About this file

This document consists of a series of Requests for Information (RFIs) related to a federal contract opportunity for P400--608-22-114 - Bldg #2, 3, 4, 5, 13 & 14 Demolition Construction, solicited by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1.

The RFIs address several technical details, including the acceptable height of construction fencing, whether crushed construction debris can be used on site, and the treatment of topsoil and seeding in the bid. The RFIs also confirm that the cabinets and transformers to be removed are isolated from the active parts of the facility. The document indicates that these items should be treated the same as all other items for the Base Lump Sum Bid, but broken out separately in the submitted Schedule of Values.

View the file

Other files

File Type Posted
36C24124B0037 0005.docx DOCX document
SF_1409 - Abstract for 36C24124B0037.pdf PDF
36C24124B0037 0004.docx DOCX document
608-22-114 Electrical One-Line Diagrams.pdf PDF
RFIs D1-D9.pdf PDF
36C24124B0037 0003.docx DOCX document
852.219-75 VA Notice of Limitations on Subcontracting - Certificate of Compliance for Services and Construction.pdf PDF
Appendix A Identified Suspect ACM- Building 2.xls XLS spreadsheet
Appendix A Identified Suspect ACM- Building 13.xls XLS spreadsheet
Appendix A Identified Suspect ACM- Building 5.xls XLS spreadsheet
Appendix A Identified Suspect ACM- Building 3.xls XLS spreadsheet
RFIs B1-B10.pdf PDF
36C24124B0037 0002.docx DOCX document
024100.pdf PDF
Appendix A Identified Suspect ACM- Building 4.xls XLS spreadsheet
Appendix A Identified Suspect ACM- Building 14.xls XLS spreadsheet
RFIs A1-A6.pdf PDF
608-22-114 Construction Solicitation Walkthrough Sign-In.pdf PDF
36C24124B0037 0001.docx DOCX document
100 Bid Document 608-22-144 Manchester NH BLDG DEMO 3 of 5.pdf PDF
100 Bid Document 608-22-144 Manchester NH BLDG DEMO 2 of 5.pdf PDF
100 Bid Document 608-22-144 Manchester NH BLDG DEMO 5 of 5.pdf PDF
100 Bid Document 608-22-144 Manchester NH BLDG DEMO 4 of 5.pdf PDF
Attachment E- Construction Design Narrative_608-22-114_Manchester NH_Bldg Demo.pdf PDF
Attachment F-90 Construction Document 608-22-144.pdf PDF
100 Bid Document 608-22-144 Manchester NH BLDG DEMO 1 of 5.pdf PDF
100 SPECIFICATIONS 608-22-114 MANCHESTER NH Demo 2 Feb 2024.pdf PDF
Attachment C- Building 2-3-4-5-13-14- ACM Inspection Report.pdf PDF
Davis-Bacon Act WD NH20240021 revised 010524.pdf PDF
Attachment D- Building 2-3-4-5-13-14- Lead Paint Report.pdf PDF
Construction Bid Document Narrative_608-22-114_Manchester NH_Bldg Demo_100.pdf PDF
Attachment B- Memorandum of Agreement.pdf PDF
Attachment A-Campus Map.pdf PDF
Attachment G-Combined Specs.pdf PDF
36C24124B0037.docx DOCX document
Construction-SOW Building Demolition 2-3-4-5-13-14.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C1: Detail C1 on CD501 Shows a 7' Construc on Fence SOW calls for a 6' Construc on Fence

Is a 6' Fence acceptable?

A 6 foot tall, weighted‐foot construc on fence is acceptable.

C2: Detail C1 on CD501 Provides no Post detail.

Are all posts to be driven or is temp construc on fencing sec ons with weighted feet acceptable?

A 6 foot tall, weighted‐foot construc on fence is acceptable.

C3: Can Brick, Block and Concrete be Crushed on Site?

No crushing of construc on debris shall be allowed on site.

C4:Drawing LP402 "Seed Installa on Notes "THE EXISTING TOPSOIL SOI.SMAY BE EVAIJJATEO

FOR SUITABUTY FOR USE IN PLANTING.

INCLUDE IN BID FOR NEW TOPSOIL TO BE IMPORTED AND PLACED IN ALL AREAS SHOWN

OR NOTED FOR NEW SEEDING. WITH CREDIT RETURNED

FOR AREAS WHERE TOPSOIL IS NOT REOURED. REFER TO SPECFICATIONS"

Should Topsoil and Seeding be broken out separately from the Base lump Sum Bid?

These items should be treated the same as all other items for the Base Lump Sum Bid, but should be broken out for the submi ed Schedule of Values.

C5: Drawing CU402 Key Notes 1, 3 and 4: Will the Shutdown, LOTO or removal of these cabinets and transformers affect the ac ve parts of the facility? Or are they Isolated?

The to‐be‐removed cabinets and transformers are isolated from the ac ve parts of the facility.