GROUND_TRANSPORTATION_CENTER_-_RECORD_DRAWINGS.zip
ZIP file 244 MB Posted
- Solicitation number
- 2026-IFB-086
- Issued by
- San Bernardino County, California
About this file
GROUND TRANSPORTATION CENTER - RECORD DRAWINGS
This file appears to be a collection of record drawings (as-built documentation) for the Ground Transportation Center, though the specific details of the drawings themselves are not visible in the provided materials. The document is associated with the Ontario International Airport Authority's Campus-Wide Fire Alarm System Replacement project (2027PS001) located at 2900 E. Airport Drive, Ontario, California. The project involves the design, construction, permitting, installation, and retrofit of fire alarm systems across 29 facilities at the airport. Prime bidders must hold a valid California contractor license (Class A General Engineering Contractor, Class B General Building Contractor, C-10 Electrical Contractor, or C-16 Fire Protection Contractor), self-perform a minimum of 35 percent of total project work, and document successful completion of at least three comparable campus-wide or complex fire alarm replacement projects within the past ten years. The project is organized into four phases: investigation, design, and permits (3 months); scheduling, shop drawings, and installation (12 months); testing and Fire Marshal approval (6 weeks); and acceptance and completion filing (6 weeks), with target completion in May 2028. The contract term is two years, beginning in the third quarter of fiscal year 2026-2027. Bids are due October 26, 2026 at 2:00 p.m. A non-mandatory pre-bid meeting and job walk are scheduled for October 1, 2026, with questions due by October 9, 2026 at 2:00 p.m.
The contractor must employ personnel with current NICET Level-III Fire Alarm Systems certification and maintain continuous fire alarm protection throughout construction. A bid bond or certified check equal to 10 percent of the bid amount is required, with performance and payment bonds of 100 percent of the annual contract amount required following award. The project is subject to prevailing wage requirements under California Labor Code and an executed Project Labor Agreement. Liquidated damages are assessed at $500 per calendar day for failure to meet work completion dates or milestones. The contractor must provide a minimum two-year warranty plus five years of third-party UL-listed 24-hour monitoring services. Optional pricing is required for two years of preventative maintenance and five years of service support and repairs. The Ontario International Airport Authority indicates the ability to attain 8 to 10 percent small business participation on similar projects and encourages bidders to utilize small and local businesses as subcontractors.
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .