Attachment_D-Cost_Proposal_OIAA_Ontario_Airport_Fire_Alarm.xlsx
XLSX spreadsheet 71 KB Posted
- Solicitation number
- 2026-IFB-086
- Issued by
- San Bernardino County, California
About this file
This is a cost proposal document for the Ontario International Airport Authority (OIAA) Campus-Wide Fire Alarm System Replacement project located at 2900 E. Airport Drive, Ontario, California. The project encompasses the design, construction, permitting, installation, retrofit, and replacement of fire alarm systems across 29 buildings at the airport. The scope of work includes electronic safety and security systems (classified under CSI code 28-05-00.00) and communications infrastructure (code 27-00-00.00) for each building. Specific work items include building site surveys, fire alarm design, demolition of existing systems, installation of initiation devices (horns, strobes, and pull stations), 12-strand fiber optic cable infrastructure with terminations at multiple locations, fire alarm control panels (Honeywell Fire-Lite or equivalent), conduit and cabling systems, 24-hour monitoring setup, design submittals and as-built documentation, testing and commissioning, and staff training. Buildings range from terminal facilities (Terminals 1, 2, and 4) and support structures (federal inspection services, police services modular building, PCI offices) to hangars and specialized facilities (fire stations, USPS building, airport control centers), with some buildings requiring voice evacuation systems and 24-hour fire watch services with 840-hour allowances where applicable.
The cost proposal is structured with columns for labor units (UT), unit price labor (UPL), materials (MATL), unit price equipment/services (UPS/Eq), and subcontractors (SUBCTR), culminating in total cost columns for each line item and building section. The document indicates field costs, overhead and profit calculations, general conditions, bonds and insurance, permits, design contingency, and escalation factors; however, the spreadsheet contains multiple error notations (#DIV/0! and #REF!) indicating incomplete or formula-dependent calculations, suggesting this proposal requires finalization with actual pricing data. The project assumes power availability at the site and includes professional fees and contingency allocations. The total project cost for all 29 buildings is referenced but not clearly displayed due to the calculation errors present in the document.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OIAA
29 Buildings
OIAA Ontario CA. Airport UNIT UT UPL LABOR UPM MATL UPS/Eq SUBCTR TOTAL
| Fire Alarm - Fire Station - Map Building #24 | ||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Panel - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - Not Necessary for this building | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Alarm - Terminal 1 - Map Building #1 | ERROR:#DIV/0! | per SF |
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | ||
| Fire Alarm Annuciator Panel FAAP - Honeywell Fire-Lite or Equal | ||
| Fire Alarm NAC Panel - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - When necessary (840 hr Allowance) | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - Terminal 1 | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Alarm - Terminal 2 - Voice Evac - Map Building #2 | ERROR:#DIV/0! | per SF |
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | ||
| Fire Alarm Annuciator Panel FAAP - Honeywell Fire-Lite or Equal | ||
| Fire Alarm NAC Panel - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Voice Evacuation System Devices, Speakers, Strobes, Amplifiers Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - When necessary (840 hr Allowance) | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - Terminal 2 | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Alarm - Terminal 4 - Voice Evac - Map Building #3 | ERROR:#DIV/0! | per SF |
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ||
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 8 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | ||
| Fire Alarm Annuciator Panel FAAP - Honeywell Fire-Lite or Equal | ||
| Fire Alarm NAC Panel - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Voice Evacuation System Devices, Speakers, Strobes, Amplifiers Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - When necessary (840 hr Allowance) | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - Terminal 4 | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Alarm - Ground Transportation Center - Voice Evac - Map Building #4 | ||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Panel - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Voice Evacuation System Devices, Speakers, Strobes, Amplifiers Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - Not Necessary for this building | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Alarm - Federal Inspection Services - Voice Evac - Map Building #5 | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Voice Evacuation System Devices, Speakers, Strobes, Amplifiers Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - When necessary (840 hr Allowance) | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - Federal Inspection Services | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Alarm - Police Services Modular Building - Map Building #6 | ||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 1 location) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Panel - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - Not Necessary for this building | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - Police Services Modular Building | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Alarm- PCI Offices - Map Building #7 | ||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Panel - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - Not Necessary for this building | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - PCI Offices | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Station - North Airfield Vault - Map Building #8 | ||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Panel - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - Not Necessary for this building | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - Police Services Modular Building | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Station - Building 18 - Map Building #9 | ||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Panel - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - Not Necessary for this building | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - Building 18 | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Alarm - USPS Building - Map Building #10 | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - When necessary (840 hr Allowance) | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - Federal Inspection Services | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Alarm - Legacy Hangar 540 - Map Building #11 | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 1 location) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - When necessary (840 hr Allowance) | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - Federal Inspection Services | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Alarm - Legacy Hangar 550 - Map Building #12 | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - When necessary | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - Federal Inspection Services | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Alarm - Wells(Menzies) Hangar 1 - Map Building #13 | ||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Panel - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - Not Necessary for this building | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Alarm - Wells(Menzies) Hangar 2 - Map Building #14 | ||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Panel - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - Not Necessary for this building | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Alarm - AES Hangar 3 - Map Building #15 | ||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Panel - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - Not Necessary for this building | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Alarm - Old FedEx Building - Map Building #16 | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - When necessary | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - Federal Inspection Services | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Alarm - Building 5 - Map Building #17 | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - When necessary | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - Federal Inspection Services | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Alarm - Hangar 35 - Map Building #18 | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - When necessary | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - Federal Inspection Services | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Alarm - Hangar 34 - Map Building #19 | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - When necessary | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - Federal Inspection Services | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Alarm - Building 27 - Map Building #20 | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - When necessary | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - Federal Inspection Services | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Alarm - Building 27 - Map Building #20 | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - When necessary | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - Federal Inspection Services | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Alarm - Building 11 - Map Building #21 | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - When necessary | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - Federal Inspection Services | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Alarm - Admin East #2 - Map Building #22 | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - When necessary | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - Federal Inspection Services | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Alarm - Admin East #1 - Map Building #23 | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - When necessary | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - Federal Inspection Services | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Station - South Airfield Vault - Map Building #25 | ||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Panel - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - Not Necessary for this building | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - Police Services Modular Building | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Alarm - Hangar 4 - Map Building #29 | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - When necessary | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - Federal Inspection Services | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Station - Lift Station - Map Building #26 | ||
| 28-05-00.00 ELECTRONIC SAFETY & SECURITY - | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Panel - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - Not Necessary for this building | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - Police Services Modular Building | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Alarm - Backup Airport Control Center (Emergency Operations Center) - Map Building #27 | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - When necessary (840 hr Allowance) | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - Federal Inspection Services | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
| Fire Alarm - Airport Control Center (ACC) - Map Building #28 | ERROR:#DIV/0! | per SF |
| Building Site Survey & Pathway Investigation | ||
| Building Fire Alarm Design | ||
| Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance | ||
| Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway | ||
| 12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations) | ||
| Fiber Optic Cable Testing | ||
| Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal | ||
| Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance | ||
| Class B Fire alarm - Red Conduit & Cabling System, includes terminations | ||
| Fire Alarm - 24 hr Monitoring Setup & Equipment | ||
| Fire Alarm - 24 hr Fire Watch - When necessary (840 hr Allowance) | ||
| Design Submitals, Deliverables & As-built Documentation | ||
| Fire Alarm Testing & Troubleshooting | ||
| Acceptance Testing & Final Comissioning | ||
| OIAA Staff Training & Documentation | ||
| 27-00-00.00 COMMUNICATIONS - Federal Inspection Services | ||
| IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF | ||
| IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc. | ||
| IT/ Data Testing & Troubleshooting |
| Coodination/Meetings with Other Trades |
| Supervision |
| Sub-Total |
FIELD COST $0 $0 $0 ERROR:#REF!
| OHD & PROFIT | ERROR:#REF! | ||
| Assume power is available at site | ERROR:#REF! | ||
| ERROR:#REF! | |||
| General conditions | ERROR:#REF! | ||
| Bonds and insurance | ERROR:#REF! | ||
| Permits | ERROR:#REF! | ||
| Sub total | ERROR:#REF! | ||
| Design Contingency | ERROR:#REF! | ||
| Escalation | ERROR:#REF! | ||
| Sub total | ERROR:#REF! | ||
| Professional fees | ERROR:#REF! | ||
| OIAA Ontario CA. Airport | Total | ERROR:#REF! | |
| UNIT | ERROR:#REF! |
File details come from the government source that posted it. Updated .