Attachment_D-Cost_Proposal_OIAA_Ontario_Airport_Fire_Alarm_v3.xlsx
XLSX spreadsheet 176 KB Posted
- Solicitation number
- 2026-IFB-086
- Issued by
- San Bernardino County, California
About this file
Summary of Cost Proposal for Campus-Wide Fire Alarm System Replacement
This is a cost proposal template document prepared by the Ontario International Airport Authority (OIAA) for the design, construction, permitting, installation, and retrofit of fire alarm systems across the airport's campus. The project encompasses 29 buildings totaling approximately 907,425 square feet, including terminals, fire stations, hangars, administrative buildings, and support facilities. The proposal template provides line-item cost breakdowns organized by building and categorized by work scope, including electronic safety and security systems (fire alarm panels, detectors, strobes, pull stations, conduit, cabling, terminations, monitoring setup, and testing) and communications infrastructure (IT/data conduit, cabling, devices, and software). The document is structured with unit types, labor rates, material costs, equipment and subcontractor costs, and total pricing columns for each scope item. A completed example for the Fire Station building (#24) totaling $118,456.25 is provided to demonstrate how bidders should populate the template. The project requires coordination with other trades, supervision, staff training, and design submittals and as-built documentation. Response and bid due dates are specified in the related solicitation as October 26, 2026 at 2:00 p.m., with a non-mandatory pre-bid meeting and job walk scheduled for October 1, 2026.
The cost proposal template indicates that bidders must provide detailed pricing for labor, materials, equipment, and subcontractor services across all 29 buildings and associated line items. The document contains error indicators showing that pricing cells require completion by bidders. Additional costs to be included in the final proposal are General Conditions, bonds and insurance, permits, design contingency, escalation, and professional fees. The template indicates that power is assumed to be available at the site. Bidders must also submit optional pricing for two years of preventative maintenance and five years of service support and repairs, as referenced in the related solicitation. The project includes a contractual requirement for a two-year warranty and five years of UL-listed 24-hour monitoring services. The proposal structure demonstrates the OIAA's expectation for comprehensive cost transparency across labor, materials, and equipment categories to facilitate evaluation of bid submissions.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OIAA (3)
| ERROR:#VALUE! | Fill in cells of this color |
| OIAA Ontario CA. Airport | |
| Campus Wide Fire Alarm System Replacement |
UNIT UT UPL LABOR UPM MATL UPS/Eq SUBCTR TOTAL
| Fire Alarm - Fire Station - Map Building #24 | 14,425 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Panel - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - Not Necessary for this building | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Alarm - Terminal 1 - Map Building #1 | 140,000 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Annuciator Panel FAAP - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm NAC Panel - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - When necessary (840 hr Allowance) | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Alarm - Terminal 2 - Voice Evac - Map Building #2 | 150,000 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Annuciator Panel FAAP - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm NAC Panel - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Voice Evacuation System Devices, Speakers, Strobes, Amplifiers Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - When necessary (840 hr Allowance) | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Alarm - Terminal 4 - Voice Evac - Map Building #3 | 150,000 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 8 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Annuciator Panel FAAP - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm NAC Panel - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Voice Evacuation System Devices, Speakers, Strobes, Amplifiers Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - When necessary (840 hr Allowance) | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Alarm - Ground Transportation Center - Voice Evac - Map Building #4 | 13,000 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Panel - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Voice Evacuation System Devices, Speakers, Strobes, Amplifiers Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - Not Necessary for this building | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Alarm - Federal Inspection Services - Voice Evac - Map Building #5 | 40,000 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Voice Evacuation System Devices, Speakers, Strobes, Amplifiers Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - When necessary (840 hr Allowance) | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Alarm - Police Services Modular Building - Map Building #6 | 3,900 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 1 location) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Panel - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - Not Necessary for this building | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Alarm- PCI Offices - Map Building #7 | 5,100 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Panel - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - Not Necessary for this building | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Station - North Airfield Vault - Map Building #8 | 2,500 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Panel - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - Not Necessary for this building | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Station - Building 18 - Map Building #9 | 10,400 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Panel - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - Not Necessary for this building | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Alarm - USPS Building - Map Building #10 | 29,000 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - When necessary (840 hr Allowance) | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Alarm - Legacy Hangar 540 - Map Building #11 | 59,200 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 1 location) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - When necessary (840 hr Allowance) | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Alarm - Legacy Hangar 550 - Map Building #12 | 72,600 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - When necessary | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Alarm - Wells(Menzies) Hangar 1 - Map Building #13 | 15,000 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Panel - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - Not Necessary for this building | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Alarm - Wells(Menzies) Hangar 2 - Map Building #14 | 10,500 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Panel - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - Not Necessary for this building | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Alarm - AES Hangar 3 - Map Building #15 | 10,500 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Panel - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - Not Necessary for this building | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Alarm - Old FedEx Building - Map Building #16 | 33,500 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - When necessary | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Alarm - Building 5 - Map Building #17 | 22,500 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - When necessary | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Alarm - Hangar 35 - Map Building #18 | 67,500 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - When necessary | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Alarm - Hangar 34 - Map Building #19 | 23,000 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - When necessary | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Alarm - Building 27 - Map Building #20 | 22,500 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - When necessary | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Alarm - Building 11 - Map Building #21 | 25,000 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - When necessary | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Alarm - Admin East #2 - Map Building #22 | 32,000 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - When necessary | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Alarm - Admin East #1 - Map Building #23 | 22,000 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - When necessary | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Station - South Airfield Vault - Map Building #25 | N/A | SF | ERROR:#VALUE! | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Panel - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - Not Necessary for this building | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Alarm - Hangar 4 - Map Building #29 | 74,200 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - When necessary | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Station - Lift Station - Map Building #26 | N/A | SF | ERROR:#VALUE! | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Panel - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - Not Necessary for this building | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Alarm - Backup Airport Control Center (Emergency Operations Center) - Map Building #27 | 2,925 | SF | - 0 | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - When necessary (840 hr Allowance) | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
| Fire Alarm - Airport Control Center (ACC) - Map Building #28 | N/A | SF | ERROR:#VALUE! | per SF | ||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||||||||||
| Building Site Survey & Pathway Investigation | - 0 | - 0 | - 0 | - 0 | ||||||
| Building Fire Alarm Design | - 0 | - 0 | - 0 | - 0 | ||||||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | - 0 | - 0 | - 0 | - 0 | ||||||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | - 0 | - 0 | - 0 | - 0 | ||||||
| Fiber Optic Cable Testing | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | - 0 | - 0 | - 0 | - 0 | ||||||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm - 24 hr Fire Watch - When necessary (840 hr Allowance) | - 0 | - 0 | - 0 | - 0 | ||||||
| Design Submitals, Deliverables & As-built Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| Fire Alarm Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 | ||||||
| Acceptance Testing & Final Comissioning | - 0 | - 0 | - 0 | - 0 | ||||||
| OIAA Staff Training & Documentation | - 0 | - 0 | - 0 | - 0 | ||||||
| 27-00-00.00 COMMUNICATIONS - | ||||||||||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | - 0 | - 0 | - 0 | - 0 | ||||||
| IT/ Data Testing & Troubleshooting | - 0 | - 0 | - 0 | - 0 |
| Coodination/Meetings with Other Trades | - 0 | - 0 | - 0 | - 0 |
| Supervision | - 0 | - 0 | - 0 | - 0 |
| Sub-Total | - 0 |
FIELD COST $0 $0 $0 - 0
| OHD & PROFIT | - 0 | ||
| Assume power is available at site | Sub-Total | - 0 |
| General Conditions | - 0 | |
| Bonds and insurance | - 0 | |
| Permits | - 0 | |
| Sub-Total | - 0 |
| Design Contingency | - 0 | |
| Escalation | - 0 | |
| Sub-Total | - 0 |
| Professional fees | - 0 | |
| Total | $ - 0 |
OIAA (Example)
| ERROR:#VALUE! | Fill in cells of this color |
| OIAA Ontario CA. Airport | |
| Campus Wide Fire Alarm System Replacement |
UNIT UT UPL LABOR UPM MATL UPS/Eq SUBCTR TOTAL
| Fire Alarm - Fire Station - Map Building #24 | 14,425 | SF | 8.21 | per SF | |||||||||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | |||||||||||||
| Building Site Survey & Pathway Investigation | 1 | Ea | 500.00 | 500.00 | - 0 | - 0 | - 0 | - 0 | 500.00 |