About this file
This document is an Architect-Engineering (A-E) Fee Proposal Worksheet that provides instructions and a template for submitting pricing proposals for A-E services. It includes worksheets for the prime contractor and subcontractors, with sections for entering hours, labor rates, overhead, profit, and other direct costs for three types of services: Concept (Type A), Design (Type B), and Construction Support (Type C). The worksheet also includes a Cover Sheet that summarizes the total proposed pricing. The template is designed to be used for a federal contract opportunity related to providing A-E design services on an as-needed basis under a Multiple Award Indefinite Delivery Indefinite Quantity (IDIQ) contract for the Department of Veterans Affairs Veterans Integrated Service Network 22 (VISN 22). The contract will have a base period and four option periods, with a total anticipated value not to exceed $45 million. The North American Industry Classification System (NAICS) codes for this opportunity are 541310 Architectural Services, 541320 Landscape Architectural Services, and 541330 Engineering Services.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C26224R0013_1 AMENDMENT 0005 AE MATOC IDIQ FY25 FINAL.pdf | ||
| 36C26224R0013_1 AMENDMENT 0004 AE MATOC IDIQ FY25 FINAL.docx | DOCX document | |
| 36C26224R0013_1 AMENDMENT 0003 AE MATOC IDIQ FY25 FINAL.pdf | ||
| 36C26224R0013_1 AMENDMENT 0002 AE MATOC IDIQ FY25 FINAL.pdf | ||
| S06 36C26224R0013_1 AMENDMENT 0001 AE MATOC IDIQ FY25 FINAL.pdf | ||
| ATTACHMENT I - Directives_Manuals_Guides.pdf | ||
| ATTACHMENT III - Past Performance Questionnaire.pdf | ||
| S02 36C26224R0013_1 AE MATOC IDIQ FY25 FINAL.pdf | ||
| ATTACHMENT II - Forms.pdf | ||
| ATTACHMENT V VA Form 6298 Oct 2021 PDF.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
1. This is an automated version of a "Boiler Plate" Worksheet and Cover Page for Architect-Engineer Proposals and Independent Government Estimates (IGE).
2. The "Prime A-E Worksheet" rolls up data from each subconsultant worksheet.
3. The "Cover Sheet" rolls up most of the data from the Prime A-E Worksheet.
4. The "Detail" Tab is used for populating the hours proposed by each discipline (Prime in-house only) for Investigative (Type A), Design (Type B) and Construction Support (Type C) services. Those hours will be reflected in the "Prime" worksheet.
5. All editable areas of this workbook should be highlighted in Yellow. All other areas are locked to prevent accidental erasure of formulas. There are also some individual Comments attached to some of the blocks giving more detailed instructions. Please take the time to read these comments before entering any data, as they may affect related areas in the workbook.
6. Each Contractor Proposal or IGE will include the Cover Sheet, the Prime A-E Worksheet and any subcontractor sheets as appropriate.
7. Should something not work properly, please notify the Contracting Officer so he/she can try to correct it.
(Spreadsheet Formulas Updated as of: 10 May 2008) (Coversheet Updated as of: 10 May 2008) (Updated/Corrected MCC 6% formula on 18 March 2003)
Prime
| Architect-Engineer Worksheet | ||||||||||
| RFP/Project Number: | Contract No: | |||||||||
| Title: | DO/TO No: | |||||||||
| Contractor: | Date: | |||||||||
| Concept A Services | Design B Services | Construction C Services | ||||||||
| Services (In House) | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total | |
| Project Manager | 0 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Sr. Architect | 0 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Civil Engr | 0 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Struct. Engr | 0 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Mech. Engr | 0 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Electrical Engr | 0 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| CADD | 0 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Arch Drafter | 0 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Elect Drafter | 0 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Mech Drafter | 0 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Spec Writer | 0 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Estimator (see sub1) | 0 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Typist | 0 | $0.00 | 0 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| Subtotal | $0.00 | Subtotal | $0.00 | $0.00 | ||||||
| On-site Inspection | Hours per day | $ x | Days = | |||||||
| Cost: | 0 | 0 | $0.00 | |||||||
| Subtotal | $0.00 | |||||||||
| Direct Labor Overhead (%) | 150.00% | $0.00 | $0.00 | $0.00 | ||||||
| Gen & Admin. Overhead (%) | 0.00% | $0.00 | $0.00 | $0.00 | ||||||
| Materials & Supplies | ||||||||||
| Subtotal: | $0.00 | Subtotal: | $0.00 | Subtotal: | $0.00 | |||||
| Other - Subcontractor / Consultants | ||||||||||
| 0 | $0.00 | $0.00 | $0.00 | |||||||
| SUB 2 | $0.00 | $0.00 | $0.00 | |||||||
| SUB 3 | $0.00 | $0.00 | $0.00 | |||||||
| 0 | $0.00 | $0.00 | $0.00 | |||||||
| SUB 1 | $0.00 | $0.00 | $0.00 | |||||||
| Subtotal | $0.00 | Subtotal | $0.00 | Subtotal | $0.00 | |||||
| Profit or Fee (%) | 10.00% | $0.00 | $0.00 | $0.00 | ||||||
| Travel Cost (per JTR) | $0.00 | $0.00 | $0.00 | |||||||
| Subtotal | $0.00 | Subtotal | $0.00 | Subtotal | $0.00 | |||||
| Sumbmittal Reproduction Cost (Show here if not part of G&A Overhead) | As-Built Drawings | |||||||||
| Cost x | Sets | |||||||||
| 35% | $20.00 | $0.00 | ||||||||
| 65% | $20.00 | $0.00 | ||||||||
| 100% | $20.00 | $0.00 | ||||||||
| Final | $40.00 | $0.00 | ||||||||
| Totals (Each Service) | Total A | $0.00 | Total B | $0.00 | Total C | $0.00 | ||||
| Subtotal for A, B & C | $0.00 | |||||||||
| Cost | Sets | |||||||||
| Bid Reproduction Documents: | $0.00 | |||||||||
| Code and Criteria Review: | $0.00 | |||||||||
| (Sample comments: Lump sum price for each written report. No revision to drawings or specs. Performed at 6 month intervals.) | ||||||||||
| Grand Total | $0.00 | |||||||||
| Estimated Number of Drawings: Site _ Civil _ Arch __ Mech _ Elect __ Other ___l . | ||||||||||
| Maximum Cost of Const: | ||||||||||
| Type A % of MCC: | 0.00% | Type B % of MCC: | 0.00% | Type C % of MCC: | 0.00% | |||||
| (Statutory Max of 6% for Type B) |
Change and add disciplines as necessary. This will populate the column header in "Detail" tab Enter the Rates in the Type A Services Culumn Only. They will carry Thru to This Column.
Enter the Rates in the Type A Services Culumn Only. They will carry Thru to This Column.
Include Itemized Breakdown for any Travel Costs not incluced in Overhead.
Include Itemized Breakdown for any Travel Costs not incluced in Overhead.
Include Itemized Breakdown for any Travel Costs not incluced in Overhead.
Include Itemized Breakdown for any Travel Costs not incluced in Overhead.
Include Itemized Breakdown for any Costs not incluced in Overhead.
Include Itemized Breakdown for any Costs not incluced in Overhead.
Include Itemized Breakdown for any Costs not incluced in Overhead.
Include Itemized Breakdown for any Costs not incluced in Overhead.
The MCC block must be completed as well as at least some of the data in the top portion for any of the percentages on this line to work.
Add the rates in this column only - even if not using the discipline for Type A Services. The rate will carry through to the Type B and C columns.
Check the appropriate block indicating whether this is the Proposal or the IGE Check the appropriate block indicating whether this is the Initial or Revised Proposal/IGE.
Note: The hours for this column are entered in the "Detail" tab for each discipline. Do not enter here.
PHOENIX:
The hours for this column are entered in the "Detail" tab for each discipline
PHOENIX:
The hours for this column are entered in the "Detail" tab for each discipline
PHOENIX:
Note: Disciplines entered in this column will reflect on the "Detail" tab as headers for hourly rates.
Government Estimate Fee Proposal Initial Revised
Sub1
| Architect-Engineer Worksheet | |||||||||
| RFP/Project Number: | Contract No: | ||||||||
| Title: | DO No: | ||||||||
| Contractor: | SUB 1 | Date: | |||||||
| Concept A Services | Design B Services | Inspection C Services | |||||||
| Services (In House) | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total |
| $0.00 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Add individual desciplines | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| as they apply to each | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| project. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Insure the rates are | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| correct for the option | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| period you are in | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Subtotal | $0.00 | Subtotal | $0.00 | $0.00 | |||||
| Inspection Cost: | Hours per day | $ x | Days = | ||||||
| $0.00 | |||||||||
| Subtotal | $0.00 | ||||||||
| Direct Labor Overhead (%) | 130.00% | $0.00 | $0.00 | $0.00 | |||||
| Gen & Admin. Overhead (%) | 0.00% | $0.00 | $0.00 | $0.00 | |||||
| Materials & Supplies | $0.00 | $0.00 | |||||||
| Subtotal: | $0.00 | Subtotal: | $0.00 | Subtotal: | $0.00 | ||||
| Other - Subcontractor / Consultants | |||||||||
| Subtotal | $0.00 | Subtotal | $0.00 | Subtotal | $0.00 | ||||
| Profit or Fee (%) | 10.00% | $0.00 | $0.00 | $0.00 | |||||
| Travel Cost (per JTR) | |||||||||
| Subtotal | $0.00 | Subtotal | $0.00 | Subtotal | $0.00 | ||||
| Total for A, B & C | $0.00 |
Check the appropriate block indicating whether this is the Proposal or the IGE Check the appropriate block indicating whether this is the Initial or Revised Proposal/IGE.
Change and add disciplines as necessary Enter the Rates in the Type A Services Culumn Only. They will carry Thru to This Column.
Enter the Rates in the Type A Services Culumn Only. They will carry Thru to This Column.
Include Itemized Breakdown for any Costs not incluced in Overhead.
Include Itemized Breakdown for any Costs not incluced in Overhead.
Include Itemized Breakdown for any Costs not incluced in Overhead.
Include Itemized Breakdown for any Costs not incluced in Overhead.
Include Itemized Breakdown for any Travel Costs not incluced in Overhead.
Include Itemized Breakdown for any Travel Costs not incluced in Overhead.
Include Itemized Breakdown for any Travel Costs not incluced in Overhead.
Include Itemized Breakdown for any Travel Costs not incluced in Overhead.
Government Estimate Fee Proposal Initial Revised
Sub2
| Architect-Engineer Worksheet | |||||||||
| RFP/Project Number: | Contract No: | ||||||||
| Title: | DO No: | ||||||||
| Contractor: | SUB 2 | Date: | |||||||
| Concept A Services | Design B Services | Inspection C Services | |||||||
| Services (In House) | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total |
| Add individual desciplines | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| as they apply to each | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| project. | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Insure the rates are | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| correct for the option | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| period you are in | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Subtotal | $0.00 | Subtotal | $0.00 | $0.00 | |||||
| Inspection Cost: | Hours per day | $ x | Days = | ||||||
| $0.00 | |||||||||
| Subtotal | $0.00 | ||||||||
| Direct Labor Overhead (%) | $0.00 | $0.00 | $0.00 | ||||||
| Gen & Admin. Overhead (%) | 0.00% | $0.00 | $0.00 | $0.00 | |||||
| Materials & Supplies | $0.00 | $0.00 | $0.00 | ||||||
| Subtotal: | $0.00 | Subtotal: | $0.00 | Subtotal: | $0.00 | ||||
| Other - Subcontractor / Consultants | |||||||||
| Subtotal | $0.00 | Subtotal | $0.00 | Subtotal | $0.00 | ||||
| Profit or Fee (%) | 10.00% | $0.00 | $0.00 | $0.00 | |||||
| Travel Cost (per JTR) | |||||||||
| Subtotal | $0.00 | Subtotal | $0.00 | Subtotal | $0.00 | ||||
| Total for A, B & C | $0.00 |
Check the appropriate block indicating whether this is the Proposal or the IGE Check the appropriate block indicating whether this is the Initial or Revised Proposal/IGE.
Change and add disciplines as necessary Add the rates in this column only - even if not using the discipline for Type A Services. The rate will carry through to the Type B and C columns.
Enter the Rates in the Type A Services Culumn Only. They will carry Thru to This Column.
Enter the Rates in the Type A Services Culumn Only. They will carry Thru to This Column.
Include Itemized Breakdown for any Costs not incluced in Overhead.
Include Itemized Breakdown for any Costs not incluced in Overhead.
Include Itemized Breakdown for any Costs not incluced in Overhead.
Include Itemized Breakdown for any Costs not incluced in Overhead.
Include Itemized Breakdown for any Travel Costs not incluced in Overhead.
Include Itemized Breakdown for any Travel Costs not incluced in Overhead.
Include Itemized Breakdown for any Travel Costs not incluced in Overhead.
Include Itemized Breakdown for any Travel Costs not incluced in Overhead.
Government Estimate Fee Proposal Initial Revised
Sub3
| Architect-Engineer Worksheet | |||||||||
| RFP/Project Number: | Contract No: | ||||||||
| Title: | DO No: | ||||||||
| Contractor: | SUB 3 | Date: | |||||||
| Concept A Services | Design B Services | Inspection C Services | |||||||
| Services (In House) | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total |
| Geologist | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| HAZMAT Inspector/Eng | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| Technician/HAZMAT | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Subtotal | $0.00 | Subtotal | $0.00 | $0.00 | |||||
| Inspection Cost: | Hours per day | $ x | Days = | ||||||
| $0.00 | |||||||||
| Subtotal | $0.00 | ||||||||
| Direct Labor Overhead (%) | $0.00 | $0.00 | $0.00 | ||||||
| Gen & Admin. Overhead (%) | 0.00% | $0.00 | $0.00 | $0.00 | |||||
| Materials & Supplies | $0.00 | $0.00 | |||||||
| Subtotal: | $0.00 | Subtotal: | $0.00 | Subtotal: | $0.00 | ||||
| Other - Subcontractor / Consultants | |||||||||
| Subtotal | $0.00 | Subtotal | $0.00 | Subtotal | $0.00 | ||||
| Profit or Fee (%) | 10.00% | $0.00 | $0.00 | $0.00 | |||||
| Travel Cost (per JTR) | |||||||||
| Subtotal | $0.00 | Subtotal | $0.00 | Subtotal | $0.00 | ||||
| Total for A, B & C | $0.00 |
Check the appropriate block indicating whether this is the Proposal or the IGE Check the appropriate block indicating whether this is the Initial or Revised Proposal/IGE.
Change and add disciplines as necessary Add the rates in this column only - even if not using the discipline for Type A Services. The rate will carry through to the Type B and C columns.
Enter the Rates in the Type A Services Culumn Only. They will carry Thru to This Column.
Enter the Rates in the Type A Services Culumn Only. They will carry Thru to This Column.
Include Itemized Breakdown for any Costs not incluced in Overhead.
Include Itemized Breakdown for any Costs not incluced in Overhead.
Include Itemized Breakdown for any Costs not incluced in Overhead.
Include Itemized Breakdown for any Costs not incluced in Overhead.
Include Itemized Breakdown for any Travel Costs not incluced in Overhead.
Include Itemized Breakdown for any Travel Costs not incluced in Overhead.
Include Itemized Breakdown for any Travel Costs not incluced in Overhead.
Include Itemized Breakdown for any Travel Costs not incluced in Overhead.
Government Estimate Fee Proposal Initial Revised
Sub4
| Architect-Engineer Worksheet | |||||||||
| RFP/Project Number: | Contract No: | ||||||||
| Title: | DO No: | ||||||||
| Contractor: | Date: | ||||||||
| Concept A Services | Design B Services | Inspection C Services | |||||||
| Services (In House) | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Subtotal | $0.00 | Subtotal | $0.00 | $0.00 | |||||
| Inspection Cost: | Hours per day | $ x | Days = | ||||||
| $0.00 | |||||||||
| Subtotal | $0.00 | ||||||||
| Direct Labor Overhead (%) | $0.00 | $0.00 | $0.00 | ||||||
| Gen & Admin. Overhead (%) | 0.00% | $0.00 | $0.00 | $0.00 | |||||
| Materials & Supplies | $0.00 | $0.00 | $0.00 | ||||||
| Subtotal: | $0.00 | Subtotal: | $0.00 | Subtotal: | $0.00 | ||||
| Other - Subcontractor / Consultants | |||||||||
| Subtotal | $0.00 | Subtotal | $0.00 | Subtotal | $0.00 | ||||
| Profit or Fee (%) | 10.00% | $0.00 | $0.00 | $0.00 | |||||
| Travel Cost (per JTR) | |||||||||
| Subtotal | $0.00 | Subtotal | $0.00 | Subtotal | $0.00 | ||||
| Total for A, B & C | $0.00 |
Check the appropriate block indicating whether this is the Proposal or the IGE Check the appropriate block indicating whether this is the Initial or Revised Proposal/IGE.
Change and add disciplines as necessary Add the rates in this column only - even if not using the discipline for Type A Services. The rate will carry through to the Type B and C columns.
Enter the Rates in the Type A Services Culumn Only. They will carry Thru to This Column.
Enter the Rates in the Type A Services Culumn Only. They will carry Thru to This Column.
Include Itemized Breakdown for any Costs not incluced in Overhead.
Include Itemized Breakdown for any Costs not incluced in Overhead.
Include Itemized Breakdown for any Costs not incluced in Overhead.
Include Itemized Breakdown for any Costs not incluced in Overhead.
Include Itemized Breakdown for any Travel Costs not incluced in Overhead.
Include Itemized Breakdown for any Travel Costs not incluced in Overhead.
Include Itemized Breakdown for any Travel Costs not incluced in Overhead.
Include Itemized Breakdown for any Travel Costs not incluced in Overhead.
Government Estimate Fee Proposal Initial Revised
Sub5
| Architect-Engineer Worksheet | |||||||||
| RFP/Project Number: | Contract No: | ||||||||
| Title: | DO No: | ||||||||
| Contractor: | Date: | ||||||||
| Concept A Services | Design B Services | Inspection C Services | |||||||
| Services (In House) | Hours | Rate | Total | Hours | Rate | Total | Hours | Rate | Total |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||
| Subtotal | $0.00 | Subtotal | $0.00 | $0.00 | |||||
| Inspection Cost: | Hours per day | $ x | Days = | ||||||
| $0.00 | |||||||||
| Subtotal | $0.00 | ||||||||
| Direct Labor Overhead (%) | $0.00 | $0.00 | $0.00 | ||||||
| Gen & Admin. Overhead (%) | 0.00% | $0.00 | $0.00 | $0.00 | |||||
| Materials & Supplies | $0.00 | $0.00 | $0.00 | ||||||
| Subtotal: | $0.00 | Subtotal: | $0.00 | Subtotal: | $0.00 | ||||
| Other - Subcontractor / Consultants | |||||||||
| Subtotal | $0.00 | Subtotal | $0.00 | Subtotal | $0.00 | ||||
| Profit or Fee (%) | 10.00% | $0.00 | $0.00 | $0.00 | |||||
| Travel Cost (per JTR) | |||||||||
| Subtotal | $0.00 | Subtotal | $0.00 | Subtotal | $0.00 | ||||
| Total for A, B & C | $0.00 |
Check the appropriate block indicating whether this is the Proposal or the IGE Check the appropriate block indicating whether this is the Initial or Revised Proposal/IGE.
Change and add disciplines as necessary Add the rates in this column only - even if not using the discipline for Type A Services. The rate will carry through to the Type B and C columns.
Enter the Rates in the Type A Services Culumn Only. They will carry Thru to This Column.
Enter the Rates in the Type A Services Culumn Only. They will carry Thru to This Column.
Include Itemized Breakdown for any Costs not incluced in Overhead.
Include Itemized Breakdown for any Costs not incluced in Overhead.
Include Itemized Breakdown for any Costs not incluced in Overhead.
Include Itemized Breakdown for any Costs not incluced in Overhead.
Include Itemized Breakdown for any Travel Costs not incluced in Overhead.
Include Itemized Breakdown for any Travel Costs not incluced in Overhead.
Include Itemized Breakdown for any Travel Costs not incluced in Overhead.
Include Itemized Breakdown for any Travel Costs not incluced in Overhead.
Government Estimate Fee Proposal Initial Revised
Cover Sheet
| Section B | |||||
| Supplies or Services and Prices | Contract No: | 0 | |||
| DO/TO No: | 0 | ||||
| Title: | 0 | Date: | 31-Dec-99 | ||
| ITEM | Description | QTY | UNIT | AMOUNT | TOTAL |
| 0001 | Concept (Type A / 35%) | 1 | SV | $0.00 | $0.00 |
| 0002 | Design Services (Type B) | ||||
| 0002AA | Pre-Final (65%) | 1 | SV | $0.00 | |
| 0002AB | Final (incl. 100%) | 1 | SV | $0.00 | |
| Subtotal: | $0.00 | ||||
| Sub-Total "A" and "B" Services | $0.00 | ||||
| 0003 | Code and Criteria Review (Estimate that reviews will be conducted at 6-8 months intervals.) | SV | $0.00 | $0.00 | |
| 0004 | Bid Reproduction | 1 | SV | $0.00 | $0.00 |
| 0005 | Inspection Services (Type C) | ||||
| 0005AA | Professional Services | 1 | SV | $0.00 | |
| 0005AB | On-Site Inspection Services | 1 | NTE SVC | $0.00 | |
| (Per__ Hr Day = $.00 X __ Days = SV) | |||||
| Sub-Total "C" Services | $0.00 | ||||
| TOTAL TYPE "A" THRU "C" | $0.00 | ||||
| Name and Title | Name of Firm or Government Agency | ||||
| Signature | Date of Submission |
Detail
| Services | Project Manager | Sr. Architect | Civil Engr | Struct. Engr | Mech. Engr | Electrical Engr | CADD | Arch Drafter | Elect Drafter | Mech Drafter | Spec Writer | Estimator (see sub1) | Typist |
| Concept (Type A svcs) | |||||||||||||
| Site Investigation | |||||||||||||
| As-built drawings | |||||||||||||
| 35% Drawings | |||||||||||||
| Specfications | |||||||||||||
| 35% Cost Estimate | |||||||||||||
| Review Meeting | |||||||||||||
| Subtotal | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Design (Type B svcs) | |||||||||||||
| 65% Submittal drawings | |||||||||||||
| 100% Submittal drawings | |||||||||||||
| Backcheck Submittal | |||||||||||||
| 65% spec's | |||||||||||||
| 100% spec's | |||||||||||||
| Backcheck spec's | |||||||||||||
| 65% Cost Estimate | |||||||||||||
| 100% Cost Estimate | |||||||||||||
| 65% review meeting | |||||||||||||
| 100% review meeting | |||||||||||||
| Subtotal | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
| Construction (Type C svcs) | |||||||||||||
| Shop drawing review | |||||||||||||
| RFI / Change order review | |||||||||||||
| As-built drawings | |||||||||||||
| Subtotal | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 |
PHOENIX:
Total Project Mgr hours for C svcs included in Prime sheet
PHOENIX:
Total Project Mgr hours for B svcs included in Prime sheet
PHOENIX:
Total Project Mgr hours for A svcs included in Prime sheet