text by basic designations only.

B. American Society of Safety Engineers (ASSE):

A10.1-2011 .......................... Pre-Project & Pre-Task Safety and Health Planning

A10.34-2012 ........................ Protection of the Public on or Adjacent to Construction Sites

A10.38-2013 ........................ Basic Elements of an Employer’s Program to Provide a Safe and

Healthful Work Environment American National Standard

Construction and Demolition Operations

C. American Society for Testing and Materials (ASTM):

E84-2013 ............................. Surface Burning Characteristics of Building Materials

D. The Facilities Guidelines Institute (FGI):

FGI Guidelines for Design and Construction of Hospitals, latest version

FGI Guidelines for Design and Construction of Outpatient Facilities, latest version

E. National Fire Protection Association (NFPA):

10 ......................................... Standard for Portable Fire Extinguishers

30 ......................................... Flammable and Combustible Liquids Code

51B ...................................... Standard for Fire Prevention During Welding, Cutting and Other

Hot Work

70 ......................................... National Electrical Code

70B ...................................... Recommended Practice for Electrical Equipment Maintenance

70E ...................................... Standard for Electrical Safety in the Workplace

99 ......................................... Health Care Facilities Code

101 ....................................... Life Safety Code

SAFETY REQUIREMENTS 013526 -3

241 ....................................... Standard for Safeguarding Construction, Alteration, and

Demolition Operations

F. The Joint Commission (TJC)

TJC Manual ........................ Comprehensive Accreditation and Certification Manual

G. U.S. Occupational Safety and Health Administration (OSHA):

29 CFR 1910 ...................... Safety and Health Regulations for General Industry

29 CFR 1926 ...................... Safety and Health Regulations for Construction Industry

1.2 DEFINITIONS:

A. Critical Lift. A lift with the hoisted load exceeding 75% of the crane’s maximum capacity; lifts made out of the view of the operator (blind picks); lifts involving two or more cranes; personnel being hoisted; and special hazards such as lifts over occupied facilities, loads lifted close to power-lines, and lifts in high winds or where other adverse environmental conditions exist; and any lift which the crane operator believes is critical.

B. OSHA “Competent Person” (CP). One who is capable of identifying existing and predictable hazards in the surroundings and working conditions which are unsanitary, hazardous or dangerous to employees, and who has the authorization to take prompt corrective measures to eliminate them (see 29 CFR 1926.32(f)).

C. "Qualified Person" means one who, by possession of a recognized degree, certificate, or professional standing, or who by extensive knowledge, training and experience, has successfully demonstrated his ability to solve or resolve problems relating to the subject matter, the work, or the project.

D. High Visibility Accident. Any mishap which may generate publicity or high visibility.

E. Accident/Incident Criticality Categories:

1. No impact – near miss incidents that should be investigated but are not required to be reported to the Government;

2. Minor incident/impact – incidents that require first aid or result in minor equipment damage

(less than $5000). These incidents must be investigated but are not required to be reported to the Government;

3. Moderate incident/impact – Any work-related injury or illness that results in:

a. Days away from work (any time lost after day of injury/illness onset);

SAFETY REQUIREMENTS 013526 -4

b. Restricted work;

c. Transfer to another job;

d. Medical treatment beyond first aid;

e. Loss of consciousness;

4. A significant injury or illness diagnosed by a physician or other licensed health care professional, even if it did not result in (1) through (5) above or,

5. Any incident that leads to major equipment damage (greater than $5000).

F. These incidents must be investigated and are required to be reported to the Government;

1 Major incident/impact – Any mishap that leads to fatalities, hospitalizations, amputations, and losses of an eye as a result of contractors’ activities. Or any incident which leads to major property damage (greater than $20,000) and/or may generate publicity or high visibility.

These incidents must be investigated and are required to be reported to the Government as soon as practical, but not later than 2 hours after the incident.

G. Medical Treatment. Treatment administered by a physician or by registered professional personnel under the standing orders of a physician. Medical treatment does not include first aid treatment even through provided by a physician or registered personnel.

1.3 REGULATORY REQUIREMENTS:

A. In addition to the detailed requirements included in the provisions of this contract, comply with 29

CFR 1926, comply with 29 CFR 1910 as incorporated by reference within 29 CFR 1926, comply with ASSE A10.34, and all applicable [federal, state, and local] laws, ordinances, criteria, rules and regulations. Submit matters of interpretation of standards for resolution before starting work.

Where the requirements of this specification, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements govern except with specific approval and acceptance by the Contracting Officer Representative.

1.4 ACCIDENT PREVENTION PLAN (APP):

A. The APP (aka Construction Safety & Health Plan) shall interface with the Contractor's overall safety and health program. Include any portions of the Contractor's overall safety and health program referenced in the APP in the applicable APP element and ensure it is site-specific. The

Government considers the Prime Contractor to be the "controlling authority" for all worksite safety and health of each subcontractor(s). Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract and the penalties for noncompliance, coordinating the work to prevent one craft from interfering with or creating

SAFETY REQUIREMENTS 013526 -5

hazardous working conditions for other crafts, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

B. The APP shall be prepared as follows:

1. Written in English by a qualified person who is employed by the Prime Contractor articulating the specific work and hazards pertaining to the contract (model language can be found in

ASSE A10.33). Specifically articulating the safety requirements found within these

Government contract safety specifications. APP shall be made available in other languages as necessary to convey the contents of the plan.

2. Address both the Prime Contractors and the subcontractors work operations.

3. State measures to be taken to control hazards associated with materials, services, or equipment provided by suppliers.

4. Address all the elements/sub-elements and in order as follows:

a. SIGNATURE SHEET. Title, signature, and phone number of the following:

1) Plan preparer (Qualified Person such as corporate safety staff person or contracted

Certified Safety Professional with construction safety experience);

2) Plan approver (company/corporate officers authorized to obligate the company);

3) Plan concurrence (e.g., Chief of Operations, Corporate Chief of Safety, Corporate

Industrial Hygienist, project manager or superintendent, project safety professional).

Provide concurrence of other applicable corporate and project personnel

(Contractor).

b. BACKGROUND INFORMATION. List the following:

1) Contractor;

2) Contract number;

3) Project name;

4) Brief project description, description of work to be performed, and location; phases of work anticipated (these will require an AHA).

c. STATEMENT OF SAFETY AND HEALTH POLICY. Provide a copy of current corporate/company Safety and Health Policy Statement, detailing commitment to providing a safe and healthful workplace for all employees. The Contractor’s written

SAFETY REQUIREMENTS 013526 -6

safety program goals, objectives, and accident experience goals for this contract should be provided.

d. RESPONSIBILITIES AND LINES OF AUTHORITIES. Provide the following:

1) A statement of the employer’s ultimate responsibility for the implementation of the

Safety and Occupational Health (SOH) program;

2) Identification and accountability of personnel responsible for safety at both corporate and project level. Contracts specifically requiring safety or industrial hygiene personnel shall include a copy of their resumes.

3) The names of Competent and/or Qualified Person(s) and proof of competency/qualification to meet specific OSHA Competent/Qualified Person(s) requirements must be attached.

4) Requirements that no work shall be performed unless a designated competent person is present on the job site;

5) Requirements for pre-task Activity Hazard Analysis (AHAs);

6) Lines of authority;

7) Policies and procedures regarding noncompliance with safety requirements (to include disciplinary actions for violation of safety requirements) should be identified;

e. SUBCONTRACTORS AND SUPPLIERS. If applicable, provide procedures for coordinating SOH activities with other employers on the job site:

1) Identification of subcontractors and suppliers (if known);

2) Safety responsibilities of subcontractors and suppliers.

f. TRAINING.

1) Site-specific SOH orientation training at the time of initial hire or assignment to the project for every employee before working on the project site is required.

2) Mandatory training and certifications that are applicable to this project (e.g., explosive actuated tools, crane operator, rigger, crane signal person, fall protection, electrical lockout/NFPA 70E, machine/equipment lockout, confined space, etc…) and any requirements for periodic retraining/recertification are required.

3) Procedures for ongoing safety and health training for supervisors and employees shall be established to address changes in site hazards/conditions.

SAFETY REQUIREMENTS 013526 -7

4) OSHA 10-hour training is required for all workers on site and the OSHA 30-hour training is required for Trade Competent Persons (CPs)

g. SAFETY AND HEALTH INSPECTIONS.

1) Specific assignment of responsibilities for a minimum daily job site safety and health inspection during periods of work activity: Who will conduct (e.g., “Site Safety and

Health CP”), proof of inspector’s training/qualifications, when inspections will be conducted, procedures for documentation, deficiency tracking system, and follow-up procedures.

2) Any external inspections/certifications that may be required (e.g., contracted CSP or

CSHT)

h. ACCIDENT/INCIDENT INVESTIGATION & REPORTING. The Contractor shall conduct mishap investigations of all Moderate and Major as well as all High Visibility Incidents.

The APP shall include accident/incident investigation procedure and identify person(s) responsible to provide the following to the Contracting Officer Representative:

1) Exposure data (man-hours worked);

2) Accident investigation reports;

3) Project site injury and illness logs.

i. PLANS (PROGRAMS, PROCEDURES) REQUIRED. Based on a risk assessment of contracted activities and on mandatory OSHA compliance programs, the Contractor shall address all applicable occupational, patient, and public safety risks in site-specific compliance and accident prevention plans. These Plans shall include but are not be limited to procedures for addressing the risks associates with the following:

1) Emergency response;

2) Contingency for severe weather;

3) Fire Prevention;

4) Medical Support;

5) Posting of emergency telephone numbers;

6) Prevention of alcohol and drug abuse;

7) Site sanitation (housekeeping, drinking water, toilets);

8) Night operations and lighting;

SAFETY REQUIREMENTS 013526 -8

9) Hazard communication program;

10) Welding/Cutting “Hot” work;

11) Electrical Safe Work Practices (Electrical LOTO/NFPA 70E);

12) General Electrical Safety;

13) Hazardous energy control (Machine LOTO);

14) Site-Specific Fall Protection & Prevention;

15) Excavation/trenching;

16) Asbestos abatement;

17) Lead abatement;

19) Respiratory protection;

20) Health hazard control program;

21) Heat/Cold Stress Monitoring;

22) Crystalline Silica Monitoring (Assessment);

23) Demolition plan (to include engineering survey);

24) Formwork and shoring erection and removal;

25) PreCast Concrete;

26) Public (Mandatory compliance with ANSI/ASSE A10.34-2012).

C. Submit the APP to the Contracting Officer Representative for review for compliance with contract requirements in accordance with Section 013300 SUBMITTALS 15 calendar days prior to commencement of on-site work. Work cannot proceed without an accepted APP.

D. Once accepted by the Contracting Officer Representative, the APP and attachments will be enforced as part of the contract. Disregarding the provisions of this contract or the accepted APP will be cause for stopping of work, at the discretion of the Contracting Officer in accordance with

FAR Clause 52.236-13, Accident Prevention, until the matter has been rectified.

E. Once work begins, changes to the accepted APP shall be made with the knowledge and concurrence of the Contracting Officer Representative Should any severe hazard exposure, i.e.

imminent danger, become evident, stop work in the area, secure the area, and develop a plan to remove the exposure and control the hazard. Notify the Contracting Officer within 24 hours of discovery. Eliminate/remove the hazard. In the interim, take all necessary action to restore and

SAFETY REQUIREMENTS 013526 -9

maintain safe working conditions in order to safeguard onsite personnel, visitors, the public and the environment.

1.5 ACTIVITY HAZARD ANALYSES (AHAs):

A. AHAs are also known as Job Hazard Analyses, Job Safety Analyses, and Activity Safety

Analyses. Before beginning each work activity involving a type of work presenting hazards not experienced in previous project operations or where a new work crew or sub-contractor is to perform the work, the Contractor(s) performing that work activity shall prepare an AHA.

B. AHAs shall define the activities being performed and identify the work sequences, the specific anticipated hazards, site conditions, equipment, materials, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level of risk.

C. Work shall not begin until the AHA for the work activity has been accepted by the Contracting

Officer Representative and discussed with all engaged in the activity, including the Contractor, subcontractor(s), and Government on-site representatives at preparatory and initial control phase meetings.

1. The names of the Competent/Qualified Person(s) required for a particular activity (for example, excavations, scaffolding, fall protection, other activities as specified by OSHA and/or other State and Local agencies) shall be identified and included in the AHA.

Certification of their competency/qualification shall be submitted to the Contracting Officer

Representative for acceptance prior to the start of that work activity.

2. The AHA shall be reviewed and modified as necessary to address changing site conditions, operations, or change of competent/qualified person(s).

a. If more than one Competent/Qualified Person is used on the AHA activity, a list of names shall be submitted as an attachment to the AHA. Those listed must be

Competent/Qualified for the type of work involved in the AHA and familiar with current site safety issues.

b. If a new Competent/Qualified Person (not on the original list) is added, the list shall be updated (an administrative action not requiring an updated AHA). The new person shall acknowledge in writing that he or she has reviewed the AHA and is familiar with current site safety issues.

3. The AHA list will be reviewed periodically (at least monthly) at the Contractor supervisory safety meeting and updated as necessary when procedures, scheduling, or hazards change.

5. Develop the activity hazard analyses using the project schedule as the basis for the activities performed. All activities listed on the project schedule will require an AHA. The AHAs will be

SAFETY REQUIREMENTS 013526 -10

developed by the contractor, supplier, or subcontractor and provided to the prime contractor for review and approval and maintained onsite for review by Contracting Officer

Representative.

1.6 PRECONSTRUCTION CONFERENCE:

A. Contractor representatives who have a responsibility or significant role in implementation of the accident prevention program, as required by 29 CFR 1926.20(b)(1), on the project shall attend the preconstruction conference to gain a mutual understanding of its implementation. This includes the project superintendent, subcontractor superintendents, and any other assigned safety and health professionals.

B. Deficiencies in the submitted APP will be brought to the attention of the Contractor within 14 days of submittal, and the Contractor shall revise the plan to correct deficiencies and re-submit it for acceptance. Do not begin work until there is an accepted APP.

1.7 “SITE SAFETY AND HEALTH OFFICER” (SSHO) and “COMPETENT PERSON” (CP):

A. The Prime Contractor shall designate a minimum of one SSHO at each project site that will be identified as the SSHO to administer the Contractor's safety program and government-accepted

Accident Prevention Plan. Each subcontractor shall designate a minimum of one CP in compliance with 29 CFR 1926.20 (b)(2) that will be identified as a CP to administer their individual safety programs.

B. Further, all specialized Competent Persons for the work crews will be supplied by the respective contractor as required by 29 CFR 1926 (i.e. Asbestos, Electrical, Cranes, & Derricks, Demolition, Fall Protection, Fire Safety/Life Safety, Ladder, Rigging, Scaffolds, and Trenches/Excavations).

C. These Competent Persons can have collateral duties as the subcontractor’s superintendent and/or work crew lead persons as well as fill more than one specialized CP role (i.e. Asbestos, Electrical, Cranes, & Derricks, Demolition, Fall Protection, Fire Safety/Life Safety, Ladder, Rigging, Scaffolds, and Trenches/Excavations).

D. The SSHO or an equally-qualified Designated Representative/alternate will maintain a presence on the site during construction operations in accordance with FAR Clause 52.236-6:

Superintendence by the Contractor. CPs will maintain presence during their construction activities in accordance with above mentioned clause. A listing of the designated SSHO and all known CPs shall be submitted prior to the start of work as part of the APP with the training documentation and/or AHA as listed in Section 1.8 below.

E. The repeated presence of uncontrolled hazards during a contractor’s work operations will result in the designated CP as being deemed incompetent and result in the required removal of the employee in accordance with FAR Clause 52.236-5: Material and Workmanship, Paragraph (c).

SAFETY REQUIREMENTS 013526 -11

1.8 TRAINING:

A. The designated Prime Contractor SSHO must meet the requirements of all applicable OSHA standards and be capable (through training, experience, and qualifications) of ensuring that the requirements of 29 CFR 1926.16 and other appropriate Federal, State, Tribal, and local requirements are met for the project. As a minimum the SSHO must have completed the OSHA

30-hour Construction Safety class and have five (5) years of construction industry safety experience or three (3) years if he/she possesses a Certified Safety Professional (CSP) or certified Construction Safety and Health Technician (CSHT) certification or have a safety and health degree from an accredited university or college.

B. All designated CPs shall have completed the OSHA 30-hour Construction Safety course within the past 5 years.

C. In addition to the OSHA 30 Hour Construction Safety Course, all CPs with high hazard work operations such as operations involving asbestos, electrical, cranes, demolition, work at heights/fall protection, fire safety/life safety, ladder, rigging, scaffolds, and trenches/excavations shall have a specialized formal course in the hazard recognition & control associated with those high hazard work operations. Documented “repeat” deficiencies in the execution of safety requirements will require retaking the requisite formal course.

D. All other construction workers shall have the OSHA 10-hour Construction Safety Outreach course and any necessary safety training to be able to identify hazards within their work environment.

E. Prior to any worker for the contractor or subcontractors beginning work, they shall undergo a safety briefing provided by the SSHO or his/her designated representative. As a minimum, this briefing shall include information on the site-specific hazards, construction limits, Service Unit safety guidelines, means of egress, break areas, work hours, locations of restrooms, use of

Government furnished equipment, emergency procedures, accident reporting etc...

Documentation shall be provided to the Contracting Officer Representative that individuals have undergone contractor’s safety briefing.

G. Ongoing safety training will be accomplished in the form of weekly documented safety meeting.

1.9 INSPECTIONS:

A. The SSHO shall conduct frequent and regular safety inspections (daily) of the site and each of the subcontractors CPs shall conduct frequent and regular safety inspections (daily) of the their work operations as required by 29 CFR 1926.20(b)(2). Each week, the SSHO shall conduct a formal documented inspection of the entire construction areas with the subcontractors’ “Trade

Safety and Health CPs” present in their work areas. Coordinate with, and report findings and corrective actions weekly to Contracting Officer Representative.

SAFETY REQUIREMENTS 013526 -12

B. A Certified Safety Professional (CSP) with specialized knowledge in construction safety or a certified Construction Safety…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .