This document provides details for a federal solicitation for demolition and construction services. The solicitation number is 36C24124B0037 and seeks offers for project P400-608-22-114, which involves demolition and construction of Buildings 2, 3, 4, 5, 13, and 14. The opportunity is being issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1. Offerors should review Attachment D of the solicitation, which is the Building 2-3-4-5-13-14 Lead Paint Report, for relevant pre-construction information. The solicitation is an Invitation for Bid, with responses due on the date specified. The award is expected to be a firm-fixed-price contract.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VOLUME II
LEAD CONTAINING PAINT
SURVEY REPORT
BUILDING 3
VISN 1
Manchester VA Medical Center
718 Smyth Road Manchester, New Hampshire
Project No. 2009023.010
August 31, 2011
TM
Mabbett & Associates, Inc.
Environmental Consultants & Engineers
5 Alfred Circle Bedford, MA 01730-2318
Telephone: (781) 275-6050 Toll Free: (800) 877-6050 Facsimile: (781) 275-5651 info(c)mabbett.com www. mabbett. corn
© 2011, Mabbett & Associates, Inc.
U
ACKNOWLEDGMENT
This Lead Containing Paint (LCP) Building Survey Report was prepared for the Veterans Affairs (VA) New England Healthcare System (VISN 1) in accordance with an established scope of work as defined in Contract Number VA241-P-1653. The information presented herein is based on the facts and information conveyed to or received by Mabbett & Associates, Inc. (M&A) during the preparation of this report. If any of the information provided to M&A that was used in preparing this report is incorrect, incomplete, or subject to change, M&A would wish to alter its opinion(s) accordingly. In addition, the professional opinions and information contained in this report are based solely on the requirements of the applicable regulations and technical data as known to M&A as of the date of this report and considered applicable to this report.
This individual building report from Volume II which contains building specific lead findings is part of the Comprehensive VAMC Lead Survey Report consisting of:
Volume I - General
Chapter 1 - Introduction and Executive Summary Chapter 2 - Lead Containing Paint Survey Tables
Volume II — Individual Building Reports
Individual Building Reports Chapters including:
• Cover page with building number
• Building narrative summary
• Floor plans
• Relevant lead containing paint findings for the building
• Relevant photos
Volume III — Appendices and Supporting Data
Appendix A - XRF Performance Characteristics/Calibration Records
Volume IV — HUD Residential LBP Reports (If Applicable)
Manchester VAMC - Building 3 August 2011 ©2011, Mabbett & Associates, Inc. Page i Vol II Survey Rpt Manchester Bldg 3 Final (8-1 1).doc
This report was prepared by the following Mabbett & Associates, Inc. personnel:
~ II
Michael F. Delaney Project Manager
This report has been reviewed and approved by:
MABBETT & ASSOCIATES, INC.
Robert K. McKinley, MPH, CIH, LIH Director of Industrial Hygiene Services
©2011, Mabbett & Associates, Inc. Page ii Vol II Survey Rpt Manchester Bldg 3 Final (8-11).doc
TABLE OF CONTENTS
Description Page
1.0 INTRODUCTION & EXECUTIVE SUMMARY
2.0 BUILDING DESCRIPTION
3.0 LEAD SCREENING SURVEY
3.1 Screening Survey Methodology
3.2 Summary of Lead Screening Survey Findings
4.0 LIMITATIONS
5.0 CLOSING REMARKS
5.1 Lead Containing Paint
Tables Table 1 — Specific Inaccessible Areas Table 2 — Summary of Positive XRF Measurements by Building Components Table 3—Summary of XRF Measurements Above HUD Standards Table 4 — Summary of XRF Measurements Above 0.1 mg/cm2 Table 5 — Summary of XRF Measurements by Substrate .......................................... Appendix A
Figures Figure 1 — Lead Reading Location Plan - Building 3, Basement Figure 2 — Lead Reading Location Plan - Building 3, Floor 1 Figure 3 — Lead Reading Location Plan - Building 3, Floor 2
Appendices Appendix A — Table 5 - Summary of XRF Measurements by Substrate Appendix B — Relevant Photographs of Non-Intact Lead Containing Paint
©2011, Mabbett & Associates, Inc. Page iii Vol II Survey Rpt Manchester Bldg 3 Final (8-1 1).doc
1.0 INTRODUCTION & EXECUTIVE SUMMARY
Mabbett and Associates, Inc. (M&A), with Covino Environmental Associates, Inc. (Covino) as a sub-contractor, performed surveys for suspect lead containing paint (LOP) surfaces utilizing an X-Ray Fluorescence (XRF) analyzer. Surveys were performed of selected buildings at the VA Medical Center (VAMC) located at 718 Smyth Road, Manchester, NH, under Contract VA241-P- 1653. A complete list of buildings surveyed is in Volume I of this report. Site survey work was performed during October and November 2010, by appropriately credentialed personnel as required. The survey effort involved the collection of the following samples, resulting in the following conclusions:
62 XRF analyzer measurements of building surfaces were taken on the interior, and exterior of this building, and from adjacent structures.
Seventeen of the XRF measurements revealed concentrations of lead that exceed HUD residential standards of 1.0 mg/cm2 .
• Only eight of these XRF measurements were collected on surfaces inside the building.
• Nine of the measurements were taken on metal and wooden objects outside of the building.
18 of the XRF measurements taken on interior and exterior building components, and adjacent structures revealed concentrations of lead that exceeded the threshold concentration of 0.1 mg/cm2 established by the VISN CEEOHS Group.
This building report consists of a summary of findings, floor plans indicating sample locations, detailed analytical findings for the specific surveyed building materials, and photos of lead containing paint greater than 1.0 mg/cm2 and in an other than intact condition, when observed, were provided. Calibration records are available in Volume III of the Comprehensive VAMC Lead Survey Report.
2.0 BUILDING DESCRIPTION
According to information provided by the VAMC Office of Facilities Management and observations made by the M&A team at the time of the survey, Building 3 was a three-story A&MM and Fiscal Service building and occupied 3,910 square feet.
Table 1 — Specific Inaccessible Areas Manchester VA Medical Center, Building 3
Buildin Floor Room Reason Area Was Inaccessible and Survey g No. Impacts, If Applicable
There were no inaccessible areas identified during this survey.
©2011, Mabbett & Associates, Inc. Page 1 of 5 Vol II Survey Rpt Manchester Bldg 3 Final (8-11).doc
3.0 LEAD SCREENING SURVEY
3.1 Screening Survey Methodology
M&A completed a Lead Containing Paint Risk Analysis in accordance with the SOP and determined that a LCP screening survey was warranted in this building. The LCP screening survey was performed by trained lead inspectors/screeners meeting the qualifications outlined in the SOP. The screening survey measured lead concentrations in accessible building surfaces by using a Niton XLp 303A XRF (serial number 18580). The XRF instrument was calibrated at the frequency specified in the SOP.
3.2 Summary of Lead Screening Survey Findings
3.2.1 Data Tables
Table 2 presents a summary of the number of samples collected for each building component category, as well as the number of samples above the HUD Residential Standard of 1.0 mg/cm2, and the VISN CEEOHS criteria, for interior and exterior building components.
Table 2 - XRF Reading Summary by Building Component Manchester VA M edical Center, Building 3
~1 Number of Readings Number of Readings Number of
Component Readings Above 1.0 mglcmz Above 0.1 mg/cm` (VISN
Collected Type (HUD Standard) Criteria)
Interior Exterior Interior Exterior Interior Exterior
Baseboards 3 0 0 NA 0 NA
Ceilings 5 0 1 (20%) NA 1 (20%) NA
Columns 0 2 0 2 (100%) 0 2 (100%)
Curbs, Floors, 0 0 NA NA NA NA
Stair Treads
Doors and Door 19 4 6 2(50%) 6 (31.58%) 2(50%)
Casings
(31.58%)
Walls 10 0 0 NA 1 (10%) NA
Windows 5 0 0 NA 0 NA
Remaining Metal
Building
Components 3 4 (33.33%) 3 (75%) 1 (33.33%) 3 (75%) (handrails, lintels and radiators)
Remaining
Wood Building
Components
(trim, awning 4 3 0 2 (66.67%) 0 2 (66.67%) fence, scuttle, spindle and stringer)
Other 0 0 NA NA NA NA
% Value in parenthesis indicates the percentage of readings that exceeded the applicable limit.
©2011, Mabbett & Associates, Inc. Page 2 of 5 Vol II Survey Rpt Manchester Bldg 3 Final (8-1 1).doc
XRF-screened painted interior and exterior building components containing lead at concentrations greater than the HUD Residential Standard, arranged by building component, are described in detail in Table 3 below:
Table 3 - Summary of XRF Measurements Above Established HUD Residential Standards (1.0mg/cm2) Manchester VA Medical Center, Building 3
Reading No.
Floor Location Substrate and Component Side Condition Color Results
(mg,CM2)
Ceilings
699 First Ns01 I Wood Ceiling East Intact White 20.9
Columns
749 First Exterior Wood Column East Intact White 1.2
750 First Exterior Wood Column East Peeling White 1.4
Doors
646 Basement M3 Wood Door South Intact Brown 13.5
647 Basement M3 Wood Door Casing South Intact White 10.1
678 First N11 Wood Door North Intact Blue 3.4
679 First N11 Wood Door Casing North Intact Blue 14.9
694 First S10 Wood Door West Intact Blue 3.2
700 First Ns01 Wood Door Casing West Intact Blue 25
754 First Exterior Wood Door Casing West Intact Brown 24.9
755 First Exterior Wood Door West Intact Brown 20.5
Metal Building Components Not Included in Other Groups
701 First NsO1 Metal Lintel West Intact Blue 13.9
747 First Exterior Metal Lintel East Cracked Black 24.6
751 First Exterior Metal Lintel East Cracked Black 30
756 First Exterior Metal Lintel West Intact Brown 18.4
Wood Components Not Included in Other Groups
748 First Exterior Wood Trim South Intact White 10.1
757 First Exterior Wood Awning West Intact White 6.2
©2011, Mabbett & Associates, Inc. Page 3 of 5 Vol II Survey Rpt Manchester Bldg 3 Final (8-1 1).doc
As specified by VISN 1 CEEOHS, a listing of XRF-screened painted interior and exterior building components containing lead at concentrations greater than 0.1 mg/cm2, have been included in Table 4 below:
Table 4 - Summary of Positive XRF Measurements Above VISN 1 Criteria (0.1 mg/cm2) Manchester VA Medical Center, Building 3
Reading Substrate and Results Floor Location Side Conditii r on Color 2) No. component (mg/cm
Ceilings
699 First Ns01 Wood Ceiling East intact J White7 20.9
-------- - —~— - Columns
749 First Exterior Wood Column East Intact White 1 2
750 First Exterior Wood Column East Peeling l - White 1.4
Doors
646 Basement M3 Wood Door South Intact Brown 13.5
647 Basement M3 Wood Door Casing South Intact White 10.1
678 First N11 Wood Door North Intact Blue 3.4
679 First N11 Wood Door Casing North Intact Blue 14.9
694 First S10 Wood Door West Intact Blue 3.2
700 First Ns01 Wood Door Casing West Intact Blue 25
754 First Exterior Wood Door Casing West Intact Brown 24.9
755 First Exterior Wood Door West Intact Brown 20.5
Walls
692 First S15 Plaster Wall (Exterior) North Intact Green 0.17
Metal Building Components Not Included in Other Groups
701 First NsO1 Metal Lintel West Intact Blue 13.9
747 First Exterior Metal Lintel East Cracked Black 24.6
751 First Exterior Metal Lintel East Cracked Black 30
756 First Exterior Metal Lintel West Intact Brown 18.4
Wood Components Not Included in Other Groups
748 First Exterior Wood Trim South Intact White 10.1
757 First Exterior Wood Awning West Intact White 6.2
In addition, XRF measurements collected during the screening survey of interior and exterior building components are included in Table 5 — Summary of XRF Measurements by Substrate.
Table 5, arranged by building component, includes a description of each screened surface and resulting XRF-measured lead concentration.
3.2.2 Photographs
Representative photographs of building materials greater than or equal to 1.0 mg/cm2 and where in other than in intact condition (e.g. fair, peeling, cracking) are provided in Appendix B of this report.
©2011, Mabbett & Associates, Inc. Page 4 of 5 Vol II Survey Rpt Manchester Bldg 3 Final (8-1 1).doc
3.2.3 CADD Drawings
Lead reading location drawings with XRF sampling locations are included in the Figures section of this report. Concentrations are color coded, black for readings below the VISN 1 CEEOHS threshold of 0.1 mg/cm2, blue for readings above the VISN 1 CEEOHS threshold of
0.1 mg/cm2, but less than 1.0 mg/cm2, and red for readings greater than 1.0 mg/cm2.
4.0 LIMITATIONS
This inspection report is the result of a diligent search of the building for LCP. Only accessible areas were included in this survey. However comprehensive this inspection appears, it does not claim to have identified all of the LCP that could be present in the facility. M&A's survey was performed with limitations inherent to visual inspections. M&A has conducted this assessment with reasonable care and has performed this project within generally accepted industry standards. There can be no assurances, and M&A makes no assurances, that the information, research, and technology used to prepare this report may not change in the future, thus affecting the results provided.
5.0 CLOSING REMARKS
Prior to initiating plans for maintenance, renovation or demolition activities, the VAMC should review the lead survey results to determine whether any of the materials identified as LCP will be disturbed by proposed work activities.
5.1 Lead Containing Paint
The purpose of the LCP screening survey was to identify patterns of LCP. For the purpose of this LCP screening survey, representative interior and exterior building components were tested. The regulations addressing LCP in non-residential buildings are focused on protecting workers who are involved with paint disturbing activities and related waste disposal activities.
Worker protection is regulated by OSHA regulations as well as applicable state regulations.
These regulations involve air monitoring of workers to determine exposure levels when disturbing paint containing measurable lead. A LCP determination cannot determine a safe level of lead, but is intended to provide guidance as to the locations of where LCP is present.
VA employees and contractors may use this information to better determine exposures of workers to airborne lead by understanding the different concentrations of lead paint on representative components and surfaces. Worker exposure controls can then be implemented and air monitoring can then be performed during activities that disturb paint on representative surfaces.
A concentration of lead greater than or equal to 1.0 mg/cm2 exceeds HUD residential standards and is an indicator of risk. OSHA does not specify a safe concentration of LCP.
However, for the purposes of this LCP screening survey the lead concentrations greater than
0.1 mg/cm2 have been utilized as a threshold established by VISN 1 CEEOHS for areas where possible worker exposures may occur.
©2011, Mabbett & Associates, Inc. Page 5 of 5 Vol II Survey Rpt Manchester Bldg 3 Final (8-1 1).doc
O
Figures
C)
BUT LESS THAN 1.0 mg/cm2
BASEMENT
CrAI 1. 1 /A"-1'_n"
BUILDING 3
L (2
25 tSLLUW lilt V1J1N1 INKt 1lULll or u.i nlgcm
25* ABOVE THE VISNI THRESHOLD OF 0.1 mg/cm2.
25 GREATER THAN 1.0 mg/cm2 Manchester VAMC - Building 3 Lead Reading Location Plan
Figure 1 - Basement
749**
691 758 r %JV 697 lull... /52 698 701**
699** FIRS1 FLOOR
LEGEND BUILDING 3
APPROXIMATE XRF READING LOCATION
25 BELOW THE VISNI THRESHOLD OF 0.1 mg/cm2 Manchester VAMC - Building 3 25* ABOVE THE VISNI THRESHOLD OF 0.1 mg/cm2, BUT LESS THAN 1.0 mg/cm2
25** GREATER THAN 1.0 mg/cm2 Figure 2-Floor I
CLOSET CLOSET
3 SF 3 SF
SECOND FLOOR
LEGEND
APPROXIMATE XRF READING LOCATION B U I L D I N G 3 25 BELOW THE VISNI THRESHOLD OF 0.1 mg/cm2
25* ABOVE THE VISNI THRESHOLD OF 0.1 mg/cm2, BUT LESS THAN 1.0 mg/cm2
GREATER THAN 1.0 mg/cm2
Manchester VAMC - Building 3
Figure 3 - Floor 2
Appendix A
Table 5 Summary of XRF Measurements by Substrate
Table 5-Summary of XRF Measurements by Substrate Manchester VA Medical Center, Building 3
Reading No.
Floor Location Substrate and Component
Side Condition Color Results
(mg/cm 2)
Baseboards
657 Second S24 Wood Baseboard West Intact Blue 0
670 Second N26 Wood Baseboard West Intact Blue 0
690 First S14 Wood Baseboard West Intact Blue 0
Ceilings
658 Second S24 Plaster Ceiling West Intact White 0
667 Second Stairwell Plaster Ceiling East Intact White 0
675 Second Corridor Outside
N23 Plaster Ceiling East Intact White 0
693 First S15 Plaster Ceiling North Intact Green 0
699 First Ns01 Wood Ceiling East Intact White 20.9
Columns
749 First Exterior Wood Column East Intact White 1.2
750 First Exterior Wood Column East Peeling White 1.4
Doors
646 Basement M3 Wood Door South Intact Brown 13.5
647 Basement M3 Wood Door Casing South Intact White 10.1
649 Basement M3 Metal Door East Intact White 0
650 Basement M3 Metal Door Casing West Intact White 0
659 Second S24 Metal Door Casing East Intact Blue 0
662 Second Corridor Outside
S22 Wood Door East Intact White 0
663 Second Corridor Outside
S22 Metal Door Casing East Intact Blue 0
673 Second Corridor Outside
N23 Wood Door East Intact Blue 0
674 Second Corridor Outside
N23 Wood Door Casing East Intact Blue 0
678 First N11 Wood Door North Intact Blue 3.4
679 First N11 Wood Door Casing North Intact Blue 14.9
685 First S12 Wood Door Casing West Intact Blue 0
686 First S12 Wood Screen Door West Intact Blue 0
688 First S14 Wood Door West Intact Blue 0
689 First S14 Wood Door Casing West Intact Blue 0
694 First S10 Wood Door West Intact Blue 3.2
697 First Ns01 Wood Door East Intact White 0
698 First Ns01 Wood Door Casing East Intact Blue 0
700 First Ns01 Wood Door Casing West Intact Blue 25
752 First Exterior Metal Door East Intact Brown 0
753 First Exterior Wood Door Casing East Intact White 0
754 First Exterior Wood Door Casing West Intact Brown 24.9
755 First Exterior Wood Door West Intact Brown 20.5
©2011, Mabbett & Associates, Inc. Page 1 of 2 Appendix A, Table 5 - Survey Report Manchester Building 3
Table 5 - Summary of XRF Measurements by Substrate Manchester VA Medical Center, Building 3
Reading Substrate and Results No.
Floor Location Component
Side Condition Color (mg/cm2)
Walls
648 Basement M3 Concrete Wall
(Exterior) South Intact White 0
654 Second S24 Plaster Wall (Exterior) West Intact Blue 0
664 Second Corridor Outside
S22 Plaster Wall (Interior) East Intact Multi 0
668 Second N26 Plaster Wall (Exterior) West Intact Multi 0
671 Second N26 Drywall Wall (Interior) South Intact Blue 0
680 First N11 Plaster Wall (Exterior) East Intact Blue 0
684 First S12 Concrete Wall
(Interior) North Intact Blue 0
687 First S14 Plaster Wall (Exterior) West Intact Blue 0
692 First S15 Plaster Wall (Exterior) North Intact Green 0.17
696 First S10 Drywall Wall (Exterior) East Intact Blue 0
Windows
655 Second S24 Wood Window Sill West Intact Blue 0
669 Second N26 Wood Window Casing West Intact Blue 0
681 First N11 Wood Window Casing East Intact Blue 0
682 First N11 Wood Window Sill East Intact Blue 0
691 First S14 Wood Window Sill West Intact Blue 0
Metal Building Components (Not included in other groups)
656 Second S24 Metal Radiator West Intact Blue 0
683 First N11 Metal Radiator East Intact Blue 0
701 First Ns01 Metal Lintel West Intact Blue 13.9
747 First Exterior Metal Lintel East Cracked Black 24.6
751 First Exterior Metal Lintel East Cracked Black 30
756 First Exterior Metal Lintel West Intact Brown 18.4
758 First Exterior Metal Handrail West Intact Brown 0
Wood Components Not Included in Other Groups
660 Second S24 Wood Scuttle East Intact White 0
661 Second S24 Wood Scuttle Casing East Intact White 0
665 Second Stairwell Wood Spindle East Intact Blue 0
666 Second Stairwell Wood Stringer East Intact Blue 0
748 First Exterior Wood Trim South Intact White 10.1
757 First Exterior Wood Awning West Intact White 6.2
759 First Exterior Wood Fence West Poor White 0
Font Color Annotation
Black - Below the VISN1 Threshold of 0.1 mg/cm2 Blue - Above the VISN1 Threshold of 01. mg/cm2, but less than 1.0 mg/cm2 Red - Greater than 1.0 m /cm2
©2011, Mabbett & Associates, Inc. Page 2 of 2 Appendix A, Table 5 - Survey Report Manchester Building 3
Appendix B
Relevant Photographs of Non-Intact Lead Containing Paint Greater than 1.Q mg/cm2
Metal Lintel Sample 747
Wood Column Sample 750
VAMC Manchester— Building 3 August 2011 ©2011, Mabbett & Associates, Inc. Page 1 of 2 Appendix B, Survey Report Manchester Building 3
Metal Lintel Samples 751
VAMC Manchester— Building 3 August 2011 ©2011, Mabbett & Associates, Inc. Page 2 of 2 Appendix B, Survey Report Manchester Building 3
SURVEY REPORT
BUILDING 4
VISN 1
Manchester VA Medical Center
718 Smyth Road Manchester, New Hampshire
Project No. 2009023.010
August 31, 2011
TM
! A
Mabbett & Associates, Inc.
Environmental Consultants & Engineers
5 Alfred Circle Bedford, MA 01730-2318
Telephone: (781) 275-6050 Toll Free: (800) 877-6050 Facsimile: (781) 275-5651 info mabbett. corn www.mabbett.com
Affairs (VA) New England Healthcare System (VISN 1) in accordance with an established scope of work as defined in Contract Number VA241-P-1653. The information presented herein is based on the facts and information conveyed to or received by Mabbett & Associates, Inc. (M&A) during the preparation of this report. If any of the information provided to M&A that was used in preparing this report is incorrect, incomplete, or subject to change, M&A would wish to alter its opinion(s) accordingly. In addition, the professional opinions and information contained in this report are based solely on the requirements of the applicable regulations and technical data as known to M&A as of the date of this report and considered applicable to this report.
This individual building report from Volume II which contains building specific lead findings is part of the Comprehensive VAMC Lead Survey Report consisting of:
Volume I - General
Chapter 1 - Introduction and Executive Summary Chapter 2 - Lead Containing Paint Survey Tables
Volume II — Individual Building Reports
Individual Building Reports Chapters including:
• Cover page with building number
• Building narrative summary
• Floor plans
• Relevant lead containing paint findings for the building
• Relevant photos
Volume III — Appendices and Supporting Data
Appendix A - XRF Performance Characteristics/Calibration Records
Volume IV — HUD Residential LBP Reports (If Applicable)
Manchester VAMC - Building 4 August 2011
©2011, Mabbett & Associates, Inc. Page iVol II Survey Rpt Manchester Bldg 4 Final (8-11).doc.doc
Michael F. Delaney Project Manager
This report has been reviewed and approved by:
MABBETT & ASSOCIATES, INC.
-r7r. / kl •
Robert K. McKinley, MPH, CIH, LIH Director of Industrial Hygiene Services
©2011, Mabbett & Associates, Inc. Page iVol II Survey Rpt Manchester Bldg 4 Final (s-11).doc.doc
Descriotion
1.0 INTRODUCTION & EXECUTIVE SUMMARY
2.0 BUILDING DESCRIPTION
3.0 LEAD SCREENING SURVEY
3.1 Screening Survey Methodology
3.2 Summary of Lead Screening Survey Findings
4.0 LIMITATIONS
5.0 CLOSING REMARKS
5.1 Lead Containing Paint
Tables Table 1 — Specific Inaccessible Areas Table 2 — Summary of Positive XRF Measurements by Building Components Table 3 — Summary of XRF Measurements Above HUD Standards Table 4—Summary of XRF Measurements Above 0.1 mg/cm2 Table 5 — Summary of XRF Measurements by Substrate .......................................... Appendix A
Figures Figure 1 — Lead Reading Location Plan - Building 4, Basement Figure 2 — Lead Reading Location Plan - Building 4, Floor 1 Figure 3 — Lead Reading Location Plan - Building 4, Floor 2
Appendices Appendix A — Table 5 - Summary of XRF Measurements by Substrate Appendix B — Relevant Photographs of Non-Intact Lead Containing Paint
©2011, Mabbett & Associates, Inc. Page iiiVol II Survey Rpt Manchester Bldg 4 Final (s-11).doc.doc
Cl) sub-contractor, performed surveys for suspect lead containing paint (LOP) surfaces utilizing an X-Ray Fluorescence (XRF) analyzer. Surveys were performed of selected buildings at the VA Medical Center (VAMC) located at 718 Smyth Road, Manchester, NH, under Contract VA241-P- 1653. A complete list of buildings surveyed is in Volume I of this report. Site survey work was performed during October and November 2010, by appropriately credentialed personnel as required. The survey effort involved the collection of the following samples, resulting in the following conclusions:
• 57 XRF analyzer measurements of building surfaces were taken on the interior, and exterior of this building, and from adjacent structures.
• Ten of the XRF measurements revealed concentrations of lead that exceed HUD residential standards of 1.0 mg/cm2
• Only two of these XRF measurements were collected on surfaces inside the building.
• Eight of the measurements were taken on metal and wooden objects outside of the building.
• 12 of the XRF measurements taken on interior and exterior building components, and adjacent structures revealed concentrations of lead that exceeded the threshold concentration of 0.1 mg/cm2 established by the VISN CEEOHS Group.
This building report consists of a summary of findings, floor plans indicating sample locations, detailed analytical findings for the specific surveyed building materials, and photos of lead containing paint greater than 1.0 mg/cm2 and in an other than intact condition, when observed, were provided. Calibrations records are available in Volume III of the Comprehensive VAMC Lead Survey Report.
2.0 BUILDING DESCRIPTION
According to information provided by the VAMC Office of Facilities Management and observations made by the M&A team at the time of the survey, Building 4 was a three-story Human Resources and Quarters building and occupied 3,730 square feet.
Table 1 — Specific Inaccessible Areas Manchester VA Medical Center, Building 4
Building Floor Room Reason Area Was Inaccessible and Survey
No. Impacts, If Applicable
There were no inaccessible areas identified during this survey.
©2011, Mabbett & Associates, Inc. Page 1 of 5 Vol II Survey Rpt Manchester Bldg 4 Final (8-1 1).doc.doc
M&A completed a Lead Containing Paint Risk Analysis in accordance with the SOP and determined that a LCP screening survey was warranted in this building. The LCP screening survey was performed by trained lead inspectors/screeners meeting the qualifications outlined in the SOP. The screening survey measured lead concentrations in accessible building surfaces by using a Niton XLp 303A XRF (serial number 18580). The XRF instrument was calibrated at the frequency specified in the SOP.
3.2 Summary of Lead Screening Survey Findings
3.2.1 Data Tables
Table 2 presents a summary of the number of samples collected for each building component category, as well as the number of samples above the HUD Residential Standard of 1.0 mg/cm2, and the VISN CEEOHS criteria, for interior and exterior building components.
Table 2 - XRF Reading Summary by Building Component Manchester VA Medical Center, Building 4
Number of Readings Number of Readings Number of Readings
Collected Above 1.0 mg/cm (HUD Above 0.1 mg/cm (VISN
Component Type
Standard) Criteria)
Interior Exterior Interior Exterior Interior Exterior
Baseboards 4 0 0 NA 0 NA
Ceilings 3 1 0 1 (100%) 0 1 (100%)
Columns 0 1 NA 1 (100%) NA 1 (100%)
Curbs, Floors, Doors a ings nd
Door 11 3 2(18.18%) 2(66.67%) 2(18.18%) 2(66.67%) C as
Walls 5 6 0 0 1 (20%) 0
Windows 6 3 0 0 1 (16.67%) 0
Components 3 2 0 2 (66.67%) 0 2 (66.67%) (lintels and radiators)
Remaining Wood l+rim cri rt+Ic A 2 rl 7 IAA 7O/\ fl 7 IRA A7O/1 handrail, awning, shelf, spindle and stringer)
©2011, Mabbett & Associates, Inc. Page 2 of 5 Vol II Survey Rpt Manchester Bldg 4 Final (8-1 1).doc.doc are described in detail in Table 3 below:
Table 3 - Summary of XRF Measurements Above Established HUD Residential Standards (1.0mg/cm2) Manchester VA Medical Center, Building 4
Re N d o ing
Floor Location Substrate and Component Side Condition Color Results
(mg/cm2)
Columns
772 First Exterior Wood Column South Intact White 3.3 Ceilings
775 First Exterior Wood Ceiling South Intact White 18.4 Doors
637 Basement M4 Wood Door North Intact Brown 9.5
638 Basement M4 Wood Door Casing North Intact Brown 6.5
778 First Exterior Wood Door North Intact Brown 6.7
779 First Exterior Wood Door Casing North Intact Brown 20.1 Metal Building Components Not Included in Other Groups
776 First Exterior Metal Lintel South Intact Black 17
777 First Exterior Metal Lintel North Intact Brown 10.8 Wood Building Components Not Included in Other Groups
771 First Exterior Wood Trim West Intact White 21.7
780 First Exterior Wood Awning North Intact White 6.1
As specified by VISN 1 CEEOHS, a listing of XRF-screened painted interior and exterior building components containing lead at concentrations greater than 0.1 mg/cm2, have been included in Table 4 below:
Table 4 - Summary of XRF Measurements Above VISN Criteria (0.1 mg/cmZ) Manchester VA Medical Center, Building 4
Reading No.
Floor Location Substrate and Component
Side Condition Color Results
(mg/cm )
Columns
772 First Exterior Wood Column South Intact White 3.3 Ceilings
775 First Exterior Wood Ceiling South Intact White 18.4 Doors
637 Basement M4 Wood Door North Intact Brown 9.5
638 Basement M4 Wood Door Casing North Intact Brown 6.5
778 First Exterior Wood Door North Intact Brown 6.7
779 First Exterior Wood Door Casing North Intact Brown 20.1
©2011, Mabbett & Associates, Inc. Page 3 of 5 Vol II Survey Rpt Manchester Bldg 4 Final (8-1 1).doc.doc
Table 4 - Summary of XRF Measurements Above VISN Criteria (0.1mg/cm2)
Reading Substrate and Results Floor Location Side Condition Color No. Component (mglcm
Walls
608 Second E25 Drywall Wall Interior South Intact White 0.11 Windows
609 Second E25 Wood Window Sill East Intact White 0.5 Metal Building Components Not Included in Other Groups
776 First Exterior Metal Lintel South Intact Black 17
777 First Exterior Metal Lintel North Intact Brown 10.8 Wood Building Components Not Included in Other Groups
771 First Exterior Wood Trim West Intact White 21.7
780 First Exterior Wood Awning North Intact White 6.1
In addition, XRF measurements collected during the screening survey of interior and exterior building components are included in Table 5 — Summary of XRF Measurements by Substrate.
Table 5 arranged by building component, includes a description of each screened surface and resulting XRF-measured lead concentration.
3.2.2 Photographs
Representative photographs of building materials greater than or equal to 1.0 mg/cm2 and where in other than in intact condition (e.g. fair, peeling, cracking) are provided in Appendix B of this report.
3.2.3 CADD Drawings
Lead reading location drawings with XRF sampling locations are included in the Figures section of this report. Concentrations are color coded, black for readings below the VISN 1 CEEOHS threshold of 0.1 mg/cm2, blue for readings above the VISN 1 CEEOHS threshold of
0.1 mg/cm2, but less than 1.0 mg/cm2, and red for readings greater than 1.0 mg/cm2.
4.0 LIMITATIONS
This inspection report is the result of a diligent search of the building for LCP. Only accessible areas were included in this survey. However comprehensive this inspection appears, it does not claim to have identified all of the LCP that could be present in the facility. M&A's survey was performed with limitations inherent to visual inspections. M&A has conducted this assessment with reasonable care and has performed this project within generally accepted industry standards. There can be no assurances, and M&A makes no assurances, that the information, research, and technology used to prepare this report may not change in the future, thus affecting the results provided.
©2011, Mabbett & Associates, Inc. Page 4 of 5 Vol II Survey Rpt Manchester Bldg 4 Final (8-1 1).doc.doc
5.0 CLOSING REMARKS
Prior to initiating plans for maintenance, renovation or demolition activities, the VAMC should review the lead survey results to determine whether any of the materials identified as LCP will be disturbed by proposed work activities.
5.1 Lead Containing Paint
The purpose of the LCP screening survey was to identify patterns of LCP. For the purpose of this LCP screening survey, representative interior and exterior building components were tested. The regulations addressing LCP in non-residential buildings are focused on protecting workers who are involved with paint disturbing activities and related waste disposal activities.
Worker protection is regulated by OSHA regulations as well as applicable state regulations.
These regulations involve air monitoring of workers to determine exposure levels when disturbing paint containing measurable lead. A LCP determination cannot determine a safe level of lead, but is intended to provide guidance as to the locations of where LCP is present.
VA employees and contractors may use this information to better determine exposures of workers to airborne lead by understanding the different concentrations of lead paint on representative components and surfaces. Worker exposure controls can then be implemented and air monitoring can then be performed during activities that disturb paint on representative surfaces.
A concentration of lead greater than or equal to 1.0 mg/cm2 exceeds HUD residential standards and is an indicator of risk. OSHA does not specify a safe concentration of LCP.
However, for the purposes of this LCP screening survey the lead concentrations greater than
0.1 mg/cm2 have been utilized as a threshold established by VISN 1 CEEOHS for areas where possible worker exposures may occur.
©2011, Mabbett & Associates, Inc. Page 5 of 5 Vol II Survey Rpt Manchester Bldg 4 Final (8-11).doc.doc
D
LEGEND
(S) APPROXIMATE XRF READING LOCATION
25 BELOW THE VISNI THRESHOLD OF 0.1 mg/cm2
25~ ABOVE THE VISN 1 THRESHOLD OF 0.1 mg/cm2, BUT LESS THAN 1.0 mg/cm2
25 * GREATER THAN 1.0 mg/cm2
BASEMENT
BUILDING 4
Manchester VAMC - Building 4
Figure 1 - Basement
780** 779** 778** 777**
D
O 88 S~OM
1Q
10 BEDROOM
4G ) BATHROOM
16 1Q BEDROOM
115 SF
HALL 121 SF
64 SF
CLOSET
ll
8 SF
HALL
82 SF
BATHROOM
W
1W 15 SF 43 SF
CLOSET
c BEDROOM 11
B.M.S. CL
18 SF
117 SF
LOUNGE
E
BEDROOM
223 SF
220 SF
FOYER
94 SF
70 SF
,- 1
II II
l
771**
635 * 773 , : 'FIST FLOOR
636 772*
BUI[DING 4
LEGEND
776** 77-55*{
(S) APPROXIMATE XRF READING LOCATION
25 BELOW THE VISN] THRESHOLD OF 0.1 mg/cm2
25* ABOVE THE VISNI THRESHOLD OF 0.1 mg/cm2, BUT LESS THAN 1.0 mg/cm2
25* * GREATER THAN 1.0 mg/cm2
O2
Q BEDROOM
117 SF
Manchester VAMC - Building 4
Figure 2 - Floor 1
609*
608*
LEGEND
(S) APPROXIMATE XRF READING LOCATION
25 BELOW THE VISNI THRESHOLD OF 0.1 mg/cm2
25* ABOVE THE VISNI THRESHOLD OF 0.1 mg/cm2, BUT LESS THAN 1.0 mg/cm2
25** GREATER THAN 1.0 mg/cm2
LINEN LINEN 613
CLOSET CLOSET 614
3 SF 3 SF 615
SECOND FLOOR 617
BUILDING 4
Manchester VAMC - Building 4
Figure 3 - Floor 2
El)
Reading No.
Floor Location Substrate and Component Side I
Condition Color Results
(mgfcm2)
Baseboards
611 Second E25 Wood Baseboard East Intact White 0
622 Second Stairwell Wood Baseboard North Intact White 0
629 First E12 Metal Baseboard West Intact White 0
633 First W11 Wood Baseboard East Intact White 0
Columns
772 First Exterior Wood Column South Intact White 3.3
Ceilings
597 Second W25 Drywall Ceiling North Intact White 0
598 Second W25 Drywall Ceiling West Intact White 0
618 Second Stairwell Drywall Ceiling North Intact White 0
775 First Exterior Wood Ceiling South Intact White 18.4
Doors
602 Second W25 Wood Door West Intact Gray 0
603 Second W25 Metal Door Casing West Intact White 0
612 Second E25 Metal Door Casing West Intact White 0
613 Second E21 Closet Wood Door Casing North Intact Yellow 0
614 Second E21 Closet Wood Door North Intact White 0
626 First E12 Wood Door North Intact White 0
632 First W1 1 Metal Door Casing East Intact White 0
637 Basement M4 Wood Door North Intact Brown 9.5
638 Basement M4 Wood Door Casing North Intact Brown 6.5
640 Basement M4 Metal Door West Poor White 0
641 Basement M4 Metal Door Casing West Poor White 0
773 First Exterior Wood Door Casing South Intact White 0
778 First Exterior Wood Door North Intact Brown 6.7
779 First Exterior Wood Door Casing North Intact Brown 20.1
Walls
599 Second W25 Drywall Wall (Exterior) West Intact Lilac 0
600 Second W25 Drywall Wall (Interior) West Intact Lilac 0
606 Second E25 Drywall Wall (Exterior) East Intact White 0
608 Second E25 Drywall Wall Interior South Intact White 0.11
615 Second E21 Closet Drywall Wall Interior South Intact Yellow 0.05
623 First E12 Drywall Wall (Exterior) North Intact White 0
630 First E12 Drywall Wall (Interior) West Intact White 0
631 First W1 1 Drywall Wall (Interior) East Intact White 0
634 First W11 Drywall Wall (Exterior) South Intact White 0
639 Basement M4 Concrete Wall (Exterior) North Intact White 0
©2011, Mabbett & Associates, Inc. Page 1 of 2 Appendix A, Table 5 - Survey Report Manchester Building 4
Noo
Floor Location Re Results
Substrate and Component Side Condition Color (mg/cm2)
767 First Exterior Wood Wall (Exterior) South Poor Red 0 Windows
601 Second W25 Wood Window Casing North Intact White 0
609 Second E25 Wood Window Sill East Intact White 0.5
624 First E12 Wood Window Casing North Intact White 0
625 First E12 Wood Window Sash North Intact White 0
627 First E12 Wood Window Casing North Intact White 0
635 First W1 1 Wood Window Sill South Intact White 0
768 First Exterior Wood Window Casing South Intact White 0
769 First Exterior Wood Window Sash South Intact White 0
770 First Exterior Wood Window Sill South Intact White 0 Metal Building Components (Not included in other groups)
610 Second E25 Metal Radiator East Intact White 0
628 First E12 Metal Radiator North Intact White 0
636 First W1 1 Metal Radiator South Intact White 0
776 First Exterior Metal Lintel South Intact Black 17
777 First Exterior Metal Lintel North Intact Brown 10.8 Wood Building Components (Not included in other groups)
604 Second W25 Wood Scuttle Upper Intact White 0
605 Second W25 Wood Scuttle Casing Upper Intact White 0
616 Second E21 Closet Wood Shelf South Intact Multi 0
617 Second E21 Closet Wood Shelf Support South Intact Yellow 0
619 Second Stairwell Wood Spindle South Intact White 0
620 Second Stairwell Wood Stringer South Intact White 0
771 First Exterior Wood Trim West Intact White 21.7
774 First Exterior Wood Handrail South Intact Brown 0
780 First Exterior Wood Awning North Intact White 6.1 Font Color Annotation
Black - Below the VISN1 Threshold of 0.1 mg/cm2
Blue - Above the VISN1 Threshold of 01. mg/cm2, but less than 1.0 mg/cmz
Red - Greater than 1.0 m /cm2
©2011, Mabbett & Associates, Inc. Page 2 of 2 Appendix A, Table 5 - Survey Report Manchester Building 4
Greater than 1.0 mg/cm2
SURVEY REPORT
BUILDING 5
VISN 1
Manchester VA Medical Center
718 Smyth Road Manchester, New Hampshire
Project No. 2009023.010
August 31, 2011
Tr,, Mabbett & Associates, Inc.
Environmental Consultants & Engineers
5 Alfred Circle Bedford, MA 01730-2318
Telephone: (781) 275-6050 Toll Free: (800) 877-6050 Facsimile: (781) 275-5651 info mabbett. com
©2011, Mabbett & Associates, Inc.
1 j
1)
Affairs (VA) New England Healthcare System (VISN 1) in accordance with an established scope of work as defined in Contract Number VA241-P-1653. The information presented herein is based on the facts and information conveyed to or received by Mabbett & Associates, Inc. (M&A) during the preparation of this report. If any of the information provided to M&A that was used in preparing this report is incorrect, incomplete, or subject to change, M&A would wish to alter its opinion(s) accordingly. In addition, the professional opinions and information contained in this report are based solely on the requirements of the applicable regulations and technical data as known to M&A as of the date of this report and considered applicable to this report.
This individual building report from Volume II which contains building specific lead findings is part of the Comprehensive VAMC Lead Survey Report consisting of:
Volume I - General
Chapter 1 - Introduction and Executive Summary Chapter 2 - Lead Containing Paint Survey Tables
Volume II — Individual Building Reports
Individual Building Reports Chapters including:
• Cover page with building number
• Building narrative summary
• Floor plans
• Relevant lead containing paint findings for the building
• Relevant photos
Volume III — Appendices and Supporting Data
Appendix A - XRF Performance Characteristics/Calibration Records
Volume IV — HUD Residential LBP Reports (If Applicable)
Manchester VAMC - Building 5 August 2011 ©2011, Mabbett & Associates, Inc. Page i Vol II Survey Rpt Manchester Bldg 5 Final (8-11).doc
Project Manager
This report has been reviewed and approved by:
MABBETT & ASSOCIATES, INC.
4 i
Robert K. McKinley, MPH, CIH, LIH Director of Industrial F-(ygiene Services
©2011, Mabbett & Associates, Inc. Page ii Vol II Survey Rpt Manchester Bldg 5 Final (8-1 1).doc
1.0 INTRODUCTION & EXECUTIVE SUMMARY
2.0 BUILDING DESCRIPTION
3.0 LEAD SCREENING SURVEY
3.1 Screening Survey Methodology
3.2 Summary of Lead Screening Survey Findings
4.0 LIMITATIONS
5.0 CLOSING REMARKS
5.1 Lead Containing Paint
Tables Table 1 — Specific Inaccessible Areas Table 2 — Summary of Positive XRF Measurements by Building Components Table 3—Summary of XRF Measurements Above HUD Standards Table 4—Summary of XRF Measurements Above 0.1 mg/cm2 Table 5 — Summary of XRF Measurements by Substrate .......................................... Appendix A
Figures Figure 1 — Lead Reading Location Plan - Building 5, Basement and Floor 1
Appendices Appendix A — Table 5, Summary of XRF Measurements by Substrate Appendix B — Relevant Photographs of Non-Intact Lead Containing Paint
©2011, Mabbett & Associates, Inc. Page iii Vol II Survey Rpt Manchester Bldg 5 Final (8-11).doc c) l9 sub-contractor, performed surveys for suspect lead containing paint (LCP) surfaces utilizing an X-Ray Fluorescence (XRF) analyzer. Surveys were performed of selected buildings at the VA Medical Center (VAMC) located at 718 Smyth Road, Manchester, NH, under Contract VA241-P- 1653. A complete list of buildings surveyed is in Volume I of this report. Site survey work was performed during October and November 2010, by appropriately credentialed personnel as required. The survey effort involved the collection of the following samples, resulting in the following conclusions:
44 XRF analyzer measurements of building surfaces were taken on the interior, and exterior of this building, and from adjacent structures.
Ten of the XRF measurements revealed concentrations of lead that exceed HUD residential standards of 1.0 mg/cm2
• Only five of these XRF measurements were collected on surfaces inside the building.
• Five of the measurements were taken on wooden objects outside of the building.
13 of the XRF measurements taken on interior and exterior building components, and adjacent structures revealed concentrations of lead that exceeded the threshold concentration of 0.1 mg/cm2 established by the VISN CEEOHS Group
This building report consists of a summary of findings, floor plans indicating sample locations, detailed analytical findings for the specific surveyed building materials, and photos of lead containing paint greater than 1.0 mg/cm2 and in an other than intact condition, when observed, were provided. Calibration records are available in Volume III of the Comprehensive VAMC Lead Survey Report.
2.0 BUILDING DESCRIPTION
According to information provided by the VAMC Office of Facilities Management and observations made by the M&A team at the time of the survey, Building 5 was a two-story National Guard building and occupied 5,020 square feet.
Table I - Specific Inaccessible Areas Manchester VA Medical Center, Building 5
Building Floor l Room Reason Area Was Inaccessible and Survey
No. Impacts, If Applicable
There were no inaccessible areas identified during this survey.
©2011, Mabbett & Associates, Inc. Page 1 of 5 Vol II Survey Rpt Manchester Bldg 5 Final (8-1 1).doc
M&A completed a Lead Containing Paint Risk Analysis in accordance with the SOP and determined that a LCP screening survey was warranted in this building. The LCP screening survey was performed by trained lead inspectors/screeners meeting the qualifications outlined in the SOP. The screening survey measured lead concentrations in accessible building surfaces by using a Niton XLp 303A XRF (serial number 18580). The XRF instrument was calibrated at the frequency specified in the SOP.
3.2 Summary of Lead Screening Survey Findings
3.2.1 Data Tables
Table 2 presents a summary of the number of samples collected for each building component category, as well as the number of samples above the HUD Residential Standard of 1.0 mg/cm2, and the VISN CEEOHS criteria, for interior and exterior building components.
XRF-screened painted interior and exterior building components containing lead at concentrations greater than the HUD Residential Standard, arranged by building component, are described in detail in Table 3 below:
Manchester VA Medica Center, Building 5 Medical
Number of Readings Number of Readings Number of Readings
Component Type Collected Above 1.0 rng/cm (HUD Above 0.1 rrtg/cm (VISN
Baseboards 3 0 0 NA 0 NA
Ceilings 4 1 0 1 (100%) 0 1 (100%)
Columns 0 1 NA 0 NA 0
Curbs, Floors, 0 0 NA NA NA NA Stair Treads
C as and ings Door 13 5 3 (23.08%) 3 (60%) 4 (30.80%) 3 (60%)
Walls 4 3 0 NA 2(66.67%) NA
Windows 5 0 1 (20%) NA 2 (40%) NA
Components 2 1 0 0 0 0 (handrails and radiators)
Remaining Wood
Components 0 2 NA 1 (50%) NA 1 (50%) (screens and lintels)
©2011, Mabbett & Associates, Inc. Page 2 of 5 Vol II Survey Rpt Manchester Bldg 5 Final (8-1 1).doc
Manchester VA Medical Center, Building 5
Component Type Collected Above 1.0 mg/cm' (HUD Above 0.1 mg/cm2 (VISN
Interior I Exterior Interior Exterior Interior Exterior
% Value in parenthesis indicates the percentage of readings that exceeded the applicable limit.
Table 3 - Summary of XRF Measurements Above Established HUD Residential Standards (1.Omg/cm2) Manchester VA Medical Center, Building 5
Reading No. Floor Location
Substrate and Component Side Conditi on Color
Results (mg/Cm )
Ceilings
447 First Exterior Wood Ceiling North Peeling White 17.8
Doors
441 First Exterior Wood Door Casing South Peeling Brown 14.5
448 First Exterior Wood Door West Fair Brown 16.6
449 First Exterior Wood Door Casing West Intact Brown 18.5
460 First C10 Wood Door East Intact White 3.9
477 First Corridor Outside C26 Wood Door South Intact White 3.7
482 Basement Mechanical Wood Door North Intact White 7.9
Windows
483 Basement Mechanical Wood Window Casing North Intact White 4.6
Wood Building Components (Not included in other groups)
440 First Exterior Wood Screen South Peeling Brown 13.8
As specified by VISN 1 CEEOHS, a listing of XRF-screened painted interior and exterior building components containing lead at concentrations greater than 0.1 mg/cm2, have been included in Table 4 below:
Table 4-Summary of XRF Measurements Above VISN Criteria (0.1mg/cm') Manchester VA Medical Center, Building 5
Reading No. Floor Location Substrate and Component Side Condition Color
Results (mg/cm )
Ceilings
447 First Exterior Wood Ceiling North Peeling White 17.8
Doors
441 First Exterior Wood Door Casing South Peeling Brown 14.5
448 First Exterior Wood Door West Fair Brown 16.6
449 First Exterior Wood Door Casing West Intact Brown 18.5
©2011, Mabbett & Associates, Inc. Page 3 of 5 Vol II Survey Rpt Manchester Bldg 5 Final (8-1 1).doc
Table 4 - Summary of XRF Measurements Above VISN Criteria (0.1mg/cm')
Reading Substrate and Results No.
Floor Location Component
Side Condition Color 2 (mg/cm)
460 First C10 Door - Wood East Intact White 3.9
477 First Corridor Outside C26 Wood Door South Intact White 3.7
482 Basement Mechanical Wood Door North Intact White 7.9
470 First C25 Wood Door East Intact Gray 0.15 Walls
450 First C11-C9 Plaster Wall (Exterior) West Chalking White 0.23
472 First C25 Plaster Wall (Exterior) East Intact Gray 0.7 Windows
483 Basement Mechanical Wood Window Casing North Intact White 4.6
475 First C25 Wood Window Sill South Intact Gray 1 Wood Building Components (Not included in other groups)
440 First Exterior Wood Screen South Peeling Brown 13.8
In addition, XRF measurements collected during the screening survey of interior and exterior building components are included in Table 5 — Summary of XRF Measurements by Substrate.
Table 5, arranged by building component, includes a description of each screened surface and resulting XRF-measured lead concentration.
3.2.2 Photographs
Representative photographs of building materials greater than or equal to 1.0 mg/cm2 and where in other than in intact condition (e.g. fair, peeling, cracking) are provided in Appendix B of this report.
3.2.3 CADD Drawings
Lead reading location drawings with XRF sampling locations are included in the Figures section of this report. Concentrations are color coded, black for readings below the VISN 1 CEEOHS threshold of 0.1 mg/cm2, blue for readings above the VISN 1 CEEOHS threshold of
0.1 mg/cm2, but less than 1.0 mg/cm2, and red for readings greater than 1.0 mg/cm2 .
4.0 LIMITATIONS
This inspection report is the result of a diligent search of the building for LCP. Only accessible areas were included in this survey. However comprehensive this inspection appears, it does not claim to have identified all of the LCP that could be present in the facility. M&A's survey was performed with limitations inherent to visual inspections. M&A has conducted this assessment with reasonable care and has performed this project within generally accepted industry standards. There can be no assurances, and M&A makes no assurances, that the information, research, and technology used to prepare this report may not change in the future, thus affecting the results provided.
©2011, Mabbett & Associates, Inc. Page 4 of 5 Vol II Survey Rpt Manchester Bldg 5 Final (8-1 1).doc
5.0 CLOSING REMARKS
Prior to initiating plans for maintenance, renovation or demolition activities, the VAMC should review the lead survey results to determine whether any of the materials identified as LCP will be disturbed by proposed work activities.
5.1 Lead Containing Paint
The purpose of the LCP screening survey was to identify patterns of LCP. For the purpose of this LCP screening survey, representative interior and exterior building components were tested. The regulations addressing LCP in non-residential buildings are focused on protecting workers who are involved with paint disturbing activities and related waste disposal activities.
Worker protection is regulated by OSHA regulations as well as applicable state regulations.
These regulations involve air monitoring of workers to determine exposure levels when disturbing paint containing measurable lead. A LCP determination cannot determine a safe level of lead, but is intended to provide guidance as to the locations of where LCP is present.
VA employees and contractors may use this information to better determine exposures of workers to airborne lead by understanding the different concentrations of lead paint on representative components and surfaces. Worker exposure controls can then be implemented and air monitoring can then be performed during activities that disturb paint on representative surfaces.
A…