Appendix A Identified Suspect ACM- Building 2.xls

XLS spreadsheet 39 KB Posted

Attached to
P400--608-22-114 - Bldg #2, 3, 4, 5, 13 & 14 Demolition Construction
Solicitation number
36C24124B0037
Issued by

About this file

This document is an Excel spreadsheet titled "Appendix A Identified Suspect ACM- Building 2.xls" that provides a detailed inventory of suspected asbestos-containing materials (ACM) in Building 2 of a VA Medical Center facility in Manchester, New Hampshire. The spreadsheet lists the location, material, estimated quantity, condition, and AHERA hazard/response assessment for various suspected ACM, such as pipe insulation, flooring materials, and transite radiator enclosures. It also identifies non-ACM building materials like ceiling tiles, drywall, and window caulk.

The document is related to a federal contract opportunity, Solicitation Number 36C24124B0037, for the demolition and construction of Buildings 2, 3, 4, 5, 13, and 14 at the VA Medical Center. The Invitation for Bid (IFB) seeks contractors to perform this work for the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 1.

View the file

Other files

File Type Posted
36C24124B0037 0005.docx DOCX document
SF_1409 - Abstract for 36C24124B0037.pdf PDF
36C24124B0037 0004.docx DOCX document
608-22-114 Electrical One-Line Diagrams.pdf PDF
RFIs D1-D9.pdf PDF
36C24124B0037 0003.docx DOCX document
852.219-75 VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction.pdf PDF
Appendix A Identified Suspect ACM- Building 13.xls XLS spreadsheet
RFIs C1-C5.pdf PDF
Appendix A Identified Suspect ACM- Building 5.xls XLS spreadsheet
Appendix A Identified Suspect ACM- Building 3.xls XLS spreadsheet
RFIs B1-B10.pdf PDF
36C24124B0037 0002.docx DOCX document
024100.pdf PDF
Appendix A Identified Suspect ACM- Building 4.xls XLS spreadsheet
Appendix A Identified Suspect ACM- Building 14.xls XLS spreadsheet
RFIs A1-A6.pdf PDF
608-22-114 Construction Solicitation Walkthrough Sign-In.pdf PDF
36C24124B0037 0001.docx DOCX document
100 Bid Document 608-22-144 Manchester NH BLDG DEMO 3 of 5.pdf PDF
100 Bid Document 608-22-144 Manchester NH BLDG DEMO 2 of 5.pdf PDF
100 Bid Document 608-22-144 Manchester NH BLDG DEMO 5 of 5.pdf PDF
100 Bid Document 608-22-144 Manchester NH BLDG DEMO 4 of 5.pdf PDF
Attachment E- Construction Design Narrative_608-22-114_Manchester NH_Bldg Demo.pdf PDF
Attachment F-90 Construction Document 608-22-144.pdf PDF
100 Bid Document 608-22-144 Manchester NH BLDG DEMO 1 of 5.pdf PDF
100 SPECIFICATIONS 608-22-114 MANCHESTER NH Demo 2 Feb 2024.pdf PDF
Attachment C- Building 2-3-4-5-13-14- ACM Inspection Report.pdf PDF
Davis-Bacon Act WD NH20240021 revised 010524.pdf PDF
Attachment D- Building 2-3-4-5-13-14- Lead Paint Report.pdf PDF
Construction Bid Document Narrative_608-22-114_Manchester NH_Bldg Demo_100.pdf PDF
Attachment B- Memorandum of Agreement.pdf PDF
Attachment A-Campus Map.pdf PDF
Attachment G-Combined Specs.pdf PDF
36C24124B0037.docx DOCX document
Construction-SOW Building Demolition 2-3-4-5-13-14.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Location(s)MaterialHAEstimated QuantityConditionAHERA Hazard /Response
Assessment
INTERIOR
Room A1 - ACMAssumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed – Flooring Paper – Under Plywood FloorNANANA7/5
Room A1-Non-ACM2' x 4' Ceiling Tiles2-11NANANA
Sheetrock Walls2-10NANANA
Joint Compound2-09NANANA
Interior Window Frame Caulk - 6 Windows2-05NANANA
Room A2 - ACMAssumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed - Pipe Insulation - Enclosed in CeilingNANANA7/5
Assumed – Flooring Paper – Under Plywood FloorNANANA7/5
Assumed - Transite- 2 Radiator EnclosuresNANANA7/5
Room A2- Non-ACMSkim Coat Plaster2-01NANANA
Base Coat Plaster2-02NANANA
Sheetrock associated with plaster walls and ceilings2-03NANANA
Interior Window Frame Caulk - 2 Windows2-05NANANA
Room A3 - ACMAssumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed - Pipe Insulation - Enclosed in CeilingNANANA7/5
Assumed – Flooring Paper – Under Hardwood FloorNANANA7/5
Assumed - Transite- 2 Radiator EnclosuresNANANA7/5
Room A3- Non-ACMSkim Coat Plaster2-01NANANA
Base Coat Plaster2-02NANANA
Sheetrock associated with plaster walls and ceilings2-03NANANA
Interior Window Frame Caulk - 2 Windows2-05NANANA
Room A4 - ACMAssumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed – Flooring Paper – Under Hardwood FloorNANANA7/5
Room A4- Non-ACMSheetrock associated with plaster walls and ceilings2-03NANANA
Skim Coat Plaster2-01NANANA
Base Coat Plaster2-02NANANA
Room A5 - ACM2” – 4” Aircell Pipe Insulation2-045 ln ftGood7/5
Assumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed – Flooring Paper – Under Hardwood FloorNANANA7/5
Room A5- Non-ACMSheetrock associated with plaster walls and ceilings2-03NANANA
Skim Coat Plaster2-01NANANA
Base Coat Plaster2-02NANANA
Room A6 - ACMAssumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed - Pipe Insulation - Enclosed in CeilingNANANA7/5
Assumed – Flooring Paper – Under Plywood FloorNANANA7/5
Room A6- Non-ACMSheetrock associated with plaster walls and ceilings2-03NANANA
Skim Coat Plaster2-01NANANA
Base Coat Plaster2-02NANANA
12" x 12" White Floor Tile2-06NANANA
Yellow Mastic Associated with 12" x 12" White Floor Tile2-07NANANA
Room A7 - ACMAssumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed - Pipe Insulation - Enclosed in CeilingNANANA7/5
Assumed - Transite- 1 Radiator EnclosureNANANA7/5
Room A7- Non-ACMSheetrock associated with plaster walls and ceilings2-03NANANA
Skim Coat Plaster2-01NANANA
Base Coat Plaster2-02NANANA
Ceramic Tile Grout2-15NANANA
Interior Window Frame Caulk - 1 Window2-05NANANA
Room A8 - ACMBlack Sink Coating2-081 eaGood7/5
Assumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed - Pipe Insulation - Enclosed in CeilingNANANA7/5
Assumed – Flooring Materials – Under Plywood FloorNANANA7/5
Assumed - Transite- 1 Radiator EnclosureNANANA7/5
Room A8- Non-ACMSheetrock associated with plaster walls and ceilings2-03NANANA
Skim Coat Plaster2-01NANANA
Base Coat Plaster2-02NANANA
12" x 12" White Floor Tile2-06NANANA
Yellow Mastic Associated with 12" x 12" White Floor Tile2-07NANANA
Interior Window Frame Caulk - 1 Window2-05NANANA
Room A9 - ACMAssumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed - Pipe Insulation - Enclosed in CeilingNANANA7/5
Assumed – Flooring Paper – Under Hardwood FloorNANANA7/5
Assumed - Transite- 1 Radiator EnclosureNANANA7/5
Room A9- Non-ACMSheetrock associated with plaster walls and ceilings2-03NANANA
Skim Coat Plaster2-01NANANA
Base Coat Plaster2-02NANANA
Interior Window Frame Caulk - 1 Window2-05NANANA
Room A10 - ACMAssumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed - Pipe Insulation - Enclosed in CeilingNANANA7/5
Assumed – Flooring Paper – Under Hardwood FloorNANANA7/5
Room A10- Non-ACMSheetrock associated with plaster walls and ceilings2-03NANANA
Skim Coat Plaster2-01NANANA
Base Coat Plaster2-02NANANA
Room A11 - ACMAssumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed - Pipe Insulation - Enclosed in CeilingNANANA7/5
Assumed - Transite- 1 Radiator EnclosureNANANA7/5
Room A11- Non-ACMSheetrock associated with plaster walls and ceilings2-03NANANA
Skim Coat Plaster2-01NANANA
Base Coat Plaster2-02NANANA
Ceramic Tile Grout2-15NANANA
Interior Window Frame Caulk - 1 Window2-05NANANA
Room A12 - ACMAssumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed - Pipe Insulation - Enclosed in CeilingNANANA7/5
Room A12- Non-ACMTextured Application on Sheetrock Ceiling2-19NANANA
Sheetrock Ceiling2-10NANANA
Joint Compound2-09NANANA
Interior Window Frame Caulk - 1 Window2-05NANANA
Room B1 - ACMAssumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed - Pipe Insulation - Enclosed in CeilingNANANA7/5
Assumed – Flooring Paper – Under Hardwood FloorNANANA7/5
Assumed - Transite- 2 Radiator EnclosuresNANANA7/5
Room B1- Non-ACMSheetrock associated with plaster walls and ceilings2-03NANANA
Skim Coat Plaster2-01NANANA
Base Coat Plaster2-02NANANA
Interior Window Frame Caulk - 2 Windows2-05NANANA
Room B2 - ACMAssumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed - Pipe Insulation - Enclosed in CeilingNANANA7/5
Assumed – Flooring Paper – Under Hardwood FloorNANANA7/5
Room B2- Non-ACMSheetrock associated with plaster walls and ceilings2-03NANANA
Skim Coat Plaster2-01NANANA
Base Coat Plaster2-02NANANA
Room B3 - ACMAssumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed - Pipe Insulation - Enclosed in CeilingNANANA7/5
Assumed – Flooring Paper – Under Hardwood FloorNANANA7/5
Assumed - Transite- 2 Radiator EnclosuresNANANA7/5
Room B3- Non-ACMSheetrock associated with plaster walls and ceilings2-03NANANA
Skim Coat Plaster2-01NANANA
Base Coat Plaster2-02NANANA
Interior Window Frame Caulk - 2 Windows2-05NANANA
Room B4 - ACMAssumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed - Pipe Insulation - Enclosed in CeilingNANANA7/5
Assumed – Flooring Paper – Under Hardwood FloorNANANA7/5
Room B4- Non-ACMSheetrock associated with plaster walls and ceilings2-03NANANA
Skim Coat Plaster2-01NANANA
Base Coat Plaster2-02NANANA
Room B5 - ACMAssumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed - Pipe Insulation - Enclosed in CeilingNANANA7/5
Assumed – Flooring Paper – Under Hardwood FloorNANANA7/5
Room B5- Non-ACMSheetrock associated with plaster walls and ceilings2-03NANANA
Skim Coat Plaster2-01NANANA
Base Coat Plaster2-02NANANA
Room B6 - ACMAssumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed - Pipe Insulation - Enclosed in CeilingNANANA7/5
Assumed – Flooring Paper – Under Hardwood FloorNANANA7/5
Room B6- Non-ACMSheetrock associated with plaster walls and ceilings2-03NANANA
Skim Coat Plaster2-01NANANA
Base Coat Plaster2-02NANANA
Room B7 - ACMAssumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed - Pipe Insulation - Enclosed in CeilingNANANA7/5
Assumed – Flooring Paper – Under Hardwood FloorNANANA7/5
Room B7- Non-ACMSheetrock associated with plaster walls and ceilings2-03NANANA
Skim Coat Plaster2-01NANANA
Base Coat Plaster2-02NANANA
Yellow Covebase Mastic2-14NANANA
12" x 12" Orange Floor Tile2-12NANANA
Black Mastic Associated with12" x12" Orange Floor Tile2-13NANANA
Room B8- ACMAssumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed - Pipe Insulation - Enclosed in CeilingNANANA7/5
Assumed - Transite- Radiator EnclosureNANANA7/5
Room B8- Non-ACMSheetrock associated with plaster walls and ceilings2-03NANANA
Skim Coat Plaster2-01NANANA
Base Coat Plaster2-02NANANA
Ceramic Tile Grout2-15NANANA
Interior Window Frame Caulk - 1 Window2-05NANANA
Room B9 - ACMAssumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed - Pipe Insulation - Enclosed in CeilingNANANA7/5
Assumed – Flooring Paper – Under Hardwood FloorNANANA7/5
Assumed - Transite- 2 Radiator EnclosuresNANANA7/5
Room B9- Non-ACMSheetrock associated with plaster walls and ceilings2-03NANANA
Skim Coat Plaster2-01NANANA
Base Coat Plaster2-02NANANA
Interior Window Frame Caulk - 2 Windows2-05NANANA
Room B10 - ACMAssumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed - Pipe Insulation - Enclosed in CeilingNANANA7/5
Assumed – Flooring Paper – Under Hardwood FloorNANANA7/5
Room B10- Non-ACMSheetrock associated with plaster walls and ceilings2-03NANANA
Skim Coat Plaster2-01NANANA
Base Coat Plaster2-02NANANA
Room B11 - ACMAssumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed - Pipe Insulation - Enclosed in CeilingNANANA7/5
Assumed - Transite- Radiator EnclosureNANANA7/5
Room B11- Non-ACMSheetrock associated with plaster walls and ceilings2-03NANANA
Skim Coat Plaster2-01NANANA
Base Coat Plaster2-02NANANA
Ceramic Tile Grout2-15NANANA
Interior Window Frame Caulk - 1 Window2-05NANANA
Room B12 - ACMAssumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed - Pipe Insulation - Enclosed in CeilingNANANA7/5
Room B12- Non-ACMSheetrock associated with plaster walls and ceilings2-03NANANA
Skim Coat Plaster2-01NANANA
Base Coat Plaster2-02NANANA
Room M2 (Basement) - ACMAssumed - Pipe Insulation - Enclosed in Wall ChaseNANANA7/5
Assumed - Pipe Insulation - Enclosed in CeilingNANANA7/5
Room M2 (Basement) - Non-ACMInterior Window Frame Caulk - 1 Window2-05NANANA
EXTERIOR
Roof - ACMRoofing Materials (Assumed)NANANA7/5
Non-ACMExterior Garage Door Frame Caulk12-18NANANA
Exterior Door Glazing Compound1 - 3 Doors2-16NANANA
Exterior Window Frame Caulk - 25 Windows2-17NANANA

&C&"Arial,Bold"&12Appendix A&"Arial,Regular"&10 &"Arial,Bold"&12Summary of Identified Suspect Asbestos-Containing Materials VA Medical Center Building #2 Manchester, New Hampshire &LNotes:

1) Material reported to contain less than 1% asbestos.

2) Please refer to the report for additional information regarding the scope of work and limitations of this inspection.&RA-&P

Sheet2