RFIs C1-C5.pdf
PDF 61 KB Posted
- Solicitation number
- 36C24124B0037
About this file
This document consists of a series of Requests for Information (RFIs) related to a federal contract opportunity for P400--608-22-114 - Bldg #2, 3, 4, 5, 13 & 14 Demolition Construction, solicited by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1.
The RFIs address several technical details, including the acceptable height of construction fencing, whether crushed construction debris can be used on site, and the treatment of topsoil and seeding in the bid. The RFIs also confirm that the cabinets and transformers to be removed are isolated from the active parts of the facility. The document indicates that these items should be treated the same as all other items for the Base Lump Sum Bid, but broken out separately in the submitted Schedule of Values.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C1: Detail C1 on CD501 Shows a 7' Construc on Fence SOW calls for a 6' Construc on Fence
Is a 6' Fence acceptable?
A 6 foot tall, weighted‐foot construc on fence is acceptable.
C2: Detail C1 on CD501 Provides no Post detail.
Are all posts to be driven or is temp construc on fencing sec ons with weighted feet acceptable?
A 6 foot tall, weighted‐foot construc on fence is acceptable.
C3: Can Brick, Block and Concrete be Crushed on Site?
No crushing of construc on debris shall be allowed on site.
C4:Drawing LP402 "Seed Installa on Notes "THE EXISTING TOPSOIL SOI.SMAY BE EVAIJJATEO
FOR SUITABUTY FOR USE IN PLANTING.
INCLUDE IN BID FOR NEW TOPSOIL TO BE IMPORTED AND PLACED IN ALL AREAS SHOWN
OR NOTED FOR NEW SEEDING. WITH CREDIT RETURNED
FOR AREAS WHERE TOPSOIL IS NOT REOURED. REFER TO SPECFICATIONS"
Should Topsoil and Seeding be broken out separately from the Base lump Sum Bid?
These items should be treated the same as all other items for the Base Lump Sum Bid, but should be broken out for the submi ed Schedule of Values.
C5: Drawing CU402 Key Notes 1, 3 and 4: Will the Shutdown, LOTO or removal of these cabinets and transformers affect the ac ve parts of the facility? Or are they Isolated?
The to‐be‐removed cabinets and transformers are isolated from the ac ve parts of the facility.
File details come from the government source that posted it. Updated .