Attachment_D-Cost_Proposal_OIAA_Ontario_Airport_Fire_Alarm.xlsx

XLSX spreadsheet 71 KB Posted

Attached to
2027PS001 - Campus-Wide Fire Alarm System Replacement
Solicitation number
2026-IFB-086
Issued by
San Bernardino County, California

About this file

This is a cost proposal document for the Ontario International Airport Authority (OIAA) Campus-Wide Fire Alarm System Replacement project located at 2900 E. Airport Drive, Ontario, California. The project encompasses the design, construction, permitting, installation, retrofit, and replacement of fire alarm systems across 29 buildings at the airport. The scope of work includes electronic safety and security systems (classified under CSI code 28-05-00.00) and communications infrastructure (code 27-00-00.00) for each building. Specific work items include building site surveys, fire alarm design, demolition of existing systems, installation of initiation devices (horns, strobes, and pull stations), 12-strand fiber optic cable infrastructure with terminations at multiple locations, fire alarm control panels (Honeywell Fire-Lite or equivalent), conduit and cabling systems, 24-hour monitoring setup, design submittals and as-built documentation, testing and commissioning, and staff training. Buildings range from terminal facilities (Terminals 1, 2, and 4) and support structures (federal inspection services, police services modular building, PCI offices) to hangars and specialized facilities (fire stations, USPS building, airport control centers), with some buildings requiring voice evacuation systems and 24-hour fire watch services with 840-hour allowances where applicable.

The cost proposal is structured with columns for labor units (UT), unit price labor (UPL), materials (MATL), unit price equipment/services (UPS/Eq), and subcontractors (SUBCTR), culminating in total cost columns for each line item and building section. The document indicates field costs, overhead and profit calculations, general conditions, bonds and insurance, permits, design contingency, and escalation factors; however, the spreadsheet contains multiple error notations (#DIV/0! and #REF!) indicating incomplete or formula-dependent calculations, suggesting this proposal requires finalization with actual pricing data. The project assumes power availability at the site and includes professional fees and contingency allocations. The total project cost for all 29 buildings is referenced but not clearly displayed due to the calculation errors present in the document.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OIAA

29 Buildings

OIAA Ontario CA. Airport UNIT UT UPL LABOR UPM MATL UPS/Eq SUBCTR TOTAL

Fire Alarm - Fire Station - Map Building #24
28-05-00.00 ELECTRONIC SAFETY & SECURITY -ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations)
Fiber Optic Cable Testing
Fire Alarm Panel - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - Not Necessary for this building
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS -
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Alarm - Terminal 1 - Map Building #1ERROR:#DIV/0!per SF
28-05-00.00 ELECTRONIC SAFETY & SECURITY -
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations)
Fiber Optic Cable Testing
Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal
Fire Alarm Annuciator Panel FAAP - Honeywell Fire-Lite or Equal
Fire Alarm NAC Panel - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - When necessary (840 hr Allowance)
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS - Terminal 1
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Alarm - Terminal 2 - Voice Evac - Map Building #2ERROR:#DIV/0!per SF
28-05-00.00 ELECTRONIC SAFETY & SECURITY -
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations)
Fiber Optic Cable Testing
Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal
Fire Alarm Annuciator Panel FAAP - Honeywell Fire-Lite or Equal
Fire Alarm NAC Panel - Honeywell Fire-Lite or Equal
Fire alarm - Voice Evacuation System Devices, Speakers, Strobes, Amplifiers Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - When necessary (840 hr Allowance)
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS - Terminal 2
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Alarm - Terminal 4 - Voice Evac - Map Building #3ERROR:#DIV/0!per SF
28-05-00.00 ELECTRONIC SAFETY & SECURITY -
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 8 locations)
Fiber Optic Cable Testing
Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal
Fire Alarm Annuciator Panel FAAP - Honeywell Fire-Lite or Equal
Fire Alarm NAC Panel - Honeywell Fire-Lite or Equal
Fire alarm - Voice Evacuation System Devices, Speakers, Strobes, Amplifiers Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - When necessary (840 hr Allowance)
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS - Terminal 4
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Alarm - Ground Transportation Center - Voice Evac - Map Building #4
28-05-00.00 ELECTRONIC SAFETY & SECURITY -ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations)
Fiber Optic Cable Testing
Fire Alarm Panel - Honeywell Fire-Lite or Equal
Fire alarm - Voice Evacuation System Devices, Speakers, Strobes, Amplifiers Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - Not Necessary for this building
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS -
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Alarm - Federal Inspection Services - Voice Evac - Map Building #5ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations)
Fiber Optic Cable Testing
Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal
Fire alarm - Voice Evacuation System Devices, Speakers, Strobes, Amplifiers Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - When necessary (840 hr Allowance)
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS - Federal Inspection Services
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Alarm - Police Services Modular Building - Map Building #6
28-05-00.00 ELECTRONIC SAFETY & SECURITY -ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 1 location)
Fiber Optic Cable Testing
Fire Alarm Panel - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - Not Necessary for this building
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS - Police Services Modular Building
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Alarm- PCI Offices - Map Building #7
28-05-00.00 ELECTRONIC SAFETY & SECURITY -ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations)
Fiber Optic Cable Testing
Fire Alarm Panel - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - Not Necessary for this building
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS - PCI Offices
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Station - North Airfield Vault - Map Building #8
28-05-00.00 ELECTRONIC SAFETY & SECURITY -ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations)
Fiber Optic Cable Testing
Fire Alarm Panel - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - Not Necessary for this building
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS - Police Services Modular Building
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Station - Building 18 - Map Building #9
28-05-00.00 ELECTRONIC SAFETY & SECURITY -ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations)
Fiber Optic Cable Testing
Fire Alarm Panel - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - Not Necessary for this building
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS - Building 18
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Alarm - USPS Building - Map Building #10ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations)
Fiber Optic Cable Testing
Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - When necessary (840 hr Allowance)
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS - Federal Inspection Services
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Alarm - Legacy Hangar 540 - Map Building #11ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 1 location)
Fiber Optic Cable Testing
Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - When necessary (840 hr Allowance)
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS - Federal Inspection Services
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Alarm - Legacy Hangar 550 - Map Building #12ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations)
Fiber Optic Cable Testing
Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - When necessary
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS - Federal Inspection Services
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Alarm - Wells(Menzies) Hangar 1 - Map Building #13
28-05-00.00 ELECTRONIC SAFETY & SECURITY -ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations)
Fiber Optic Cable Testing
Fire Alarm Panel - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - Not Necessary for this building
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS -
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Alarm - Wells(Menzies) Hangar 2 - Map Building #14
28-05-00.00 ELECTRONIC SAFETY & SECURITY -ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations)
Fiber Optic Cable Testing
Fire Alarm Panel - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - Not Necessary for this building
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS -
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Alarm - AES Hangar 3 - Map Building #15
28-05-00.00 ELECTRONIC SAFETY & SECURITY -ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations)
Fiber Optic Cable Testing
Fire Alarm Panel - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - Not Necessary for this building
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS -
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Alarm - Old FedEx Building - Map Building #16ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations)
Fiber Optic Cable Testing
Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - When necessary
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS - Federal Inspection Services
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Alarm - Building 5 - Map Building #17ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations)
Fiber Optic Cable Testing
Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - When necessary
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS - Federal Inspection Services
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Alarm - Hangar 35 - Map Building #18ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations)
Fiber Optic Cable Testing
Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - When necessary
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS - Federal Inspection Services
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Alarm - Hangar 34 - Map Building #19ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations)
Fiber Optic Cable Testing
Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - When necessary
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS - Federal Inspection Services
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Alarm - Building 27 - Map Building #20ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations)
Fiber Optic Cable Testing
Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - When necessary
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS - Federal Inspection Services
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Alarm - Building 27 - Map Building #20ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations)
Fiber Optic Cable Testing
Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - When necessary
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS - Federal Inspection Services
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Alarm - Building 11 - Map Building #21ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations)
Fiber Optic Cable Testing
Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - When necessary
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS - Federal Inspection Services
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Alarm - Admin East #2 - Map Building #22ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations)
Fiber Optic Cable Testing
Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - When necessary
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS - Federal Inspection Services
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Alarm - Admin East #1 - Map Building #23ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 4 locations)
Fiber Optic Cable Testing
Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - When necessary
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS - Federal Inspection Services
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Station - South Airfield Vault - Map Building #25
28-05-00.00 ELECTRONIC SAFETY & SECURITY -ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations)
Fiber Optic Cable Testing
Fire Alarm Panel - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - Not Necessary for this building
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS - Police Services Modular Building
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Alarm - Hangar 4 - Map Building #29ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations)
Fiber Optic Cable Testing
Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - When necessary
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS - Federal Inspection Services
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Station - Lift Station - Map Building #26
28-05-00.00 ELECTRONIC SAFETY & SECURITY -ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations)
Fiber Optic Cable Testing
Fire Alarm Panel - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - Not Necessary for this building
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS - Police Services Modular Building
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Alarm - Backup Airport Control Center (Emergency Operations Center) - Map Building #27ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations)
Fiber Optic Cable Testing
Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - When necessary (840 hr Allowance)
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS - Federal Inspection Services
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total
Fire Alarm - Airport Control Center (ACC) - Map Building #28ERROR:#DIV/0!per SF
Building Site Survey & Pathway Investigation
Building Fire Alarm Design
Demo Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. and Disposal - Square Foot Allowance
Underground 12 Strand Fiber Optic Cable - VIA Existing Pathway
12 Strand Fiber Optic Cable Terminations - (12 strands both ends x 2 locations)
Fiber Optic Cable Testing
Fire Alarm Control Panel FACP - Honeywell Fire-Lite or Equal
Fire alarm - Initiation Devices, Horns, Strobes, Pull Stations, Etc. - Square Foot Allowance
Class B Fire alarm - Red Conduit & Cabling System, includes terminations
Fire Alarm - 24 hr Monitoring Setup & Equipment
Fire Alarm - 24 hr Fire Watch - When necessary (840 hr Allowance)
Design Submitals, Deliverables & As-built Documentation
Fire Alarm Testing & Troubleshooting
Acceptance Testing & Final Comissioning
OIAA Staff Training & Documentation
27-00-00.00 COMMUNICATIONS - Federal Inspection Services
IT/Data Conduit, Cabling, Back Boxes, Etc. in IDF
IT/ Data Devices, Software, Servers, Gateways, Interfaces, Equipment, Patch Panels, Racks, UPS etc.
IT/ Data Testing & Troubleshooting
Coodination/Meetings with Other Trades
Supervision
Sub-Total

FIELD COST $0 $0 $0 ERROR:#REF!

OHD & PROFITERROR:#REF!
Assume power is available at siteERROR:#REF!
ERROR:#REF!
General conditionsERROR:#REF!
Bonds and insuranceERROR:#REF!
PermitsERROR:#REF!
Sub totalERROR:#REF!
Design ContingencyERROR:#REF!
EscalationERROR:#REF!
Sub totalERROR:#REF!
Professional feesERROR:#REF!
OIAA Ontario CA. AirportTotalERROR:#REF!
UNITERROR:#REF!

File details come from the government source that posted it. Updated .